A precise measurement of the $W$-boson mass with the Collider Detector at Fermilab
Abstract Not Provided
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract Not Provided
Not Available
A system for bunch-by-bunch detection of transverse proton and antiproton coherent oscillations in the Tevatron is described. It is based on the signal from a single beam-position monitor located in a region of the ring with large amplitude functions. The signal is digitized over a large number of turns and Fourier-analyzed offline with a dedicated algorithm. To enhance the signal, band-limited noise is applied to the beam for about 1 s. This excitation does not adversely affect the circulating beams even at high luminosities. The device has a response time of a few seconds, a frequency resolution of 1.6e-5 in fractional tune, and it is sensitive to oscillation amplitudes of 60 nm. It complements Schottky detectors as a diagnostic tool for tunes, tune spreads, and beam-beam effects. Measurements of coherent mode spectra are presented to show the effects of betatron tunes, beam-beam parameter, and collision pattern, and to provide an experimental basis for beam-beam numerical codes. Comparisons with a simplified model of beam-beam oscillations are also described.
Abstract Not Provided
Here, a 100 TeV scale Hadron Collider (HC) with a nominal operation field of at least 15 T is being considered for the post-LHC era, which requires using the Nb 3 Sn technology. Practical demonstration of this field level in an accelerator-quality magnet and substantial reduction of the magnet costs are the key conditions for realization of such a machine. FNAL has started the development of a 15 T Nb 3 Sn dipole demonstrator for a 100 TeV scale HC. The magnet design is based on 4-layer shell type coils, graded between the inner and outer layers to maximize the performance and reduce the cost. The experience gained during the Nb 3 Sn magnet R&D is applied to different aspects of the magnet design. This paper describes the magnetic and structural designs and parameters of the 15 T Nb 3 Sn dipole and the steps towards the demonstration model fabrication.
Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. The background magnetic field of 15 T in the HFVMTF will be produced by a magnet provided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics (HEP), and Fusion Energy Sciences (FES), and will serve as a superconducting cable test facility in high magnetic fields and a wide range of temperatures for HEP and FES communities. This facility will also be used to test high-field superconducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of the facility, including construction, cryostat designs, top and lambda plates, and systems for powering, and quench protection and monitoring.
In this study we develop an a priori method for simulating dynamic resonant frequency and temperature responses in a radio frequency quadrupole (RFQ) and its associated water-based cooling system respectively. Our model provides a computationally efficient means to evaluate the transient response of the RFQ over a large range of system parameters. The model was constructed prior to the delivery of the PIP-II Injector Test RFQ and was used to aid in the design of the water-based cooling system, data acquisition system, and resonance control system. Now that the model has been validated with experimental data, it can confidently be used to aid in the design of future RFQ resonance controllers and their associated water-based cooling systems. Finally, without any empirical fitting, it has demonstrated the ability to predict absolute temperature and frequency changes to 11% accuracy on average, and relative changes to 7% accuracy.
Not Available
The Short-Baseline Neutrino (SBN) program consists of three liquid argon time-projection chamber detectors located along the Booster Neutrino Beam at Fermi National Accelerator Laboratory. Its main goals include searches for New Physics—particularly eV-scale sterile neutrinos, detailed studies of neutrino–nucleus interactions at the GeV energy scale, and the advancement of the liquid argon detector technology that will also be used in the DUNE/LBNF long-baseline neutrino experiment in the next decade. Here, we review these science goals and the current experimental status of SBN.
Explore the source record for details and available documents.
The Muon g-2 (E989) experiment aims to reduce the uncertainty on the muon magnetic anomaly value (aμ = g-22 ) by a factor four (0.14 ppm) compared to the previous experiment at Brookhaven National Laboratory (BNL) in order to clarify the difference (now greater than 3 σ) between the experimental value and the Standard Model (SM) prediction. E989 collected a dataset with the same statistical power of the BNL experiment during the Run 1 data taking (2018). The analysis of data is approaching the final stage and the first result should become available in2021. In this paper, I will briefly describe the experimental setup and discuss the measure of the muon’s spin anomalous precession frequency.
This data package includes measurements of carbonyl sulfide (OCS) fluxes and concentrations from flux towers in the midwestern US. The measurements were made at AmeriFlux towers and thus the data package also includes a subset of the standard eddy covariance and meteorological data (e.g. VPD and NEE) that are also available from the AmeriFlux portal. The measurements presented here were made to provide an independent constraint on whole ecosystem stomatal conductance from these ecosystems with the goal of testing how the relationship between gross primary production and stomatal conductance varies through the growing season. Furthermore, we derived whole canopy nighttime stomatal conductance estimates to test how stomatal conductance varies between native prairie and maize ecosystems. All data presented here were discussed in the publication "Seasonal evolution of canopy stomatal conductance for a prairie and maize field in the midwestern US from continuous carbonyl sulfide fluxes" in Geophysical Research Letters (doi: 10.1029/2019GL085652).
As part of the Nova upgrades in 2012, the Recycler was repurposed as proton stacker for the Main Injector with the aim to deliver 700 kW. Since January 2017, this design power has been run routinely. The steps taken to commission the Recycler and run at 700 kW operationally will be discussed as well as plans for future running.
During slip stacking in the Recycler, up to six batches of 84 bunches each are slipped by each other to and then captured to double the intensity of the the extracted beam. For nominal chromaticity settings, a bunch by bunch transverse damper system is needed to maintain beam stability but this system is blind to the bunches as they are slipping. The initial solution was to drastically raise the chromaticity to keep the beam stable. A new frequency based damper using diode detectors was developed to provide damping during slip stacking and allow the chromaticity to be reduced to nominal settings.
The PIP-II project will replace the existing 400 MeV linac with a new, CW-capable, 800 MeV superconducting one. With respect to current operations, a 50% increase in beam intensity in the rapid cycling Booster synchrotron is expected. Booster batches are combined in the Recycler ring; this process limits the allowed longitudinal emittance of the extracted Booster beam. To suppress eddy currents, the Booster has no beam pipe; magnets are evacuated, exposing the beam to core laminations and this has a substantial impact on the longitudinal impedance. Noticeable longitudinal emittance growth is already observed at transition crossing. Operation at higher intensity will likely necessitate mitigation measures. We describe systematic efforts to construct a predictive model for current operating conditions. A longitudinal only code including a laminated wall impedance model, space charge effects, and feedback loops is developed. Parameter validation is performed using detailed measurements of relevant beam, rf and control parameters. An attempt is made to benchmark the code at operationally favorable machine settings.