Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Database dedicated to nuclear criticality events that occurred in fuel cycle facilities

Nuclear fuel cycle facilities can encounter events, resulting from human errors, failure of safety organization or technical failures. However, the application of the concept of defense in depth, especially the first two levels (prevention of abnormal situations and detection) requires to ensure safety in such undesirable situations. Furthermore, the periodic safety reviews of each nuclear fuel cycle facility involve the evaluation of the safety of these facilities with regard to the regulation evolution, the best safety practices, the facility evolution (modifications, aging...) and the global feedback. Part of this work is based on the analysis of the feedback and lessons learned from the events that occurred during the past period. This specific work indeed provides lessons about the operating conditions of the facility and highlights malfunctions that have occurred during operations, maintenance or restart after a shutdown. Taking into account this feedback, IRSN developed a database gathering the events which have affected the safety of French fuel cycle facilities (from conversion to waste storage, laboratories and experimental facilities, facilities under dismantling and decommissioning). Among all the recorded events, it is possible to extract in particular those impacting the criticality safety. In order to extend the analysis of these events, the IRSN criticality safety department developed a specific database dedicated to criticality risks. The 'criticality events' database is continuously updated on the basis of the declared events and their analysis by engineers from the criticality safety department. At this time, about 600 events are described and analyzed in this database. (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Flexible Packaging and Real Time Assay Techniques to Divert Low Activity Waste LLW from the UK LLWR - 18011

Historically, all Low Level Waste (LLW) produced in the UK was sent to the Low Level Waste Repository (LLWR) near Drigg in Cumbria in mild steel IP2 containers. However, this single national asset is filling up very quickly and the UK national LLW policy is to divert waste to alternative sites wherever possible. This paper will describe how through a collaboration between Magnox Ltd, NUVIA Limited, Pactec EPS and Augean Plc has allowed for low activity LLW (<200 MBq/Tonne) to be packaged into IP1 flexible bags, assayed within the flexible packages and then consigned to a suitably designed and licensed landfill site. The Magnox site at Harwell in Oxfordshire is in the process of total decommissioning. A project was initiated to explore the viability of utilising the PACTEC LIFTPAC{sup R} IP1 flexible packages which can contain 1 m{sup 3} of waste and assaying the waste using the NUVIA Limited transportable High Resolution Assay Monitor (HiRAM) before sending the waste for disposal at the Augean Plc East Northants Resource Management Facility (ENRMF) in Cambridgeshire. The project led to a fundamental change in the culture of LLW disposal and the paper will explore the commonly held misconception that flexible packaging can only be used for the transportation and disposal of Very Low Level Waste (VLLW). It will also explore how the NUVIA Limited HiRAM system can assay large quantities of these bags in a short time period to a high level of accuracy such that they were able to consign the waste for disposal to ENRMF. This technique and disposal route is open and available to many other waste producers both within the UK and beyond and has proven cost savings to the waste producer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

French Industrial Management Plan for Low and Intermediate Short-lived Wastes (LISLW) - 18012

Disposal pathway for low and intermediate short-lived wastes (LILSL) was the first to be operational in France. Successive evolutions - from the Manche disposal facility, close by La Hague to the Aube disposal facility (East of France) - allowed a steady pace of operation to be reached both in terms of volumes, type of waste and packaging. After 25 years of operation the Andra's Aube disposal facility waste management plan is intended to assess how this approach can be updated as new needs and new issues are emerging as tritiated wastes or decommissioning wastes. The disposal system could evolve to meet these needs as far as waste management should indeed be considered in an overall approach. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Germany's First Steps in the Restarted Site Selection Process - 18015

After the Fukushima event in 2011 Germany has decided to phase out nuclear power. Subsequently, it seemed to be politically attractive also to achieve a broad consensus with respect to final disposal of the high-active heat-generating waste after a long societal conflict lasting for decades. Germany has then decided to start a new site selection program for the determination of a site for high-active and heat-generating waste. In 2013, an overall parliamentary consensus could be achieved to agree on a new Repository Site Selection Act. This law has then been evaluated by a commission and the Repository Site Selection Act became amended. Besides, also organization and responsibilities became adapted as well as the financing system. A fund has been installed, which was financed by the utilities, to secure the availability of money to finance the whole process. In the meanwhile, the organizations for licensing of interim storage and final disposal facilities (BfE), for the operation of interim storage facilities for spent fuel, high-active waste and low and intermediate level waste (BGZ) and for site investigation, construction, operation and decommissioning of repositories for spent fuel and high-active waste as well as for low and intermediate level waste (BGE) had been founded and the site investigation process has just started. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solutions and Challenges Posed by the Increasing Use of Technology Within the Nuclear Industry - 18023

Whereas the increasing influence of technology within the nuclear industry can be seen by many as providing significant advancements and solutions across many areas of the sector - it can also be seen to conversely represent a considerable number of challenges. Unlike the well-publicised technological advancements that have accelerated both operations and decommissioning at nuclear facilities around the world, the challenges that technology have brought to the nuclear industry are either not fully understood or have yet to be entirely assessed. One of the greatest technological benefits to the nuclear industry exists from the increased use of robotic technologies - specifically unmanned aerial vehicle (UAV) systems and other autonomous platforms, as part of routine and emergency site monitoring. The use of this technology by other (unauthorised) parties, however, represents a significant challenge, and one that has yet to be fully un-assessed. Other technologies, their advantages and challenges within the nuclear industry, discussed in this work include the potential / growing use of Small Modular Reactor (SMR) systems and the 'Internet of Things' (IoT). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Immobilization of Organic Liquid Radioactive Waste (LWR) in a Sulfur Composite Matrix at the BN-350 Fast Neutron Reactor Site, Kazakhstan - 18031

The immobilization treatment and final disposition of all forms of organic radioactive liquids, such as pump oil, spent solvent, tri-butyl-phosphate (TBP) and scintillation fluids, remain a significant challenge for nuclear waste generators and national regulators. The majority of nuclear nations have instituted regulations that require some form of encapsulation of treated organic liquid, notwithstanding LLW organic liquids that can be safely incinerated. In most cases cement is the designated material for encapsulation; however, cement can pose certain problems with the containment of treated organic liquids. In 2013, with funding from the U.S. Department of Energy - National Nuclear Security Administration through its Global Initiative for Proliferation Prevention Program (GIPP), a proven U.S. technology for the treatment of radioactive organic liquids was introduced at the BN-350 fast neutron reactor facility in Aktau, Kazakhstan. As the facility was undergoing full decommissioning, one hundred and sixty cubic meters of contaminated pump oil (including Cs-137, Sr-90 and U-235/238) contained in large above ground tanks had to be treated for final disposal. As a result of the research conducted over a two-year period, a new 2-step treatment process was invented by combining the U.S. solidification technology with a newly developed inorganic filler and molecular sulfur, referred to as radiation-resistant composite (RRC) to fully encapsulate the waste oil. The outcome of extensive test program indicates that the final form can reach up to 60 wt.% with a compressive strength of about 100 kg/cm{sup 2}. Preliminary conclusions indicate that RRC outperforms cement as an encapsulation form for final waste treatment which meets U.S. Nuclear Regulatory requirements for final disposal. This paper examines the preliminary experimental work that was conducted in Kazakhstan with the U.S. polymer technology and radioactive pump oil, and the subsequent secondary process of combining the solidified material into a homogeneous final form utilizing RRC. Topics covered in the paper include: - Kazakhstan's regulatory requirements for attaining an achievable waste form for acceptance, which led to the RRC invention; - Technical objectives for the application of polymer technology and RRC materials to radioactive liquid waste; - Polymer solidification with radioactive oil and the result; step one of the RRC process; - Description of RRC materials, their origin and chemical characteristics; - Process of combining the solidified polymer mass with RRC materials into a solid, homogeneous matrix; step two of the RRC process; - Experimental results including leaching data, waste loading estimates and heat process calculations to create the matrix; - Cost advantages of the RRC process over cementation; - Limitations of the RRC process; - Next steps to verify conformance of the RRC technology to the U.S. requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulating Operational Safety at a Future Geological Disposal Facility in the UK - 18038

The United Kingdom (UK) has generated commercial nuclear energy for over 60 years; generating a significant and varied inventory of higher activity radioactive waste (HAW). In accordance with international practice, UK Government policy for long-term management of HAW is disposal in a geological disposal facility (GDF). The nuclear materials comprising HAW include high level waste, intermediate level waste and some low level waste, not suitable for disposal to the Low Level Waste Repository. In addition, other nuclear materials may be reclassified as waste in the future and will require to be managed as HAW for disposal to a GDF; these include spent fuel, uranium and plutonium. The operator of a GDF will be required to obtain a nuclear site licence from the Office for Nuclear Regulation (ONR), as the nuclear safety and security regulator, in order to construct and operate the facility. In the period prior to submission of a licence application, ONR is working to develop its regulatory expectations and provide advice on its regulatory role with regards to a future GDF. ONR has developed regulatory guidance on operational safety, benchmarked against the relevant IAEA Safety Standards and the Western European Nuclear Regulators Association (WENRA) Safety Reference Levels for Disposal. This guidance draws upon ONR's current expectations for nuclear sites; including operational reactors, fuel manufacture and reprocessing facilities, and reactors undergoing decommissioning; and incorporates relevant good practice drawn from international programmes for geological disposal and related industries (eg mining). In addition to the technical assessment guidance, ONR has developed guidance on the licensing process specific to a GDF; providing clarity for example on when a licence will be required. A review of the standard licence conditions applied to all nuclear sites concluded no significant amendment would be required for application to a GDF. Through its voluntary agreement with Radioactive Waste Management Limited (RWM), the developer and future operator of a GDF in the UK, ONR exerts regulatory influence on the design and organisational development of the future licensee. As part of this scrutiny, ONR has assessed RWM's generic Disposal System Safety Case. Subjecting the generic design and safety case to regulatory review provides opportunity for early engagement to ensure the appropriate standards will be achieved. ONR will only grant the necessary regulatory permissions if RWM adequately demonstrates the GDF will be constructed, operated and closed safely. Future challenges faced by ONR with respect to a GDF include building and maintaining regulatory competence and confidence, and engaging effectively with the public as the UK begins its search for a suitable site to provide appropriate assurance that a GDF will be operated safely and securely. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Test of Removal of Gaseous Radioactive Methyl Iodide by TEDA-Impregnated Activated Carbon - 18049

During the operation of nuclear facility as well as decommissioning stage, various radioactive gaseous wastes are generated. It is generally recognized that radioiodine is potentially one of the most hazardous gas on the human body and environment. Iodine-131 release in the gaseous effluents at the nuclear facilities had been a critical environmental concern. Reducing iodine release is a critical issue in radioactive waste system evaluation, especially in their adherence to the 'as low as reasonably achievable' (ALARA) criteria because radioiodine among these gaseous wastes has radiological harm. Therefore, numerous studies for the removal of radioiodine from the off-gas stream of nuclear facilities have been performed with formation processes and chemical structure. This paper aims to evaluate the performance of removal efficiency of radioiodine gas by TEDA-impregnated activated carbon, which is used for radioiodine retention in nuclear facilities. The removal efficiencies of methyl iodide were evaluated by using a radioactive methyl iodide tracer at various temperatures up to 250 deg. C. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methodology for Waste Forecasting and Informing an Integrated Waste Strategy at CNL - 18055

CNL is Canada's premier nuclear science and technology organization. CNL is a world leader in developing peaceful and innovative applications from nuclear technology through its expertise in physics, metallurgy, chemistry, biology and engineering. CNL is responsible for managing wastes from various locations across Canada. As a result of this work, legacy wastes have been generated and ongoing operations will continue to generate wastes. In order to identify gaps and ensure that paths are available to manage wastes, a waste forecast was developed. The waste forecast is intended to inform corporate strategy based on the volume of waste generated and into the future. One of the key pieces of output has been an estimate on the variability for forecasted volumes of wastes. Various sources of information were analyzed to provide a high-level summary. Many inputs were considered due to the various locations of waste generation, continuing operations, capital construction, decommissioning activities, and environmental remediation activities. In order to allow a holistic view, all waste streams were considered, including conventional industrial wastes to high-level wastes. The resulting output has mainly been used in identifying potential gaps in future storage requirements and disposition routes. It allows for the identification of the magnitude and the timing, if a gap is present. This information becomes a critical dataset to an Integrated Waste Strategy. Critical decisions regarding waste management can then be prioritized and scheduled. As the waste forecast is a living document, the existing information currently captured represents a baseline. To ensure quality management, future changes are to be documented through a change control process. Such changes can be from actual data or from updates to estimates through characterization, etc. As time progresses, comparisons between actual waste volumes versus forecasted volumes can then be used to further refine predictions on future waste generation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel, Fast Readout, Gamma Detector System for Nuclear Fingerprinting - 18083

Decommissioning or cleanup of a nuclear facility or after a nuclear accident requires detailed knowledge of the type, distribution and amount of nuclear isotopes. Gamma spectroscopy is a technique that can provide this information in situ, using the energy deposited by incident photons into the spectrometer. However, the high precision needed limits the speed of measurement. In this work, we present a novel technique to achieve fast, precise measurements, employing a multi-detector system with a fast readout which is suitable for high radiation environments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: Theme 2: PuO{sub 2} and Fuel Residues - 18132

The safe and secure management of Pu is a matter of serious international concern, with ∼250 t of separated Pu currently stockpiled worldwide. Nearly 50% of this material is in long-term storage in the UK whilst the British government develops its options for final treatment and disposition. Options for this are: (i) reuse as a fuel in modern reactors (e.g. as MOX fuel or within a fast reactor) prior to disposal; (ii) prompt immobilisation for disposal as soon as is practicable; or, (iii) continued long term storage (prior to disposition). The focus of the work presented here is options (ii) and (iii). The R and D needs of both are now pressing: in option (iii) due to it being the current default; in option (ii) because of a comparative lack of R and D on Pu conditioning and packaging due to policy uncertainty as to whether it would be disposed of in a Geologic Disposal Facility (GDF). Addressing these needs is complicated by Pu's high radioactivity, decay heat and radiotoxicity, nuclear safeguard requirements and, for some UK Pu contaminated materials targeted for disposal, poor inventory. Thus, there is also a critical requirement for underpinning research on characterisation methods for Pu bearing materials. In response to these needs, the DISTINCTIVE Consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories, a multi-disciplinary collaboration of 11 universities and 3 key industry partners from across the UK's civil nuclear sector) has been seeking to: - Understand how the structure and properties of PuO{sub 2} change with time in the presence of H{sub 2}O. - Understand the roles these processes play in gaseous product evolution from PuO{sub 2} in storage. - Understand radiation-induced amorphization and dissolution kinetics of Pu waste forms. - Develop novel, fast neutron based radiometric methods for the quantification, isotopic composition assessment and remote imaging of Pu-bearing materials. This paper describes recent progress made towards achieving these objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Strategic Benefit of Self Shielded Boxes for Storage and Disposal of Metallic Uranic Material-18141

Sellafield Ltd, on behalf of the Nuclear Decommissioning Authority (NDA), is responsible for the management of a number of facilities whose inventories include a range of metallic uranic material. Additional fuel and fuel bearing materials exist in the NDA estate, some of which are similar to the Sellafield-managed inventory and others present different management challenges. Whilst UK Government policy directs that some of these materials are assets and are therefore managed with eventual future use in mind, there remains a large quantity of material, principally either out-of-scope for reprocessing or which derives from legacy facilities, which is likely to be disposed of to a future Geological Disposal Facility (GDF). The majority of this material is stored under wet conditions to facilitate dose shielding and heat dissipation and will therefore require removal from wet storage, consolidation and conditioning, prior to transfer to GDF. In order to accelerate high hazard and risk reduction by sooner retrieval of legacy material from wetted storage, one of the legacy storage facilities has led technical work to develop the design of Self Shielded Boxes (SSBs) and to substantiate their use for interim storage of the materials in question. Use of the SSBs would represent a change of strategy on the Sellafield Site: historically, timescales for retrieval of material have been reliant upon a waste treatment and storage/disposal route being available. SSBs provide the opportunity to retrieve uranic materials from aging legacy storage facilities for immediate buffer storage, by decoupling the timing of retrieval from the availability of an onward route. An understanding was required of the scope for defining optimal routes for each metallic uranic fuel and fuel bearing material group for safe transport and storage commensurate with current final disposal assumptions and risks, taking into account international best practice. A study is underway to understand options for transfer of material into SSBs, buffer/interim storage locations, treatment/conditioning processes and transport to the GDF. This work forms the basis of a prioritised road-map for the development of routes for study material groups aligned with ongoing and existing planned technical work, which is a pre-requisite to strategy development. The ultimate output of the study will be identification of full life cycle management strategies for metallic uranic material from an enterprise perspective. The combination of this strategic work and ongoing technical work will underpin a series of decisions to divert sub-groups of uranic material away from currently assumed baseline routes in support of earliest practicable hazard and risk reduction. Hence, each decision will reduce the scope of a placeholder future uranic fuel treatment capability, which will diminish the associated British Pound 1 bn capital cost. To date, a technical case for interim storage of uranic material in SSBs has been substantiated for around two thirds of the study materials. The requirement for a new strategy at Sellafield was driven by technical development of SSBs in response to the needs of one programme, but this prompted the study into the potential utilisation of SSBs in order to derive benefit for the wider enterprise and across the NDA estate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pathways towards Valid Data: Assessment of Optimized Packaging Strategies for Core Components - 18158

Every company that runs nuclear power plants needs a strategy for disposal of the radioactive waste and for decommissioning and dismantling of its nuclear reactors. The dismantling progress of several German NPPs is already in an advanced stage. Hence, particularly highly activated core components have to be disposed of as radioactive waste. Nevertheless, this is also an issue during the operating phase due to necessary replacements of highly activated core components such as PWR control elements or RPV heads. The conditioning of waste packages for final disposal in the German repository Konrad requires the core components to be dismantled, packaged and dried. Therefore, a qualified packaging strategy is needed to ensure a reliable compliance with the protection objectives of the repository and an optimized utilization of prescribed contingents. Exemplified by PWR control elements a pathway is drawn how to perform an optimized packaging strategy in compliance with the protection objectives of the repository based on only few relevant radionuclides derived from activation calculations. For these calculations, particularly the influence of trace impurities in the materials has to be considered and their amounts have to be verified or analyzed by sampling. Furthermore, low nuclide activities from contamination cannot simply be neglected because some of them are obliged to be declared or their radiological relevance has not been sufficiently determined. Due to various influence factors, qualified sampling strategies need carefully considered concepts. Therefore, detailed planning facilitates the qualification and approval process and reduces the costs for analyses and the number of containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adsorptive Removal of Cs-137 and Sr-90 from Water in the Spent Fuel Pool of Taiwan Research Reactor - 18169

The cleanup of spent fuel pool in Taiwan Research Reactor (TRR) is a significant milestone in the decommissioning project of TRR. Due to the water was polluted by the ruptured spent nuclear fuel rods, the fission products and actinides were required to be removed from the water prior to transporting the water to the radioactive liquid wastes treatment plant. A granular aluminosilicate adsorbent (namely GWC) was loaded into a special designed water submersion adsorber to remove radionuclides from water in consideration of the subsequent retrieving after used. The unit is able to be placed underwater without heavy shield shroud, and easily to be assembled and disassembled. More than 95% of β-emitters had been removed from the 980 m{sup 3} of contaminated water in the SFP and generated about 1.5 m{sup 3} of spent GWC which adsorbed with 4*10{sup 12} Bq of radionuclides. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plans for the Removal of Inventory from HLW Storage Tanks and Impact on Vitrification Feeds - 18175

Over the next 4 years Sellafield will cease reprocessing nuclear fuel. This represents a significant change in the mission of Sellafield Ltd, shifting the site focus from reprocessing operations to preparations for decommissioning. The storage tanks which have stored the acidic high level waste produced during reprocessing will require washing out. These tanks have been used since the 1950's and over time the nature of this waste has changed. It poses unique challenges for both removal and vitrification. A large collaborative programme of work is underway at Sellafield to characterise this inventory and prepare a strategy for its removal and vitrification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Damaged Fuel Rod Service with German Turnkey Technology NCS 45 Transport Casks and Under-Water-Brazing Technology - 18182

Transportation of damaged irradiated fuel rods with the package NCS 45 developed and operated by DAHER Nuclear Technologies GmbH (DNT) saves considerable technical and financial resources in the German phase-out scenario. The technology can be used world-wide to speed up decommissioning of NPPs. In each German reactor (and most likely in all reactors in the world) a small number of damaged fuel rods have accumulated over the operation phase. In general, transport and storage solutions for fuel are concentrated on the bulk of material, i. e. complete fuel assemblies containing undamaged fuel rods. It is hence a rather straightforward process to remove almost all the fuel from the reactor pools. However, damaged fuel rods - which have to be removed from the pool prior to dismantling - can cause considerable delay in dismantling and high costs for safe-guarding and specialized solutions, even though they only contain a comparatively very tiny amount of fuel. DNT has all required tools, equipment and experience to mitigate the described problem: - The package NCS 45 licensed for the transport of damaged Uranium Oxide (UOX) and Mixed Oxide (MOX) fuel rods with a burn-up of up to 120 GWd/MgHM; - A patented underwater brazing (encapsulation) technology to render very high burn-up damaged fuel rods fit for transport; - Qualified personnel to plan, license and operate such encapsulation process and the NCS 45 in a NPP and to carry out the transports; - Proven record of successful removal of damaged fuel rods from several shut-down reactors in Germany. The package NCS 45 is currently licensed in several European countries. Due to its state-of-technique design - type B(U)F-96 approval - it could be licensed and used for world-wide applications. The underwater brazing technology was developed and patented by DNT to address the challenge of transporting high burn-up and/or damaged UOX and MOX fuel rods. Above a burn-up of 55 GWd/MgHM there are neither enough data to assess the behavior of the cladding under stress nor sufficient benchmarks available to validate the source terms of the fuel. Hence, high burn-up fuel rods are encapsulated in the fuel pool by using the underwater-brazing-technology before they are loaded into the package NCS 45. Furthermore, the capacity of the NCS 45 to transport damaged fuel rods can be considerably enhanced by encapsulating these rods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Quality Management for Transport Packages Not Requiring Authority Design Approval - 18194

The majority of transports of radioactive materials are carried out in packages which don't need a package design approval of a competent authority. Low active radioactive materials are transported in such kind of packages e.g. in the medical and pharmaceutical industry and in the nuclear industry as well. In Germany the decision to phase out nuclear energy leads to a strong demand for packages to transport low and middle active radioactive waste due to the dismantling and decommissioning of nuclear power plants. According to IAEA regulations the 'non-competent authority approved package types' are the excepted packages and the industrial packages of Type IP-1, IP-2 and IP-3 and of Type A. For the packages of Type IP-2, IP-3 and Type A an assessment by the German competent authority is required for the quality management for the design, manufacture, testing, documentation, use, maintenance and inspection. In general a compliance audit of the manufacturer of the packaging is required during this assessment procedure. Their regulatory level in the IAEA regulations is not comparable with the regulatory density for packages requiring competent authority design approval. The countries apply different approaches within the assessment of the quality assurance measures in the management system as well as in the quality assurance program of a special package design. To use the package or packaging in a safe manner and in compliance with the regulations a management system for each phase of the life of the package or packaging is necessary. In order to help manufactures, which measurements and documents are needed for the assessment procedure, BAM developed a guideline. The guideline BAM-GGR 016 [5] describes the needed quality management for the design, manufacture, testing, documentation, use, maintenance and inspection of a packaging and the package. The poster to be presented will explain the different requirements of the quality assurance measures and give examples. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗