Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Evolution of shuttle avionics redundancy management/fault tolerance

The challenge of providing redundancy management (RM) and fault tolerance to meet the Shuttle Program requirements of fail operational/fail safe for the avionics systems was complicated by the critical program constraints of weight, cost, and schedule. The basic and sometimes false effectivity of less than pure RM designs is addressed. Evolution of the multiple input selection filter (the heart of the RM function) is discussed with emphasis on the subtle interactions of the flight control system that were found to be potentially catastrophic. Several other general RM development problems are discussed, with particular emphasis on the inertial measurement unit RM, indicative of the complexity of managing that three string system and its critical interfaces with the guidance and control systems.

Boykin, J. C.↗

In situ orbital debris experiment concepts

Implementation of the radar, lidar and passive optical remote sensing concepts for measuring space debris from an Earth orbiting platform was investigated. Each system was compared for their requirements on the host platform, their performance relative to the space debris measurement program and the estimated cost of developing each concept into a flight instrument. It is found that the radar and lidar systems offer the greatest versatility and accuracy since they control the direction, intensity and duration of the energy incident on the target object. The performance of the passive optical system is determined by the capability of the detector and by the baseline separation of the telescopes, which requires the use of an on-orbit deployment mechanism. The passive optical concept provides the largest total event rae, and includes significant detections of particle sizes greater than 10 cm to allow correlation with ground based observations of the larger particles. The event rate for the radar system is relatively constant with particle while the lidar system is slightly biased toward the smaller sizes. These event rate differences result from a combination of the debris flux size distribution and the variation of sensitive detection area with particle size for the three concepts.

Neste, S. L.↗

An automated methodology development

The design methodology employed in testing the applicability of Ada in large-scale combat simulations is described. Ada was considered as a substitute for FORTRAN to lower life cycle costs and ease the program development efforts. An object-oriented approach was taken, which featured definitions of military targets, the capability of manipulating their condition in real-time, and one-to-one correlation between the object states and real world states. The simulation design process was automated by the problem statement language (PSL)/problem statement analyzer (PSA). The PSL/PSA system accessed the problem data base directly to enhance the code efficiency by, e.g., eliminating non-used subroutines, and provided for automated report generation, besides allowing for functional and interface descriptions. The ways in which the methodology satisfied the responsiveness, reliability, transportability, modifiability, timeliness and efficiency goals are discussed.

Hawley, L. R.↗

Space platform expendables resupply concept definition study. Volume 3: Work breakdown structure and work breakdown structure dictionary

The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.

Source record↗

A Study of the Utilization of Advanced Composites in Fuselage Structures of Commercial Aircraft

A study was conducted to define the technology and data needed to support the introduction of advanced composites in the future production of fuselage structure in large transport aircraft. Fuselage structures of six candidate airplanes were evaluated for the baseline component. The MD-100 was selected on the basis of its representation of 1990s fuselage structure, an available data base, its impact on the schedule and cost of the development program, and its availability and suitability for flight service evaluation. Acceptance criteria were defined, technology issues were identified, and a composite fuselage technology development plan, including full-scale tests, was identified. The plan was based on composite materials to be available in the mid to late 1980s. Program resources required to develop composite fuselage technology are estimated at a rough order of magnitude to be 877 man-years exclusive of the bird strike and impact dynamic test components. A conceptual composite fuselage was designed, retaining the basic MD-100 structural arrangement for doors, windows, wing, wheel wells, cockpit enclosure, major bulkheads, etc., resulting in a 32 percent weight savings.

Watts, D. J.↗

System analysis study of space platform and station accommodations for life sciences research facilities. Volume 2: Study results, attachment 2. Phase A: Conceptual design and programmatics

The study results from the conceptual design and programmatics segment of the Space Platform and Station Accommodation for Life Sciences Research Facilities. The results and significant findings of the conceptual design and programmatics were generated by these tasks: (1) the review and update engineering and science requirements; (2) analysis of life sciences mission transition scenario; (3) the review and update of key trade issues; (4) the development of conceptual definition and designs; and (5) the development of the work breakdown schedule and its dictionary, program schedule, and estimated costs.

Wiley, Lowell F.↗

SP-100 flight qualification testing assessment

The SP-100 is a compact space power system driven by a nuclear reactor that provides 100 kWe to the user at 200 VDC. The thermal energy generated by the nuclear reactor is converted into electrical energy by passive thermoelectric devices. Various options for tailoring the MIL-STD-1540B guidelines to the SP-100 nuclear power system are discussed. This study aids in selecting the appropriate qualification test program based on the cost, schedule, and test effectiveness of the various options.

Jeanmougin, Nanette M.↗

ENVIRONET database on vibroacoustics

This paper discusses the current ENVIRONET computer based information management system on vibroacoustic (random vibration and acoustic) environments for Space Transportation System payloads. The application of the data base to support cost effective payload development programs is described. Included also is a discussion of the current status of the data base and future plans for expanding and improving the data base to include additional payload carriers, Space Station, and expendable launch vehicle payloads.

On, Frank J.↗

Improved Computation of Dynamic Stresses

Method combining modified computational procedure with preprocessing and postprocessing program yields additional data and reduces time and cost of using DYNRE1 module of STARDYNE computer program to compute distributions of stresses in machinery under dynamic loads.

Ghosh, Tarun K.↗

Issues in NASA program and project management

This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Solar system exploration in the 1990's and beyond

Exploration of Venus by Magellan and Pioneer Venus continues. Additionally, Galileo's Venus-earth-earth gravity assist trajectory to Jupiter has already provided targets of opportunity at Venus and at earth. Additional opportunities exist during the October 29, 1991, flyby of the asteroid Gaspra, the second earth gravity assist on December 8, 1992, and the flyby of the asteroid Ida on October 18, 1993. A fully successful mission through entry of the Jupiter atmospheric probe is anticipated in 1995/1996. The buildup of the Mars Observer spacecraft for a September 1992 launch is accelerating, and the development of the CRAF spacecraft and the orbiter for the NASA-ESA Cassini mission to Saturn is proceeding. Strategic plans to continue this ambitious program include early initiation of a phased program to detect other planetary systems; start of a program of low-cost, near-earth missions beginning with a near-earth asteroid rendezvous; continuation of moon-Mars exploration using sequentially launched single experiment Lunar Scouts and clusters of small landers to build up a Mars network of 16 stations; and finally, start of a major mission late in the century to explore Neptune and/or Pluto.

Huntress, Wesley T., Jr.↗

Constructor selection system

Future space construction missions will involve both human and machine constructors. Selection of the optimum constructor mix requires a model of constructor capabilities and requirements. The database for that model is developed via extrapolation from current literature. Optimization is done via minimization of total mission cost using a linear programming approach. This prototype is the first cut at producing a general tool for choosing a near-optimum constructor mix for any space construction mission. It illuminates some significant representational and data-gathering problems with the modelling approach.

Johnson, Richard↗

Mission operations management

Redefining the approach and philosophy that operations management uses to define, develop, and implement space missions will be a central element in achieving high efficiency mission operations for the future. The goal of a cost effective space operations program cannot be realized if the attitudes and methodologies we currently employ to plan, develop, and manage space missions do not change. A management philosophy that is in synch with the environment in terms of budget, technology, and science objectives must be developed. Changing our basic perception of mission operations will require a shift in the way we view the mission. This requires a transition from current practices of viewing the mission as a unique end product, to a 'mission development concept' built on the visualization of the end-to-end mission. To achieve this change we must define realistic mission success criteria and develop pragmatic approaches to achieve our goals. Custom mission development for all but the largest and most unique programs is not practical in the current budget environment, and we simply do not have the resources to implement all of our planned science programs. We need to shift our management focus to allow us the opportunity make use of methodologies and approaches which are based on common building blocks that can be utilized in the space, ground, and mission unique segments of all missions.

Rocco, David A.↗

School Science Comes Alive

Phase 3 of the School Science Comes Alive Program (S(sup 2)CAP) created an exciting, science - enrichment experience for third, fourth and fifth graders and their teachers and enhanced the science-teaching skills of teacher teams at each of four participating elementary schools on Virginia's Peninsula. The schools involved enroll a majority of Black students, many of whom are from economically disadvantaged households. Designed to build on the highly successful S(sup 2)CAP program of the preceding two years, this project brought college faculty together with classroom teachers and trained volunteers in a cooperative effort to make a lasting difference in the quality of science education at the four schools. In total, this program touched approximately 1000 the school children, more than half of whom are black, giving them direct and indirect exposure to the spirit of inquiry and adventure of the world-wide science community. In S(sup 2)CAP Phase 3, a large measure of responsibility was placed on the classroom teachers, thus creating a more sustainable partnership between college faculty and grade school teacher. Our college physics professors coached and supported teams of teachers from each school at intensive training workshops. A volunteer program provided each teacher with one or more trained volunteers to assist in class with the hands-on activities that have been central to the S2CAP program. Most of the equipment for these activities was constructed during the workshops by the teachers and volunteers from low cost materials provided by the program. Two types of volunteers were enlisted: science smart black college students and technically trained retirees (many of whom are ex-NASA employees). One goal of this program was to increase the numbers of minority students who see science as an interesting and exciting subject, to make the science period a time which students look forward to in the school day. Such an attitude is expected to translate naturally into a higher interest in science and engineering as a career for these students. A second goal was to create a sustainable improvement in the way science is taught at the elementary level. By the end of the program we expected that our teachers would be significantly more self reliant in using hands-on-activities as a part of their science curricula than they were prior to their involvement with S2CAP. In summary, S2CAP Phase 3 offered intensive training workshops for teachers and supporting volunteers followed by stimulating hands-on activities in the classroom for the children. These components combined to amplify the experience, enthusiasm, and ideas of our scientists in a way that complements the normal elementary school curriculum in each of the two school systems involved.

Hartline, Frederick F.↗

Human Mars Missions: Cost Driven Architecture Assessments

This report investigates various methods of reducing the cost in space transportation systems for human Mars missions. The reference mission for this task is a mission currently under study at NASA. called the Mars Design Reference Mission, characterized by In-Situ propellant production at Mars. This study mainly consists of comparative evaluations to the reference mission with a view to selecting strategies that would reduce the cost of the Mars program as a whole. One of the objectives is to understand the implications of certain Mars architectures, mission modes, vehicle configurations, and potentials for vehicle reusability. The evaluations start with year 2011-2014 conjunction missions which were characterized by their abort-to-the-surface mission abort philosophy. Variations within this mission architecture, as well as outside the set to other architectures (not predicated on an abort to surface philosophy) were evaluated. Specific emphasis has been placed on identifying and assessing overall mission risk. Impacts that Mars mission vehicles might place upon the Space Station, if it were to be used as an assembly or operations base, were also discussed. Because of the short duration of this study only on a few propulsion elements were addressed (nuclear thermal, cryogenic oxygen-hydrogen, cryogenic oxygen-methane, and aerocapture). Primary ground rules and assumptions were taken from NASA material used in Marshall Space Flight Center's own assessment done in 1997.

Interplanetary Mission↗

Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team

The Reference Mission was developed over a period of several years and was published in NASA Special Publication 6107 in July 1997. The purpose of the Reference Mission was to provide a workable model for the human exploration of Mars, which is described in enough detail that alternative strategies and implementations can be compared and evaluated. NASA is continuing to develop the Reference Mission and expects to update this report in the near future. It was the purpose of the Reference Mission to develop scenarios based on the needs of scientists and explorers who want to conduct research on Mars; however, more work on the surface-mission aspects of the Reference Mission is required and is getting under way. Some aspects of the Reference Mission that are important for the consideration of the surface mission definition include: (1) a split mission strategy, which arrives at the surface two years before the arrival of the first crew; (2) three missions to the outpost site over a 6-year period; (3) a plant capable of producing rocket propellant for lifting off Mars and caches of water, O, and inert gases for the life-support system; (4) a hybrid physico-chemical/bioregenerative life-support system, which emphasizes the bioregenerative system more in later parts of the scenario; (5) a nuclear reactor power supply, which provides enough power for all operations, including the operation of a bioregenerative life-support system as well as the propellant and consumable plant; (6) capability for at least two people to be outside the habitat each day of the surface stay; (7) telerobotic and human-operated transportation vehicles, including a pressurized rover capable of supporting trips of several days' duration from the habitat; (7) crew stay times of 500 days on the surface, with six-person crews; and (8) multiple functional redundancies to reduce risks to the crews on the surface. New concepts are being sought that would reduce the overall cost for this exploration program and reducing the risks that are indigenous to Mars exploration. Among those areas being explored are alternative space propulsion approaches, solar vs. nuclear power, and reductions in the size of crews.

Connolly, John↗

Cost and Schedule Analytical Techniques Development: Option 2 Year

This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.

Source record↗

Workshop on evolution of igneous asteroids: Focus on Vesta and the HED meteorites

Recently, the geology of the surface of Vesta has been coming to light. In 1983 Gaffey first began showing maps of the surface geology of Vesta constructed from numerous spectra obtained at different times as the asteroid rotated. By noting the details of spectral variation with rotation, he was able to develop two possible gross-scale geologic maps of Vesta showing the distributions of mafic and ultramafic materials. These maps were published in 1997. Finally, the capabilities of the Hubble Space Telescope were brought to bear on Vesta and images with a resolution of about 50 km were obtained using four different filters by Binzel and co-workers. Maps produced by this team published in 1997 began to reveal the geology of Vesta in sufficient detail that crude interpretations of the geologic history of the asteroid could be attempted. Additionally, in 1993 Binzel and Xu published a study of small asteroids in the region near Vesta in orbital-element space. In this study, they showed that there are a number of asteroids a few kilometers in size with reflectance spectra like that of Vesta that form a trail in orbital-element space from near Vesta to near resonances that can more easily supply material to near-Earth space. Binzel and Xu thus concluded that these small asteroids were spells of Vesta ejected by impact and that some of their brethren had been perturbed to Earth-approaching orbits. They suggested that these latter were the immediate parents of HED meteorites. This seemed to remove a long-standing dynamical objection to Vesta as the HED parent body, as discussed by Wasson and Wetherill in 1979. Within the last few years, NASA has initiated the Discovery program of low-cost, rapid-timescale development, exploration missions. Vesta has been proposed as an object worthy of study by a Discovery mission, although a Vesta mission has not yet been selected. With all the recent activity aimed at studying Vesta and the HED meteorites, and the possibility of a space mission to Vesta, we felt that time was ripe to convene a workshop bringing together astronomers, meteoriticists, and planetary geologists to focus on what could be learned about the geologic evolution of Vesta through integrating astronomical and HED meteorite studies. This, of course, assumes that the HED meteorites are from Vesta, and this issue was specifically addressed (but not resolved) in the workshop. Indeed, it seems likely that this issue can only be resolved by returning samples from Vesta for detailed study on Earth. The workshop was held at the LPI on October 16-18,1996, and was attended by some 70 scientists. Sessions included a set of talks on Earth- and space-based astronomical observations of Vesta plus the evidence pro and con for Vesta being the HED parent body, talks on the petrology and geochemistry of HED meteorites, talks on the formation and dynamics of ejecta from Vesta, talks on the thermal history of asteroids and HED meteorites, volcanic processes and differentiation history, and a short session devoted to possible missions to Vestal By all accounts, the workshop was considered a great success, although this is the opinion of a biased set of observers.

Mittlefehldt, D. W.↗