Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Core characterization of the new CABRI Water Loop Facility

The CABRI experimental reactor is located at the Cadarache nuclear research center, southern France. It is operated by the Atomic Energy Commission (CEA) and devoted to IRSN (Institut de Radioprotection et de Surete Nucleaire) safety programmes. It has been successfully operated during the last 30 years, enlightening the knowledge of FBR and LWR fuel behaviour during Reactivity Insertion Accident (RIA) and Loss Of Coolant Accident (LOCA) transients in the frame of IPSN (Institut de Protection et de Surete Nucleaire) and now IRSN programmes devoted to reactor safety. This operation was interrupted in 2003 to allow for a whole facility renewal programme for the need of the CABRI International Programme (CIP) carried out by IRSN under the OECD umbrella. The principle of operation of the facility is based on the control of {sup 3}He, a major gaseous neutron absorber, in the core geometry. The purpose of this paper is to illustrate how several dosimetric devices have been set up to better characterize the core during the upcoming commissioning campaign. It presents the schemes and tools dedicated to core characterization. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Overview of SNS accelerator shielding analyses

The Spallation Neutron Source is an accelerator driven neutron scattering facility for materials research. During all phases of SNS development, including design, construction, commissioning and operation, extensive neutronics work was performed in order to provide adequate shielding, to assure safe facility operation from radiation protection point of view, and to optimize performance of the accelerator and target facility. Presently, most of the shielding work is concentrated on the beam lines and instrument enclosures to prepare for commissioning, safe operation and adequate radiation background in the future. Although the accelerator is built and in operation mode, there is extensive demand for shielding and activation analyses. It includes redesigning some parts of the facility, facility upgrades, designing additional structures, storage and transport containers for accelerator structures taken out of service, and performing radiation protection analyses and studies on residual dose rates inside the accelerator. (authors)

43 PARTICLE ACCELERATORS↗

Hanford Tank Waste Treatment and Immobilization Plant (WTP) Waste Feed Qualification Program Development Approach - 13114

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a nuclear waste treatment facility being designed and constructed for the U.S. Department of Energy by Bechtel National, Inc. and subcontractor URS Corporation (under contract DE-AC27-01RV14136 [1]) to process and vitrify radioactive waste that is currently stored in underground tanks at the Hanford Site. A wide range of planning is in progress to prepare for safe start-up, commissioning, and operation. The waste feed qualification program is being developed to protect the WTP design, safety basis, and technical basis by assuring acceptance requirements can be met before the transfer of waste. The WTP Project has partnered with Savannah River National Laboratory to develop the waste feed qualification program. The results of waste feed qualification activities will be implemented using a batch processing methodology, and will establish an acceptable range of operator controllable parameters needed to treat the staged waste. Waste feed qualification program development is being implemented in three separate phases. Phase 1 required identification of analytical methods and gaps. This activity has been completed, and provides the foundation for a technically defensible approach for waste feed qualification. Phase 2 of the program development is in progress. The activities in this phase include the closure of analytical methodology gaps identified during Phase 1, design and fabrication of laboratory-scale test apparatus, and determination of the waste feed qualification sample volume. Phase 3 will demonstrate waste feed qualification testing in support of Cold Commissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel elements of research reactor CM

In 1961 the CM research reactor was commissioned at the Research Institute of Atomic Reactors (Dimitrovgrad, Russia), it was intended to carry on investigations and the production of transuranium nuclides. The reactor is of a tank type. Original fuel assembly contained plate fuels that were spaced with vanes and corrugated bands. Nickel was used as a cladding material, fuel meat was produced from UO{sub 2} + electrolytic nickel composition. Fuel plates have been replaced by self-spacing cross-shaped dispersion fuels clad in stainless steel. In 2005 the reactor was updated. The purpose of this updating was to increase the quantity of irradiation channels in the reactor core and to improve the neutron balance. The updating was implemented at the expense of 20 % reduction in the quantity of fuel elements in the core which released a space for extra channels and decreased the mass of structural materials in the core. The updated reactor is loaded with modified standard fuel elements with 20 % higher uranium masses. At the same time stainless steel in fuel assembly shrouds was substituted by zirconium alloy. Today in progress are investigations and work to promote the second stage of reactor updating that involve developments of cross-shaped fuel elements having low neutron absorption matrix materials. This article gives an historical account of the design and main technical changes that occurred for the CM reactor since its commissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A complete dosimetry experimental program in support to the core characterization and to the power calibration of the CABRI reactor. A complete dosimetry experimental program in support of the core characterization and of the power calibration of the CABRI reactor

CABRI is an experimental pulse reactor operated by CEA at the Cadarache research center. Since 1978 the experimental programs have aimed at studying the fuel behavior under Reactivity Initiated Accident (RIA) conditions. Since 2003, it has been refurbished in order to be able to provide RIA and LOCA (Loss Of Coolant Accident) experiments in prototypical PWR conditions (155 bar, 300 deg. C). This project is part of a broader scope including an overall facility refurbishment and a safety review. The global modification is conducted by the CEA project team. It is funded by IRSN, which is conducting the CIP experimental program, in the framework of the OECD/NEA project CIP. It is financed in the framework of an international collaboration. During the reactor restart, commissioning tests are realized for all equipment, systems and circuits of the reactor. In particular neutronics and power commissioning tests will be performed respectively in 2015 and 2016. This paper focuses on the design of a complete and original dosimetry program that was built in support to the CABRI core characterization and to the power calibration. Each one of the above experimental goals will be fully described, as well as the target uncertainties and the forecasted experimental techniques and data treatment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

URS/WTP's Future Leader Program and AECOM's Early Career Professional Technology Exchange - 17239

URS Energy and Construction, Inc. (URS), a subsidiary of AECOM, is the Bechtel National, Inc. (BNI) teaming subcontractor on the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project. Recently, the WTP Project has begun a transition toward facility turnover and commissioning. With that transition came the hiring of staff for the startup and commissioning workforce. With many of these individuals being Early Career Professionals (ECPs), URS recognized a need to create and implement a workforce development program to give these professionals the skills to thrive in a professional environment and provide a sense of community to improve talent retention. The result of this recognition of need was the creation of URS/WTP Future Leaders. This paper will share the successes and lessons learned related to founding the URS/WTP Future Leaders. This includes establishing programs such as the Continuous Learning Workshops, Rotational Program, and implementing a mentor program. In addition, establishing a budget and obtaining support from Human Resources will be discussed. By March 2017, the ECP program will have been in effect for approximately two years. As a separate effort, many of AECOM's major waste remediation contractors have started having Early Career Professional Technology Exchanges (ECP TE) in an effort to create collaboration between sites and to establish industry contacts that will continue to be a resource for years to come. Washington River Protection Solutions, LLC; URS/WTP; Savannah River Remediation, LLC; and Nuclear Waste Partnership, LLC have conducted ECP TE, with each site hosting an event. For these events, each participant prepares a presentation and answers questions on the presentation topic. This allows ECPs to practice presentation skills, develop skills in answering questions from their peers and management, and be the expert in the room on a particular topic. Tours of the onsite facilities also are given as a way for ECPs to gain a broader understanding of the waste remediation industry and the challenges that other sites are facing. Accomplishments, lessons learned, and future plans for ECP TE will be discussed. The ECP TE events allow AECOM, as the parent company, to provide a unique learning opportunity to the next generation of engineers within the DOE nuclear field and to ensure the safe operations of these nuclear sites for years to come. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 17275

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB), collectively known as LBL; - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the PT Facility; - Completing the design and construction of the HLW Facility; - Resolving the technical issues associated with the PT Facility; - Completing all WTP facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree, establishing revised milestone dates for the Hanford WTP that generally align with DOE's plans for completing the WTP facilities in sequence. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to accommodate direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion of hot commissioning of the WTP facilities needed for DFLAW operations no later than December 31, 2023. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transitioning from Construction to Startup at WTP from a Plant Engineering Perspective - 16461

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind facility being designed, built and commissioned for the U.S. Department of Energy by Bechtel National, Inc. and principal subcontractor URS to solidify liquid radioactive waste stored in underground tanks at the Hanford Site. WTP consists of 20 infrastructure facilities and structures, known as Balance of Facilities, designed to support the Plant's four major facilities - Pretreatment Facility, High-Level Waste Vitrification Facility, Low-Activity Waste Vitrification Facility and the Analytical Laboratory. As construction moves toward startup and commissioning, a turnover process facilitates the transition of facilities and systems between organizations. The transition from Construction is initiated by an approved Design Completion List, which documents that design and construction have been completed, and the facility or system is ready for startup testing. Qualified individuals perform an inspection to ensure the facility or system has been constructed per the design during an eight-week engineering walk-down. During this phase in turnover, Plant Engineering personnel are responsible for updating and maintaining the Master Equipment List, developing spare parts recommendations, developing and issuing instrument calibration data sheets, evaluating temporary modifications, and supporting plant operations and maintenance activities. As of 2015, two electrical switchgear buildings and the non-radioactive liquid waste disposal system have been turned over from Construction to Startup. This paper discusses the turnover process, organizational interfaces, and experiences from a Plant Engineering perspective. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solving Operational Challenges with INL's Integrated Waste Treatment Unit (IWTU) - 19003

In 2005, the THOR steam reforming fluidized-bed reactor technology was selected by the U.S. Department of Energy for treatment of sodium-bearing waste at the INL. The initial commissioning was typical, until June of 2012 when an over-pressurization event resulted in a significant release of solids. Recovery and subsequent testing systematically dealt with challenges associated with operation of three primary vessels: the denitration and mineralization reformer, the process gas filter, and the carbon reduction reformer. Additional challenges with the following ancillary systems surfaced during testing: the auger/grinder, sample system, and the approach to decontamination of the process vessels prior to outages. The major operational challenges covered fluidization issues, premature refractory failure, high-temperature gaseous filter element blinding, cementitious material formation in solids handling equipment, sampling reliability, and vessel decontamination. The purpose of this paper is to share the lessons learned during the extended commissioning of the Integrated Waste Treatment Unit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of the Spent Resins Hot Compaction Unit at Tihange NPP, Belgium - 19139

Design, construction and commissioning of the Spent Ion Exchange Resins Hot Compaction Unit at Tihange Nuclear Power Plant took place from 2005 till 2011. In this conditioning process, batches of radioactive resin beads were first dried to less than 4% moisture by a conical vacuum dryer. Resins were then poured in compactable 200-liter drums and super-compacted. Resulting pellets were emplaced in standard 400-liter drums, the packages qualified for final disposal in Belgium, and eventually grouted. The Belgian Waste Management Agency (ONDRAF/NIRAS) was consulted before initiating the project and issued a statement of no objection. The technology turned out to be used for the first time in the particular case of bead shaped resins (unlike powdered resins) and with a grouting requirement. Finally, commissioning tests ended in a safe and reproducible waste form, compliant with prevailing Waste Acceptance Criteria. Volume Reduction Factors of about 2 were recorded after drying and compaction. New tests were carried out to support the Qualification File of the process, which was submitted to ONDRAF/NIRAS. After performing many trials using inactive resins, the Operator dried two batches of radioactive resins and super-compacted four drums: this was a planned qualification step, aiming at the validation of process parameters. In the meantime, ONDRAF/NIRAS made parallel progress in the design of the future Near Surface Repository, where conditioned resins will be disposed of, and found some incompatibility between encapsulated dried resin beads and water intrusion hazards inside the repository. Based on the risk that dried resin beads will swell if they absorb water, causing mechanical stresses likely to compromise the integrity of the disposal site, ONDRAF/NIRAS informed Tihange NPP that the Hot Compaction Unit would not be qualified as spent resins conditioning process. Further to this irrevocable decision, the Operator undertook three actions: - The first one was the qualification and purchase of waste containers to provide additional temporary storage capacity on site for its operational spent resins; - The second one is the selection of a new spent resins conditioning process and the performance of the related qualification tests to demonstrate it meets the updated Waste Acceptance Criteria; - The last one is the dismantling of the Hot Compaction Unit to clear the space and enable the installation of new equipment. This latter task was carried out in 2018, involving decontamination and free release measurements of all the materials, a very limited fraction of it having to be further processed as radioactive waste. Nevertheless, Tihange NPP wishes to keep the super-compactor and its hydraulic unit for a possible resale or reuse for the treatment of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Analysis, Reporting, and Archiving for Robotic Nondestructive Assay of Holdup Deposits - 19508

To decommission deactivated gaseous diffusion enrichment facilities, miles of contaminated pipe must be measured. The current method requires thousands of manual measurements, repeated manual data transcription, and months of manual analysis. The Pipe Crawling Activity Measurement System (PCAMS), developed by Carnegie Mellon University and in commissioning for use at the DOE Portsmouth Gaseous Diffusion Enrichment Facility, uses a robot to measure Uranium-235 from inside pipes and automatically log the data. Radiation measurements, as well as imagery, geometric modeling, and precise measurement positioning data are digitally transferred to the PCAMS server. On the server, data can be automatically processed in minutes and summarized for analyst review. Measurement reports are auto-generated with the push of a button. A database specially-configured to hold heterogeneous data such as spectra, images, and robot trajectories serves as archive. This paper outlines the features and design of the PCAMS Post-Processing Software, currently in commissioning for use at the Portsmouth Gaseous Diffusion Enrichment Facility. The analysis process, the analyst interface to the system, and the content of auto-generated reports are each described. Example pipe-interior geometric surface models, illustration of how key report features apply in operational runs, and user feedback are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Start-up of Silo 130 Waste Retrieval at La Hague: first Step Towards Reducing Legacy Inventory - 20020

On June 25, 2019, the first grapple of waste and debris was lifted from Silo 130, one of the most challenging legacy waste storage silos at La Hague. This was the achievement of more than ten years of studies and efforts focused on solving some very unique technical and safety challenges, and on designing an innovative, efficient solution. The waste is from de-cladding materials from past Gas-Cooled Reactor fuel reprocessing operations. It is an unsorted mixture of magnesium cladding pieces, graphite debris, and various other metallic waste types. These materials can be chemically reactive and therefore need specific dispositions for handling and storing. The building is more than 40 years old and does not meet modern standards. French safety authorities have required the silo to be emptied. After about three years of operation, the bulk of this waste will be removed and placed in safe storage, pending the selection of a final conditioning solution. Removal of bottom debris will then be possible. When finished, this operation will bring a conclusion to a significant legacy-related hazard on the site. The silo will then be available for final cleaning and de-activation. This paper will describe the technical, safety, and economical challenges, and the various decisions and optimizations that led to the definition of the process and technology to be implemented. Several innovative features were developed and implemented, in all sections of the project: project organization, progressive approach for the waste disposition strategy, light building design, customized and robust retrieval technology, processing technologies involving the most modern robotic and sorting techniques, storage method... Several of these first-of-a-kind innovative features have been developed and qualified specifically for this application, using the detailed qualification procedure specified for all La Hague projects. The facility was built in less than five years, overcoming various difficulties along the line. Commissioning is now finished with the combined efforts of the project, engineering, start-up, and operating teams assisted by dedicated suppliers. The facility is now ramping-up. The paper will also report on the commissioning and start-up of the facility and describe the first operational results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Korean Localization Program for Performance Verification Test of APR1400's RCP

The Korean government together with the Korean nuclear society completed the development of technologies for the design, manufacturing, and performance verification test of the APR1400's Reactor Coolant Pump (RCP) as one of the national programs for the localization of deficient nuclear technology. The RCP localization program was driven by KAERI, which was responsible for the development of the performance verification and evaluation technology, and by DOOSAN heavy industrial company, which was in charge of the design and manufacturing of the RCP. The test facility for the localized APR1400's RCP was constructed at the KAERI site at the end of 2012. The thermal hydraulic and electric capability of the RCP test facility (RCPTF) covers up to 18.5 MPa, 343 deg. C, 11.7 m{sup 3}/s, and 14.0 MW for the design pressure, temperature, flow rate, and maximum electric power, respectively. In 2013, a commissioning test was performed to verify its designed capability, followed by several modifications in the RCPTF including signal processing and control logic to enhance the verification and evaluation capability of the RCP performance. After finishing the commissioning and modification of the RCPTF, a type test for the new-type of RCP was performed successfully. In 2014 and 2015, eight production tests for the localized RCPs, which will be installed in a commercial nuclear power plant in Korea, were successfully completed. As a final stage of the localization program of the RCP, KAERI will perform a seal LOCA test to verify the leakage characteristics and produce experimental data on the localized seal assembly for a safety analysis during a station black out (SBO) condition. In this summary, several technical issues developed through a series of research processes for a performance verification test of the localized RCP are described.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Comparing the Predicted Neutron Yields and Radioactivities of Two Accelerators in Taiwan: 235-MeV Proton Cyclotron and 3-GeV Electron Synchrotron - Paper 27

Two major accelerator facilities in Taiwan are about to open. The first proton treatment center equipped with a 235 MeV proton cyclotron and four gantry rooms in Linkou Chang Gung Memorial Hospital is currently under beam commissioning and clinical trials are expected to start soon. In addition, the second light source facility, named Taiwan Photon Source (TPS), in National Synchrotron Radiation Research Center is now approaching its final assembly and will be ready for beam commissioning in this year. These two facilities mark significant milestones in accelerator development and application of Taiwan. Operation of these accelerators could potentially produce intense secondary neutrons and serious material activation. Both issues are crucial and must be carefully evaluated for the purpose of radiation safety, especially in a densely populated hospital or in a crowded user experimental floor. Monte Carlo simulations with evaluated cross sections or benchmarked nuclear models are considered as the most reliable method for accelerator shielding designs or related analyses. This study predicted and compared the magnitudes of potential neutron production and induced radioactivity due to the operation of these two accelerators. For conservative consideration, the primary particle energy and full beam output were assumed to hit a thick target for maximum radiation production. In order to ensure the quality of predictions, much effort has been devoted to associated benchmark calculations, targeting those bombardment experiments involving with the same particle types and similar beam energies and targets. (authors)

43 PARTICLE ACCELERATORS↗

RHIC LUMINOSITY UPGRADE PROGRAM

The Relativistic Heavy Ion Collider (RHIC) operates with either ions or polarized protons. After increasing the heavy ion luminosity by two orders of magnitude since its commissioning in 2000, the current luminosity upgrade program aims for an increase by another factor of 4 by means of 3D stochastic cooling and a new 56 MHz SRF system. An Electron Beam Ion Source is being commissioned that will allow the use of uranium beams. Electron cooling is considered for collider operation below the current injection energy. For the polarized proton operation both luminosity and polarization are important. In addition to ongoing improvements in the AGS injector, the construction of a new high-intensity polarized source has started. In RHIC a number of upgrades are under way to increase the intensity and polarization transmission to 250 GeV beam energy. Electron lenses will be installed to partially compensate the head-on beam-beam effect.

43 PARTICLE ACCELERATORS↗