Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BOOSTER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Simulation of 6 to 3 to 1 merge and squeeze of Au77+ bunches in AGS

In order to increase the intensity per Au77+ bunch at AGS extraction, a 6 to 3 to 1 merge scheme was developed and implemented by K. Zeno during the 2016 RHIC run. For this scheme, 12 Booster loads, each consisting of a single bunch, are delivered to AGS per AGS magnetic cycle. The bunch from Booster is itself the result of a 4 to 2 to 1 merge which is carried out on a flat porch during the Booster magnetic cycle. Each Booster bunch is injected into a harmonic 24 bucket on the AGS injection porch. In order to fit into the buckets and allow for the AGS injection kicker rise time, the bunch width must be reduced by exciting quadrupole oscillations just before extraction from Booster. The bunches are injected into two groups of six adjacent harmonic 24 buckets. In each group the 6 bunches are merged into 3 by bringing on RF harmonic 12 while reducing harmonic 24. This is a straightforward 2 to 1 merge (in which two adjacent bunches are merged into one). One ends up with two groups of three adjacent bunches sitting in harmonic 12 buckets. These bunches are accelerated to an intermediate porch for further merging. Doing the merge on a porch that sits above injection energy helps reduce losses that are believed to be due to the space-charge force acting on the bunched particles. (The 6 to 3 merge is done on the injection porch because the harmonic 24 frequency on the intermediate porch would be too high for the AGS RF cavities.) On the intermediate porch each group of 3 bunches is merged into one by bringing on RF harmonics 8 and 4 and then reducing harmonics 12 and 8. One ends up with 2 bunches, each the result of a 6 to 3 to 1 merge and each sitting in a harmonic 4 bucket. This puts 6 Booster loads into each bunch. Each merged bunch needs to be squeezed into a harmonic 12 bucket for subsequent acceleration. This is done by again bringing on harmonic 8 and then harmonic 12. Results of simulations of the 6 to 3 to 1 merge and the subsequent squeeze into harmonic 12 buckets are presented in this note. In particular, they provide a benchmark for what can be achieved with the available RF voltages.

43 PARTICLE ACCELERATORS↗

Analysis of separation of a two-stage winged launch vehicle

The feasibility of separating a two-stage winged, parallel configured launch vehicle at Mach 3 has been determined. The two-stage fully-reusable launch vehicle is comprised of an orbiter, which can be used alone as a single-stage-to-orbit vehicle, and a booster which is identical to the baseline orbiter design. A three-degree-of-freedom analysis was conducted on the ascent trajectory of the two-stage concept to determine the optimum staging conditions. The booster provides all propellant for both stages using a crossfeed system until staging occurs. After staging, the empty booster glides back to the launch site for a horizontal landing. To analyze the separation maneuver, the six-degree-of-freedom equations of motion for both stages were numerically integrated using a computer program which incorporates analytically derived interference aerodynamic data. The necessary conditions for a successful separation were determined and required the use of active controls on both the orbiter and booster. Once the booster and orbiter were separated, a three-degree-of-freedom analysis was conducted on the booster's glideback trajectory.

Naftel, J. C.↗

Hybrid propulsion technology program. Volume 1: Conceptional design package

A concept design study was performed to configure two sizes of hybrid boosters; one which duplicates the advanced shuttle rocket motor vacuum thrust time curve and a smaller, quarter thrust level booster. Two sizes of hybrid boosters were configured for either pump-fed or pressure-fed oxygen feed systems. Performance analyses show improved payload capability relative to a solid propellant booster. Size optimization and fuel safety considerations resulted in a 4.57 m (180 inch) diameter large booster with an inert hydrocarbon fuel. The preferred diameter for the quarter thrust level booster is 2.53 m (96 inches). As part of the design study critical technology issues were identified and a technology acquisition and demonstration plan was formulated.

Jensen, Gordon E.↗

Trial by Fire

The NASa/ATK Thiokol space shuttle solid rocket motor program has doubled ground test firings and enhanced manufacturing quality and process control to increase safety for Discovery's return to flight. There are a number of places where we've strengthened our engineering and our processes, says Mike Kahn, ATK Thiokol vice president of space launch systems. Protecting the booster against corrosion in the humid Florida environment is one area that has been addressed. Since the loss of Columbia, ATK Thiokol and the Marshall Space Flight Center have completely reevaluated the shuttle solid rocket motor's design certification and found no major problems, Kahn said. The Thiokol solid motors did not play a role in the 2003 Columbia accident, but the motor's older field joint design (since replaced) was the primary cause of the 1986 Challenger accident that killed seven astronauts. The 129 X 12-ft. ATK Thiokol reusable solid rocket motor forms the core of the shuttle's two solid rocket boosters (SRBs). United Space Alliance (USA) has overall responsibility for the booster's nose-mounted systems such as recovery parachutes and aft-mounted thrust vector control systems that increase the length to 149 ft. USA and its subcontractors have also reaffirmed quality control on systems such as the booster's Hamilton Sundstrand hydraulic power units for critical thrust vector control. And to ensure greater safeguards against booster debris jeopardizing the orbiter, a bolt-catcher system to restrain the large bolts, severed at booster separation, was also redesigned.

Covault, Craig↗

Apollo and Beyond

The orbiter medium has a pod that can be ejected from the pad or from anywhere in flight. The essence of that ejectable pod and its capacity and its systems could also be used as a lifeboat, similar to the X-38. The orbiter medium, when boosted by one booster, goes into low-Earth orbit. With two boosters and a tank, it can then rendezvous with things at the L-1 port. The L-1 port really comes from the habitable volumes that are put up. We would envision looking at a prototype during this period and actually launching one before the end of the year 2008 into the space station orbit of the International Space Station, where it could supplement what we think is a desirable thing . . . an orbiter on station. Owen Garriott, who flew on Skylab, has been pioneering the activity of long-duration orbiters that could be left at the Station and relieved on Station by another orbiter, thereby relieving the burden of having to rely on the lifeboat Soyuz and a half module, both of which have been sort of postponed now by NASA because of cost overruns. The booster large now is a fly-back booster for the Shuttle, and two of those go with the Shuttle system as it proceeds toward phase out. One large booster launches an orbiter large into low-Earth orbit for Space Shuttle transportation two into the future. With two boosters and a tank, it can then go to high orbits, which means it can intercept cycling space ships. Cycling space ships are a derivative of what we first put at the 51.6-degree inclination and then work close to the International Space Station, perhaps take the nose section of the tank and put it actually on the ISS as a larger half module than we plan to do right now.

Aldrin, Buzz↗

Dynamic Tow Maneuver Orbital Launch Technique

An orbital launch system and its method of operation use a maneuver to improve the launch condition of a booster rocket and payload. A towed launch aircraft, to which the booster rocket is mounted, is towed to a predetermined elevation and airspeed. The towed launch aircraft begins the maneuver by increasing its lift, thereby increasing the flight path angle, which increases the tension on the towline connecting the towed launch aircraft to a towing aircraft. The increased tension accelerates the towed launch aircraft and booster rocket, while decreasing the speed (and thus the kinetic energy) of the towing aircraft, while increasing kinetic energy of the towed launch aircraft and booster rocket by transferring energy from the towing aircraft. The potential energy of the towed launch aircraft and booster rocket is also increased, due to the increased lift. The booster rocket is released and ignited, completing the launch.

Rutan, Elbert L.↗

SLS Test Stand Site Selection

Test site selection is a critical element of the design, development and production of a new system. With the advent of the new Space Launch System (SLS), the National Aeronautics and Space Administration (NASA) had a number of test site selection decisions that needed to be made early enough in the Program to support the planned Launch Readiness Date (LRD). This case study focuses on decisions that needed to be made in 2011 and 2012 in preparation for the April 2013 DPMC decision about where to execute the Main Propulsion Test that is commonly referred to as "Green Run." Those decisions relied upon cooperative analysis between the Program, the Test Lab and Center Operations. The SLS is a human spaceflight vehicle designed to carry a crew farther into space than humans have previously flown. The vehicle consists of four parts: the crew capsule, the upper stage, the core stage, and the first stage solid rocket boosters. The crew capsule carries the astronauts, while the upper stage, the core stage, and solid rocket boosters provide thrust for the vehicle. In other words, the stages provide the "lift" part of the lift vehicle. In conjunction with the solid rocket boosters, the core stage provides the initial "get-off-the-ground" thrust to the vehicle. The ignition of the four core stage engines and two solid rocket boosters is the first step in the launch portion of the mission. The solid rocket boosters burn out after about 2 minutes of flight, and are then jettisoned. The core stage provides thrust until the vehicle reaches a specific altitude and speed, at which point the core stage is shut off and jettisoned, and the upper stage provides vehicle thrust for subsequent mission trajectories. The integrated core stage primarily consists of a liquid oxygen tank, a liquid hydrogen tank, and the four core stage engines. For the SLS program, four RS-25 engines were selected as the four core stage engines. The RS-25 engine is the same engine that was used for Space Shuttle. The test plan for the integrated core stage was broken down into several segments: Component testing, system level testing, and element level testing. In this context, components are items such as valves, controllers, sensors, etc. Systems are items such as an entire engine, a tank, or the outer stage body. The core stage itself is considered to be an element. The rocket engines are also considered an element. At the program level, it was decided to perform a single green run test on the integrated core stage prior to shipment of it to Kennedy Space Center (KSC) for use in the EM-1 test flight of the SLS vehicle. A green run test is the first live fire of the new integrated core stage and engine elements - without boosters of course. The SLS Program had to decide where to perform SLS green run testing.

Crowe, Kathryn↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

NSLS-II Transport Line Progress

The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

3-GeV↗

Comments on Injector Proton Beam Study in Run 2014

During the entire period of injector proton study in run 2014, it seems that the beam transverse emittance out of Booster is larger than that in run 2013. The emittance measured at the BtA transfer line and also the transmission from Booster late to AGS late are presented for this argument. In addition to this problem, it seems that the multiturn Booster injection, which defines the transverse emittance, needs more attention. Moreover, for high intensity operations, the space charge effect may be already relevant in RHIC polarized proton runs. With the RHIC proton intensity improvement in the next several years, higher Booster input intensity is needed, therefore, the space charge effect at the Booster injection and early ramp may become a new limiting factor.

43 PARTICLE ACCELERATORS↗

Electron Cooling in NICA Acceleration Complex

The Nuclotron-based Ion Collider fAcility (NICA) is under assembling at JINR. NICA will provide colliding beams for study of hot strongly interacting baryonic matter and spin physics. The NICA injection complex includes a tandem of 2 superconducting synchrotrons: Booster (up to 600 MeV/u) and Nuclotron (up 3.9 GeV/u fully stripped heavy ions). Since the start of injection complex commissioning in 2020 its four Runs were carried out. To the present time the beams of He, Fe, C and Xe were accelerated. Booster electron cooling was first used for cooling of continuous Fe¹⁴⁺ beam at the energy of 3.2 MeV/u in Run II. In the last Run we demonstrated longitudinal cooling of Xe²⁸⁺ in the presence of RF voltage at the Booster injection energy. This regime is required for accumulation in Booster the intensity required for Collider operation. The cooling enabled a 2 times intensity increase of slow extracted beam from Nuclotron. Optimization of Booster electron cooling for beam accumulation will be carried out in the next Run. Another (high voltage) electron cooling system will be used in the NICA Collider rings for ion accumulation in a barrier bucket and consecutive bunch formation.

43 PARTICLE ACCELERATORS↗

SPE5 Sub-Scale Test Series Summary Report

A series of 2 SPE5 sub-scale tests were performed to experimentally confirm that a booster system designed and evaluated in prior tests would properly initiate the PBXN-110 case charge fill. To conduct the experiments, a canister was designed to contain the nominally 50 mm diameter booster tube with an outer fill of approximately 150 mm diameter by 150 mm in length. The canisters were filled with PBXN-110 at NAWS-China Lake and shipped back to LLNL for testing in the High Explosives Applications Facility (HEAF). Piezoelectric crystal pins were placed on the outside of the booster tube before filling, and a series of piezoelectric crystal pins along with Photonic Doppler Velocimetry (PDV) probes were placed on the outer surface of the canister to measure the relative timing and magnitude of the detonation. The 2 piezoelectric crystal pins integral to the booster design were also utilized along with a series of either piezoelectric crystal pins or piezoelectric polymer pads on the top of the canister or outside case that utilized direct contact, gaps, or different thicknesses of RTV cushions to obtain time of arrival data to evaluate the response in preparation for the large-scale SPE5 test. To further quantify the margin of the booster operation, the 1st test (SPE5SS1) was functioned with both detonators and the 2nd test (SPE5SS2) was functioned with only 1 detonator. A full detonation of the material was observed in both experiments as observed by the pin timing and PDV signals. The piezoelectric pads were found to provide a greater measured signal magnitude during the testing with an RTV layer present, and the improved response is due to the larger measurement surface area of the pad. This report will detail the experiment design, canister assembly for filling, final assembly, experiment firing, presentation of the diagnostic results, and a discussion of the results.

36 MATERIALS SCIENCE↗

Validation of Analytical Calculations for the NSLS-II Injection Shutters with FLUKA Monte-Carlo Program

The NSLS-II injector consists of a 200 MeV linac and a 3.0 GeV booster synchrotron for beam injection into the 3.0 GeV electron storage ring. The linac serves as the initial accelerator for the facility and is designed to produce 15nC/pulse at 200 MeV. The linac typically operates at a 1Hz rep rate. The linac injects 200 MeV electron pulses to the booster synchrotron to be accelerated to the energy of 3.0 GeV. The injection process to the booster is done through a transfer line from the linac to the booster ring. Similarly, the booster serves as the accelerating synchrotron to ramp up the electron energy to 3.0 GeV before being injected into the storage ring through a transfer line.

36 MATERIALS SCIENCE↗

Stripping Foils at the RHIC Injectors: A History

Stripping foils are used throughout Collider-Accelerator Department to strip ions of unwanted electrons. This is done in stages throughout the complex to optimize the transmission of particles. For polarized protons, they are injected into the AGS Booster as H-, and then stripped to H+. For ions from the tandem source, there are two stripping foils: one at the center and the other at the end of the tandem. The tandem foils will not be covered in this document. For ions out of the EBIS source, there is no use of stripping foils upstream of injection into the Booster. All ions that are not fully stripped in Booster are stripped further in the Booster to AGS (BTA) transfer line stripping foil assembly. Finally, any ions that are not fully stripped in the AGS are either stripped in the AGS to RHIC transfer line stripping foil, or as they are being dumped in the AGS by the plunging stripping foil (PSF) dependent on the particles intensity and charge. The BTA foil is the workhorse of the complex, having to provide the desired charge state of ions as light as O, and as heavy as Uranium. Optimizing the stripping efficiency to the desired charge state, while minimizing the energy lost and emittance growth from transiting the foil, requires careful consideration of the foil materials and thicknesses. This paper serves an overview of stripping foils at C-AD, with a review of foils from the construction of the AGS Booster to now.

43 PARTICLE ACCELERATORS↗

Space shuttle phase B extension, volume 2

Space shuttle systems are defined using a low technology orbiter combined with either an F-1 flyback booster or a pressure-fed booster. The mission and system requirements are given, and orbiter and booster configuration concepts are evaluated. Systems analyses and trades are discussed for LO2-RP propellent, F-1 engine main propulsion system, winged flyback recovery booster and for the pressure-fed, ocean recoverable, refurbishable booster system. Trade studies are also made for aluminum versus titanium orbiter and for crew location and compartment size.

Source record↗

Space shuttle ascent flight turbulence response

A totally reusable space shuttle configuration has been analyzed during ascent flight to determine its response to atmospheric turbulence. Responses in the form of booster and orbiter body accelerations and booster wing root shear, bending moment and turque were obtained due to random and quasi-square-wave discrete turbulence. The configuration was also analyzed with booster aerodynamic surfaces removed to simulate an expendable booster. Symmetric and antisymmetric analyses were performed. Propellant sloshing, gust penetration, and automatic control system effects were included. It was found that the symmetric responses were generally higher than the antisymmetric ones. The stability augmentation system tended to lower the booster accelerations in the symmetric case, while increasing the orbiter accelerations.

Source record↗

Space shuttle system program definition. Volume 4: Cost and schedule report

The supporting cost and schedule data for the second half of the Space Shuttle System Phase B Extension Study is summarized. The major objective for this period was to address the cost/schedule differences affecting final selection of the HO orbiter space shuttle system. The contending options under study included the following booster launch configurations: (1) series burn ballistic recoverable booster (BRB), (2) parallel burn ballistic recoverable booster (BRB), (3) series burn solid rocket motors (SRM's), and (4) parallel burn solid rocket motors (SRM's). The implications of varying payload bay sizes for the orbiter, engine type for the ballistics recoverable booster, and SRM motors for the solid booster were examined.

Source record↗

Viscoelastic propellant effects on Space Shuttle Dynamics

The program of solid propellant research performed in support of the space shuttle dynamics modeling effort is described. Stiffness, damping, and compressibility of the propellant and the effects of many variables on these properties are discussed. The relationship between the propellant and solid rocket booster dynamics during liftoff and boost flight conditions and the effects of booster vibration and propellant stiffness on free free solid rocket booster modes are described. Coupled modes of the shuttle system and the effect of propellant stiffness on the interfaces of the booster and the external tank are described. A finite shell model of the solid rocket booster was developed.

Bugg, F.↗