Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utility resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

The Global Technical, Economic, and Feasible Potential of Renewable Electricity

Renewable electricity generation will need to be rapidly scaled to address climate change and other environmental challenges. Doing so effectively will require an understanding of resource availability. We review estimates for renewable electricity of the global technical potential, defined as the amount of electricity that could be produced with current technologies when accounting for geographical and technical limitations as well as conversion efficiencies; economic potential, which also includes cost; and feasible potential, which accounts for societal and environmental constraints. We consider utility-scale and rooftop solar photovoltaics, concentrated solar power, onshore and offshore wind, hydropower, geothermal electricity, and ocean (wave, tidal, ocean thermal energy conversion, and salinity gradient energy) technologies. We find that the reported technical potential for each energy resource ranges over several orders of magnitude across and often within technologies. Therefore, we also discuss the main factors explaining why authors find such different results. According to this review and on the basis of the most robust studies, we find that technical potentials for utility-scale solar photovoltaic, concentrated solar power, onshore wind, and offshore wind are above 100 PWh/year. Hydropower, geothermal electricity, and ocean thermal energy conversion have technical potentials above 10 PWh/year. Rooftop solar photovoltaic, wave, and tidal have technical potentials above 1 PWh/year. Salinity gradient has a technical potential above 0.1 PWh/year. The literature assessing the global economic potential of renewables, which considers the cost of each renewable resource, shows that the economic potential is higher than current and near-future electricity demand. Fewer studies have calculated the global feasible potential, which considers societal and environmental constraints. While these ranges are useful for assessing the magnitude of available energy sources, they may omit challenges for large-scale renewable portfolios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Land-Based Wind Energy Siting: A Foundational and Technical Resource

This land-based wind energy siting resource was created by the U.S. Department of Energy Wind Energy Technologies Office’s WINDExchange initiative and presents foundational information about land-based utility-scale wind energy that local decision makers can use when making community decisions about wind energy development. Consolidated, accessible, and easy to understand, this information resource focuses on land-based wind energy from the community perspective and examines siting-related impacts and mitigation strategies. Other impacts and strategies exist, such as those related to economics, climate, health, water, emissions, and waste; however, they are not covered in this resource. For more information on economic considerations, see the “Land-Based Wind: Economic Development Guide” and “Advancing the Growth of the U.S. Wind Industry: Federal Incentives, Funding, and Partnership Opportunities.” The intended audience for this guide is county-level decision officials, as they are often responsible for approving both wind energy ordinances and applicable permits needed for wind energy development. This guide may also provide relevant information to decision makers from other government jurisdictions and interested community members.

17 WIND ENERGY↗

US Department of Energy Federal Energy Management Program Energy Treasure Hunt Toolkit

The US Department of Energy’s Federal Energy Management Program (FEMP) aims to assist federal agencies and their stakeholders with their energy-focused goals, opportunities, and barriers. The program offers various technical trainings and resources to its stakeholders. One of these resources is an energy treasure hunt program. This report presents the FEMP energy treasure hunt toolkit, a technical resource designed for systematic application for federal facilities seeking to optimize their energy and carbon usage. The toolkit was designed to help facilitate energy-focused kaizen events, identify energy-saving recommendations, analyze identified opportunities, and provide the tools needed to detect actionable projects to advance federal facilities. Through a collaboration with the Oak Ridge National Laboratory team that executed the industrial-focused Better Plants energy treasure hunt program, a similar treasure hunt toolkit was designed for FEMP. The purpose of this report is to provide an overview of the treasure hunt process and FEMP toolkit capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Comparison of Transportation Systems for Human Missions to Mars

There are many ways to send humans to Mars. Credible technical reports can be traced to the 1950's. More recently, NASA has funded major studies that depict a broad variety of trajectories, technologies, stay times, and costs. Much of this data is still valid with direct application to today's exploration planning. This paper presents results comparing these studies with particular emphasis on the in-space transportation aspects of the mission. Specifically, comparisons are made on propulsion systems used for getting the crew and mission equipment from Earth orbit to Mars orbit, descending and ascending from the surface, and returning to Earth orbit. Areas of comparison for each of these phases include crew size, mission mass, propellant mass, delta v, specific impulse, transit time, surface stay time, aero-braking, and others. Data is analyzed to demonstrate either strong trends toward particular technologies or diverging solutions.

Bipropellants↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Multidisciplinary Design Optimization and Analysis of an Open Rotor Stage: Part 1

Successful design of open rotor propulsors requires effective analysis across multiple disciplines, including aerodynamics, acoustics, and structures. A viable design must not only be efficient but must also produce an acceptable level of noise and meet all static and dynamic structural requirements. For design and optimization, this is especially challenging because running high fidelity analyses is resource-intensive, and optimizing a design may require many thousands of cases to be analyzed. For this reason, the NASA team has applied design methodology that utilizes low-cost aerodynamic methods, machine learning models, and high-fidelity analyses when necessary. This includes standard two-dimensional methods such as throughflow analysis and quasi-3D blade-to-blade CFD, as well as some newly developed methods. Optimization using 3D CFD is necessary to maximize performance, and this is considered as well. All optimizations are carried out subject to structural constraints evaluated using finite element analysis. Doing this accurately requires a robust trunnion design, capable of pitching the blade between cruise and takeoff conditions while maintaining acceptable factor of safety. Hot to cold analysis must also be applied in order to correctly determine the as-manufactured shape. For acoustics, the unsteady pressures on the blade surfaces must be predicted, and this can be done either through full-annulus unsteady CFD or through a nonlinear harmonic method (NLH). NLH can run much faster, allowing some acoustic considerations to be made earlier in the design process. The design process is ongoing, and this presentation will review the current status and planned next steps. This part of the talk will focus on aerodynamic performance and be followed by a talk on structures and acoustics.

Design↗

Voices from Rural Electric Cooperatives: A Call for a DER Integration Playbook for Rural and Agricultural Income & Savings from Renewable Energy (RAISE)

Rural-serving electric utilities (RSEUs)—including electric cooperatives, municipal systems, and small investor-owned utilities—are essential players in the evolving energy landscape. These community-focused entities are increasingly being asked to consider distributed energy resources (DERs) such as rooftop and ground-mounted solar, wind, battery storage, smart water heaters, and demand response programs (NRECA 2025; Lenhart et al. 2020). Yet the path to DER adoption is far from straightforward in the rural context. This report is based on in-depth interviews with managers of rural electric cooperatives across the United States. These conversations offer a grounded, unvarnished look at how DERs are perceived, what barriers exist, and what conditions might enable integration and adoption. While the utilities interviewed vary in geography, size, and DER experience, several clear and common themes emerged across electric cooperatives such that the report recommends the development of a DER Integration Runbook to help utilities assess readiness, define local use cases, engage stakeholders, pilot projects, and iterate, expanding over time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Understanding Economic and Deployment Benefits of Wind-PV Hybrid Power Plants

The least-cost approach to decarbonizing the U.S. electricity supply will likely involve a significantly expanded share of variable renewable energy (VRE) generation. Many strategies and approaches have been identified to address integration challenges in a VRE-dominated system, including standalone and coupled battery systems. In this study, we explored the current and future potential of utility-scale hybrid energy systems comprising PV, wind, and lithium-ion battery technologies (PV-wind-battery systems). Analysis results include temporal complementarity of wind and PV resources across the contiguous United States, with an emphasis on metrics that quantify reductions in variability that can be achieved through hybridization. We further use a price-taker model with simulated hourly energy and capacity prices to determine the revenue-maximizing dispatch of a range of PV-wind-battery configurations across Texas, from the present through 2050. We find that coupling PV, wind, and battery technologies allows for more effective utilization of interconnection capacity by increasing capacity factors to 60-80%+ and capacity credits to close to 100%, depending on battery capacity. We also compared the energy and capacity values of PV-wind and PV-wind-battery systems to the corresponding stability coefficient metric, which describes the location-and configuration-specific complementarity of PV and wind resources. Our results show that the stability coefficient effectively predicts the configuration-location combinations in which a smaller battery component can provide comparable economic performance in a PV-wind-battery system (compared to a PV-battery system). These PV-wind-battery hybrids can help integrate more VRE by providing smoother, more predictable generation and greater flexibility. Finally, capacity expansion modeling of PV-wind systems indicates that hybridization can reduce transmission expansion requirements associated with a heavily decarbonized U.S. electricity system.

complementarity↗

Microgrid Tiered Circuits Effects for a Planned Housing Community in Puerto Rico

Puerto Rico faced a double strike from hurricanes Irma and Maria in 2017. The resulting damage required a comprehensive rebuild of electric infrastructure. There are plans and pilot projects to rebuild with microgrids to increase resilience. This paper provides a techno-economic analysis technique and case study of a potential future community in Puerto Rico that combines probabilistic microgrid design analysis with tiered circuits in building energy modeling. Tiered circuits in buildings allow electric load reduction via remote disconnection of non-critical circuits during an emergency. When coupled to a microgrid, tiered circuitry can reduce the chances of a microgrid's storage and generation resources being depleted. The analysis technique is applied to show 1) Approximate cost savings due to a tiered circuit structure and 2) Approximate cost savings gained by simultaneously considering resilience and sustainability constraints in the microgrid optimization. The analysis technique uses a resistive capacitive thermal model with load profiles for four tiers (tier 1-3 and non-critical loads). Three analyses were conducted using: 1) open-source software called Tiered Energy in Buildings and 2) the Microgrid Design Toolkit. For a fossil fuel based microgrid 30% of the total microgrid costs of 1.18 million USD were calculated where the non-tiered case keeps all loads 99.9% available and the tiered case keeps tier 1 at 99.9%, tier 2 at 95%, tier 3 at 80% availability, with no requirement on non-critical loads. The same comparison for a sustainable microgrid showed 8% cost savings on a 5.10 million USD microgrid due to tiered circuits. The results also showed 6-7% cost savings when our analysis technique optimizes sustainability and resilience simultaneously in comparison to doing microgrid resilience analysis and renewables net present value analysis independently. Though highly specific to our case study, similar assessments using our analysis technique can elucidate value of tiered circuits and simultaneous consideration of sustainability and resilience in other locations.

building energy modeling↗

A database of synthetic inelastic neutron scattering spectra from molecules and crystals

Abstract Inelastic neutron scattering (INS) is a powerful tool to study the vibrational dynamics in a material. The analysis and interpretation of the INS spectra, however, are often nontrivial. Unlike diffraction, for which one can quickly calculate the scattering pattern from the structure, the calculation of INS spectra from the structure involves multiple steps requiring significant experience and computational resources. To overcome this barrier, a database of INS spectra consisting of commonly seen materials will be a valuable reference, and it will also lay the foundation of advanced data-driven analysis and interpretation of INS spectra. Here we report such a database compiled for over 20,000 organic molecules and over 10,000 inorganic crystals. The INS spectra are obtained from a streamlined workflow, and the synthetic INS spectra are also verified by available experimental data. The database is expected to greatly facilitate INS data analysis, and it can also enable the utilization of advanced analytics such as data mining and machine learning. Notice: This manuscript has been authored by UT-Battelle, LLC under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy. The United States Government retains and the publisher, by accepting the article for publication, acknowledges that the United States Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce the published form of this manuscript, or allow others to do so, for United States Government purposes. The Department of Energy will provide public access to these results of federally sponsored research in accordance with the DOE Public Access Plan ( http://energy.gov/downloads/doe-public-access-plan ).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integrated Life Cycle and Techno-Economic Assessments of Central Appalachian Legacy Mine Sites for Biomass Development and Waste Coal Utilization

This project, funded by the U.S. Department of Energy – National Energy Technology Laboratory (DOE-NETL) under award DE-FE0032212, evaluated how legacy coal mine lands and coal refuse piles in Central Appalachia (West Virginia and Pennsylvania) can be reclaimed and repurposed to support biomass development and beneficial utilization of waste coal, with the long-term goal of supporting net-zero or net-negative greenhouse gas (GHG) pathways. The project had two primary objectives: 1. Characterize legacy mine sites (including site conditions, waste coal/refuse resources, and soil/ecosystem indicators) and develop reclamation and best management practices (BMPs) for biomass cultivation; and 2. Conduct integrated machine learning (ML)-assisted life cycle assessment (LCA) and techno-economic analysis (TEA) to quantify environmental and economic outcomes for multiple biomass and waste-coal utilization pathways. Across West Virginia, the team identified ~625 coal refuse sites covering ~19,705 acres, and developed methods to estimate refuse pile volume using digital elevation models (DEMs) and geospatial workflows. A large subset of sites received volume estimates totaling ~1.6 billion m³.

01 COAL, LIGNITE, AND PEAT↗

Remote Sensing Education and Development Countries: Multilateral Efforts through the Committee on Earth Observation Satellites (CEOS)

The Committee on Earth Observation Satellites (CEOS) is an international organization which coordinates space-based Earth observations world wide. Created in 1984, CEOS now comprises 38 national space agencies, regional organizations and international space-related and research groups. The aim of CEOS is to achieve international coordination in the planning of satellite missions for Earth observation and to maximize the utilization of data from these missions world-wide. With regard to developing countries, the fundamental aim of CEOS is to encourage the creation and maintenance of indigenous capability that is integrated into the local decision-making process, thereby enabling developing countries to obtain the maximum benefit from Earth observation. Obtaining adequate access to remote sensing information is difficult for developing countries and students and teachers alike. High unit data prices, the specialized nature of the technology , difficulty in locating specific data, complexities of copyright provisions, the emphasis on "leading edge" technology and research, and the lack of training materials relating to readily understood application are frequently noted obstacles. CEOS has developed an education CD-ROM which is aimed at increasing the integration of space-based data into school curricula, meeting the heretofore unsatisfied needs of developing countries for information about Earth observation application, data sources and future plans; and raising awareness around the world of the value of Earth observation data from space. The CD-ROM is designed to be used with an Internet web browser, increasing the information available to the user, but it can also be used on a stand-alone machine. It contains suggested lesson plans and additional resources for educators and users in developing countries.

Charles, Leslie Bermann↗

Microwave Processing of Planetary Surfaces for Volatile Extraction

In-Situ Resource Utilization will be necessary for sustained exploration of space. Volatiles are present in planetary soils, but water by far has the strongest potential for effective utilization. The presence of water at the lunar poles, Mars, and possibly on Phobos opens the possibility of producing LOX for propellant. Water is also a useful radiation shielding material and water (and oxygen) are expendables that are also required for habitation in space. Because of the strong function of water vapor pressure with temperature, heating soil effectively liberates water vapor by sublimation. Microwave energy will penetrate soil and heat from within much more efficiently than heating from the surface with radiant heat. This is especially true under vacuum conditions since the heat transfer rate is very low. The depth of microwave penetration is a strong function of the microwave frequency and to a lesser extent on soil dielectric properties. Methods for measuring the complex electric permittivity and magnetic permeability are being developed and have been measured for some lunar soil simulants at 0.5, 2.45, and 10 GHz from room temperature down to liquid nitrogen temperature. A new method for delivery of microwaves deep into a planetary surface is being prototyped with laboratory experiments and modeled with COMSOL MultiPhysics. We have plans to set up a planetary testbed in a large vacuum chamber in the coming year. Recent results will be presented.

Ethridge, Edwin C.↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

First Wave of Incentive-Driven CCS Projects in North Dakota

Conference poster presented at American Association of Petroleum Geologists (AAPG) Carbon Capture, Utilization, and Storage (CCUS) Conference, Houston, Texas, March 28–30, 2022. While the central interior of North America offers a tremendous storage resource, optimization will be key to meaningfully reducing the more than 2.6 billion tons of CO 2 emitted annually from large point sources in the United States. These initial projects tend to have the most favorable economics and are often able to take advantage of the best geology, with little to no competition for resource. This initial wave of projects is informing investment in and creating the opportunity for innovation that will enable the next wave of incentive-based CCS projects. Such innovation is critical for reducing costs, enhancing the design and operability of the next wave of CCS projects, and realizing more of the 250 billion tons of storage resource in North Dakota.

01 COAL, LIGNITE, AND PEAT↗

Lunar Science Investigations and Exploration in Celestial Mapping System

Introduction: As NASA expands the mission portfolio on the lunar surface, there is a need for applications with a broad range of analytical and functional capabilities that can be simultaneously deployed onto multiple mobile and desktop platforms to perform in-situ operations and hence enabling extensive Lunar exploration. Celestial Mapping System (CMS) [1,2] is developed to address the need for tools for science investigations, mission planning, operations and support for planetary sciences. Built on top of NASA WorldWind libraries, CMS can be simultaneously deployed onto multiple platforms, has the flexibility to update to the latest imagery and terrain datasets as they are being acquired (in real time) before and/or during the exploration mission and has the potential to enable traverse path planning suited for rovers, EVA and surface mobility units. It can provide critical functionalities such as equipment planning and optimized placement on Lunar surface, line of sight analysis to inform the coverage area for various equipment, powerful measurement tools based on 3D terrain, 3D COLLADA models to represent rovers, humans and equipment, visualization of derived mapping products (e.g. resource maps), and a data engine for hosting new observations that are not available in other contemporary lunar data tools [1]. Visualization of PSRs: The current presentation focuses on the work performed by the authors, to consume a unique dataset of super-enhanced images of the permanently shadowed regions (PSRs) at the lunar poles which were produced by the Hyper-effective nOise Removal U-net Software (HORUS) tool [3]. This tool was developed in direct support of NASA's VIPER and Artemis programs to enhance the extremely low-light images of the interior of PSRs and provide the first-time ability to see within these regions at and discern surface features (i.e. boulders and craters) down to 3 meters in size. We focused on the region near Nobili crater near Lunar south pole, selected site for VIPER mission and stitched several images to create a high-resolution map within one of the PSR of Nobile crater. Line of Sight Analysis and Traverse Planning in PSRs: We have developed an in-built line of sight analysis (LOS) tool in CMS that analyzes the terrain profile and obstructions and provides the visibility of a given terrain for a remote observer. This tool was utilized to perform viewshed analysis to investigate the area inside the PSR, a remote observer such as a rover could see without actually crossing the region. Figure 1 shows the viewshed analysis on the PSR in Nobile region. The yellow pin shows the observer location outside the PSR. The yellow area shows the visible part of PSR. The obstructed area with no visibility for the observer is shown in red. Figure 1: (left) PSR image on top of a high-resolution mosaic of sunlit images of a crater, in Nobile region (right) Viewshed Analysis of the same PSR with observer location shown by yellow pin. This analysis was extended further to set different heights for various observers and then perform the viewshed analysis. Combining the different visibility profiles can help designing improved traverses within the crater. Future plans: Eventually, HORUS datasets will be integrated into CMS as a layer in selected lunar polar regions. Hazard Maps will then be created based on terrain analysis in those regions. This integration will enable multiple scientific and exploration applications, such as designing traverses within PSRs, analyzing potential landing and science mission targets, investigating the meter-scale geomorphology of PSRs, including craters, boulder, surface roughness, mass wasting features and other indications of the presence of water-ice and other volatiles. Acknowledgments: CMS developers team including Kaitlyn J. Dickinson, Tyler A. Lucarz, Tyler W. Choi from USRA, NASA WorldWind Advisory team including Mark Peterson and Guillermo Miguel Del Castillo, HORUS team member V.T. Bickel, Robinson, M., LRO MOON LROC 2 EDR V1.0, LRO-L-LROC-2-EDR-V1.0, NASA Planetary Data System (PDS), 2009. https://doi.org/10.17189/1520643 References: [1] https://celestial.arc.nasa.gov [2] Agrawal et. al. “Celestial Mapping System for Lunar Surface Mapping and Analytics”, Lunar Surface Innovation Consortium, 2021 [3] Bickel V. et al. (2021) Nat Commun 12, 5607

Lunar Mapping↗