Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time minimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Rapid Turn Around BRIC-PDFU Payload: A New Paradigm for Spaceflight Experiments

In 2009, NASA's Fundamental Space Biology program provided an opportunity for investigators to propose for a quick-turn-around multi-user spaceflight experiment that focused on the model plant species Arabidopsis thaliana. This was a passive payload with no on-orbit power or communications available. An NRA was rapidly written (8/09), released (NNH09ZTT004N; 9/09), proposals were received (11/09) and peer reviewed with 3 PI groups selected for flight (1/10): (1) A-L Paul, University of Florida, (2) E. Blancaflor, Noble Foundation, (3) J. Kiss, Miami University. The investigators flew Arabidopsis seeds or callus cultures of their choosing (plated onto 60 mm diameter Petri dishes containing agarsolidified media) on the STS-131 Space Shuttle mission (launched 4/5/10) and the resulting plant tissues returned to earth on 4/20/10. Each petri dish was placed inside its own Petri Dish Fixation Unit (PDFU), which was assembled and loaded with either formaldehyde, glutaraldehyde or RNAlater for crew-facilitated on-orbit fixation. Five PDFUs plus a temperature data logger were loaded into each of 8 BRIC-PDFUs (Biological Research In Canisters PDFU). All eight BRIC-PDFUs were loaded into a half tray along with actuator equipment that the crew used for the fixations. Pre-flight turn-over was 28 hours prior to launch. The BRIC-PDFU assemblies were removed from the orbiter and handed over to the investigator teams for processing 5-6 hours after landing. This payload demonstrated a rapid response turnaround for flying multiple peer-reviewed science investigations using previously flown hardware and minimal ISS-resources. The approach used reduced both hardware/certification and PI costs. The time waiting for a flight opportunity for the selected Pls was minimal. This new paradigm for spaceflight experiments may provide a model for future flight research opportunities. The ultimate goal is to fly as many investigators as rapidly as possible and reinvigorate the space biology community while obtaining high-quality, peer-reviewed science.

Levine, Howard G.↗

Aerial Refueling Process Rescheduling Under Job Related Disruptions

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.

Kaplan, Sezgin↗

Adaptive Time Step Control for Multirate Infinitesimal Methods

Multirate methods have been used for decades to temporally evolve initial-value problems in which different components evolve on distinct time scales, and thus use of different step sizes for these components can result in increased computational efficiency. Generally, such methods select these different step sizes based on experimentation or stability considerations. For problems that evolve on a single time scale, adaptivity approaches that strive to control local temporal error are widely used to achieve numerical results of a desired accuracy with minimal computational effort, while alleviating the need for manual experimentation with different time step sizes. However, there is a notable gap in the publication record on the development of adaptive time step controllers for multirate methods. In this paper, we extend the single-rate controller work of Gustafsson [ACM Trans. Math. Software, 20 (1994), pp. 496-517] to the multirate method setting. Specifically, we develop controllers based on polynomial approximations to the principal error functions for both the "fast" and "slow" time scales within multirate infinitesimal (MRI) methods. We additionally investigate a variety of approaches for estimating the errors arising from each time scale within MRI methods. We then numerically evaluate the proposed multirate controllers and error estimation strategies on a range of multirate test problems, comparing their performance against an estimated optimal performance. Through this work, we combine the most performant of these approaches to arrive at a set of multirate adaptive time step controllers that robustly achieve desired solution accuracy with minimal computational effort.

97 MATHEMATICS AND COMPUTING↗

Real-time Adaptive Control Using Neural Generalized Predictive Control

The objective of this paper is to demonstrate the feasibility of a Nonlinear Generalized Predictive Control algorithm by showing real-time adaptive control on a plant with relatively fast time-constants. Generalized Predictive Control has classically been used in process control where linear control laws were formulated for plants with relatively slow time-constants. The plant of interest for this paper is a magnetic levitation device that is nonlinear and open-loop unstable. In this application, the reference model of the plant is a neural network that has an embedded nominal linear model in the network weights. The control based on the linear model provides initial stability at the beginning of network training. In using a neural network the control laws are nonlinear and online adaptation of the model is possible to capture unmodeled or time-varying dynamics. Newton-Raphson is the minimization algorithm. Newton-Raphson requires the calculation of the Hessian, but even with this computational expense the low iteration rate make this a viable algorithm for real-time control.

Haley, Pam↗

Cost impact of hexose-to-pentose sugar ratios for biomanufacturing

Central to the long-term vision for biomanufacturing is the ability to deconstruct plant cell walls to sugars that microbes can convert to products. Aside from glucose, the most abundant sugar in biomass is xylose, a pentose sugar. Industrially relevant microbes have been engineered to co-ferment xylose and glucose. Most nth plant technoeconomic analyses (TEAs) assume similar consumption rates and product yields for both sugars, but in reality, xylose is consumed more slowly. Feedstocks can be selected, or engineered, to alter the glucan-to-xylan ratio (GXR) but no TEAs have quantified the impact of this strategy systematically. This study explores the cost impacts of varying the glucan-to-xylan ratio (GXR) from 1.9 to 6.7 for co-fermenting glucose and xylose to ethanol and bisabolene. The minimum selling prices (MSPs) for both products decrease as the GXR increases, with the largest reductions at shorter residence times. For instance, with an increase in GXR from 1.9 to 6.7, ethanol’s MSP drops by 16 %, 5 %, and 3 % at 24, 72, and 144 h, respectively, while bisabolene’s MSP declines by 23 %, 20 %, and 15 % at 24, 72, and 120 h. Particularly for early-stage commercialization, the results suggest that altering or selecting for feedstocks with higher GXR can minimize capital costs by reducing optimal residence times. Capital-constrained biorefineries operating with shorter residence times can justify paying up to 1.5X to 2X the price for feedstocks with a higher GXR, based on the expected improvements in their product yield and overall process economics.

Delayed xylose utilization↗

A Low Cost GPS System for Real-Time Tracking of Sounding Rockets

In an effort to minimize the need for costly, complex, tracking radars, the German Space Operations Center has set up a research project for GPS based tracking of sounding rockets. As part of this project, a GPS receiver based on commercial technology for terrestrial applications has been modified to allow its use under the highly dynamical conditions of a sounding rocket flight. In addition, new antenna concepts are studied as an alternative to proven but costly wrap-around antennas.

Markgraf, M.↗

Mean-square error bounds for reduced-error linear state estimators

The mean-square error of reduced-order linear state estimators for continuous-time linear systems is investigated. Lower and upper bounds on the minimal mean-square error are presented. The bounds are readily computable at each time-point and at steady state from the solutions to the Ricatti and the Lyapunov equations. The usefulness of the error bounds for the analysis and design of reduced-order estimators is illustrated by a practical numerical example.

Baram, Y.↗

Mean-square-error bounds for reduced-order linear state estimators

The mean-square error of reduced-order linear state estimators for continuous-time linear systems is investigated. Lower and upper bounds on the minimal mean-square error are presented. The bounds are readily computable at each time-point and at steady state from the solutions to the Ricatti and the Liapunov equations. The usefulness of the error bounds for the analysis and design of reduced-order estimators is illustrated by a practical numerical example.

Baram, Y.↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal control/structure integrated design of a flexible space platform with articulated appendages

A complete set of closed form symbolic equations are developed for a 2-D model of a system comprised of a flexible platform with articulated appendages. The system considered has a flexible two link manipulator, with joint compliance, at one end of the flexible platform and an articulated antenna on the other end. The model is formulated using a Lagrangian approach which incorporates homogeneous transformation matrices, similar to those typically seen in the robotics literature, for the kinematic representation. The integrated control/structure design strategy considered emphasizes rapid system response and minimal structural weight. Constraints are included to keep antenna pointing error to a minimum, and at the same time achieve accurate end point positioning of the manipulator with minimal oscillations.

Kelkar, Atul G.↗

Introducing a Markov chain-based time calibration procedure for multi-channel particle detectors: application to the SuperFGD and ToF detectors of the T2K experiment

Inter-channel mis-synchronisation can be a limiting factor to the time resolution of high performance timing detectors with multiple readout channels and independent electronics units. In these systems, time calibration methods employed must be able to efficiently correct for minimal mis-synchronisation between channels and achieve the best detector performance. We present an iterative time calibration method based on Markov Chains, suitable for detector systems with multiple readout channels. Starting from correlated hit pairs alone, and without requiring an external reference time measurement, the method solves for fixed per-channel offsets, with precision limited only by the intrinsic single-channel resolution. A mathematical proof that the method is able to find the correct time offsets to be assigned to each detector channel in order to achieve inter-channel synchronisation is given, and it is shown that the number of iterations to reach convergence within the desired precision is controllable with a single parameter. Numerical studies are used to confirm unbiased recovery of true offsets. Finally, the application of the calibration method to the Super Fine-Grained Detector (SuperFGD) and the Time of Flight (TOF) detector at the upgraded T2K near detector (ND280) shows good improvement in overall timing resolution, demonstrating the effectiveness in a real-world scenario and scalability.

calibration and fitting methods↗

Characterization of Connected Lighting System Potential for Grid Services Under Real-Time Pricing

Increasingly over the last decade, the management of end-use electricity demand has been examined as a potential source of services for the electric power grid beyond contracts with large commercial and industrial customers. Lighting represents about 17\% of U.S. commercial building annual electricity consumption; however, its potential rapid speed of response may position it to uniquely contribute to services that improve the reliability and resilience of the grid. Connected lighting systems (CLS), which build upon solid-state lamp technology, can change state by adjusting power demand more quickly than most other building electricity end uses and could be used as a platform to monitor lighting electricity use and space conditions. But the potential of CLS to provide grid services has not been extensively studied. In this paper, we describe initial research to evaluate the potential of CLS for grid services. We develop a model for CLS using a set of parameters to represent operation behaviors and constraints: maximal power, minimal power, nominal power, ramp rate, and time delay. Parameter values are generated for representative building types. CLS demand curves are constructed, indirectly capturing building occupant preferences for lighting as functions of electricity price. The CLS model and the demand curves are incorporated into a Transactive Control and Coordination (TCC) Platform to simulate CLS providing grid services. Previous research has shown TCC to be a powerful tool to enable end uses to provide grid services through a hybrid economic-control approach. Initial quantitative results will be provided for CLS grid services potential.

Wang, Peng↗

Terra and Aqua MODIS Intercomparison Using LEO-GEO Double Difference Method

The Moderate Resolution Imaging Spectroradiometer (MODIS) onboard the Terra and Aqua satellites havesuccessfully operated since their launch in 1999 and in 2002, providing more than 18 and 16 years ofcontinuous global observations, respectively. The inter-comparison between the two MODIS instruments can bevery supportive for the instrument calibration and uncertainty assessment. Aqua and Terra MODIS have almostidentical relative spectral response, spatial resolution, and dynamic range for each band. Therefore, a sitedependent correction for a sensor spectral band pair is not necessary for their comparison. However, Terra is inthe morning orbit with an equator crossing time of 10:30 am, and Aqua is in the afternoon orbit with equatorcrossing time of 1:30 pm. Consequently, there is a dearth of simultaneous nadir overpasses (SNOs)between the two satellites. Major challenges in cross-sensor comparison of instruments on different satellitesinclude differences in observation time, solar angle, and view angle over selected pseudo-invariant sites.In this work, the inter-comparisons of thermal emissive bands are performed over a pseudo-invariant target,using the observations from a sensor onboard a geostationary satellite as a bridge. Himawari8 was launched onOctober 7, 2014. The Advanced Himawari Imager (AHI) onboard Himawari8 can be used as a reference tobridge the comparison between Terra and Aqua MODIS. AHI has 16 channels; with spatial resolutions from 0.5km to 2 km at nadir and produces a full disk observations every 10 minutes. The band spectral coveragematchup, comparable spatial resolution and near-simultaneous observation between MODIS and AHI providefeasibility to implement a double difference method. This comparison method minimizes the impact of thedifference in observation time and solar angle. The comparison results will be used as an assessment for MODISinstrument calibration and will be helpful for future enhancement of the L1B product.

Himawari8↗

Improved light yield and growth of large-volume ultrafast single crystal scintillators Cs 2 ZnCl 4 and Cs 3 ZnCl 5

Due to their reported fast decay times, Cs 2 ZnCl 4 and Cs 3 ZnCl 5 are promising candidates for detection of gamma rays and X-rays in high count rate and fast timing applications. In this work, we show that single crystals with better optical quality than previously demonstrated – and larger in size – can be grown via the vertical Bridgman method. Highly transparent Ø7 mm crystals of undoped Cs 2 ZnCl 4 and Cs 3 ZnCl 5 are grown and measured to have light yields surpassing those previously reported, achieving 1980 ± 100 ph/MeV and 1460 ± 70 ph/MeV at 662 keV – a 55% and 232% improvement, respectively. We observe single-component scintillation decay times for both Cs 2 ZnCl 4 (1.66 ns) and Cs 3 ZnCl 5 (0.82 ns) and radioluminescence emission with maximum intensity at ~290 nm. Scalability of these materials is also evaluated based on growth of Ø22 mm crystals. Minimal cracking is observed, and the fast decay times are maintained at this size. Coincidence time resolution of 3 × 3 × 5 mm 3 and 7 × 7 × 10 mm 3 pixels cut from Ø22 mm Cs 2 ZnCl 4 are measured to be 148 ± 1 ps FWHM and 175 ± 1 ps FWHM, respectively. Here, the improved performance and ability to be fabricated in large sizes now place Cs 2 ZnCl 4 and Cs 3 ZnCl 5 on the map as potential contenders for radiation detection applications where BaF 2 – the most commonly used ultrafast inorganic scintillator – is typically considered.

36 MATERIALS SCIENCE↗

A thermally-limited bubble growth model for the relaxation time of superheated fuels

Here, we propose a novel approach to evaluate the relaxation time of vapor bubble growth in the context of the flash boiling of a superheated liquid. In alternative to the empirical correlation derived from superheated water experiments almost fifty years ago, the new model describes the thermally-dominated growth of vapor bubbles in terms that are dependent on the local Jakob number (the ratio of sensible heat to latent heat during phase change) and the number density of vapor bubbles. The model is tested by plugging the resulting relaxation time into the Homogenous Relaxation Model (HRM). Flash-boiling simulations carried out with HRM are compared with n-pentane (C 5 H 12 ) injection and boil-off experiments conducted with a real-size, axial-hole, transparent gasoline injector discharging into a constant-pressure vessel. The long-distance microscopy images from the experiments, processed to derive the projected liquid volume (PLV) of the spray, provide a unique set of time-resolved validation data for direct fuel injection simulations. At conditions ranging from flaring to mild and minimal flash boiling, we show that switching to the new relaxation time improves the agreement with the measured PLV profiles with respect to the standard empirical model. Particularly at flaring conditions, the predicted increase in gas cooling caused by rapid vapor production is shown to be more consistent with the observed boil-off.

42 ENGINEERING↗

Rise-time response of nickel-foil-on-Kapton-substrate, hot-film, shear-stress sensors

An existing nickel-foil-on-Kapton-substrate sensor design was modified by including two heated elements in an attempt to minimize or reduce substrate conduction effects. The rise-time responses of the original and modified sensors were then investigated in unsteady flows of 0.5-1-s duration, consistent with flows encountered in wind-energy applications. The results obtained indicate a measurable degradation in transient performance due to the activation of the dynamic guard heater. Transient heat conduction within the substrate remains the limiting factor in such applications.

Reda, Daniel C.↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic calibration of differential equations using machine learning, with application to turbulence models

We present a methodology for calibration of parametric ordinary and partial differential equation models, using off-the-shelf software for back-propagation in Neural Networks (NN). As a prototypical example, we consider calibration of a Reynolds-averaged Navier-Stokes (RANS) turbulence closure model, against ground truth data from direct numerical simulations (DNS) of two different turbulent flows. Numerical time integration is represented as a custom NN, where only the RANS model parameters are trainable. A loss function is defined to quantify the mismatch between the NN prediction and the ground truth over a predefined, finite time integration window. This loss function is then minimized using a gradient descent method utilizing the back-propagation algorithm. Furthermore, this dynamic approach to training is to be contrasted with a static approach, wherein a least square regression estimate for parameters is obtained in the limit of an infinitesimal time integration window. In a first test of static and dynamic approaches against ground truth data generated by the model, the former proves to be significantly faster and more accurate than the latter at recovering the parameters. When both calibration approaches are tested against DNS data, for which it is known that the model cannot achieve a perfect fit, the static approach yields a good prediction only for short times, while the dynamic approach results in physical and stable predictions over the entire integration window. After optimization of the dynamic approach for time step, spatial resolution, stability, and physics-based constraints, we obtain a 50% improvement of outcomes over those obtained from the existing, manually calibrated set of parameters, demonstrating the merits of this systematic and automated procedure.

97 MATHEMATICS AND COMPUTING↗