Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Space shuttle OMS helium regulator design and development

Analysis, design, fabrication and design verification testing was conducted on the technological feasiblity of the helium pressurization regulator for the space shuttle orbital maneuvering system application. A prototype regulator was fabricated which was a single-stage design featuring the most reliable and lowest cost concept. A tradeoff study on regulator concepts indicated that a single-stage regulator with a lever arm between the valve and the actuator section would offer significant weight savings. Damping concepts were tested to determine the amount of damping required to restrict actuator travel during vibration. Component design parameters such as spring rates, effective area, contamination cutting, and damping were determined by test prior to regulator final assembly. The unit was subjected to performance testing at widely ranging flow rates, temperatures, inlet pressures, and random vibration levels. A test plan for propellant compatibility and extended life tests is included.

Wichmann, H.↗

Restore-L Satellite Servicing Internship Final Report

An experiment was conducted to determine whether a sample of shorter flexible metal hoses could sustain tensile loads of up to 200 lbf and continue to meet the minimum mission requirements. The purpose of this experiment was to determine if tension loads during the processing of the hoses compromise performance. With this information, it will be decided whether the flight flex-hose manufacturer should proceed with the testing of the full-scale flex-hoses. To reduce the time and funding required for this test, a test fixture was designed and assembled in the Engineering Development & Operations (EDO) test facility. In this test fixture, two Engineering Development Unit (EDU) flex-hoses were loaded with free floating weights up to 350 lbf. A load of 200 lbf equates to the maximum expected loading with a margin of safety, thus all data recorded after 200 lbf was purely for reference. Measurements were taken using a tape measure and a custom datum measurement system to record the loaded and unloaded length of each flex-hose at various loads. Any permanent stretching beyond a 1/8th of an inch was indicative of inelastic yielding. The loading of each flex-hose was done with an initial weight 80 lbf and was increased to 100 lbf. Additional loading up to 350 lbf was done by 50 lbf increments thereafter. During the performance of the test, slippage occurred in the mounting of the flex-hoses in the test fixture. The first slippage occurred during the testing of the first flex-hose due to the collar of the flex-hose slipping within the collet of the top Kellem. As a result, the first flex-hose test was terminated early to modify the fixture. Due to the flex-hose not inelastically yielding, the test was repeated on the first flex hose. This test resulted in another instance of slippage in the upper collar of the Kellem due to tape interfering with the securing of a collet around the collar of the flex-hose. The test was then continued with one more slippage of the flex-hose within the collet of the bottom Kellem. Preventive measures were taken for future slippage, and the second hose remained secure during testing.Once the tests were concluded, the elongation of each hose was analyzed for inelastic yielding. Both flex-hoses stretched a measurable and repeatable amount under loading, however, this stretching was recovered once each hose was unloaded. As a result, both EDU flex-hoses did not experience any inelastic yielding during the tension testing. Once received, one additional flex-hose will be tested for yielding, but at the time of this paper, the recommendation is to proceed with testing of the full-scale flex-hoses at the flex-hose manufacturer.

Dziekan, Joseph↗

Linear Analysis of a Two-Parachute System Undergoing Pendulum Motion

Motion resembling that of a pendulum undergoing large-amplitude oscillation was ob- served during a series of flight tests of an unoccupied Orion Capsule Parachute Assembly System (CPAS) drop-test vehicle. Large excursions away from vertical by the capsule could cause it to strike the ground or ocean at a large angle with respect to vertical, with an undesirable attitude with respect to heading, or with a large horizontal or vertical speed. These conditions are to be avoided because they would endanger the occupants of the capsule in an actual mission. Pendulum motion is intimately related to a parachute’s aerodynamic normal force coefficient, which is a nonlinear function of angle of attack. An analytical investigation of the dynamics of pendulum motion is undertaken with the aid of a simplified model of the physical system and the assumption that the normal force coefficient is a linear function of angle of attack in the neighborhood of a value corresponding to stable equilibrium. The analysis leads to a simple relationship for the location of a pivot point, which provides insights that are consistent with previous studies.

Roithmayr, Carlos M.↗

A Risk Analysis Tool for Estimating the Risk of Electrical Failures Due to Human Induced Defects

Aerospace electrical systems are required to withstand and adequately operate in extremely harsh environments that include, for example, high radiation exposure, temperature extremes, intense vibrational stress and drastic temperature cycling. The nature of aerospace electronics also demands high reliability since, with very few exceptions, there is no chance for hardware servicing or repairs. Common risk mitigation techniques for this type of situation are to perform a Reliability Analysis of the system throughout the development cycle, and to use electrical components that are regarded as “high reliability” because of additional controls and requirements applied in their design, manufacturing and testing. Unfortunately, studies have shown that even though these techniques are used, many systems fail to meet mission requirements well before the predicted lifetimes. This paper presents the analysis of failures of electrical parts, experienced during various stages of system development, at NASA Goddard Space Flight Center, Greenbelt MD, between the years 2001 and 2013. These components were subjected to qualification, screening and testing in which the goal was to ensure that the components would survive the stresses of the mission. The analysis categorizes failures by part type and failure mechanisms. One of the results of the analysis was the realization that a surprising proportion of failures experienced during system integration and testing were caused by human error (i.e. human induced defect). Further analysis included the determination of root failure mechanisms and any influencing factors contributing to these failures. The major causes of these defects were attributed to electrostatic damage (ESD), electrical overstress (EOS), mechanical overstress (MOS), and thermal overstress (TOS). Finally, the study proposes a risk analysis tool which incorporates these major causes for the failures, termed error-producing conditions (EPCs), and a proportionality factor representing the number of each type of failure that has occurred at the facility under study. These factors are quantified and used to communicate the risk of human induced defects for the assembly, integration and testing of space hardware based on the system’s electrical parts list. The new risk identification can trigger risk-mitigating actions more effectively, based on the presence of component categories or other hazardous conditions that have a history of failure due to human error.

Majewicz, Peter J.↗

Helium Cryo Testing of a SLMS(TM) (Silicon Lightweight Mirrors) Athermal Optical Assembly

SLMS (TM) a thermal technology has been demonstrated in the small 4-foot helium cryogenic test chamber located at the NASA/MSFC X-Ray Calibration Facility (XRCF). A SLMS (TM) Ultraviolet Demonstrator Mirror (UVDM) produced by Schafer under a NASA/MSFC Phase I SBIR was helium cryo tested both free standing and bonded to a Schafer designed prototype carbon fiber reinforced silicon carbide (Cesic) mount. Surface figure data was obtained with a test measurement system that featured an Instantaneous Phase Interferometer (IPI) by ADE Phase Shift. The test measurement system s minimum resolvable differential figure deformation and possible contributions from test chamber ambient to cryo window deformation are under investigation. The free standing results showed differential figure deformation of 10.4 nm rms from 295K to 27K and 3.9 nm rms after one cryo cycle. The surface figure of the UVDM degraded by lambda/70 rms HeNe once it was bonded to the prototype Cesic mount. The change was due to a small astigmatic aberration in the rototype Cesic mount due to lack of finish machining and not the bonding technique. This effect was seen in SLMST (TM) optical assembly results, which showed differential figure deformation of 46.5 nm rms from 294K to 27K, 42.9 nm rms from 294K to 77K, 28.0 nm rms from 294K to 193K and 6.2 nm rms after one cryo cycle.

Jacoby, Marc T.↗

Design Improvements and X-Ray Performance of a Time Projection Chamber Polarimeter for Persistent Astronomical Sources

The design of the Time-Projection Chamber (TPC) Polarimeter for the Gravity and Extreme Magnetism Small Explorer (GEMS) was demonstrated to Technology Readiness Level 6 (TRL-6)3 and the flight detectors fabricated, assembled and performance tested. A single flight detector was characterized at the Brookhaven National Laboratory Synchrotron Light Source with polarized X-rays at 10 energies from 2.3-8.0 keV at five detector positions. The detector met all of the GEMS performance requirements. Lifetime measurements have shown that the existing flight design has 23 years of lifetime4, opening up the possibility of relaxing material requirements, in particular the consideration of the use of epoxy, to reduce risk elsewhere. We report on design improvements to the GEMS detector to enable a narrower transfer gap that, when operated with a lower transfer field, reduces asymmetries in the detector response. In addition, the new design reduces cost and risk by simplifying the assembly and reducing production time. Finally, we report on the performance of the narrow-gap detector in response to polarized and unpolarized X-rays.

GEMS↗

Validating Phasing and Geometry of Large Focal Plane Arrays

The Kepler Mission is designed to survey our region of the Milky Way galaxy to discover hundreds of Earth-sized and smaller planets in or near the habitable zone. The Kepler photometer is an array of 42 CCDs (charge-coupled devices) in the focal plane of a 95-cm Schmidt camera onboard the Kepler spacecraft. Each 50x25-mm CCD has 2,200 x 1,024 pixels. The CCDs accumulate photons and are read out every six seconds to prevent saturation. The data is integrated for 30 minutes, and then the pixel data is transferred to onboard storage. The data is subsequently encoded and transmitted to the ground. During End-to-End Information System (EEIS) testing of the Kepler Mission System (KMS), there was a need to verify that the pixels requested by the science team operationally were correctly collected, encoded, compressed, stored, and transmitted by the FS, and subsequently received, decoded, uncompressed, and displayed by the Ground Segment (GS) without the outputs of any CCD modules being flipped, mirrored, or otherwise corrupted during the extensive FS and GS processing. This would normally be done by projecting an image on the focal plane array (FPA), collecting the data in a flight-like way, and making a comparison between the original data and the data reconstructed by the science data system. Projecting a focused image onto the FPA through the telescope would normally involve using a collimator suspended over the telescope opening. There were several problems with this approach: the collimation equipment is elaborate and expensive; as conceived, it could only illuminate a limited section of the FPA (.25 percent) during a given test; the telescope cover would have to be deployed during testing to allow the image to be projected into the telescope; the equipment was bulky and difficult to situate in temperature-controlled environments; and given all the above, test setup, execution, and repeatability were significant concerns. Instead of using this complicated approach of projecting an optical image on the FPA, the Kepler project developed a method using known defect features in the CCDs to verify proper collection and reassembly of the pixels, thereby avoiding the costs and risks of the optical projection approach. The CCDs composing the Kepler FPA, as all CCDs, had minor defects. At ambient temperature, some pixels look far brighter than they should. These ghot h pixels have a higher rate of charge leakage than the others due to manufacturing variations. They are usually stable over time, and appear at temperatures above 5 oC. The hot pixels on the Kepler FPA were mapped before photometer assembly during module testing. Selected hot pixels were used as target gstars h for the purposes of EEIS testing. gDead h pixels are permanently off, producing a permanently black pixel. These can also be used if there is some illumination of the FPA. During EEIS testing, Dark Current Full Frame Images (FFIs) taken at room temperature were used to create the hot pixel maps for all 84 Kepler photometer CCD channels. Data from two separate nights were used to create two hot pixel maps per channel, which were cross-correlated to remove cosmic ray events which appear to be hot pixels. These hot pixel maps obtained during EEIS testing were compared to the maps made during module testing to verify that the end-to-end data flow was correct.

Standley, Shaun P.↗

Design, fabrication and acceptance testing of a zero gravity whole body shower

Recent research and development programs have established the ability of the zero gravity whole body shower to maintain a comfortable environment in which the crewman can safely cleanse and dry the body. The purpose of this program was to further advance the technology of whole body bathing and to demonstrate technological readiness including in-flight maintenance by component replacement for flight applications. Three task efforts of this program are discussed. Conceptual designs and system tradeoffs were accomplished in task 1. Task 2 involved the formulation of preliminary and final designs for the shower, while task 3 included the fabrication and test of the shower assembly. Particular attention is paid to the evaluation and correction of test anomalies during the final phase of the program.

Schumacher, E. A.↗

In-Situ Load System for Calibrating and Validating Aerodynamic Properties of Scaled Aircraft in Ground-Based Aerospace Testing Applications

An In-Situ Load System for calibrating and validating aerodynamic properties of scaled aircraft in ground-based aerospace testing applications includes an assembly having upper and lower components that are pivotably interconnected. A test weight can be connected to the lower component to apply a known force to a force balance. The orientation of the force balance can be varied, and the measured forces from the force balance can be compared to applied loads at various orientations to thereby develop calibration factors.

Commo, Sean A.↗

Spacecraft Vibration Testing: Benefits and Potential Issues

JPL has traditionally performed system level vibration testing of flight spacecraft. The benefits and potential issues of fully assembled flight spacecraft vibration testing are discussed herein. The following specific topics, which may be complementary to the special session on “Virtual Vibration Testing,” are discussed: spacecraft workmanship, functional and structural integrity testing to uncover workmanship problems, force- and moment-limited vibration testing, potential issues with structural frequency identification using base shake test data, and several failures related to vibration shaker testing. The information provided in this paper is complementary to the special session on “Virtual Shaker Testing,’ and attention is given to issues that virtual shaker testing may face.

Kolaini, Ali R.↗

Low Crossover Polymer Electrolyte Membranes for Direct Methanol Fuel Cells

Direct Methanol Fuel Cells (DMFC's) using polymer electrolyte membranes are promising power sources for portable and vehicular applications. State of the art technology using Nafion(R) 117 membranes (Dupont) are limited by high methanol permeability and cost, resulting in reduced fuel cell efficiencies and impractical commercialization. Therefore, much research in the fuel cell field is focused on the preparation and testing of low crossover and cost efficient polymer electrolyte membranes. The University of Southern California in cooperation with the Jet Propulsion Laboratory is focused on development of such materials. Interpenetrating polymer networks are an effective method used to blend polymer systems without forming chemical links. They provide the ability to modify physical and chemical properties of polymers by optimizing blend compositions. We have developed a novel interpenetrating polymer network based on poly (vinyl - difluoride)/cross-linked polystyrenesulfonic acid polymer composites (PVDF PSSA). Sulfonation of polystyrene accounts for protonic conductivity while the non-polar, PVDF backbone provides structural integrity in addition to methanol rejection. Precursor materials were prepared and analyzed to characterize membrane crystallinity, stability and degree of interpenetration. USC JPL PVDF-PSSA membranes were also characterized to determine methanol permeability, protonic conductivity and sulfur distribution. Membranes were fabricated into membrane electrode assemblies (MEA) and tested for single cell performance. Tests include cell performance over a wide range of temperatures (20 C - 90 C) and cathode conditions (ambient Air/O2). Methanol crossover values are measured in situ using an in-line CO2 analyzer.

Prakash, G. K. Surya↗

One-Step Facile Synthesis of High-Activity Nitrogen-Doped PtNiN Oxygen Reduction Catalyst

PtM alloy electrocatalysts (M = Fe, Co, Ni) have been the subject of many investigations aimed at increasing their attractive properties, in particular oxygen reduction reaction (ORR) activity, while reducing total platinum-group-metal content and improving durability. Despite some success, these catalysts still have relatively high Pt content and lack the necessary durability as M metals leach out from the alloys during potential cycling. Previously, we synthesized nitrogen (N)-doped PtMN/C catalysts consisting of thin Pt shells on M nitride cores by a two-step method, which showed higher ORR activity and stability than their PtM counterparts. In the present work, we developed a facile one-step synthesis method, which comprises a single thermal annealing process of the N-doped PtNiN/C alloy. The ORR performance of the one-step synthesized PtNiN/C catalyst is much higher than that of the two-step synthesized PtNiN/C, as revealed by rotating disk electrode measurements. Membrane electrode assembly fuel cell testing demonstrated superb durability and high activity. Formation of Pt monolayer shells on the nitrided (Pt x Ni 1-x ) 4 N cores was confirmed by in situ X-ray absorption spectroscopy. The origins of the enhanced activity and stability of the one-step synthesized PtNiN/C catalyst are elucidated based on density functional theory calculations together with the experimental results.

30 DIRECT ENERGY CONVERSION↗

James Webb Space Telescope: The First Light Machine

NASA James Webb Space Telescope (JWST) will search for the first luminous objects of the Universe to help answer fundamental questions about how the Universe came to look like it does today. At 6.5 meters in diameter, JWST will be the world's largest space telescope. Its architecture, e.g. aperture, wavelength range and operating temperature, is driven by JWST's science objectives. Introduction: Scheduled to start its 5 year mission after 2018, JWST will study the origin and evolution of galaxies, stars and planetary systems. Its science mission is to: Identify the first bright objects that formed in the early Universe, and follow the ionization history. Determine how galaxies form. Determine how galaxies and dark matter, including gas, stars, metals, overall morphology and active nuclei evolved to the present day. Observe the birth and early development of stars and the formation of planets. And, study the physical and chemical properties of solar systems for the building blocks of Life. Principle: To accomplish the JWST science objectives requires a larger aperture infrared cryogenic space telescope. A large aperture is required because the objects are very faint. The infrared spectral range is required because the objects are so far away that their ultraviolet and visible wavelength spectral lines are red-shifted into the infrared. Because the telescope is infrared, it needs to be cryogenic. And, because of the telescope is infrared, it must operate above the Earth's atmosphere, i.e. in space. JWST is probably the single most complicated mission that humanity has attempted. It is certainly the most difficult optical fabrication and testing challenge of our generation. The JWST 6.5 m diameter primary mirror is nearly a parabola with a conic constant of -0.9967 and radius of curvature at 30K of 15.880 m. The primary mirror is divided into 18 segments with 3 different prescriptions; each with its own off-axis distance and aspheric departure. The radius of curvature for all 18 segments must match to +/- 0.150 mm at 30K. JWST is diffraction limited at 2 micrometers which translates into a transmitted wavefront specification of 156 nm rms. Of that amount, 50 nm rms is allocated to the primary mirror. Each segment is allocated 22 nm rms surface error. At the start of the JWST program, the capability to make such a mirror did not exist. In 1996, NASA began a systematic and comprehensive mirror technology development effort which resulted in JWST. This program resulted in a qualified mirror fabrication process being approved in 2006. Today, all JWST primary mirror segments meet their requirements and are on schedule for a 2018 launch. The next step is system level assembly, integration and test. Ambient tests will be conducted at Goddard Space Flight Center and cryogenic system level testing will be performed in Chamber A at the Johnson Space Center.

Stahl, H. Philip↗

In-Rod Sensor System Overview, Benefits and Recent Irradiation Test Results

Westinghouse is developing an In-Rod Sensor (IRS) System capable of measuring critical fuel rod parameters such as center-line fuel temperature, rod internal pressure and axial fuel pellet stack elongation without having penetrations to the fuel rod. The technology is similar to the Halden Reactor instrumentation, but the IRS system focuses on commercial fuel rod instrumentation. Both systems circumvent fuel rod penetrations, however the IRS system overcomes unique geometric challenges found in commercial fuel rod assemblies. The IRS could also play a key role in accelerated fuel qualification by allowing real-time measurements during separate effects tests, integral fuel testing or during irradiation of lead test rods or lead test assemblies. Combining these measurements with data acquired from targeted separate effects testing and multi-scale modelling could significantly reduce the time required to qualify new fuel and reduce the safety margin uncertainty of operating plants. The IRS is actively in development for Light Water Reactors (LWR) based fuel assemblies but can also be applied to Gen IV reactor designs with minimal modifications.

Carvajal, Jorge↗

Electrodynamic Dust Shield (EDS) Preparation for MISSE-11 Launch

The dusty surfaces of the Moon, Mars, and various asteroids present a significant challenge to NASA’s manned and unmanned space exploration efforts. The fine, electrostatically charged dust is difficult to remove and has resulted in vision obscuration, false instrument readings, contamination, elevated temperatures, performance reduction, and equipment failure. To alleviate these problems, NASA KSC’s Electrostatics and Surface Physics Laboratory (ESPL) is developing active dust mitigation systems for solar system exploration and in situ resource utilization (ISRU). Part of KSC’s Swamp Works system, the lab emphasizes fast-paced, hands-on, cost-effective, and collaborative innovation. The Electrodynamic Dust Shield (EDS) is an ESPL technology being developed to prevent dust accumulation on space components. It consists of a dielectric substrate embedded with parallel electrodes which, when applied with high voltage out-of-phase waveforms, produce a traveling electric field wave that scatters dust particles from its surface via dielectrophoretic and electrostatic forces. The EDS is currently fully functional and has been tested for scalability and endurance in reduced gravity/pressure flight. Next, it will be part of the May 2019 Materials International Space Station Experiment-11 (MISSE-11) payload, which will test small shield samples for performance durability with exposure to the harsh space environment. The summer objective was to test EDS functionality before active and passive dust shield samples launch on MISSE-11, in order to screen for good flight/control samples as well as to compare pre-flight and post-flight clearing efficiencies. I imaged glass and Kapton shields of 2-phase and 3-phase electrode configurations with the Keyence VHX-5000 digital microscope to check for damage before and after all testing for a qualitative pre-flight baseline; helped with vacuum testing of high-voltage shield breakdown; assembled shields and wires using Electrobond 004 silver epoxy; and helped with vacuum and cryogenic dust clearance testing of assembled EDS systems. I learned CAD (computer-aided design) and 3D printing skills to create parts for a shaker table/motor assembly, which will allow for repeatable experiments by evening out EDS dust distribution in a consistent manner prior to dust scattering testing. I will also be improving the interfacing with Alpha Space’s prototype Data Communications Unit (DCU), a payload component to control power to the EDS and store data, by mapping the DCU structure upon power-up and writing shell scripts to improve various processes. Finally, I also CADed and 3D-printed plastic supports for three different geometries of the Electrostatic Precipitator (ESP), a project that aims to use high voltage electrodes to charge and filter out dust from the Martian atmosphere drawn for ISRU devices. This work on dust mitigation technologies will help to support future robotic and human space exploration missions, including NASA’s Journey to Mars; the EDS has especially significant applications to spacecraft solar panels, thermal radiators, viewports, and astronaut visors. This opportunity has also allowed me to become more familiar with various lab equipment and hardware testing, develop key modeling skills in SolidWorks, explore past and present components critical to America’s space program, work with inspiring peers and mentors, and ascertain my dream of working permanently for NASA.

space↗

Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies

An Engineering-of-Failure approach to designing and executing an accelerated product qualification test was performed to support a risk assessment of a "work-around" necessitated by an on-orbit failure of another piece of hardware on the Mars Global Surveyor spacecraft. The proposed work-around involved exceeding the previous qualification experience both in terms of extreme cold exposure level and in terms of demonstrated low cycle fatigue life for the power shunt assemblies. An analysis was performed to identify potential failure sites, modes and associated failure mechanisms consistent with the new use conditions. A test was then designed and executed which accelerated the failure mechanisms identified by analysis. Verification of the resulting failure mechanism concluded the effort.

Gibbel, Mark↗

State-of-the-Art: Small Spacecraft Technology

When the first edition of NASA’s Small Spacecraft Technology State-of-the-art report was published in 2013, 247 CubeSats and 105 other non-CubeSat small spacecraft under 50 kilograms (kg) had been launched worldwide, representing less than 2% of launched mass into orbit over multiple years. In 2013 alone, around 60% of the total spacecraft launched had a mass under 600 kg, and of those under 600 kg, 83% were under 200 kg and 37% were nanosatellites (1). Of the total 1,849 spacecraft launched in 2021, 94% were small spacecraft with an overall mass under 600 kg, and of those under 600 kg, 40% were under 200 kg, and 11% were nanosatellites (1). Since 2013, the fight heritage for small spacecraft has increased by over 30% and has become the primary source to space access for commercial, government, private, and academic institutions. The total number of spacecraft launched in the past 10 years is 5,681 and 45% of those had a mass. As with all previous editions of this report, the 2022 edition captures and distills a wealth of new information available on small spacecraft systems from NASA and other publicly available sources. This report is limited to publicly available information and cannot reflect major advances in development that are not publicly disclosed. We encourage any opportunity to publish mission outcomes and technology development milestones (e.g., via conference papers, press releases, company website) so they can be reflected in this report. Overall, this report is a survey of small spacecraft technologies sourced from open literature; it does not endeavor to be an original source, and only considers literature in the public domain to identify and classify devices. Commonly used sources for data include manufacturer datasheets, press releases, conference papers, journal papers, public filings with government agencies, news articles, presentations, the compendium of databases accessed via NASA’s Small Spacecraft Systems Virtual Institute (S3VI) Information Search, and engagement with companies. Data not appropriate for public dissemination, such as proprietary, export controlled, or otherwise restricted data, are not considered. As a result, this report includes many dedicated hours of desk research performed by subject matter experts reviewing resources noted above. Content in this 2022 edition is based on data available by October 2022. This report should not be considered as a comprehensive overview of all the technologies but a great reference for the current state-of-the-art SmallSat technologies. The organizational approach for each chapter is relatively consistent with previous editions and includes an introduction of the technology, current development status of the technology’s procurable systems, and summary tables of technologies surveyed. The content in each chapter is uniquely organized to present a mini-stand-alone report on spacecraft subsystems. As in previous years, chapters include information from previous editions but are updated with new and maturating technologies and reference missions. Tables in each section provide a convenient summary of the technologies discussed, with explanations and references in the body text. The authors have attempted to isolate trends in the small spacecraft industry to point out which technologies have been adopted after successful demonstration missions. Lastly, the authors tried to use the terms “SmallSat,” “microsatellite,” “nanosatellite,” and “CubeSat” in a consistent manner, even as these terms are often used interchangeably in the space industry. Every subsystem chapter contains updated information to reflect the growth in the small spacecraft market. Significant changes are included in several chapters. The “Complete Spacecraft Platforms” chapter now includes information on the two main market options, hosted payload services and dedicated buses. The “Power” chapter provides information on the development of solid-state batteries with significantly higher energy than the current state-of-theart lithium-ion batteries. A large effort was made to update the “Communications” chapter to appropriately capture the recent technology maturation of optical communications for SmallSats. The “Ground Data Systems and Mission Operations” chapter was updated to reflect the recent establishment of the Near Space Network and influx of SmallSat Optical Ground Stations. The “Guidance, Navigation and Control” chapter was updated to include Lidar sensor technology. The “Deorbit Systems” chapter includes a discussion of recently proposed changes by the Federal Communications Commission (FCC) to limit a spacecraft’s lifetime to no longer than 5 years after end-of-mission. The “Identification and Tracking” Chapter includes updated information on the progress of SmallSat tracking. Finally, this report now encompasses technology funded by NASA’s Small Spacecraft Technology (SST) program’s SmallSat Technology Partnerships (STP) initiative which is described further in this Introduction. The reader can find the included SST technology in the “On the Horizon” section of the “Thermal Systems”, “Communications”, and “Guidance, Navigation, and Control” chapters. A central element of this report is to list state-of-the-art technologies by NASA standard Technology Readiness Level (TRL) as defined by the 2020 NASA Engineering Handbook, found in NASA NPR 7123.1C NASA Systems Engineering Processes and Requirements. The authors have endeavored to independently verify the TRL value of each technology by reviewing and citing published test results or publicly available data to the best of their ability. Where test results and data disagree with vendors’ own advertised TRL, the authors have attempted to engage the vendors to discuss the discrepancy. Readers are strongly encouraged to follow the references cited in the literature describing the full performance range and capabilities of each technology. Readers of this report should reach out to individual companies to further clarify information. It is important to note that this report takes a broad system-level view. To attain a high TRL, the subsystem must be in a flight-ready configuration with all supporting infrastructure—such as mounting points, power conversion, and control algorithms—in an integrated unit. An accurate TRL assessment requires a high degree of technical knowledge on a subject device, and an in-depth understanding of the mission (including interfaces and environment) on which the device was flown. There is variability in TRL values depending on design factors for a specific technology. For example, differences in TRL assessment based on the operating environment may result from the thermal environment, mechanical loads, mission duration, or radiation exposure. If a technology has flown on a mission without success, or without providing valid confirmation to the operator, such claimed “flight heritage” was discounted. The authors believe TRLs are most accurately determined when assessed within the context of a program’s unique requirements. While the overall capability of small spacecraft has matured since the 2021 edition of this report, technologies are still being developed to make deep space SmallSat missions more routine and more cost effective. Future editions of this report may include content dedicated to the rapidly growing fields of assembly, integration, and testing services, and mission modeling and simulation–all of which are now extensively represented at small spacecraft conferences. Many of these subsystems and services are still in their infancy, but as they evolve and reliable conventions and standards emerge, the next iteration of this report may also evolve to include additional chapters.

Bruce Yost↗

High Fidelity Modeling of Evolutionary Structures in IMOS

A methodology is proposed for testing, modal identification, and model correlation of structures which are assembled in an evolutionary manner. The methodology prescribes initial testing of a base structure without any attached components. The experimental modal properties are used to update the physical properties of the base structure finite element model using a Bayesian Estimation Technique (BET). The BET is implemented in METLAB using IMOS functions. As components are added to the base structure, additional tests are performed. Three testing options are proposed, all of which enable estimation of the physical parameters of the components alone. Furthermore, improvements to the original BET implementation have been made, which contribute to higher fidelity models and more efficient computational times.

structures testing assembling modeling BET Bayesia↗