FY22 SSTEF Annual Review Presentation

The Space Science Technology and Evaluation Facility (SSTEF) is funded through the Game Changing Development program. This presentation describes the SSTEF project, collaborations and partnerships, progress made in FY22, and planned activities for FY23.

space environment↗

Microstructure and Mechanical Properties of Additively Manufactured Haynes 282: A Comparative Analysis between L-PBF and LP-DED Technologies

This study compares the microstructure and tensile properties of Haynes 282 fabricated using laser powder bed fusion and laser powder directed energy deposition. Both sets underwent stress-relieving, followed by hot isostatic pressing, and the standard double aging heat treatment. Tensile testing was conducted at room temperature on specimens fabricated with both technologies to evaluate and compare their tensile behaviors. Results show that the ultimate tensile and yield strengths of laser powder bed fused specimens were 18% and 57% higher, respectively than those of laser powder directed energy deposited ones, whereas the elongation to failure was similar in both. The difference in strengths is attributed to the differences in the size of ɣ' precipitates and grains, i.e., those in the LP-DED specimens being larger, whereas similar elongation to failure is attributed to the carbide debonding dominating the fracture mechanism in both batches.

Additive manufacturing↗

FY23 SSTEF Annual Review Presentation

The Space Science Technology and Evaluation Facility (SSTEF) is funded through the Game Changing Development program. This presentation describes the SSTEF project, collaborations and partnerships, progress made in FY23, and planned activities for FY24.

space environment↗

Ground-Based Capabilities for Lunar Infrastructure Testing

A focus of NASA’s Moon-to-Mars objectives is the development of the infrastructure on the lunar surface that will be needed to support broader lunar surface operations. This infrastructure is intended to support both United States and international partners to expand human presence on the lunar surface. As this lunar infrastructure is designed and established, it will be critical to ensure that the various hardware elements work together to both enable the capabilities and to avoid unintended actions. NASA’s Glenn Research Center (GRC) is establishing ground-based testing and emulation facilities to mimic the lunar environment that the surface power and communications infrastructure will operate in. These facilities are intended to represent power and communications providers, users, and interfaces to ensure that systems operate as intended to support the lunar economy. They will empower industry to rapidly evaluate new technologies under realistic conditions. In 2023 GRC is opening a new, state-of-the-art, Aerospace Communications Facility featuring hardware-in-the-loop and ground-to-orbit testbeds. The Multiple Asset Testbed for Research in Innovative Communications Systems (MATRICS) capability will emulate the lunar communications environment, enabling validation of mission concepts and technologies to reduce risk through performance and operations testing, training, and uncover potential issues in compatibility among communication systems providers and users. In addition to the communications testbed, GRC is also developing a full-scale power grid to reduce lunar mission risk. The Adaptable Surface Power Integration and Research (ASPIRE) project aims to reduce mission and hardware risk via high-fidelity integrated testing and pave the way for commercially supplied utility power on the lunar surface. The facility will be scalable and highly adaptable and will be available to NASA, Industry, Academia, and International Partners. ASPIRE will allow developers to integrate and demonstrate their power solutions in a relevant environment, and it will be able to characterize the lunar power performance in representative mission contexts.

ground-based testing↗

The Advanced Geared Turbofan 30,000 lb f – electrified (AGTF30-e): A Virtual Testbed for Electrified Aircraft Propulsion Research

Electrified Aircraft Propulsion (EAP) is a growing topic of research with the potential to shape the future of commercial air travel. Here, detailed mathematical models serve an essential role in developing understanding and evaluating different technologies and design concepts. The Advanced Geared Turbofan 30,000 lb f – electrified (AGTF30-e) is an open-source software package developed by the National Aeronautics and Space Administration (NASA). The AGTF30-e provides a realistic propulsion system model of a conceptual electrified advanced geared turbofan engine suitable for propelling a single-aisle commercial aircraft. Included with the engine model is a controller that provides representative dynamic performance across a full operating envelop. The model is meant to facilitate research studies and promote collaboration. It is envisioned for use in concept exploration studies, technology impact studies, and dynamics and controls studies. The engine model can be run in various modes of operation including boost and power extraction. It also has options for other electrification features and methods for engine shaft and electric machine integration. This paper documents the AGTF30-e and illustrates its use through various simulation scenarios.

AGTF30-e↗

The Advanced Geared Turbofan 30,000 lbf – electrified (AGTF30-e): A Virtual Testbed for Electrified Aircraft Propulsion Research

Electrified Aircraft Propulsion (EAP) is a growing topic of research with the potential to shape the future of commercial air travel. Here, detailed mathematical models serve an essential role in developing understanding and evaluating different technologies and design concepts. The Advanced Geared Turbofan 30,000 lbf – electrified (AGTF30-e) is an open-source software package developed by the National Aeronautics and Space Administration (NASA). The AGTF30-e provides a realistic propulsion system model of a conceptual electrified advanced geared turbofan engine suitable for propelling a single-aisle commercial aircraft. Included with the engine model is a controller that provides representative dynamic performance across a full operating envelop. The model is meant to facilitate research studies and promote collaboration. It is envisioned for use in concept exploration studies, technology impact studies, and dynamics and controls studies. The engine model can be run in various modes of operation including boost and power extraction. It also has options for other electrification features and methods for engine shaft and electric machine integration. This paper documents the AGTF30-e and illustrates its use through various simulation scenarios.

AGTF30-e↗

NON-DESTRUCTIVE THERMAL BARRIER COATING SPALLATION PREDICTION BY A LOADBASED MICRO-INDENTATION TECHNIQUE

Currently, the durability and life cycle of thermal barrier coatings (TBC) applied to gas turbine blades and combustor components are limiting the maximum temperature and subsequent efficiency at which gas turbine engines operate. The development of new materials, coating technologies and evaluation techniques is required if enhanced efficiency is to be achieved. Of the current ceramic coating materials used in gas turbine engines, yttria stabilized zirconia (YSZ) is most prevalent, its low thermal conductivity, high thermal expansion coefficient and outstanding mechanical strength make it ideal for use in TBC systems. However, residual stresses caused by coefficients of thermal expansion mismatches within the TBC system and unstable thermally grown oxides are considered the primary causes for its premature and erratic spallation failure. Through finite element simulations, it is shown that the residual stresses generated within the thermally grown oxide (TGO), bond coat (BC), YSZ and their interfaces create slight variations in indentation unloading surface stiffness response prior to spallation failure. In this research, seven air plasma sprayed and one electron beam physical vapor deposition yttria partially stabilized zirconia TBCs were subjected to isothermal and cyclic loadings at 1100°C. The associated coating degradation was evaluated using a non-destructive multiple partial unloading micro-indentation procedure. The results show that the proposed non-destructive micro-indentation evaluation technique can be an effective and specimenindependent TBC failure prediction tool capable of determining the location of initial spallation failure prior to its actual occurrence.

36 MATERIALS SCIENCE↗

What Have "Omics" Taught Us about the Health Risks Associated with Exposure to Low Doses of Ionizing Radiation

There is a plethora of data available on the DNA damages associated with exposures to ionizing radiation and the subsequent cellular responses. Indeed, much of radiation research has focused on these initial insults and induced responses, particularly DNA repair, cell signaling pathways, cell cycle checkpoint control, mutation induction, chromosomal rearrangements, transformation and apoptosis etc. While many of these endpoints correlate with exposure dose, few, if any, provide substantive information on human health risk(s) associated with radiation exposure. Here the contribution of recent advances in high throughput ‘omics technologies are evaluated to examine what they have taught us about health risk(s) to humans associated with exposure to ionizing radiation.

Morgan, William F.↗

High Temperature Fission Chamber for He- and FLiBe-cooled Reactors

We have evaluated candidate technologies for in-core fission chambers for high-temperature reactors to monitor power level via measurements of neutron flux from start-up through full power at up to 800°C. This research is important because there are no commercially available instruments capable of operating above 550 °C. Component materials and processes were investigated for fission chambers suitable for operation at 800 °C in reactors cooled by molten fluoride salt (FLiBe) or flowing He, with an emphasis placed on sensitivity (≥ 1 cps/nv), service lifetime (2 years at full power), and resistance to direct immersion in FLiBe. The latter gives the instrument the ability to survive accidents involving breach of a thimble. The device is envisioned to be a two-gap, three-electrode instrument constructed from concentric nickel-plated alumina cylinders and using a noble gas–nitrogen fill-gas. We report the results of measurements and calculations of the response of fill gasses, impurity migration in nickel alloy, brazing of the alumina insulator, and thermodynamic calculations.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Efficient Solutions for New Homes Case Study: Savannah Gardens

The Savannah Housing Department is leading sustainable and affordable housing development in Georgia. It partnered with Southface Energy Institute, a member of the U.S. Department of Energy’s Partnership for Home Innovation Building America research team, to seek cost-effective solutions for increasing the energy efficiency of the Savannah Housing Department’s standard single-family home plans in the Savannah Gardens Community. Based on engineering, cost, and constructability analyses, the combined research team chose to pilot two technologies to evaluate efficiency and comfort impacts for homeowners: a heat-pump water heater in an encapsulated attic and an insulated exterior wall sheathing.

building america↗

Building America Case Study: Multifamily Central Heat Pump Water Heaters, Davis, California

Although heat pump water heaters (HPWHs) have gained significant attention in recent years as a high efficiency electric water heating solution for single family homes, central HPWHs for commercial or multi-family applications are not as well documented in terms of measured performance and cost effectiveness. To evaluate this technology, the Alliance for Residential Building Innovation team monitored the performance of a 10.5 ton central HPWH installed on a student apartment building at the West Village Zero Net Energy Community in Davis, California. Monitoring data collected over a 16-month period were then used to validate a TRNSYS simulation model. The TRNSYS model was then used to project performance in different climates using local electric rates. Results of the study indicate that after some initial commissioning issues, the HPWH operated reliably with an annual average efficiency of 2.12 (Coefficient of Performance). The observed efficiency was lower than the unit's rated efficiency, primarily due to the fact that the system rarely operated under steady-state conditions. Changes in the system configuration, storage tank sizing, and control settings would likely improve the observed field efficiency. Modeling results suggest significant energy savings relative to electric storage water heating systems (typical annual efficiencies around 0.90) providing for typical simple paybacks of six to ten years without any incentives. The economics versus gas water heating are currently much more challenging given the current low natural gas prices in much of the country. Increased market size for this technology would benefit cost effectiveness and spur greater technology innovation.

30 DIRECT ENERGY CONVERSION↗

Building America Case Study: Multifamily Central Heat Pump Water Heaters, Davis, California

Although heat pump water heaters (HPWHs) have gained significant attention in recent years as a high efficiency electric water heating solution for single family homes, central HPWHs for commercial or multi-family applications are not as well documented in terms of measured performance and cost effectiveness. To evaluate this technology, the Alliance for Residential Building Innovation team monitored the performance of a 10.5 ton central HPWH installed on a student apartment building at the West Village Zero Net Energy Community in Davis, California. Monitoring data collected over a 16-month period were then used to validate a TRNSYS simulation model. The TRNSYS model was then used to project performance in different climates using local electric rates. Results of the study indicate that after some initial commissioning issues, the HPWH operated reliably with an annual average efficiency of 2.12 (Coefficient of Performance). The observed efficiency was lower than the unit's rated efficiency, primarily due to the fact that the system rarely operated under steady-state conditions. Changes in the system configuration, storage tank sizing, and control settings would likely improve the observed field efficiency. Modeling results suggest significant energy savings relative to electric storage water heating systems (typical annual efficiencies around 0.90) providing for typical simple paybacks of six to ten years without any incentives. The economics versus gas water heating are currently much more challenging given the current low natural gas prices in much of the country. Increased market size for this technology would benefit cost effectiveness and spur greater technology innovation.

ARBI↗

Advancing Microgrid Research at NREL

NREL expanded its microgrid research capabilities at the Energy System Integration Facility (ESIF) with the purchase of a Schweitzer Engineering Laboratories (SEL) microgrid controller, resulting in a more comprehensive microgrid research platform. NREL's microgrid research platform allows manufacturers, utilities, and integrators to develop and evaluate their technology or configuration at full power before implementation - something only possible at a handful of facilities in the world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration and Assessment of Component Health Prognostics in Supervisory Control Systems

Enhanced risk monitors (ERMs) for active components in advanced reactor concepts use predictive estimates of component failure to update, in real time, predictive safety and economic risk metrics. These metrics have been shown to be capable of use in optimizing maintenance scheduling and managing plant maintenance costs. Integrating this information with plant supervisory control systems increases the potential for making control decisions that utilize real-time information on component conditions. Such decision making would limit the possibility of plant operations that increase the likelihood of degrading the functionality of one or more components while maintaining the overall functionality of the plant. ERM uses sensor data for providing real-time information about equipment condition for deriving risk monitors. This information is used to estimate the remaining useful life and probability of failure of these components. By combining this information with plant probabilistic risk assessment models, predictive estimates of risk posed by continued plant operation in the presence of detected degradation may be estimated. In this paper, we describe this methodology in greater detail, and discuss its integration with a prototypic software-based plant supervisory control platform. In order to integrate these two technologies and evaluate the integrated system, software to simulate the sensor data was developed, prognostic models for feedwater valves were developed, and several use cases defined. The full paper will describe these use cases, and the results of the initial evaluation.

Ramuhalli, Pradeep↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

AviSense: A Real-time System for Detection, Classification, and Analysis of Aviation Signals

We present AviSense, an SDR-based real-time, versatile system for monitoring aviation bands. AviSense detects and characterizes signal activities to enable practical and effective anomaly detection. We identify and tackle the challenges posed by a diverse set of critical aviation bands and technologies. We evaluate our methodology with real-world aviation signal measurements and demonstrate that we can classify aviation signals as normal with 99% accuracy. We also provide an exhaustive evaluation of our anomalous signal detection capability and show that we can accurately classify anomalous signals with 99% accuracy, with few exceptions. We also demonstrate that AviSense can effectively distinguish between different types of anomalies. We build a prototype implementation of AviSense for distributed monitoring.

42 ENGINEERING↗

Insights from PPL's DERMS Implementation

PPL Electric Utilities’ Keystone Solar Future Project (KSFP) is part of the U.S. Department of Energy’s Office of Energy Efficiency and Renewables, Energy Enabling Extreme Real-time Grid Integration of Solar Energy (ENERGISE) grant. The three-year project, beginning in October, 2017, funded an innovative pilot program to develop and evaluate a technology platform and framework for managing high levels of distributed energy resources (DER), and improving future DER interconnection. The KSFP aimed to bridge gaps between existing and future technology, including Distributed Energy Resource Management Systems (DERMS), by monitoring, managing, and optimizing a system with high penetration of solar and other DER. Specifically, the project worked to make Demand Management Systems (DMS) applications, devices, and real-time communications technology DER-aware to allow for advanced applications for utility operations. Here, by installing and implementing a DERMS, project designers transformed how DERs interact with PPL’s distribution system, offering learnings and results worth sharing industry-wide.