Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “preconditioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Iterated Discontinuity Factors Based on Reference Outgoing Currents for Discontinuous Finite Element Diffusion

We present a novel formulation for iteratively computing Discontinuity Factors (DF) designed to reproduce reference partial outgoing currents at the interface between macro-regions using Discontinuous Galerkin Finite Elements to solve the multigroup neutron diffusion equation. Similarly, an expression for the boundary coefficients (BCf) is proposed to match the partial outgoing current at vacuum boundaries. Upon convergence, macro-region averaged reaction and leakage rates are preserved. In addition, we consider a source-free steady-state problem depending on the DFs. The existence of a non-trivial solution is due to the non-linearity of the problem. This form greatly simplifies the implementation within Rattlesnake and efficiently converges by updating the DFs and BCfs at every linear iteration of the Preconditioned Jacobian-Free Newton-Krylov solver. The main challenge then lies in determining an appropriate scaling factor to ensure that the initial values for the DFs and BCfs are not too far from their converged value. While this factor does not change the final solution, it has the potential to significantly affect convergence, for purely numerical reasons. An expression based on the reference fission source integral is proposed and satisfying results are presented for problems and compared to Superhomogénéisation (SPH) results with both reflecting and vacuum boundary conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dose to Cementitious Material for Moderator Exclusion in a Spent Nuclear Fuel Canister During a Repository Timeframe

One of the concerns regarding direct disposal of spent nuclear fuel (SNF) dual-purpose canisters (DPCs) currently in dry storage is criticality during disposal time frames (e.g., 10,000 years or more). Preconditioning DPCs with appropriate filler materials (e.g., cementitious materials, low-melting metals) before disposal could prevent post-closure criticality by means of moderator displacement. However, potential radiolysis of the filler material by ionizing radiation and release of reactive chemical species over repository time frames may negatively impact the mechanical and chemical properties of the filler materials. Evaluation of the energy deposited in candidate filler materials by SNF radiation is essential for the calculation of radiolytic species. This paper provides an evaluation of the total energy deposited by gamma and neutron radiation in a candidate filler material over 10,000 years for a representative pressurized water reactor SNF DPC. The canister is assumed to contain identical SNF assemblies with a burnup value of 55 GWd/MTU, which is the bounding burnup value for more than 95% of the SNF inventory discharged from 1968 to 2013. The evaluated energy deposited per unit volume of filler material between 10 years and 10,000 years after fuel discharge is approximately 9.3E+23 eV/cm3. Gas production from radiolysis was not evaluated and may be revisited in future work. Radiolysis may be the principal gas generation mechanism for a cementitious system.

Radulescu, Georgeta↗

Enhanced integrated operation blender based sterile medical ice slurry production device

A method and device are provided for the preparation of sterile medical ice slurry, for example having ice loadings of greater than approximately 50%. An integrated-operation ice slurry blender-based production and delivery system methods for monitoring cooling capacity of the produced and delivered slurry. All individual medical ice slurry production and delivery steps are integrated into one tightly coupled precisely sequenced and timed system. The novel procedure and equipment is simple to use and makes sterile slurry, which is ready to deliver to patients, for example, in less than 2 minutes after adding predetermined thermally preconditioned ingredient modules to a blender.

59 BASIC BIOLOGICAL SCIENCES↗

Reliable Power Rating of Perovskite PV Modules: Preprint

As the perovskite technology is ramping up into commercialization, reliable and accurate power rating of large-size perovskite modules becomes a prominent aspect for its future deployment in the PV market. It is known that the performance calibration of perovskite PV devices is very challenging due to its complex dynamic response during a conventional current-voltage (IV) measurement. PV researchers have previously proposed several steady-state performance calibration methods to reliably extract PV efficiencies, but mostly focus on small area research-type cells. In this paper, we emphasize the importance of reliable performance calibration on large-size perovskite modules. Extending the NREL Cell and Module Performance (CMP) group’s steady-state performance calibration protocol (i.e., Asymptotic PMAX Scan) for perovskite cells to modules, we justify the necessity of reporting steady-state efficiencies for perovskite cells and discuss the challenges of applying this protocol to modules. We also present our protocol for Maximum Power Point Tracking (MPPT), which is a technique often used for performance calibration of perovskite cells and modules, and show a comparison between MPPT and Asymptotic PMAX. Using MPPT we demonstrate the interplay between metastability and degradation in perovskite modules, and emphasize the necessity to develop preconditioning protocols for stabilizing these devices. Our aim is to promote development of consensus protocols for performance calibration of perovskite modules, and to advance their credible power ratings, which will be beneficial to the growth of perovskite technology in the PV market.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Two-Stage Gauss-Seidel Preconditioners and Smoothers for Krylov Solvers on a GPU Cluster: Preprint

Gauss-Seidel (GS) relaxation is often employed as a preconditioner for a Krylov solver or as a smoother for Algebraic Multigrid (AMG). However, the requisite sparse triangular solve is difficult to parallelize on many-core architectures such as graphics processing units (GPUs). In the present study, the performance of the sequential GS relaxation based on a triangular solve is compared with two-stage variants, replacing the direct triangular solve with a fixed number of inner Jacobi-Richardson (JR) iterations. When a small number of inner iterations is sufficient to maintain the Krylov convergence rate, the two-stage GS (GS2) often outperforms the sequential algorithm on many-core architectures. The GS2 algorithm is also compared with JR. When they perform the same number of ops for SpMV (e.g. three JR sweeps compared to two GS sweeps with one inner JR sweep), the GS2 iterations, and the Krylov solver preconditioned with GS2, may converge faster than the JR iterations. Moreover, for some problems (e.g. elasticity), it was found that JR may diverge with a damping factor of one, whereas two-stage GS may improve the convergence with more inner iterations. Finally, to study the performance of the two-stage smoother and preconditioner for a practical problem, these were applied to incompressible uid ow simulations on GPUs.

algebraic multigrid↗

Improvements to the Griffin Transport Solvers

Griffin is a Multiphysics Object-Oriented Simulation Environment (MOOSE) based reactor multiphysics analysis application jointly developed by Idaho National Laboratory and Argonne National Laboratory. The code includes a variety of steady-state solvers for fixed-source, k-eigenvalue, adjoint, and subcritical multiplication, as well as transient solvers for point-kinetics, improved quasi-static, and spatial dynamics. This document summarizes the transport solver development efforts pursued during Fiscal Year 2022. We added the multiphysics transient capability for the coarse-mesh finite difference accelerated Richardson iteration for discontinuous finite element method discrete ordinates (DFEM-SN) scheme to support high-order heterogeneous transport simulations. HFEM (hybrid finite element method) - PN (spherical harmonics expansion) was completed and red-black iteration was added for solving the HFEM-PN system with both preconditioned Jacobian-free Newton Krylov and Richardson iteration solvers. The HFEM-PN scheme, as one of the low-order transport schemes, is expected for supporting routine design simulations. Pin power reconstruction capability was also designed and implemented with the Griffin ISOXML module to enhance all the low-order transport solvers for more accurate multiphysics simulations. Numerical results are presented for demonstrating the capabilities and verifying their performance, and future works are discussed.

97 MATHEMATICS AND COMPUTING↗

Krylov subspace iteration for eigenvalue response matrix calculations

Recent work has revisited the eigenvalue response matrix method as an approach for reactor core analyses. In its most straightforward form, the method consists of a two-level Eigen problem. An outer Picard iteration updates the k-eigenvalue, while the inner Eigen problem imposes current continuity between coarse meshes. In this paper, several Eigen solvers are evaluated for this inner problem, using several 2-D diffusion benchmarks as test cases. The results indicate both the explicitly-restarted Arnoldi and the Krylov-Schur methods are up to an order of magnitude more efficient than power iteration. This increased efficiency makes the nested eigenvalue formulation more effective than the ILU-preconditioned Newton-Krylov formulation previously studied. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Newton-Krylov solution to the porous medium equations in the agree code

In order to improve the convergence of the AGREE code for porous medium, a Newton-Krylov solver was developed for steady state problems. The current three-equation system was expanded and then coupled using Newton's Method. Theoretical behavior predicts second order convergence, while actual behavior was highly nonlinear. The discontinuous derivatives found in both closure and empirical relationships prevented true second order convergence. Agreement between the current solution and new Exact Newton solution was well below the convergence criteria. While convergence time did not dramatically decrease, the required number of outer iterations was reduced by approximately an order of magnitude. GMRES was also used to solve problem, where ILU without fill-in was used to precondition the iterative solver, and the performance was slightly slower than the direct solution. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Phase-space finite elements in a least-squares solution of the transport equation

The linear Boltzmann transport equation is solved using a least-squares finite element approximation in the space, angular and energy phase-space variables. The method is applied to both neutral particle transport and also to charged particle transport in the presence of an electric field, where the angular and energy derivative terms are handled with the energy/angular finite elements approximation, in a manner analogous to the way the spatial streaming term is handled. For multi-dimensional problems, a novel approach is used for the angular finite elements: mapping the surface of a unit sphere to a two-dimensional planar region and using a meshing tool to generate a mesh. In this manner, much of the spatial finite-elements machinery can be easily adapted to handle the angular variable. The energy variable and the angular variable for one-dimensional problems make use of edge/beam elements, also building upon the spatial finite elements capabilities. The methods described here can make use of either continuous or discontinuous finite elements in space, angle and/or energy, with the use of continuous finite elements resulting in a smaller problem size and the use of discontinuous finite elements resulting in more accurate solutions for certain types of problems. The work described in this paper makes use of continuous finite elements, so that the resulting linear system is symmetric positive definite and can be solved with a highly efficient parallel preconditioned conjugate gradients algorithm. The phase-space finite elements capability has been built into the Sceptre code and applied to several test problems, including a simple one-dimensional problem with an analytic solution available, a two-dimensional problem with an isolated source term, showing how the method essentially eliminates ray effects encountered with discrete ordinates, and a simple one-dimensional charged-particle transport problem in the presence of an electric field. (authors)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Monte Carlo solution methods in a moment-based scale-bridging algorithm for thermal radiative transfer problems: Comparison with Fleck and Cummings

We have developed a moment-based scale-bridging algorithm for thermal radiative transfer problems. The algorithm takes the form of well-known nonlinear-diffusion acceleration which utilizes a low-order (LO) continuum problem to accelerate the solution of a high-order (HO) kinetic problem. The coupled nonlinear equations that form the LO problem are efficiently solved using a preconditioned Jacobian-free Newton-Krylov method. This work demonstrates the applicability of the scale-bridging algorithm with a Monte Carlo HO solver and reports the computational efficiency of the algorithm in comparison to the well-known Fleck-Cummings algorithm. (authors)

97 MATHEMATICS AND COMPUTING↗

A diffusion synthetic acceleration scheme for rectangular geometries based on bilinear discontinuous finite elements

A DSA technique to accelerate the iterative convergence of S{sub n} transport solves is derived for bilinear discontinuous (BLD) finite elements on rectangular grids. The diffusion synthetic acceleration equations are discretized using BLD elements by adapting the Modified Interior Penalty technique, introduced in [4] for triangular grids. The MIP-DSA equations are SPD and thus are solved using a preconditioned CG technique. Fourier analyses and implementation of the technique in a BLD S{sub n} transport code show that the technique is stable is effective. (authors)

97 MATHEMATICS AND COMPUTING↗

Dismantling of Highly Contaminated Process Installations of the German Reprocessing Facility (WAK) - Status of New Remote Handling Technology - 13287

Decommissioning and dismantling of the former German Pilot Reprocessing Plant Karlsruhe (WAK) including the Vitrification Facility (VEK) is being executed in different Project steps related to the reprocessing, HLLW storage and vitrification complexes /1/. While inside the reprocessing building the total inventory of process equipment has already been dismantled and disposed of, the HLLW storage and vitrification complex has been placed out of operation since vitrification and tank rinsing procedures where finalized in year 2010. This paper describes the progress made in dismantling of the shielded boxes of the highly contaminated laboratory as a precondition to get access to the hot cells of the HLLW storage. The major challenges of the dismantling of this laboratory were the high dose rates up to 700 mSv/h and the locking technology for the removal of the hot cell installations. In parallel extensive prototype testing of different carrier systems and power manipulators to be applied to dismantle the HLLW-tanks and other hot cell equipment is ongoing. First experiences with the new manipulator carrier system and a new master slave manipulator with force reflection will be reported. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing the interfaces for successful waste treatment operations at the river protection project - 15347

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize(vitrify) approximately 432 million liters (114 million gallons) of high level radioactive waste (after all single-shell retrievals are accomplished). The tank operating contractor (TOC) is charged with delivering feed, with preconditioning if required. Other Hanford contractors are charged with providing utilities and other services and waste disposal facilities. In all, four DOE contractors, two DOE offices along with DOE headquarters, and two Washington state regulators play essential roles in enabling successful treatment operations eliminate the radioactive and hazardous waste threats to the public and the environment. DOE has decided that the appropriate approach is to proceed with operations at the WTP's Low-Activity Waste (LAW) vitrification facility ahead of completing the WTP Pretreatment and High Level Waste (HLW) waste vitrification facilities, This paper outlines the approach that is being taken to ensure that all the functions, reviews, and approvals needed for radioactive operations are achieved to allow successful feed delivery, startup, and operations of the WTP in a direct feed to LAW mode. A massive effort is needed to be successful and a One System organization, jointly managed and staffed by WTP and TOC personnel is tasked with achieving the integration, coordination, tracking, and reporting necessary for the endeavor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The transportation factor in site evaluations for spent nuclear fuel storage and disposal facilities - 15460

New facility siting studies will be necessary to fulfill the Blue Ribbon Commission (BRC) on America's Nuclear Future 2012 recommendation to develop consolidated interim storage (CIS) for spent nuclear fuel in the next decade. Future site evaluations for used nuclear fuel (UNF) storage and disposal facilities must address transportation requirements, especially access to mainline railroads, early in the site selection process. The U.S. Department of Energy (DOE) in 2013 proposed a strategy for managing spent nuclear fuel in accordance with the BRC recommendations by establishing a pilot interim storage facility by 2021 and a consolidated interim storage facility by 2025. The authors demonstrate that currently available geographic information systems and already adopted siting criteria (defining favorable and unfavorable conditions) allow the identification of the transportation portion of a storage facility siting process to begin without delay. Ready access to the mainline rail system is absolutely critical since existing rail access, or easily constructed access, is a highly favorable condition for successful siting. Despite widespread rail abandonments over the past three decades, vast areas of the United States retain mainline rail service or could connect to existing mainlines by building new rail spurs of less than 25-50 miles. This precondition for transportation planning is critical. Planners need to start with the beginning - availability of rail transportation to and from the interim storage facility/facilities. A second step in transportation screening would be to evaluate those potential site locations within 50 miles of existing mainline railroads using other appropriate variables. This effort could begin with the application of the 1984 repository siting guidelines for transportation (10 CFR 960.5-2-7)[1]. Repository surface facilities have essentially the same transportation requirements as storage facilities. The guidelines in 10 CFR 960 provide a readily available template for evaluating sites based on transportation risks, impacts and costs. Initial site screening, after considering proximity to mainline railroads as the precursory step, should evaluate: 1) proximity to highly populated areas; 2) proximity to interstate highways; 3) proximity to environmentally sensitive areas and lands protected by federal, state, or tribal governments; and 4) proximity to military installations, hazardous materials facilities, or other facilities that might impact transportation safety and security.Several challenges exist which prevent effective transportation planning. The diversity of canister and cask types and SNF characteristics and conditions, the increasingly limited rail access at the shipping sites and the ease with which public attention can be marshalled against a waste management program, all suggest that future efforts need to identify potential storage sites that reduce transportation impacts and costs by reducing near-site transportation construction and reduce total system transportation impacts. This can most easily be accomplished by reducing shipping distances in a process that is easily defined and implemented. The paper concludes that the DOE should develop a site screening and evaluation program with transportation as a central consideration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EVs@Scale Next-Gen Profiles - EV Profile Capture 2023

As part of the U.S. DOE EVs@Scale consortium Next-Gen Profiles (NGP) project, the profile capture of production electric vehicles undergoing high power charging (HPC) is conducted over a wide range of conditions to explore variance and performance. Charge session parameters are collected from both the electric vehicle (EV) and electric vehicle supply equipment (EVSE) at a rate of 10Hz and entered into a time-series database for analysis. These charge profiles are captured under nominal and off-nominal conditions, exploring the impact of battery state of charge (SOC), battery temperature, vehicle condition, smart charge management (SCM), and EVSE limitations. Nominal conditions are defined to be ideal conditions that should transfer the maximum allowable energy in the minimum possible amount of time. Nominal condition profiles are compared across EVs to characterize state-of-the-art EV charging performance against one another. Off-nominal condition profiles are compared against its nominal condition profile counterpart to highlight the variance across less desirable starting conditions within a single EV. Under nominal conditions, most EVs can achieve the original equipment manufacturer (OEM) rated peak-power and charge times. Peak power across EVs has variance due to the vehicle design, battery topology, charging strategy, etc. These 10-100% nominal preconditioned charge profiles across 13 EVs (11 light-duty (LD), 2 heavy-duty (HD)) were used for analysis in power curve analysis, power distribution, SOC and range comparison, thermal impacts of current draw, battery pack size and energy charged, and ramp rates. Power curve analysis show the uniqueness in power vs time curves across all EVs, breaking down the features of a typical profile and where variation is typically seen. Power distribution results showed that over 50% of charge time is spent below 50kW and only 12.1% is spent above 200kW. SOC and range performance yielded different top performing EVs when exploring goals of performance from SOC and range gained after 10-min (EV2) and 20-min (EV8), and time-to-achieve 80% SOC (EV8) and 200 miles of range (EV1). Current draw from 400-volt EVs had a higher thermal impact to cable/connector temperatures when compared to 800-volt EVs, due to a higher current requirement to achieve similar power levels. There was high variance in C rating, a useful metric when comparing the relationship between peak/average charge session power and relative battery pack size, across EVs under test. Ramp rates during initial power transfer were examined, fastest and slowest speeds ranging from 192.5kW/second to 2.6kW/second respectively. A similar analysis of ramp rates was also conducted for OCPP curtailment testing, where EVs underwent a 2-minute 65A curtailment request before returning to full-power charge. Under off-nominal conditions, most EVs experienced variation from the nominal condition profiles. EVs that underwent the full set of NGP defined testing conditions were compared, analysis of which was categorized by 800-volt and 400-volt EVs. It should be noted that the 800-volt EVs had significantly higher peak power ratings than the 400-volt EVs, and thus were more prone to variance. Initial state of charge, battery temperature, and vehicle condition had a considerable impact on peak power levels and charge time for the 800-volt vehicles under test. EVSE limited tests lowered achievable power down to 200kW, greatly impacted 800-volt charging power, and had little to no effect on 400-volt charging power. Adapter testing was performed on a single 400-volt EV, where power and current limitations were found but overall charge time was not significantly impacted. Adapter and boost converter testing was performed on a single 800-volt EV, where both charge power and charge time were greatly impacted. Charge profiles are unique, and comparing such requires analysis that examines starting conditions, vehicle and battery topologies,

Charging↗

Sorbmatech{sup R}Cs, an Innovative Highly Selective Cs Sorbent for Wastewater Decontamination - 20065

The treatment of radioactive wastewater from the operating nuclear industry (energy production, reprocessing of spent fuel, decommissioning of shut-down facilities, etc.) or in case of incidental or accidental situation (such as Fukushima Daichii NPP accident) is an important issue requiring constant improvement of the technologies and techniques used to prevent radioactive releases into the environment and/or to reduce the production of secondary waste. CEA, Orano and CTI are collaborating since 2014, with the support of the French government's program 'investments for the future', to develop Sorbmatech{sup R}Cs, an innovative and patented selective sorbent (Grandjean and Barre 2014) to deal with the removal of radioactive {sup 137}Cs, one of the most hazardous isotope to be managed in nuclear waste, highly efficient either in agitated reactor or in column process. Sorbmatech{sup R}Cs sorbent consists of mesoporous silica particles loaded with potassium-copper hexacyanoferrate nanoparticles (KCu-HCF). This peculiar structure enables much faster sorption kinetics compared to denser crystalline structures, such as Silicotitanate or Zeolite sorbents, whose drawback consists in hindering the diffusion process through the material, and whose larger sorbent particles slow down the ion exchange process. The equilibrium of Sorbmatech{sup R}Cs is reached in few minutes, even at high flow rates in a fixed-bed column process (up to 10 m.h{sup -1} Darcy velocity) with low drop pressure. Moreover, Sorbmatech{sup R}Cs can be used over a wide pH range from 2 to 10 and has a very high selectivity towards {sup 137}Cs even in brine solution (saline, mineral or sea water). This new sorbent also has a K{sub d} higher than 10{sup 5} mL.g{sup -1} depending on the salinity of the wastewater, enabling a highly efficient removal of Cs trace in radioactive wastewater compared to Cs selective sorbent such as Zeolites and Silicotitanates. Its radiological resistance enables the treatment of high, medium and low activity wastewater. The CEA-Orano-CTI/ALSYS partnership leads to the development of a simple and low-cost synthetic route, which demonstrated large-scale manufacturing of the product on a batch of 100 kg. Two products have been developed and are ready for short run market introduction so far with grain size well adapted either for column processes or agitated reactors.. Finally, the industrial implementation has been studied and largely benefits from the properties of the sorbent. Indeed, its high sorption kinetics enable high flow rates resulting in a decrease of operation times, unit sizes, and volumes of secondary waste produced. Moreover, Sorbmatech{sup R}Cs is designed to be combined into a full and integrated solution, ranging from preliminary optimization of operating conditions through numerical dimensioning model, industrial implementation and treatment of the wastewater (through cartridge or preconditioned columns systems developed thanks to Orano's extensive expertise), to long-term stabilization of generated waste (under progress). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Separation of Actinides from Lanthanides in Molten Fluorides by the Modulated-Current Electrolysis

Recently, the Molten Salt Reactor (MSR) is taking a renewed attraction as one of the reactor systems highlighted by the Generation IV International Forum. It is a non-classical (liquid fuel) system which can be operated as a breeder within the {sup 232}Th-{sup 233}U fuel cycle with the very interesting breeding factor. The necessary precondition for its proper functionality is the online reprocessing within the MSR's fuel cycle. A lot of effort is given to the development of the on-line pyrochemical reprocessing technology. Among the processes considered to be suitable for this process, the electrochemical separations are highlighted. Within this context, it is necessary to study electrochemical behavior of both fissile material and fission products in the molten salt systems and to develop the processes of their extraction from the system at various stages of the whole cycle. In this contribution, the study of the electrochemical separation of U from Gd in the LiF-CaF{sub 2} molten system by the modulated current electrolysis is presented. The study of MSR-related electrochemistry will continue as a part of the new Czech MSR R and D program. The knowledge of the electrochemical behavior of actinides and lanthanides in molten fluorides is necessary to the development of any electrochemical separation process. In our previous work, electrochemical characteristics of uranium, thorium, as well as that of several lanthanides, were measured in LiF-BeF{sub 2} (the basic melt considered for the MSR concept) and Be-free melts (LiF-NaFKF, LiF-NaF, LiF-CaF{sub 2}), and added to available literature data. If the fluoride carrier melt is electrochemically stable enough, it is possible to deposit the element of interest in its basic, metallic state (e.g. uranium in all types of fluoride melts tested) by the electrolysis. In the case of insufficient electrochemical stability of the fluoride melt in which the actinides and lanthanides are dissolved for the experiments, it is possible to use a reactive working electrode made of a material which creates alloys with the element to be deposited. An alloying reaction can shift the deposition potential in a favorable direction and therefore achieve the separation of an element from the system. The use of reactive electrode can also improve the adhesion of the deposit. When two or more electroactive species are present in the system at the same time, the efficiency of their separation by an electrolysis depends on how different the deposition potentials of these two species are. If we input certain modulation to the electrolytic current, we can improve overall result of an electrolytic experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗