Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Peak Seeking Control for Reduced Fuel Consumption with Preliminary Flight Test Results

The Environmentally Responsible Aviation project seeks to accomplish the simultaneous reduction of fuel burn, noise, and emissions. A project at NASA Dryden Flight Research Center is contributing to ERAs goals by exploring the practical application of real-time trim configuration optimization for enhanced performance and reduced fuel consumption. This peak-seeking control approach is based on Newton-Raphson algorithm using a time-varying Kalman filter to estimate the gradient of the performance function. In real-time operation, deflection of symmetric ailerons, trailing-edge flaps, and leading-edge flaps of a modified F-18 are directly optimized, and the horizontal stabilators and angle of attack are indirectly optimized. Preliminary results from three research flights are presented herein. The optimization system found a trim configuration that required approximately 3.5% less fuel flow than the baseline trim at the given flight condition. The algorithm consistently rediscovered the solution from several initial conditions. These preliminary results show the algorithm has good performance and is expected to show similar results at other flight conditions and aircraft configurations.

Brown, Nelson↗

Review of Nuclear Thermal Propulsion Ground Test Options

High efficiency rocket propulsion systems are essential for humanity to venture beyond the moon. Nuclear Thermal Propulsion (NTP) is a promising alternative to conventional chemical rockets with relatively high thrust and twice the efficiency of highest performing chemical propellant engines. NTP utilizes the coolant of a nuclear reactor to produce propulsive thrust. An NTP engine produces thrust by flowing hydrogen through a nuclear reactor to cool the reactor, heating the hydrogen and expelling it through a rocket nozzle. The hot gaseous hydrogen is nominally expected to be free of radioactive byproducts from the nuclear reactor; however, it has the potential to be contaminated due to off-nominal engine reactor performance. NTP ground testing is more difficult than chemical engine testing since current environmental regulations do not allow/permit open air testing of NTP as was done in the 1960's and 1970's for the Rover/NERVA program. A new and innovative approach to rocket engine ground test is required to mitigate the unique health and safety risks associated with the potential entrainment of radioactive waste from the NTP engine reactor core into the engine exhaust. Several studies have been conducted since the ROVER/NERVA program in the 1970's investigating NTP engine ground test options to understand the technical feasibility, identify technical challenges and associated risks and provide rough order of magnitude cost estimates for facility development and test operations. The options can be divided into two distinct schemes; (1) real-time filtering of the engine exhaust and its release to the environment or (2) capture and storage of engine exhaust for subsequent processing.

Coote, David J.↗

Thermal Control of Boundaries for JWST Infrared Tests in Cryogenic Vacuum Configuration

In 2017, the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) of the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification under cryogenic vacuum conditions in Chamber A at the Johnson Space Center (JSC). Testing the infrared Science Instruments and OTIS optics below 50 degrees Kelvin required an environment architecture that comprehensively controlled the temperature and energy path of every seam and penetration in the over 1100 m2 of Chamber A helium shroud surfaces as well as the Ground Support Equipment (GSE) inside it. This paper outlines the design and implementation of thermal closeouts, thermal anchoring systems for electrical cables, and thermal control systems around room-temperature optical metrology equipment inside the helium shroud. It also details lessons learned from the repeated implementation and testing of these environmental control systems throughout the JWST Pathfinder test campaign.

Huguet, Jesse A.↗

Thermal Control of Boundaries for JWST Infrared Tests in Cryogenic Vacuum Configuration

In 2017, the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) of the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification under cryogenic vacuum conditions in Chamber A at the Johnson Space Center (JSC). Testing the infrared Science Instruments and OTIS optics below 50 K required an environment architecture that comprehensively controlled the temperature and energy path of every seam and penetration in the over 1100 sq m of Chamber A helium shroud surfaces as well as the Ground Support Equipment (GSE) inside it. This paper outlines the design and implementation of thermal closeouts, thermal anchoring systems for electrical cables, and thermal control systems around room-temperature optical metrology equipment inside the helium shroud. It also details lessons learned from the repeated implementation and testing of these environmental control systems throughout the JWST Pathfinder test campaign.

Huguet, Jesse A.↗

International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Temperature and Humidity Control Subsystem

The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.

Williams, David E.↗

Cyclic Failure Mechanisms of Thermal and Environmental Barrier Coating Systems Under Thermal Gradient Test Conditions

Plasma-sprayed ZrO2-8wt%Y2O3 and mullite+BSAS/Si multilayer thermal and environmental barrier coating (TBC-EBC) systems on SiC/SiC ceramic matrix composite (CMC) substrates were thermally cyclic tested under high thermal gradients using a laser high-heat-flux rig in conjunction with furnace exposure in water-vapor environments. Coating sintering and interface damage were assessed by monitoring the real-time thermal conductivity changes during the laser heat-flux tests and by examining the microstructural changes after exposure. Sintering kinetics of the coating systems were also independently characterized using a dilatometer. It was found that the coating failure involved both the time-temperature dependent sintering and the cycle frequency dependent cyclic fatigue processes. The water vapor environments not only facilitated the initial coating conductivity increases due to enhanced sintering and interface reaction, but also promoted later conductivity reductions due to the accelerated coating cracking and delamination. The failure mechanisms of the coating systems are also discussed based on the cyclic test results and are correlated to the sintering and thermal stress behavior under the thermal gradient test conditions.

Zhu, Dongming↗

Eighteenth Space Simulation Conference: Space Mission Success Through Testing

The Institute of Environmental Sciences' Eighteenth Space Simulation Conference, 'Space Mission Success Through Testing' provided participants with a forum to acquire and exchange information on the state-of-the-art in space simulation, test technology, atomic oxygen, program/system testing, dynamics testing, contamination, and materials. The papers presented at this conference and the resulting discussions carried out the conference theme 'Space Mission Success Through Testing.'

Stecher, Joseph L., III↗

The Use of Immersion Rigs for High Temperature Hydrogen Exposure Testing Within the Nuclear Thermal Rocket Element Environmental Simulator (NTREES)

The Nuclear Thermal Rocket Element Environmental Simulator (NTREES) was designed to perform non-nuclear testing of nuclear thermal rocket (NTR) fuel elements and materials. NTREES can simulate the thermal hydraulic environment within an NTR and has been leveraged to provide critical information on component performance and material compatibility. NTREES has the ability to expose test articles to pressurized Hydrogen gas up to 1000 psig and 225 g/s. NTREES tests are operated in a deoxygenated environment of Nitrogen or Argon pressurized up to 1000 psig. NTREES simulates fission heat through induction heating powered by a 1.2 MW AC power supply, and NTREES has recorded temperatures exceeding 3700K. To perform hot Hydrogen exposure tests on materials more rapidly and earlier in the fuel development process, NTREES must be able to test small material samples on the order of 1 square inch in volume, individual fuel assembly subcomponents, and particle materials. To meet these needs, multiple testing rigs have been developed to immerse test specimens in hot Hydrogen, with each "immersion rig" varying in its capability of sample type and performance range in order to meet the broadest range of testing needs. Herein is a discussion of a selection of these “immersion rigs.”

Nuclear Thermal Propulsion↗

International Space Station Environmental Control and Life Support System Acceptance Testing for the Pressurized Mating Adapters

The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMAs 1 and 2 flew to ISS on Flight 2A and Pressurized Mating Adapter (PMA) 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and a detailed discussion of the ISS ECLS Acceptance Testing methodologies utilized for the PMAs.

Williams, David E.↗

Stennis Space Center Environmental Geographic Information System

As NASA's lead center for rocket propulsion testing, the John C. Stennis Space Center (SSC) monitors and assesses the off-site impacts of such testing through its Environmental Office (SSC-EO) using acoustical models and ancillary data. The SSC-EO has developed a geographical database, called the SSC Environmental Geographic Information System (SSC-EGIS), that covers an eight-county area bordering the NASA facility. Through the SSC-EGIS, the Enivronmental Office inventories, assesses, and manages the nearly 139,000 acres that comprise Stennis Space Center and its surrounding acoustical buffer zone. The SSC-EGIS contains in-house data as well as a wide range of data obtained from outside sources, including private agencies and local, county, state, and U.S. government agencies. The database comprises cadastral/geodetic, hydrology, infrastructure, geo-political, physical geography, and socio-economic vector and raster layers. The imagery contained in the database is varied, including low-resolution imagery, such as Landsat TM and SPOT; high-resolution imagery, such as IKONOS and AVIRIS; and aerial photographs. The SSC-EGIS has been an integral part of several major projects and the model upon which similar EGIS's will be developed for other NASA facilities. The Corps of Engineers utilized the SSC-EGIS in a plan to establish wetland mitigation sites within the SSC buffer zone. Mississippi State University employed the SSC-EGIS in a preliminary study to evaluate public access points within the buffer zone. The SSC-EO has also expressly used the SSC-EGIS to assess noise pollution modeling, land management/wetland mitigation assessment, environmental hazards mapping, and protected areas mapping for archaeological sites and for threatened and endangered species habitats. The SSC-EO has several active and planned projects that will also make use of the SSC-EGIS during this and the coming fiscal year.

Lovely, Janette↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

I. Motivation and Background Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall Current Thruster in support of the NASA mission to establish a permanent human presence in lunar orbit and to land the next American astronauts on the South Pole of the Moon. The project is led by the NASA Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by L3 Harris Aerojet Rocketdyne (AR).The AEPS project has completed the development testing of a high power, solar electric propulsion Hall Current thruster that will be used on the NASA Power & Propulsion Element (PPE) of the Gateway space station. NASA initially built three Technology Development Units to understand key characteristics of the hall-effect rocket with magnetic shielding. The design led to development testing on two Engineering Test Unit Thrusters and multiple critical components. The project has begun production of the three flight thrusters and entered qualification testing at the component and thruster levels. II. Approach NASA and AR teams completed all development phases of the project, including full development and integration testing of the Engineering Model hardware, Critical Design Review, and ground test equipment validation, as well as fabrication and acceptance testing of the initial qualification thruster. Qualification and verification of the environmental and life requirements of the AEPS design was initiated in the Fall of 2023 and will be accomplished on two thruster units and using a series of component-level tests during 2024 and 2025. Environmental testing will incorporate functional reference firings, shock, vibration, and Thermal Vacuum (TVAC) testing. Life verification will assess the thruster wear and performance over the lifetime of the Gateway spacecraft. Critical component qualification tests include cathode heater, magnet coils, magnet heaters, temperature sensors, and a cathode assembly that will undergo life cycle testing on multiple units. Flight thrusters will complete assembly and acceptance testing and be delivered to the PPE program in early 2025. III. Preliminary and Anticipated Results The program has completed the acceptance testing, including dynamic testing and hot fire characterization, of the first qualification thruster. In the Fall of 2023, the program entered the environmental qualification phase for thruster testing. This paper will present an overview of the AEPS thruster project, thruster capabilities and flight design, preliminary results from the thruster acceptance and qualification testing, component life cycle testing and flight hardware status.

Clayton Kachele↗

International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

Williams, David E.↗

Component design, construction and evaluation for satellites

Components for a high-reliability system such as the Telstar project are obtained by: (a) design of the component for the required environment, (b) careful control of manufacturing processes, (c) elimination of potential early failures by screening tests, and (d) selection of the most stable components. For passive components, these methods could be applied by using design parameters, suppliers and screening techniques established in the earlier submarine cable program, with consideration being given to the additional effects of the satellite launch and orbit environments. Semiconductor component designs were selected by qualification tests using accelerated electrical and environmental stress conditions. Screening tests were applied to eliminate early failures, and resulting components were aged from two to six months before selection for the satellite. The recognition of the effect of ionizing radiation on transistors caused the addition of a radiation qualification test, or a screening to assure selection of the least sensitive devices. Tests have shown this screening to be effective for the radiation intensity expected. Experience with the passive components, and evaluation of the accelerated test results and aging data of the semiconductor devices, indicate that the reliability objective was obtained.

TELSTAR SATELLITE↗

CEQATR Thermal Test Overview

A thermal test overview of the Constellation Environmental Qualification and Acceptance Test Requirement (CEQATR) is presented. The contents include: 1) CEQATR Thermal Test Overview; 2) CxP Environments; 3) CEQATR Table 1.2-1; 4) Levels of Assembly; 5) Definitions for Levels of Assembly; 6) Hardware Applicability; 7) CEQATR Thermal-Related Definitions; 8) Requirements for unit-level thermal testing; 9) Requirements for major assembly level thermal testing; 10) General thermal testing requirements; 11) General thermal cycle, thermal vacuum profiles; 12) Test tolerances; 13) Vacuum vs Ambient; 14) Thermal Gradient; 15) Sequence of Testing; 16) Alternative Strategies; 17) Protoflight; 18) Halt/Hass; 19) Humidity; and 20) Tailoring.

Balusek, Alan R.↗

Sample Acquisition and Analytical Chemistry Challenges to Verifying Compliance to Aviators Breathing Oxygen (ABO) Purity Specification

NASA has been developing and testing two different types of oxygen separation systems. One type of oxygen separation system uses pressure swing technology, the other type uses a solid electrolyte electrochemical oxygen separation cell. Both development systems have been subjected to long term testing, and performance testing under a variety of environmental and operational conditions. Testing these two systems revealed that measuring the product purity of oxygen, and determining if an oxygen separation device meets Aviator's Breathing Oxygen (ABO) specifications is a subtle and sometimes difficult analytical chemistry job. Verifying product purity of cryogenically produced oxygen presents a different set of analytical chemistry challenges. This presentation will describe some of the sample acquisition and analytical chemistry challenges presented by verifying oxygen produced by an oxygen separator - and verifying oxygen produced by cryogenic separation processes. The primary contaminant that causes gas samples to fail to meet ABO requirements is water. The maximum amount of water vapor allowed is 7 ppmv. The principal challenge of verifying oxygen produced by an oxygen separator is that it is produced relatively slowly, and at comparatively low temperatures. A short term failure that occurs for just a few minutes in the course of a 1 week run could cause an entire tank to be rejected. Continuous monitoring of oxygen purity and water vapor could identify problems as soon as they occur. Long term oxygen separator tests were instrumented with an oxygen analyzer and with an hygrometer: a GE Moisture Monitor Series 35. This hygrometer uses an aluminum oxide sensor. The user's manual does not report this, but long term exposure to pure oxygen causes the aluminum oxide sensor head to bias dry. Oxygen product that exceeded the 7 ppm specification was improperly accepted, because the sensor had biased. The bias is permanent - exposure to air does not cause the sensor to return to its original response - but the bias can be accounted for by recalibrating the sensor. After this issue was found, continuous measurements of water vapor in the oxygen product were made using an FTIR. The FTIR cell is relatively large, so response time is slow - but moisture measurements were repeatable and accurate. Verifying ABO compliance for oxygen produced by commercial cryogenic processes has a different set of sample acquisition and analytical chemistry challenges. Customers want analytical chemists to conserve as much as possible. Hygrometers are not exposed to hours of continuous flow of oxygen, so they don't bias, but small amounts of contamination in valves can cause a "fail". K bottles are periodically cleaned and recertified - after cleaning residual moisture can cause a "fail". Operators let bottle pressure drop to room pressure, introduce outside air into the bottle, and the subsequent fill will "fail". Outside storage of K‐bottles has allowed enough in‐leakage, so contents will "fail".

Graf, John↗

DC-10 composite vertical stabilizer ground test program

A review of the structural configuration and ground test program is presented. Particular emphasis is placed on the testing of a full-scale stub box test subcomponent and full span ground test unit. The stub box subcomponent was tested in an environmental chamber under ambient, cold/wet, and hot/wet conditions. The test program included design limit static loads, fatigue spectrum loading to approximately two service lifetimes (with and without damage), design limit damage tolerance tests, and a final residual strength test to a structural failure. The first full-scale ground test unit was tested under ambient conditions. The test unit was to have undergone static, fatigue, and damage tolerance tests but a premature structural failure occurred at design limit load during the third limit load test. A failure theory was developed which explains the similarity in types of failure and the large load discrepancy at failure between the two test articles. The theory attributes both failures to high stress concentrations at the edge of the lower rear spar access opening. A second full-scale ground test unit has been modified to incorporate the various changes resulting from the premature failure. The article has been assembled and is active in the test program.

Palmer, J. M., Jr.↗

EVA Training and Development Facilities

Overview: Vast majority of US EVA (ExtraVehicular Activity) training and EVA hardware development occurs at JSC; EVA training facilities used to develop and refine procedures and improve skills; EVA hardware development facilities test hardware to evaluate performance and certify requirement compliance; Environmental chambers enable testing of hardware from as large as suits to as small as individual components in thermal vacuum conditions.

Cupples, Scott↗