Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Enabling Interconnected Science Workflows through an Adapter Approach

The INTERSECT Software framework project aims to create an open federated library that connects, coordinates, and controls systems in the scientific domain. It features the Adapter, a flexible and extensible interface inspired by the Adapter design pattern in object-oriented programming. By utilizing Adapters, the INTERSECT SDK enables effective communication and coordination within a diverse ecosystem of systems. This adaptability facilitates the execution of complex operations within the framework, promoting collaboration and efficient workflow management in scientific research. Additionally, the generalizability of Adapters and their patterns enhances their utility in other scientific software projects and challenges.

McGaha, Jesse↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Selective Bidentate Coordination Reconstructs Residual PbI 2 to Homogenize Interfacial Energetics in Perovskite Solar Cells

Spatially heterogeneous interfacial energetics, often originating from residual lead iodide (PbI 2 ), represent a fundamental bottleneck to both the efficiency and operational stability of perovskite photovoltaics. Conventional PbI 2 passivation strategies based on monodentate ligands or highly polar solvents either interact weakly with PbI 2 or undesirably perturb the underlying three-dimensional perovskite lattice. Here, we report a diammonium bidentate strategy that selectively reconstructs residual PbI 2 into corner-sharing PbI 6 octahedra while preserving the bulk perovskite. Enabled by dual-site coordination, a newly designed thiophene-based bidentate ligand (MeXT) stabilizes PbI 6 units during passivation and establishes spatially homogeneous interfacial energetics. Perovskite solar cells incorporating MeXT achieve 26.19% power conversion efficiency and retain over 80% of their initial efficiency after 1000 h of continuous 1-sun illumination at 75 °C. This dual-anchor coordination passivation strategy establishes a general design principle for selectively treating residual PbI 2 and creating electronically coherent and operationally stable interfaces in perovskite photovoltaics.

ligands↗

TrustDER: Trusted, Private and Scalable Coordination of Distributed Energy Resources

In this project, the Stanford and SLAC Teams have developed a Trusted, Private and Scalable platform for coordinating Coordination of Distributed Energy Resources (TrustDER). This is a layered system that ensures private, trusted and scalable coordination and monitoring of DERs. It accommodates a variety of resources, such as solar generation, gensets and loads, with a particular focus on battery systems-based resources, as they are a transformational technology experiencing fast growth in adoption by large critical facilities. The platform can be used as standalone or added to existing aggregation systems to enable trust, privacy and resilience. TrustDER consists of layers that address each of the shortcomings of the existing state of the art. Each layer in the platform can operate independently but provides information to the layers above it to enable a novel form of overall coordination architecture. The project consists of several tasks, with each task dedicated to the design of each layer. Task 2 Resource Virtualization defined a software abstraction layer for distributed energy resources (DERs). The goal of this abstraction was to simplify the implementation of algorithms utilizing cooperation of DERs resources in a variety of use cases. Task 3 is on Secure ID for Asset Authentication. Identity Management Systems (IDMS) are a foundational infrastructure for interactions between entities (organizations, users, devices, and services). Secure ID is blockchain-based a distributed identity management system allowing (1) identity provisioning, (2) authentication, (3) authorization, and (4) identity data sharing for IoT-enabled assets on the electricity grid. In this project, the SLAC team focused on designing and testing Keymaker, a protocol for authenticating device identity managed by Secure ID. Task 5 Private and Safe Integration is focused on the design and evaluation of a DER cooperation scheme which allows for the aggregation of DERs without impacting network reliability. The approach is designed based on realistic assumptions regarding data availability, communication infrastructure limitations, and privacy. Task 6 Scalable Distributed Privacy for Information explored how virtualized batteries could be managed privately. Specifically, it examined the case in which a principal provides a partitioned battery to multiple clients. Task 7 Use Cases was to ensure that this technology was applied in relevant situations and scenarios. Primarily, this means that virtualization needed to be employed in a manner that either improved flexibility, bolstered security or privacy, or decreased costs.

25 ENERGY STORAGE↗

Anthropomorphic dual-arm space telemanipulation system

Dexterous dual-arm manipulations are feasible with the system described and illustrated in the paper. The structure is based on an extensible host arm that carries the dual-arm robot which comprises two 7-DOF arms each of which includes a hand with a thumb and three fingers with 4 DOF each. Joint compliance can be stiffened to any level, and the operator uses arm harnesses and gloves to utilize the robotics in an anthropomorphic fashion. The configuration eliminates coordinate-transformation computations, and the system is found to achieve a control-frequency rate of 1000 Hz for its direct man/machine interfaces based on fiber-optic cables. The electronics control for the system utilizes a sensory system consisting of force, position, and compliance sensors. The robotics system is expected to be a user-friendly device that permits assembly, repair, tethering, and other complex mechanical operations.

Jau, Bruno M.↗

Maintenance and operations tasks accomplished at DSS 12 during the antenna panel replacement downtime

The heavy schedule of tracking activities at the Echo Deep Space Station (DSS 12) prevents some time-consuming maintenance tasks from being performed. Careful coordination prior to and during a mandatory task (antenna panel replacement) made it possible to do a large number of unrelated tasks that ordinarily would have to be deferred. The maintenance and operations tasks accomplished during the downtime are described.

Butcher, L.↗

NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests

NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).

Barta, Daniel J.↗

Faster-than-real-time Simulation with Demonstration for Resilient DER Integration

The US electric grid is facing operational, stability, and security challenges. Transmission system operators need some measure of visibility into distribution system renewable generation. Distribution system generation needs to support transmission system voltage. The grid is experiencing an expansion in measurement systems. How to take full advantage of this expansion and defend against attacks, both cyber and physical, poses additional challenges. The Faster-than-real-time Simulation with demonstration for Resilient DER Integration project set out to do the following: a. Flatten the voltage profile through the feeders and system for cost saving and voltage stabilization needs. b. Increase the amount of intermittent distributed energy resources (IDERs) that could be deployed on a utility feeder and provide 100% or more energy needed for the demands on that feeder, and c. based on an accurate model (Digital Twin) of the utilities system, be able to detect any abnormalities on the utilities distribution system. To manage the voltage and increase IDER penetration (a,b), Graph Trace Analysis is employed in a time-series, optimal power flow to coordinate the time-varying feedback control setpoints of a distribution feeder’s utility control devices. Under the coordinated control are a Load Tap Changing Transformer, a voltage regulator, and five switched capacitor banks. The feeder serves over 2000 customers, the feeder secondaries are modeled, and the feeder has 2.3 MW of PV generation, corresponding to a 17.4% penetration of PV generation. The feeder model has over 12,000 components, where every customer load bus and PV generator are modeled. The accuracy of the power flow solution is compared against historical meter voltage measurements, the improvement in conservation voltage reduction energy savings as a function of the coordinated control desired voltage profile is investigated, and the increase in PV penetration of the coordinated control over the existing control is presented. To achieve improved control performance while observing system operation constraints, bellwether Advanced Metering Infrastructure (AMI) voltage measurements are used to adjust the desired voltage profile used by the optimal power flow analysis. To detect and alleviate or negate attacks or failures on the distribution and transmission utility grids (c) the grid needs to be resilient and self-healing. In this project software was designed to do just that. At the center of the software is an Integrated System Model (ISM) that spans from transmission to secondary distribution. The ISM is employed in real-time abnormality detection, voltage stability forecasting, and multi-mode control. Testing results are presented for: 1—attacks on utility infrastructure; 2—energy savings from optimal control; 3—distribution system control response during a low voltage transmission system event; 4—cyber-attacks on PV inverters, where physical inverters are used in hard-ware-in-the-simulation-loop studies. Contributions of this work include real-time analysis that spans from three-phase transmission through secondary distribution; an approach for detecting abnormalities that employs measurements from three independent measurement systems; and a multi-mode distribution system control that responds to cyber-attacks, physical attacks, equipment failures, and transmission system needs.

Integrated System Model, Graph Trace Analysis, Adv↗

Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

integrated arrival↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) is the United States focal point to support operations controllers and payload developers conducting payload science operations for the National Aeronautics and Space Administration (NASA) aboard the International Space Station (ISS). Some of the key functions are planning, coordination and scheduling of science activities. This effort occurs in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. Additionally, in Fall 2017, NASA will increase its ability to perform payload science operations aboard the ISS with a fourth crew member. In order to support this, there will be an increasing need to quickly plan and schedule more activities. In the past, it was cumbersome and time-consuming to consolidate copious amounts of planning and change request data from various sources. Planners would summarize information from the Johnson Space Center (JSC) Operations Planning Timeline Integration System (OPTIMIS) and manually integrate it with other data in order to produce a Timeline Planning Summary (TPS). This lengthy process of updating static documents while planning and re-planning was cumbersome, introduced human error, and was inflexible to last minute changes. There was a need for a dynamic, more efficient, less erroneous, and more concise way of building a report that could be readily updated as fast as payload science plans change.

Pedoto, Ramon W.↗

A Markov Decision Process Framework for Optimal Airport Reconfiguration

The airport runway configuration is defined as a combination set of runways for arrivals and departures used at a point during operation of the airport. An optimal configuration of these runways depends on a number of factors, including traffic demand, wind magnitude and direction, other adverse weather conditions, and noise restrictions, among others. Based on the current state of these factors and predictions of traffic demand and weather conditions, runway configuration changes are made and coordinated between tower controller, other air traffic control facilities, pilots, and ground personnel. Reconfigurations can be quite disruptive to airport operations; minimizing their frequency and scheduling them well in advance is essential for mitigating some of the added workload for controllers and pilots. Unfortunately, deciding on an appropriate time to change is challenging for human decision makers. Not only do multiple factors need to be evaluated, but the uncertainty in their forecasts must also be considered. Previous optimization methods, such as mixed linear integer programming, have been proposed. Although these methods can reason over a large set of variables, they do not systematically handle the uncertainty associated with weather movement, traffic demands, and other variables. In this work, we introduce a Markov Decision Process (MDP)-based decision making framework which can reason effectively over the inherent uncertainties and make optimal decisions on if/when to change the airport configuration. In a prototype implementation, we present a single runway with three aircraft and utilize knowledge of the forecasted wind speed and direction to determine whether to keep or change the current runway configuration. Our aim through this work is to present a framework for airport reconfiguration which can be scalable to additional aircraft, multiple runways, and various input parameters. This technique will optimize the airport reconfiguration procedure by providing a proactive approach, optimizing not just at the next optimal opportunity for a reconfiguration based on varying atmospheric and traffic conditions in the terminal airspace, but also anticipating future necessary reconfigurations. This will eliminate the inefficiencies of frequent changes currently associated with runway reconfiguration procedures.

runway reconfiguration↗

Layered Coordination Architecture for Resilient Restoration of Power Distribution Systems

The current practices for restoring critical services in the distribution system during a disaster, align with the traditional centralized ideology of distribution systems operations. A central processor evaluates the distribution system after a disruption and attains a restoration plan. However, the centralized operational paradigm is susceptible to single-point failures, requires full situational awareness of the distribution system, and poses scalability challenges for large multifeeder distribution systems. This motivates a distributed decision-making paradigm where multiple agents solve smaller subproblems and jointly coordinate their individual decisions to achieve the global/network-level objective. Toward this goal, we propose a layered architecture for distributed algorithms for resilience and a two-stage distributed algorithm for distribution system restoration. The proposed distributed decision-making framework enables the bottom-up restoration of the distribution system using all available resources, including distributed generation, while only requiring local awareness and limited communications with neighboring connected regions. The proposed framework is robust to single-point failures, enables autonomy using distributed algorithms, and had reduced computational cost compared to centralized optimization solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures

Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.

Martin, J. J.↗

Interactive orbital proximity operations planning system instruction and training guide

This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

Grunwald, Arthur J.↗

Model-Free Dynamic Voltage Control of a Synchronous Generator-Based Microgrid

The main goal of this paper is to present a new dynamic voltage stability mechanism, based on model-free control (MFC), for effective control and coordination of synchronous generator (SG)-based reactive power resources in a microgrid setting. MFC has shown successful operation in various domains, and this paper presents its first use in the voltage stability of a power system. It is utilized as an online controller to achieve the dynamic voltage stability of a microgrid system under different disturbances and fault conditions. A 21-bus microgrid system fed by SG-based distributed energy resources (DERs) is considered as a use case study. The overall dynamic voltage stability of the microgrid system is investigated using time-domain dynamic simulations during emergency, hazard, and disaster events. Simulation results show that there are significant improvements and enhancements on the dynamic load bus voltage profiles of the microgrid system by the effective model-free control and coordination of the reactive power reserves of the SG-based DERs.

Hatipoglu, Kenan↗

The Mars surveyor operations project command generation process

The methods employed by the Mars surveyor operations project (MSOP) flight team to accelerate the command generation process are described. The approach adopted was to develop a ground system which could simultaneously support as many as three spacecraft in various phases of flight and two in development. The uplink element of the MSOP is discussed, including the control of the science instruments and the spacecraft bus using real-time commands as well as time-tagged stored sequences. The non-interactive payload command process, the express command process, the coordinated command process and the stored sequence process are described. The automation of these processes resulted in flight operations cost savings while maintaining a minimum of risk.

Brooks, Robert N., Jr.↗