Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Dose Rate Analysis of the WCS Consolidated Interim Storage Facility

This report describes a confirmatory calculation for a proposed consolidated interim storage facility (CISF) to support the US Nuclear Regulatory Commission’s review of the license application submitted by the Interim Storage Partners. The scope of this report is limited to an assessment of the annual dose from direct radiation associated with Phase 1 of the Waste Control Specialists (WCS) CISF and the determination of the minimum controlled area boundary based on the 10 CFR 72.104 limit of 25 mrem annual dose to the whole body. The confirmatory dose rate calculations used the source term and shielding calculation capabilities of the SCALE 6.2.3 computer code system. The calculation method employed in the confirmatory calculations uses a detailed Monte Carlo radiation transport simulation from source to dose rate. This method differs from the two-step method used in the safety analysis report (SAR), which requires determination of the photon and neutron energy and angular distributions on the cask external surface and then the use of this surface source in a new radiation transport calculation to determine dose rate as a function of distance from the storage facility. A simulation was made using the complete site geometry (all casks present) but with only one cask containing source, and a total of 467 independent calculations were performed to obtain the dose rate maps produced by each storage cask. Basic input data and assumptions used in the SAR (e.g., cask design parameters and design basis assembly characteristics) were used in this confirmatory calculation for consistency with the SAR. Local atmospheric conditions for skyshine calculations were simulated using US standard atmosphere data, which describe average air temperature, pressure, and density as a function of altitude. The determined minimum required distances from the WCS Phase 1 CISF to a contour defined by the 25 mrem annual dose limit were approximately 623 m (0.387 miles) in the N-NE direction, 594 m (0.369 miles) in the SSW direction, and 533 m (0.331 miles) in the E-SE direction and the W-NW direction. The annual dose results of the confirmatory calculation are in relatively good agreement with the annual dose values presented in the WCS SAR. The annual dose produced by the Phase 1 CISF at the nearest site boundary, 0.75 miles away from the CISF, was estimated by this study to be approximately 6.02E-02 ± 2.0E-04 mrem, which is significantly smaller than the 25 mrem annual dose limit provided in 10 CFR 72.104. The SAR annual dose rate value for the nearest site boundary was 7.52E-2 mrem, which included 7.73E-03 mrem due to postulated leakage of the FO-, FC-, and FF-canisters. A comparison with the dose rate values reported in the SAR for 16 detector locations, D1 through D16, on the protected area boundary is also included in this report. This comparison shows that the SAR determined higher annual dose values for detectors D1 through D14 by 12% to 45% and lower annual dose values for detectors D15 and D16 by 18% and 8%, respectively, as compared with this ORNL confirmatory calculation. Sensitivity studies have been performed to support a comprehensive review of the application. In these studies, the effects on dose rate of the modeled air volume, density, and humidity were analyzed. The sensitivity calculations showed that the air volume used in the Monte Carlo simulations was adequate and that a larger air volume would not further increase the dose rate due to skyshine contributions. The sensitivity analysis showed that simulation of local atmospheric conditions is important for the accuracy of dose rate estimates at large distances from the facility. Air humidity was demonstrated to have negligible effects on dose rate values for the simulated local atmospheric conditions.

61 RADIATION PROTECTION AND DOSIMETRY↗

A Primer on FERC Order No. 2222: Insights for International Power Systems

The U.S. Federal Energy Regulatory Commission (FERC) Order No. 2222 is heralded as a landmark rule on distributed energy resources (DER). Issued in September 2020, it is specifically designed for organized wholesale power markets. The rule is nonbinding for utilities that have not chosen to join an organized wholesale power market. This primer, which analyzes the order, focuses on potential insights for similar changes in the international power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Molten Salt Reactor Fundamental Safety Function PIRT

The phenomenon identification and ranking table (PIRT) process was employed to evaluate the current capability to assess the ability of liquid-salt–fueled molten salt reactors to achieve their fundamental safety functions (FSFs). The PIRT process provides a structured mechanism to elicit and document expert opinions on the most important phenomena and the corresponding level of knowledge with regard to achieving the FSFs. The PIRT panel included reactor developers, accident progression evaluation tool developers, US Department of Energy (DOE) national laboratory technical staff, university researchers, and US Nuclear Regulatory Commission (NRC) staff. The information-gathering process concentrated on phenomena related to accidents in which the fuel salt—including any in the cover gas—has been released from the first barrier layer. This information-gathering process included identifying all potential accidents that could result in the release of a substantial amount of radionuclides that could breach or bypass the first barrier. The PIRT did not identify any previously unrecognized systemic vulnerabilities. However, the elicitation process identified several areas with low levels of knowledge and significant potential impact on accident progression. These areas either require additional research to improve the state of knowledge or additional design conservatism to accommodate the remaining unknowns.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transmission Innovation Symposium: Modernizing the U.S. Electrical Grid

The foundation of the United States Department of Energy (DOE) Transmission Reliability research program was established 20 years ago by a series of commissioned white papers. Those white papers described the dramatic institutional and regulatory changes that the U.S. electricity transmission grid was undergoing at the time and articulated the technical challenges that these changes created. The challenges outlined in the white papers were the basis for the initial research goals of the DOE Transmission Reliability program. To a large extent, the reliability research needs outlined in the original white papers have now been met. As a result, now is an appropriate time to step back and review the technical challenges that the industry currently faces and to use those challenges as the basis for identifying the next set of targets for DOE’s transmission-related research and development (R&D) programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U-50Zr Microstructure and Property Assessment for LWR Applications

This project provides an initial assessment and research recommendations of U-50 wt.%Zr (U-50Zr) for its use as a light water reactor (LWR) fuel. This work based on the outcome of a recently funded exercise on the failure mode effects and analysis (FMEA) and the phenomena identification and ranking table (PIRT) to investigate high level nuclear fuel qualification metrics as derived by the United States Nuclear Regulatory Commission.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multi-Mechanism Flood Hazard Assessment: Example Use Case Studies

Multi-mechanism flood (MMF) events are caused by the combined effects of more than one flooding mechanism. Although floods can result from the occurrence of individual flood mechanisms, they can (and often do) result from multiple flooding mechanisms. MMF events may be more severe than single mechanism events, or they may differ in characteristics. To facilitate comprehensive risk-informed decision-making to protect against and mitigate the effects of flood events, understanding the hazard contributions from MMFs is important. Nevertheless, conventional probabilistic flood hazard assessment approaches typically focus on individual flood hazard mechanisms. This report is part of a research project funded by the US Nuclear Regulatory Commission (NRC) intended to assist NRC in developing the technical basis for guidance on developing probabilistic estimates of flood hazards for combinations of flood mechanisms. Specifically, the purpose of this report is to document two case studies to illustrate approaches for quantifying MMF hazards for inland and coastal flooding scenarios.

54 ENVIRONMENTAL SCIENCES↗

Nu Tools: Exploring Practical Roles for Neutrinos in Nuclear Energy and Security

For decades, physicists have used neutrinos from nuclear reactors to advance basic science. These pursuits have inspired many ideas for application of neutrino detectors in nuclear energy and security. While developments in neutrino detectors are now making some of these ideas technically feasible, their value in the context of real needs and constraints has been unclear. This report seeks to help focus the picture of where neutrino technology may find practical roles in nuclear energy and security. This report is the final product of the Nu Tools study, commissioned in 2019 by the DOE National Nuclear Security Administration (NNSA) Office of Defense Nuclear Nonproliferation Research and Development (DNN R&D). The study was conducted over two years by a group of neutrino physicists and nuclear engineers. A central theme of the study and this report is that useful application of neutrinos will depend not only on advancing physics and technology but also on understanding the needs and constraints of potential end-users. The Study Approach emphasized broad end-user engagement. The major effort, undertaken from May to December 2020, was a series of engagements with the wider nuclear energy and security communities. Interviews with 41 experts revealed points of common understanding, which this report captures in three Cross-Cutting Findings, a Framework for Evaluating Utility, and seven Use Case Findings. The report concludes with two Recommendations. The findings and recommendations are summarized below. The respective ordering within each category does not represent a prioritization or implied value judgement.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Use of Modern Tunnel Boring Machines for Underground Pumped Storage (CRADA 464)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

42 ENGINEERING↗

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗

Electron Ion Collider Machine Protection System: On the necessity of the MPS abort system for Rapid Cycling Synchrotron

The Electron Ion Collider (EIC) accelerator complex includes multiple high-energy high-power accelerators [1]. Operation of such a complex is associated with numerous dangers of possible damage to the equipment. The EIC machine protection system (MPS) scope is to protect the components of each accelerator from damage by the beam. The EIC MPS design, commissioning and operation is closely interconnected with the protection of various accelerator subsystems, such as RF-system, cryogenics, vacuum system etc. Yet, the primary goal of the MPS is to protect the EIC accelerators from the possible damage caused by electron and proton beams.

43 PARTICLE ACCELERATORS↗

Electron Ion Collider Machine Protection System: Requirements for an Electron Storage Ring abort system

The Electron Ion Collider (EIC) accelerator complex includes multiple high-energy high-power accelerators [1]. Operation of such a complex is associated with numerous hazards and risks of possible damage to the equipment. The EIC machine protection system (MPS) scope is to protect the components of each accelerator from damage by the beam. The EIC MPS design, commissioning and operation is closely interconnected with the protection of various accelerator subsystems, such as RF-system, cryogenics, vacuum system etc. Yet, the primary goal of the MPS is to protect the EIC accelerators from the possible damage caused by electron and proton beams.

43 PARTICLE ACCELERATORS↗

Assessment of Cold Spray Technology for Nuclear Power Applications

This report provides an overview of cold spray (CS) technology as it relates to repair and fabrication of metal alloys in the nuclear power industry. CS is a relatively new technology with applications established in other industries (e.g., aerospace, defense), and greater use of CS is anticipated within the nuclear power industry. This report is prepared in support of the United States Nuclear Regulatory Commission (NRC) Action Plan for Advanced Manufacturing Technologies (AMTs) Rev. 1, which includes objectives to identify the AMTs most likely to be used for nuclear power applications that require NRC approval, and to prepare NRC staff to review regulatory submittals containing components manufacturing using AMTs. In addition to providing an overview of CS technology, this report highlights engineering and scientific knowledge gaps of CS and rates the size of the knowledge gaps. It also assesses importance rankings of the knowledge gaps as they relate to several application categories. The application categories considered in this exercise include factory-applied CS for chloride induced stress corrosion cracking (CISCC) mitigation, field CISCC repair, light water reactor (LWR) factory structural fabrication, and LWR field dimensional restoration and corrosion protection. The combination of a knowledge gap size rating and importance ranking for an application can be used to prioritize additional data or information gathering efforts.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary of the CeC Experiment in RHIC Run 21

The coherent electron cooling (CeC) experiment at RHIC is crucial for determining the feasibility of this technique for cooling the hadron beam in the electron-ion collider (EIC) and reaching the luminosity of 10 34 cm -1 s -1 . During RHIC Run 21, various progresses have been made including successfully commissioning the time resolved diagnostic beam line (TRDBL), achieving the key performance parameters (KPP) of the system and the development of novel methods for accurate alignment of the electron beam with the ion beam. While the longitudinal cooling of the ion beam with cooling time of 100 hours was observed during Run 21, it was related to the traditional electron cooling since the cooling rate was not as sensitive to the energy of the electron beam as what one would expect from the CeC. In Run 21, we were not able to observe the longitudinal cooling of the ion beam caused by CeC and the main challenges are identified as the insufficient stability of the electrons' energy. The sources of the energy jitter have been identified and we are making improvements to the stability of the CeC system for Run 22.

43 PARTICLE ACCELERATORS↗

Interim Findings and Suggestions: Cyclic Steaming above Fracturing Pressure and the Associated Surface Expressions

In the wake of California’s new regulations for Underground Injection Control (enacted in April 2019) and several recent high-visibility surface expressions associated with high-pressure cyclic steaming in diatomite formations, a Moratorium on the issuance of permits for new wells using high pressure steam injection was announced on November 19, 2019. We, a panel consisting of technical experts and regulators from CalGEM and Lawrence Livermore National Laboratory, were commissioned by CalGEM to carry out the study as documented in this report, to: Determine if projects using cyclic steam injection above fracturing pressure (referred to as “cyclic steaming” hereafter) can be implemented safely, and Identify specific criteria for future permitting should the Moratorium be lifted.

02 PETROLEUM↗

FY21 NNSA-IAEC Science Area V, Environmental ISR, Waste Management and Subsurface Science (Final Report)

The FY21 NNSA NA-22 Final Report represents the progress achieved over the past year (FY21) by the research team for Topic Area 3, Waste Management & Subsurface Science (WM3), and Topic Area 7, Radiation and Thermal Effects on Bituminous Rocks (WM7). WM3 and WM7 are part of Science Area V (Subsurface Science and Waste Management) in the NNSA-IAEC Science and Technology Working Group. The project was initiated four years ago (2017) with an MOU agreement between the U.S. National Nuclear Security Administration (NNSA) and the Israel Atomic Energy Commission (IAEC) to evaluate the feasibility of geological subsurface disposal of radioactive waste in Israel. The core WM3 and WM7 teams are comprised of scientists and engineers from Los Alamos National Laboratory, the Geologic Survey of Israel (GSI), and the Nuclear Research Center - Negev (NRCN), with a close collaboration to the teams from Sandia National Laboratory (SNL) and Lawrence Livermore Laboratory (LLNL)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Software Verification and Validation Guidelines for Non-Linear Soil-Structure Interaction Analysis

Seismic analysis of structures, systems, and components (SSCs), including the consideration of soil-structure interaction (SSI) effects, is an important and required step in the design and licensing of nuclear power plant SSCs important to safety. Historically, the SSI analysis of nuclear structures has been performed using equivalent linear methods. However, there has been considerable industry investment in alternative seismic design and analysis approaches to reduce the construction cost of new reactors. Toward that goal and in alignment with the Licensing Modernization Project (LMP) framework, the Nuclear Regulatory Commission (US NRC) has proposed a risk-informed, performance-based approach to seismic design that allows inelastic response in those nuclear plant structures not required for confinement. As a complementary effort, reactor designers are exploring nonlinear seismic analysis methods to optimize structural designs and reduce construction costs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Methods and Usability Enhancements in Shift for Non-LWR Applications

Several development and analysis tasks were undertaken in FY21 under the Nuclear Energy Advanced Modeling and Simulation program to enhance modeling of non light–water reactors (LWRs) with Shift. Specifically, these efforts targeted enhancements for tristructural isotropic (TRISO) fuel modeling. A new Shift user interface was developed that allows for much better usability and ease of modeling for non-LWR problems and TRISO fuel. Performance studies were conducted using an HTR-10 fuel pebble model by comparing different geometry packages in Shift, KENO-VI, and Serpent. These studies showed that the new geometry package in Shift performs well compared to Serpent for TRISO fuel modeling with consistent tracking options between both packages. The studies also identified the most critical areas of improvement for more efficiently performing Monte Carlo transport on TRISO fuel models with Shift. Tally calculations in Shift were optimized for non-LWR cross section generation and depletion calculations, and areas for further optimization and accuracy improvements were identified. Finally, initial collaboration efforts were formed between Idaho National Laboratory, Argonne National Laboratory, and the Nuclear Regulatory Commission to use Shift for Comprehensive Reactor Analysis Bundle support.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗