Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “best practice”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Interoperability and Concepts of Operation Assessment for Space Relay Services and Partnerships

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, NASA is exploring potential industry partnerships to leverage current or planned commercial space communication and navigation infrastructure to provide services to NASA user missions in the mid-2020s. Leveraging commercial infrastructure and reducing NASA’s reliance on government-owned and operated infrastructure should yield substantial development and operations cost savings. Additionally, the commercial services market will offer NASA a variety of service offerings at competitive prices, while simultaneously allowing NASA to benefit from commercial best practices. Under Appendix G of the Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA), NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, were completed in October 2019 and detailed ten study topic areas, three of which included: service provider interoperability, user terminal interoperability, and commercial services concept of operations. This report provides a summary of the significant (non-proprietary) findings and recommendations relating to those study areas from the BAA study vendors.

Eric J Knoblock↗

Duke Energy’s Integrated System and Operations Planning: A comparative analysis of integrated planning practices

Lawrence Berkeley National Laboratory and the National Renewable Energy Laboratory provided technical assistance to the South Carolina Office of Regulatory Staff to examine how Duke Energy’s Integrated System Operations Planning (ISOP) framework interacts with other electricity planning processes in South Carolina. While this report was prepared for the South Carolina ORS, the information contained herein may be useful to audiences in other states who are interested in IDP, including public utility commissions, state energy offices, other state agencies, utilities, and stakeholders. The report discusses how to access the ISOP process diagram created for the report, provides observations about Duke Energy’s ISOP from our interviews and review of publicly available materials; and assesses ISOP, based on best practices for integrated distribution planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Covariance Manipulation for Conjunction Assessment

The manipulation of space object covariances to try to provide additional or improved information to conjunction risk assessment is not an uncommon practice. Types of manipulation include fabricating a covariance when it is missing or unreliable to force the probability of collision (Pc) to a maximum value ('PcMax'), scaling a covariance to try to improve its realism or see the effect of covariance volatility on the calculated Pc, and constructing the equivalent of an epoch covariance at a convenient future point in the event ('covariance forecasting'). In bringing these methods to bear for Conjunction Assessment (CA) operations, however, some do not remain fully consistent with best practices for conducting risk management, some seem to be of relatively low utility, and some require additional information before they can contribute fully to risk analysis. This study describes some basic principles of modern risk management (following the Kaplan construct) and then examines the PcMax and covariance forecasting paradigms for alignment with these principles; it then further examines the expected utility of these methods in the modern CA framework. Both paradigms are found to be not without utility, but only in situations that are somewhat carefully circumscribed.

Conjunction↗

The D and D of Nuclear Facilities: a Systemic Approach for Project Organization and Monitoring - 18099

The Decontamination and Decommissioning (D and D) of Licensed Nuclear facilities takes place under circumstances which make it a very complex field. On the one hand, more and more facilities of widely varying types are concerned, and many D and D projects are currently running or planned. A nuclear facility's life cycle is often very long and the building may be modified or impacted by incidents during its operation. These changes need to be known and taken into account for the D and D plans, in order to ensure safety at all times. In addition, the numerous stakeholders involved in a project express needs which impose many requirements. These encompass various points of view, and data from different detail levels must be managed to satisfactorily meet them. On the other hand, legacy data (including records, plans etc.) is a recurring issue for D and D projects. The quality and availability of relevant data regarding the different phases of the nuclear facility lifetime may be insufficient, for instance due to the lack of traceability practices in the past. The uncertainty level is not always specified and explained, old documents can be damaged and are not necessarily digitized, etc. It is therefore particularly important to define the relevant type of raw data to be collected and traced for D and D projects as early as possible. In this context, CEA (Commissariat a l'energie Atomique et aux energies Alternatives) has been analyzing past D and D projects for many years. The goal is to facilitate reproducibility by generalizing best practices and promoting efficient organizational rules and technical solutions. A method is currently being studied to help project managers to prepare specifications for future D and D operations and improve both the efficiency and the relevance of the decommissioning strategy throughout each project, depending on the expected quality of its end-state. This method first consists in formalizing and specifying the entire set of requirements to be taken into consideration, e.g. technical, operational, logistical, regulatory, financial, organizational, safety and security, human, ethical, or, naturally, environmental aspects. Second, based on these requirements, it will enable the project team to structure, check, and then to demonstrate the coherence and feasibility of the project from both the technological and organizational points of view. Lastly, the method will enable the evaluation of the various possible solutions for the management of dismantling products, for instance, regarding the waste outlets: direct disposal or interim storage. To conclude, the method should permit a constant re-evaluation of the D and D strategy depending on the possible evolution of the stakeholders' requirements, and thus it should optimize the monitoring of D and D projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Setting the Bar for the Replacement of the Probability of Collision Metric

To date, satellite conjunction assessment (CA) risk analysis has largely embraced the probability of collision (Pc) as the omnibus metric to evaluate collision likelihood, and its use in such assessments has mostly been straightforward: at the point at which a conjunction mitigation decision is required, the calculated Pc is compared to a threshold; and if the calculated Pc exceeds that threshold, then a mitigation action is warranted. With only minor variation, this approach is employed by major CA risk assessment centers (e.g., NASA, EUSST, CNES, JAXA) and is advanced as the preferred method in the published CA best practices handbooks. Despite this near unanimity of operational practice, there is a major strain of secondary literature critical of the Pc and willing to propose alternatives. Alfano (2005) pointed out the ability of the Pc to underrepresent the risk in certain situations and counselled a maximum Pc construct. Carpenter (2017, 2019) reiterated this criticism and proposed using instead a confidence interval on the miss distance. Balch et al. (2019) identified what they argued was a defect in the entire Bayesian Pc construct and believed that the use of a more conservative methodology based on covariance ellipsoid overlap was necessary. Delande (2022) introduced the framework of collision “plausibility” to the risk assessment process and sketched out how this might be used operationally. Elkantassi (2022) published a full development of the miss distance confidence interval approach and applied it to several worked examples. While these different approaches to collision risk assessment do differ in their details, they all converge on two central points: first, the Pc’s failure to give an adequate expression of the risk in dilution region situations is a fatal flaw; and second, a conjunction should be presumed risky and in need of mitigation until the evidence of the situation can establish otherwise. These criticisms, if correct, would counsel a number of modifications to current CA operational practice; as such, they force a re-examination of fundamental aspects of the CA problem, including the following: 1. Is the CA risk assessment a probability problem, a statistics problem, or something else? 2. If it is a statistics problem, does it lend itself naturally to a hypothesis test construction? 3. If it can be construed as a hypothesis test, what form should the null hypothesis take, to wit: what constraints exist on the choice of the null hypothesis, what selections are in best alignment with all of the attendant parameters of the problem, and what is implied philosophically by different choices? 4. What are the implications of using the different proposed risk assessment parameters for CA? This question should be answered both in determining how frequently the dilution region situation cited by the critics of the Pc actually appears in an operationally significant manner and the missed detection and false alarm rates of all of the proposed risk assessment metrics, compared both to the Pc and to each other. This paper explores and offers preliminary answers to the above questions, presenting a researched treatment of the philosophical nature of the CA problem and the null hypothesis choice that achieves the greatest consistency with all of the different aspects of operational CA conduct. It then profiles all of the different proposed risk assessment metrics enumerated in the earlier paragraph against an extremely large database of conjunction events at both the 550km and 700km altitudes. The combination of the philosophical exploration of the CA problem and the results of the profiling activity articulates what a risk assessment metric will need to demonstrate, in terms of both innate construction and performance, in order to be a true competitor to the Pc.

conjunction assessment↗

Optimizing Depression Care: Opportunities for the EAP.

Depression is a major workplace concern with significant impact on employee productivity, attendance and “presenteeism” and often affects the company bottom line in areas such as cost impact, employee morale, worker turnover and affected families. However, despite the frequent challenge of depression in the workplace, EAPs are often not well-equipped to fully address these employees. Often, the individual will either be directed to a 24 hour call center or seen briefly onsite by an EAP professional and referred to a treating provider without a full assessment or comprehensive approach. Diagnostic practices may be informal without use of validated tools and without a full assessment of risk or identification of appropriate level of care. However, the EAP may be ideally placed within an organization to have a significant positive impact on this condition. This article will summarize my recommendations regarding EAP strategies for optimizing assessment and care for employees who are struggling with depression. I will also briefly review a working model for the assessment and treatment of depression that we have developed at my company using best practices and a collaborative model for tracking outcomes.

Kreuch, Tony J.↗

Requirement Assurance: A Verification Process

Requirement Assurance is an act of requirement verification which assures the stakeholder or customer that a product requirement has produced its "as realized product" and has been verified with conclusive evidence. Product requirement verification answers the question, "did the product meet the stated specification, performance, or design documentation?". In order to ensure the system was built correctly, the practicing system engineer must verify each product requirement using verification methods of inspection, analysis, demonstration, or test. The products of these methods are the "verification artifacts" or "closure artifacts" which are the objective evidence needed to prove the product requirements meet the verification success criteria. Institutional direction is given to the System Engineer in NPR 7123.1A NASA Systems Engineering Processes and Requirements with regards to the requirement verification process. In response, the verification methodology offered in this report meets both the institutional process and requirement verification best practices.

Alexander, Michael G.↗

Enabling Innovation and Collaboration Across Geography and Culture: A Case Study of NASA's Systems Engineering Community of Practice

In 2004, NASA faced major knowledge sharing challenges due to geographically isolated field centers that inhibited personnel from sharing experiences and ideas. Mission failures and new directions for the agency demanded better collaborative tools. In addition, with the push to send astronauts back to the moon and to Mars, NASA recognized that systems engineering would have to improve across the agency. Of the ten field centers, seven had not built a spacecraft in over 30 years, and had lost systems engineering expertise. The Systems Engineering Community of Practice came together to capture the knowledge of its members using the suite of collaborative tools provided by the NASA Engineering Network (NEN.) The NEN provided a secure collaboration space for over 60 practitioners across the agency to assemble and review a NASA systems engineering handbook. Once the handbook was complete, they used the open community area to disseminate it. This case study explores both the technology and the social networking that made the community possible, describes technological approaches that facilitated rapid setup and low maintenance, provides best practices that other organizations could adopt, and discusses the vision for how this community will continue to collaborate across the field centers to benefit the agency as it continues exploring the solar system.

NEN↗

EPRI Guidance for Transitioning from Operation to Decommissioning at Nuclear Power Plants - 17438

A wide range of key activities are necessary after permanent shutdown of a nuclear power plant and before active dismantlement of the plant can begin. This period between permanent shutdown and the start of active dismantlement is typically referred to as the transition period (or the post-operational phase). In some cases, these transition activities may be prescribed by regulation or performed in the absence of regulations, while in other cases they may be more practically driven or even optional. In either case, it is often unclear what activities are needed and when/how those activities should be conducted to most efficiently transition from operational to decommissioning status while maintaining radiological safety and the protection of the public. The Electric Power Research Institute has prepared a report that presents experiences and guidance for transitioning from an operational to decommissioning status based on US and international decommissioning regulations and plant experiences. Regulations and experiences in a number of countries were considered, including US, Germany, France, Spain, and Switzerland. Best practices and lessons learned related to transitioning to decommissioning are identified, and guidance is presented for developing a plan to transition from normal operations to decommissioning for several scenarios, including: - Transition to DECON (immediate dismantling) for a planned shutdown; - Transition to SAFSTOR (deferred dismantling) for a planned shutdown; - Transition to DECON (immediate dismantling) for an unplanned shutdown; - Transition to SAFSTOR (deferred dismantling) for an unplanned shutdown. Further, the EPRI report contains guidance for currently operating plants that do not anticipate permanent shutdown in the near future to help minimize the cost and impact of an unexpected permanent shutdown if such a scenario were to occur. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Hydrogen Safety Knowledge Tools

With hydrogen gaining acceptance as an energy carrier for fuel cell vehicles and stationary fuel cell applications, a new community of hydrogen users is emerging and continues to grow. With this growth has come the need to spread the word about safe practices for handling, storing, and using hydrogen. Like all energy forms, hydrogen can be used safely through proper procedures and engineering techniques. However, hydrogen involves a degree of risk that must be respected, and the importance of avoiding complacency or haste in the safe conduct and performance of projects involving hydrogen cannot be overstated. To encourage and promote the safe use of hydrogen, Pacific Northwest National Laboratory (PNNL) has developed and continues to enhance two software tools in support of the U.S. Department of Energy's Fuel Cell Technologies Program: the Hydrogen Safety Best Practices online manual (www.H2BestPractices.org) and the Hydrogen Incident Reporting and Lessons Learned database (www.H2Incidents.org).

08 HYDROGEN↗

MSD CoP Webinar: Using Meta-Repositories To Facilitate Open Science in MSD Research

Context: This webinar was hosted by the MultiSector Dynamics Community of Practice (MSD CoP; https://multisectordynamics.org). Abstract: In this webinar, we will describe the use of a GitHub meta-repository, for documenting and disseminating the tools and data supporting MSD publications. The goal is to make it easier for others to understand the flow of data and code through your experiment and to be able to reproduce your results and figures with only the information you have provided for them. The webinar will cover the role of open science in the MSD community, the origins and purpose of meta-repositories, and step-by-step instructions and best practices for building a meta-repository starting from the GitHub template (https://github.com/IMMM-SFA/metarepo). We will also discuss how to leverage MSD-LIVE (https://msdlive.org/) in your meta-repository, provide links to numerous examples you can learn from, and discuss the role of meta-repositories in the IM3 project's open science mandates. Presenters : Chris R. Vernon, Casey D. Burleyson, Jennie Rice, and Mengqi Zhao Moderator: Pat M. Reed (MSD CoP Facilitation Team) This webinar was held on: February 22nd, 2024 from 2-3 PM ET

Open Science↗

Implicit Priors in Galaxy Cluster Mass and Scaling Relation Determinations

Deriving the total masses of galaxy clusters from observations of the intracluster medium (ICM) generally requires some prior information, in addition to the assumptions of hydrostatic equilibrium and spherical symmetry. Often, this information takes the form of particular parametrized functions used to describe the cluster gas density and temperature profiles. In this paper, we investigate the implicit priors on hydrostatic masses that result from this fully parametric approach, and the implications of such priors for scaling relations formed from those masses. We show that the application of such fully parametric models of the ICM naturally imposes a prior on the slopes of the derived scaling relations, favoring the self-similar model, and argue that this prior may be influential in practice. In contrast, this bias does not exist for techniques which adopt an explicit prior on the form of the mass profile but describe the ICM non-parametrically. Constraints on the slope of the cluster mass-temperature relation in the literature show a separation based the approach employed, with the results from fully parametric ICM modeling clustering nearer the self-similar value. Given that a primary goal of scaling relation analyses is to test the self-similar model, the application of methods subject to strong, implicit priors should be avoided. Alternative methods and best practices are discussed.

Mantz, A.↗

An Assessment of Evaluation Practices of Low- And Moderate-Income Solar Programs

As concerns about social equity and clean energy rise, state and local governments, utilities, and non-profit organizations are offering at least 41 active programs in 21 states to promote solar adoption as a way to reduce energy bills for low- and moderate-income (LMI) households while meeting other policy goals such as job creation and clean energy generation. A new study from Berkeley Lab looks at how those programs are being evaluated. The report provides background on how they seek to address LMI household energy burdens and gives a brief discussion of the art and science of program evaluation, drawn from decades of experience in energy efficiency programs. It then turns to how LMI solar programs are currently being evaluated, highlighting trends among evaluation methods, metrics tracked, and best practices employed. A few programs are explored in more depth to illustrate notable practices that could be applied to other program evaluations. These LMI solar programs are mostly young, operate on tight budgets, and vary considerably in their design and stated goals. Consequently, well-designed program evaluation is critical to better understand what works, what could be improved, and how to maximize program impacts under budget constraints.

14 SOLAR ENERGY↗

RC-SFA Data Management Templates and Guidance for Standardized, Reusable AI-Ready Data Packages

This data package provides templates and supporting documentation developed by the River Corridor Science Focus Area (RC-SFA; https://www.pnnl.gov/projects/river-corridor) to communicate its approach to managing and publishing AI-ready data. The package is intended to help data users and data producers understand the structures, metadata practices, and quality-control approaches that support consistent, reusable, and machine-actionable data products across RC-SFA studies. Rather than focusing on a single experimental dataset, this package documents the data management framework used to make RC-SFA data easier to find, ingest, navigate, and interpret. The materials in this package reflect RC-SFA practices for standardized data package organization, including the use of a human- and machine-readable README, file-level metadata, data dictionaries, descriptive file naming, method identifiers, and automated and review-based quality assurance procedures. Together, these components illustrate how RC-SFA extends FAIR data principles toward AI-readiness by prioritizing deep metadata, consistency across data packages, and support for informed downstream reuse by both humans and computational tools. This dataset is comprised of (1) readme; (2) presentation slides with an overview of RC-SFA approach and guidance; (3) document of RC-SFA best practices; (4) data dictionary (dd); (5) file level metadata (flmd); and a subfolder containing templates for dd and flmd. All files are .csv and .pdf. For details on how to navigate data packages generated by this project, see https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About.

AI-readiness↗

Automatic Determination of the Need for Intravenous Contrast in Musculoskeletal MRI Examinations Using IBM Watson’s Natural Language Processing Algorithm

Magnetic resonance imaging (MRI) protocoling can be time- and resource-intensive, and protocols can often be suboptimal dependent upon the expertise or preferences of the protocoling radiologist. Providing a best-practice recommendation for an MRI protocol has the potential to improve efficiency and decrease the likelihood of a suboptimal or erroneous study. The goal of this study was to develop and validate a machine learning-based natural language classifier that can automatically assign the use of intravenous contrast for musculoskeletal MRI protocols based upon the free-text clinical indication of the study, thereby improving efficiency of the protocoling radiologist and potentially decreasing errors. We utilized a deep learning-based natural language classification system from IBM Watson, a question-answering supercomputer that gained fame after challenging the best human players on Jeopardy! in 2011. We compared this solution to a series of traditional machine learning-based natural language processing techniques that utilize a term-document frequency matrix. Each classifier was trained with 1240 MRI protocols plus their respective clinical indications and validated with a test set of 280. Ground truth of contrast assignment was obtained from the clinical record. For evaluation of inter-reader agreement, a blinded second reader radiologist analyzed all cases and determined contrast assignment based on only the free-text clinical indication. In the test set, Watson demonstrated overall accuracy of 83.2% when compared to the original protocol. This was similar to the overall accuracy of 80.2% achieved by an ensemble of eight traditional machine learning algorithms based on a term-document matrix. When compared to the second reader’s contrast assignment, Watson achieved 88.6% agreement. When evaluating only the subset of cases where the original protocol and second reader were concordant (n = 251), agreement climbed further to 90.0%. The classifier was relatively robust to spelling and grammatical errors, which were frequent. Implementation of this automated MR contrast determination system as a clinical decision support tool may save considerable time and effort of the radiologist while potentially decreasing error rates, and require no change in order entry or workflow.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Real-time sensing of bioaerosols: Review and current perspectives

Detection of bioaerosols, or primary biological aerosol particles (PBAPs), has become increasingly important for a wide variety of research communities and scientific questions. In particular, real-time (RT) techniques for autonomous, online detection and characterization of PBAP properties in both outdoor and indoor environments are becoming more commonplace and have opened avenues of research. With advances in technology, however, come challenges to standardize practices so that results are both reliable and comparable across technologies and users. Here, we present a critical review of major RT instrument classes that have been applied to PBAP research, especially with respect to environmental science, allergy monitoring, agriculture, public health, and national security. Eight major classes of RT techniques are covered, including the following: (i) fluorescence spectroscopy, (ii) elastic scattering, microscopy, and holography, (iii) Raman spectroscopy, (iv) mass spectrometry, (v) breakdown spectroscopy, (vi) remote sensing, (vii) microfluidic techniques, and (viii) paired aqueous techniques. For each class of technology we present technical limitations, misconceptions, and pitfalls, and also summarize best practices for operation, analysis, and reporting. The final section of the article presents pressing scientific questions and grand challenges for RT sensing of PBAP as well as recommendations for future work to encourage high-quality results and increased cross-community collaboration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

An Authentication Vulnerability Assessment of Connected Lighting Systems

Emerging connected lighting systems (CLS) that incorporate distributed intelligence, network interfaces, and sensors can become data-collection platforms that enable a wide range of valuable new capabilities as well as greater energy savings in buildings and cities. However, CLS technology is currently at an early stage of development, and its increased connectivity introduces cybersecurity risks that are new to the lighting industry and that must be addressed for successful integration with other systems. While a number of existing frameworks, guidelines, and tests for evaluating cybersecurity vulnerability may apply to CLS in whole or in part, there is currently no mandatory requirement for cybersecurity testing or certification. The lighting industry, including technology developers and specification organizations, is currently evaluating the suitability of existing frameworks and guidelines for CLS. To support these efforts, Pacific Northwest National Laboratory (PNNL) is conducting a series of studies intended to educate lighting industry stakeholders on specific cybersecurity practices and characterize their implementation in commercially available CLS with varying system architectures, network-communication technologies, and degrees of maturity. This study demonstrates that tests for authentication vulnerabilities can be developed with objective pass/fail criteria, therby facilitating comparisons between CLS. Based on the limited results of this study, it appears that the CLS that are being brought to market have varying levels of authentication vulnerability. It is hoped that these evaluations will support and perhaps accelerate industry discussions on the risks of specific security vulnerabilities, what vulnerabilities should be addressed by in-development of future lighting-specific best practices, and whether any such practices should be included in voluntary lighting standards.

42 ENGINEERING↗