Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Target tracking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,069 records · Page 60

Discrete X-Ray Source Populations and Star-Formation History in Nearby Galaxies

This program aims in understanding the connection between the discrete X-ray source populations observed in nearby galaxies and the history of star-formation in these galaxies. The ultimate goal is to use this knowledge in order to constrain X-ray binary evolution channels. For this reason although the program is primarily observational it has a significant modeling component. During the first year of this study we focused on the definition of a pilot sample of galaxies with well know star-formation histories. A small part of this sample has already been observed and we performed initial analysis of the data. However, the majority of the objects in our sample either have not been observed at all, or the detection limit of the existing observations is not low enough to probe the bulk of their young X-ray binary populations. For this reason we successfully proposed for additional Chandra observations of three targets in Cycle-5. These observations are currently being performed. The analysis of the (limited) archival data for this sample indicated that the X-ray luminosity functions (XLF) of the discrete sources in these galaxies may not have the same shape as is widely suggested. However, any solid conclusions are hampered by the small number of detected sources. For this reason during the second year of this study, we will try to extend the sample in order to include more objects in each evolutionary stage. In addition we are completing the analysis of the Chandra monitoring observations of the Antennae galaxies. The results from this work, apart from important clues on the nature of the most luminous sources (Ultra-luminous X-ray sources; ULXs) provide evidence that source spectral and/or temporal variability does not significantly affect the shape of their X-ray luminosity functions. This is particularly important for comparisons between the XLFs of different galaxies and comparisons with predictions from theoretical models. Results from this work have been presented in several conferences. Refereed journal papers presenting these conclusions are currently in preparation. An important part of this study is the Chandra survey of the Small Magellanic Cloud, our second nearest star- forming galaxy. So far we have been awarded 5 Chandra observations of the central youngest part of the galaxy. These observations will help to study the very faint end of the young X-ray binary populations which is not possible to probe in more distant objects. Results from this study have been presented in several conferences and two papers are in preparation. In addition during year-2 we are planning of undertaking the task of identifying optical counterparts to the X-ray sources, which will help us to isolate interlopers (sources not associated with the SMC) and classify the X-ray binaries which are found to be associated with the SMC. In the theoretical front, the Star-Track X-ray binary population synthesis code which will be used for the modeling of the X-ray binary populations (led by co-I V. Kalogera and C. Belczynski), is complete. A first test using the XLF of the star-forming galaxy NGC-1569 showed remarkable agreement between the observed and the modeled XLF. These results are presented in an ApJ. Letters paper (Belczynski et al, 2004, 601, 147). During year-2 of this study we are planning of performing a parameter study in order to investigate which parameters are most important for the shape of the XLF. In addition we will perform comparisons with observations of other galaxies from our sample as they become available.

Zezas, Andreas↗

Teleoperated Marsupial Mobile Sensor Platform Pair for Telepresence Insertion Into Challenging Structures

A platform has been developed for two or more vehicles with one or more residing within the other (a marsupial pair). This configuration consists of a large, versatile robot that is carrying a smaller, more specialized autonomous operating robot(s) and/or mobile repeaters for extended transmission. The larger vehicle, which is equipped with a ramp and/or a robotic arm, is used to operate over a more challenging topography than the smaller one(s) that may have a more limited inspection area to traverse. The intended use of this concept is to facilitate the insertion of a small video camera and sensor platform into a difficult entry area. In a terrestrial application, this may be a bus or a subway car with narrow aisles or steep stairs. The first field-tested configuration is a tracked vehicle bearing a rigid ramp of fixed length and width. A smaller six-wheeled vehicle approximately 10 in. (25 cm) wide by 12 in. (30 cm) long resides at the end of the ramp within the larger vehicle. The ramp extends from the larger vehicle and is tipped up into the air. Using video feedback from a camera atop the larger robot, the operator at a remote location can steer the larger vehicle to the bus door. Once positioned at the door, the operator can switch video feedback to a camera at the end of the ramp to facilitate the mating of the end of the ramp to the top landing at the upper terminus of the steps. The ramp can be lowered by remote control until its end is in contact with the top landing. At the same time, the end of the ramp bearing the smaller vehicle is raised to minimize the angle of the slope the smaller vehicle has to climb, and further gives the operator a better view of the entry to the bus from the smaller vehicle. Control is passed over to the smaller vehicle and, using video feedback from the camera, it is driven up the ramp, turned oblique into the bus, and then sent down the aisle for surveillance. The demonstrated vehicle was used to scale the steps leading to the interior of a bus whose landing is 44 in. (.1.1 m) from the road surface. This vehicle can position the end of its ramp to a surface over 50 in. (.1.3 m) above ground level and can drive over rail heights exceeding 6 in. (.15 cm). Thus configured, this vehicle can conceivably deliver the smaller robot to the end platform of New York City subway cars from between the rails. This innovation is scalable to other formulations for size, mobility, and surveillance functions. Conceivably the larger vehicle can be configured to traverse unstable rubble and debris to transport a smaller search and rescue vehicle as close as possible to the scene of a disaster such as a collapsed building. The smaller vehicle, tethered or otherwise, and capable of penetrating and traversing within the confined spaces in the collapsed structure, can transport imaging and other sensors to look for victims or other targets.

Krasowski, Michael J.↗

Multi-Shock Shield Performance at 15 MJ for Catalogued Debris

While orbital debris of ten centimeters or more are tracked and catalogued, the difficulty of finding and accurately accounting for forces acting on the objects near the ten centimeter threshold results in both uncertainty of their presence and location. These challenges result in difficult decisions for operators balancing potential costly operational approaches with system loss risk. In this paper, the assessment of the feasibility of protecting a spacecraft from this catalogued debris is described using numerical simulations and a test of a multi-shock shield system against a cylindrical projectile impacting normal to the surface with approximately 15 MJ of kinetic energy. The hypervelocity impact test has been conducted at the Arnold Engineering Development Complex (AEDC) with a 598 g projectile at 6.905 km/s on a NASA supplied multi-shock shield. The projectile used is a hollow aluminum and nylon cylinder with an outside diameter of 8.6 cm and length of 10.3 cm. Figure 1 illustrates the multi-shock shield test article, which consisted of five separate bumpers, four of which are fiberglass fabric and one of steel mesh, and two rear walls, each consisting of Kevlar fabric. The overall length of the test article was 2.65 m. The test article was a 5X scaled-up version of a smaller multi-shock shield previously tested using a 1.4 cm diameter aluminum projectile for an inflatable module project. The distances represented by S1 and S1/2 in the figure are 61 cm and 30.5 cm, respectively. Prior to the impact test, hydrodynamic simulations indicated that some enhancement to the standard multi-shock system is needed to address the effects of the cylindrical shape of the projectile. Based on the simulations, a steel mesh bumper has been added to the shield configuration to enhance the fragmentation of the projectile. The AEDC test occurred as planned, and the modified NASA multi-shock shield successfully stopped 598 g projectile using 85.6 kg/m(exp 2). The fifth bumper layer remained in tact, although it was torn free from its support structure and thrown into the first rear wall. The outer Kevlar layer of the first rear wall tore likely from the impact of the fifth bumper's support structure, but the back of the rear wall was intact. No damage occurred to the second rear wall, or to the witness plate behind the target.

Miller, J. E.↗

Mars Planetary Network for Human Exploration Era – Potential Challenges and Solutions

During 2016-2017, a study was conducted under the sponsorship of the NASA’s Space Communications and Navigation (SCaN) Program to investigate the deep space communications capacity taking into account the needs of all the present and envisioned future missions toward 2030s. It was soon recognized that planning for human exploration to Mars would impose certain unprecedent challenges, both fiscal and technical, to the current space communications paradigm. Targeting the assumed missions concepts, i.e., Crewed Mission to Phobos (CMTP) and Mars Short Stay Mission (MSSM), a Mars Planetary Network for the human exploration era has been formulated. The activity modeling and network traffic simulation/modeling we performed gave some insight into the technical challenges in space communications for the envisioned human Mars exploration era. Chief among the potential challenges are: (1) the high demand on the deep space network (DSN) assets for achieving the high-rate links, both return and forward, from Mars farthest/farther distance (up to 2.67 AU); (2) the need for resilient, persistent communication coverage for crewed vehicles, on surface and in orbits; (3) the significant period of outage for the Mars-Earth link due to superior solar conjunction; (4) the need for on-demand, simultaneous access to the proximity link by multiple vehicles and astronauts in the exploration zone; (5) the capability of determining precise, real-time, positions of surface vehicles and astronauts by the deep space habitat and/or other tele-operations entities. Solution space to each of the above challenges has been explored and analyzed in the context of the individual problem domain and, more importantly, in conjunction with that for the other challenges. This has led to an end-to-end definition of a Mars Planetary Network that would feature: (1) the fusion of deep space Ka-band and optical communications for achieving Mars-Earth high-rate links taking advantage of the optical/RF hybrid 8m/34m antennas in DSN; (2) the integrated application of the Multiple Spacecraft Per Antenna (MSPA) technique, for return link data acquisition, and the Multiple Uplink Per Antenna (MUPA) technique, for forward link data trasnmission, to reduce the number of 34m beam-wave guide (BWG) antennas needed for the era; (3) the integration of three, arrayed, 34m beam-wave guide (BWG) antennas, to provide a high G/T aperture, with the MSPA/MUPA techniques, and a dual “trunk link”approach to cut down the needed G/T -- hence, reducing the number of 34m antennas, relative to that in the single trunk approach by 50%; (4) the deployment of two areostationary/areosynchronous Mars relay orbiters; one of them could also function as (or be served by) a notional Deep Space Habitat (DSH); (5) the opportunistic deployment of a science orbiter in a Pioneer-6 type orbit, equidistant Mars/Earth, that could also serve as an intermediary relay during the Mars superior solar conjunction perod; (6) the existence of the multi-function Mars proximity link that provides the demand-assigned, multiple access (DAMA) capability; and (7) the provision of tracking observables, by leveraging on the planned Mars orbiting and surface infrastructure, to enable the in-situ navigation for surface and orbiting vehicles. This paper provides the description of the proposed Mars Planetary Network in the human exploration era, the trade-off analysis for the various alternative architectures, and the optimal solutions to the key challenges in defining this end-to-end network.

Cheung, Kar-Ming↗

Antennas Designed for Advanced Communications for Air Traffic Management (AC/ATM) Project

The goal of the Advanced Communications for Air Traffic Management (AC/ATM) Project at the NASA Glenn Research Center at Lewis Field is to enable a communications infrastructure that provides the capacity, efficiency, and flexibility necessary to realize a mature free-flight environment. The technical thrust of the AC/ATM Project is targeted at the design, development, integration, test, and demonstration of enabling technologies for global broadband aeronautical communications. Since Ku-band facilities and equipment are readily available, one of the near-term demonstrations involves a link through a Kuband communications satellite. Two conformally mounted antennas will support the initial AC/ATM communications links. Both of these are steered electronically through monolithic microwave integrated circuit (MMIC) amplifiers and phase shifters. This link will be asymmetrical with the downlink to the aircraft (mobile vehicle) at a throughput rate of greater than 1.5 megabits per second (Mbps), whereas the throughput rate of the uplink from the aircraft will be greater than 100 kilobits per second (kbps). The data on the downlink can be narrow-band, wide-band, or a combination of both, depending on the requirements of the experiment. The AC/ATM project is purchasing a phased-array Ku-band transmitting antenna for the uplink from the test vehicle. Many Ku-band receiving antennas have been built, and one will be borrowed for a short time to perform the initial experiments at the NASA Glenn Research Center at Lewis Field. The Ku-band transmitting antenna is a 254-element MMIC phased-array antenna being built by Boeing Phantom Works. Each element can radiate 100 mW. The antenna is approximately 43-cm high by 24-cm wide by 3.3-cm thick. It can be steered beyond 60 from broadside. The beamwidth varies from 6 at broadside to 12 degrees at 60 degrees, which is typical of phased-array antennas. When the antenna is steered to 60 degrees, the beamwidth will illuminate approximately five satellites on the orbital arc. Spread spectrum techniques will be employed to keep the power impinging on the adjacent satellites below their noise floor so that no interference results. This antenna is power limited. If the antenna elements (currently 254) are increased by a factor of 4 (1024) or 16 (4096), the gain will increase and the beamwidth will decrease in proportion. For the latter two antenna sizes, the power must be "backed off" to prevent interference with the neighboring satellites. The receiving antenna, which is approximately 90-cm high, 60-cm wide, and 3.5-cm thick, is composed of 1500 phased-array elements. The system phased-array controller can control both a 1500-element receiving antenna and a 500-element transmitting antenna. For ground testing, this controller will allow manual beam pointing and polarization alignment. For normal operation, the system can be connected to the receiving antenna and the navigation system for real-time autonomous track operation. This will be accomplished by first pointing both antennas at the satellite using information from the aircraft data bus. Then, the system phased-array controller will electronically adjust the antenna pointing of the receiving antenna to find the peak signal. After the peak signal has been found, the beam of the transmitting antenna will be pointed to the same steering angles as the receiving antenna. For initial ground testing without an aircraft, the ARINC 429 data bus (ARINC Inc., Annapolis, Maryland) will be simulated by a gyro system purchased for the follow-on to the Monolithic Microwave Integrated Circuit (MMIC) Arrays for Satellite Communication on the Move (MASCOM) Project. MASCOM utilized the Advanced Communications Technology Satellite (ACTS) with a pair of Ka-band experimental phased-array antennas.

Zakrajsek, Robert J.↗

Selection and Assessment of Predictions of the Mars Pathfinder Landing Site

The successful landing of the Mars Pathfinder spacecraft on Mars allows the review of the process of selecting the landing site and assessing predictions made for the site based on Viking and Earth-based data. Selection of the landing site for Mars Pathfinder was a two-phase process. The first phase took place from October 1993 to June 1994 and involved: initial identification of engineering constraints, definition of environmental conditions at the site for spacecraft design, and evaluation of the scientific potential of different landing sites. This phase culminated with the first "Mars Pathfinder Landing Site Workshop", held at the Lunar and Planetary Institute in Houston, Texas on April 18-19, 1994, in which suggested approaches and landing sites were solicited from the entire scientific community. A preliminary site was selected by the project for design purposes in June 1994. The second phase took place from July 1994 to March 1996 and involved: developing criteria for evaluating site safety using images and remote sensing data, testing of the spacecraft and landing subsystems (with design improvements) to establish quantitative engineering constraints on landing site characteristics, evaluating all potential landing sites on Mars, and certification of the site by the project. This phase included a second open workshop, "Mars Pathfinder Landing Site Workshop II: Characteristics of the Ares Vallis Region and Field Trips in the Channeled Scabland, Washington" held in Spokane and Moses Lake September 24-30, 1995 and formal acceptance of the site by NASA Headquarters. Engineering constraints on Pathfinder landing sites were developed from the initial design of the spacecraft and the entry, descent and landing scenario. The site must be within 5 degrees of the subsolar latitude at the time of landing (15N for maximum solar power and flexible communications with Earth. It also must be below 0 km elevation to enable enough time for the parachute to bring the lander to the proper terminal velocity for landing. The entire landing ellipse, which is 70 km by 200 km due to navigational, ephemeris and atmospheric uncertainties, must be free of steep slopes, scarps and obvious hazards in Viking orbiter images, have acceptable radar reflectivity, moderate rock abundances and have little or no dust. Scientific considerations of the Mars Pathfinder payload and mission indicate that analyses of "grab bag" samples at the mouths of outflow channels can offer a first order assessment of a variety of rock types on Mars. Highland sites offer the advantage of in situ analysis of ancient rocks on Mars that record crustal differentiation and the nature of the early environment. Dark gray sites offer the potential of analyzing unweathered and unoxidized materials. Following a general assessment of the safety of different sites, a preliminary selection of a "grab bag" site was made. This site, Ares Vallis, is near the mouth of an outflow channel that may contain ancient Noachian terrain, Hesperian ridged plains, and reworked channel materials. All potential landing sites on Mars that met basic safety criteria were analyzed in detail. Sites (100 by 200 km target ellipses) were considered safe if they were below 0 km elevation, were free of obvious hazards (high relief surface features) in high-resolution (< 50 m/pixel) Viking orbiter images and had acceptable reflectivity and roughness at radar wavelengths, high thermal inertia, moderate rock abundance, low red to violet ratio, and low albedo. Only 4 sites on Mars met all the above criteria, which included 1995 opposition 3.5 cm delay-Doppler radar data. Complete data were evaluated for 7 sites and the Viking landing sites for comparison for all the above criteria as well as crater abundance, hill and mesa abundance, slopes over meter to kilometer scales, low altitude winds (from global circulation models and slopes), the size-frequency distribution of large rocks, as well as rover trafficability and science potential. Discussion of potential hazards at Ares Vallis using a variety of data sets (including radar) at a second open workshop, indicated this site cannot be shown to be any more hazardous than the Viking landing sites. Field trips to the Channeled Scabland and the Ephrata Fan, analogs for Ares Vallis and the landing site, respectively, provided valuable insight into possible geologic processes and potential surface characteristics. Three sites met all the data requirements and safety criteria for landing Pathfinder. Ares Vallis was selected by the project because it appeared acceptably safe (although it appeared to have greater rock abundances than other sites, its elevation was likely the best known) and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which would enable addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early martian environment and its subsequent evolution. The selection was reviewed by an external board at a number of meetings and accepted, and the site was approved by NASA Headquarters. Data gathered by the Pathfinder lander' and rover provides the opportunity to test the predictions made for the site in the selection process based on remote observations from Earth, orbit, and the surface. The discussion below is taken from Golombek et al. to which the reader is referred for a more complete discussion and a complete list of references, which are omitted here for brevity. Many characteristics of the landing site are consistent with its being shaped and deposited by the Ares and Tiu catastrophic floods. The rocky surface is consistent a depositional plain comprising semi-rounded pebbles, cobbles and tabular boulders (some of which appear imbricated and/or inclined in the direction of flow) that appear similar to depositional plains in terrestrial catastrophic floods. The Twin Peaks appear to be streamlined hills in lander images, which is consistent with interpretations of larger hills in Viking orbiter images of the region that suggest the lander is on the flank of a broad, gentle ridge trending northeast from Twin Peaks. This ridge, which is the rise to the north of the lander, is aligned in the downstream direction from the Ares and Tiu Valles floods, and may be a debris tail deposited in the wake of the Twin Peaks. Channels visible throughout the scene may be a result of late stage drainage. As predicted by delay-Doppler radar measurements and tracking results, the average elevation of the center of the site was about the same as Viking Lander I relative to the 6.1 mbar geoid. The Doppler tracking and two-way ranging estimate for the elevation of the spacecraft is only 45 in lower than the Viking I Lander and within 100 in of that expected, which is within the uncertainties of the measurements. After landing, surface pressures and winds (5-10 m/s) were found to be similar to expectations based on Viking data, although temperatures were about 10 K warmer. The temperature profile below 50 km was also roughly 20 K warmer. As a result, predicted densities were 5% higher near the surface and up to 40% lower at 50 km but within the entry, descent and landing design margins. The populations of craters and small hills and the slopes of the hills measured in high-resolution (38 m/pixel) Viking orbiter images and the radar derived slopes of the landing site are all consistent with observations of these properties in the lander images. A rocky surface was expected from Viking Infra-Red Thermal Mapper (IRTM) observations and comparisons with the Viking landing sites. The observed cumulative fraction of area covered by rocks with diameters greater than 3 cm and heights greater than 0.5 in (potentially hazardous to landing) at Ares is similar to that predicted by IRTM observations and models of Viking lander and Earth analog rock size-frequency distributions. The IRTM prediction postulated an effective thermal inertia of 30 (10(exp -3) cgs units - cal/cubic cm/s(exp 0.5)/K) for the rock population, but we obtain a slightly different effective thermal inertia for the actual rock population. The validity of interpretations of radar echoes prior to landing are supported by a simple radar echo model, an estimate of the reflectivity of the soil from its bulk density, and the fraction of area covered by rocks. In the calculations, the soil produces the quasi-specular echo and the rocks produce the diffuse echo. The derived quasispecular cross section is comparable to the cross-sections and reflectivities reported for 3.5-cm wavelength observations. The model yields a diffuse echo that is modestly larger than the polarized diffuse echo reported for 3.5-cm wavelength observations. At 12.5-cm wavelength, similar rock populations at Ares and the Viking I site were expected because the diffuse echoes are comparable, but the large normal reflectivities suggests that bulk densities of the soils at depth are greater than those at the surface. We also obtain a fine-component inertia near 8.4 which agrees with the fine-component inertia of 8.7 (in 10(exp -3) cgs units) estimated from thermal observations from orbit by the IRTM; for this estimate, we used a bulk thermal inertia of 10.4 for the landing site, an effective thermal inertia near 40 (10(exp -3) cgs units) for the rock population, and a graphical representation of Kieffer's model. Color and albedo data for Ares suggested surfaces of materials at Ares Vallis would be relatively dust free or unweathered prior to landing compared with the materials at the Viking landing sites. This suggestion is supported by the abundance of relatively dark-gray rocks at Ares and their relative rarity at the Viking landing sites, where rocks are commonly coated with bright red dust. Finally, the 40 km long Ephrata Fan of the Channeled Scabland in Washington state, which was deposited where c

Golombek, M. P.↗

Methodology and Results of the Near-Earth Object (NEO) Human Space Flight (HSF) Accessible Targets Study (NHATS)

Near-Earth Asteroids (NEAs) have been identified by the current administration as potential destinations for human explorers during the mid-2020s. While the close proximity of these objects' orbits to Earth's orbit creates a risk of highly damaging or catastrophic impacts, it also makes some of these objects particularly accessible to spacecraft departing Earth, and this presents unique opportunities for solar system science and humanity's first ventures beyond cislunar space. Planning such ambitious missions first requires the selection of potentially accessible targets from the growing population of nearly 7,800 NEAs. To accomplish this, NASA is conducting the Near-Earth Object (NEO) Human Space Flight (HSF) Accessible Targets Study (NHATS). Phase I of the NHATS was executed during September of 2010, and Phase II was completed by early March of 2011. The study is ongoing because previously undetected NEAs are being discovered constantly, which has motivated an effort to automate the analysis algorithms in order to provide continuous monitoring of NEA accessibility. The NHATS analysis process consists of a trajectory filter and a minimum maximum estimated size criterion. The trajectory filter employs the method of embedded trajectory grids to compute all possible ballistic round-trip mission trajectories to every NEA in the Jet Propulsion Laboratory (JPL) Small-Body Database (SBDB) and stores all solutions that satisfy the trajectory filter criteria. An NEA must offer at least one qualifying trajectory solution to pass the trajectory filter. The Phase II NHATS filter criteria were purposely chosen to be highly inclusive, requiring Earth departure date between January 1st, 2015 and December 31st, 2040, total round-trip flight time <= 450 days, stay time at the NEA >= 8 days, Earth departure C(sub 3) energy <= 60 km(exp 2)/s(exp 2), total mission delta-v <= 12 km/s (including an Earth departure maneuver from a 400 km altitude circular parking orbit), and a maximum atmospheric re-entry speed of 12 km/s. After determining which NEAs offer at least one trajectory solution meeting the criteria, the estimated size constraint is then imposed whereby those NEAs may only be considered NHATS- qualifying NEAs if their maximum estimated size is >= 30 m. This corresponds to an absolute magnitude H <= 26.5 with an assumed albedo p = 0:05. The following is a brief high-level summary of the Phase II study results. Of the 7,665 NEAs in the SBDB as of February 3rd, 2011, 765 NEAs passed the trajectory filter and yielded a total of 79,157,604 trajectory solutions. The trajectory solutions for each NEA are post-processed into Pork Chop Contour (PCC) plots which show total mission delta-v as a function of Earth departure date and total mission duration. Although the PCC plots necessarily compress a very multi-dimensional design space into a two-dimensional plot, they permit rapid assessment of the breadth and quality of an NEA's available Earth departure season and clearly indicate the regions of the trajectory design space which warrant further analysis and optimization. The PCC plot for the NEA with the greatest number of NHATS-qualifying trajectory solutions, 2000 SG-344, is shown. Of the 765 NEAs which passed the Phase II trajectory filter, a total of 590 NEAs also satisfied the further constraint of maximum estimated size >= 30 m. The distributions of osculating heliocentric orbital semi-major axis (a), eccentricity (e), and inclination (i), for those 590 NEAs are shown. Note that the semi-latus rectum used is equal to alpha (1-e(exp 2)). To further our understanding of round-trip trajectory accessibility dynamics, it is instructive to examine the distribution of the NHATS-Qualifying NEAs according to orbit classification. NEAs are grouped into four orbit families: Atiras (aphelion < 0.983 AU), Atens (aphelion > 0.983 AU, alpha < 1.0 AU), Apollos (perihelion < 1.017 AU, alpha > 1.0 AU), and Amors (1.017 < perihelion < 1.3 AU). Of the 765 NEAhich satisfied the NHATS trajectory criteria, none are Atiras, 193 are Atens (31% of known Atens), 456 are Apollos (11% of known Apollos), and 116 are Amors (4% of known Amors). While Apollos comprise 60% of the NEAs which pass the NHATS trajectory filter and Atens comprise only 25%, the percentages according to orbit family are perhaps more relevant. Note that only 11% of known Apollos passed the trajectory filter while 31% of known Atens passed. These simple statistics alone strongly suggest that Aten orbits possess features which tend to enhance their round-trip trajectory accessibility as compared to Apollos or Amors. This is significant because Atens' orbits cause them to spend considerable time in Earth's daytime sky, making them difficult to discover and track using ground-based observing assets. In this paper we will detail the NHATS analysis algorithms, present and analyze all NHATS results to date, and discuss aspects of HSF mission architecture design for future NEA missions.

Barbee, Brent↗