Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Response to Comment on "The National Ignition Facility Laser Performance Status"

We appreciate Stephen Bodner's continuing interest in the performance of the NIF laser system. However, we find it necessary to disagree with the conclusions he reached in his comments [Appl. Opt. 47, XXX (2008)] on 'National Ignition Facility Laser Performance Status' [Appl. Opt. 46, 3276 (2007)]. In fact, repeated and ongoing tests of the NIF beamlines have demonstrated that NIF can be expected not only to meet or exceed its requirements as established in the mid-1990s in the document National Ignition Facility Functional Requirements and Primary Criteria [Revision 1.3, Report NIF-LLNL-93-058 (1994)], but also to have the flexibility that provides for successfully meeting an ever expanding range of mission goals, including those of ignition.

42 ENGINEERING↗

STATUS OF CHEMICAL CLEANING OF WASTE TANKS AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT - 9114

Chemical Cleaning is currently in progress for Tanks 5 and 6 at the Savannah River Site. The Chemical Cleaning process is being utilized to remove the residual waste heel remaining after completion of Mechanical Sludge Removal. This work is required to prepare the tanks for closure. Tanks 5 and 6 are 1950s vintage carbon steel waste tanks that do not meet current containment standards. These tanks are 22.9 meters (75 feet) in diameter, 7.5 meters (24.5 feet) in height, and have a capacity of 2.84E+6 liters (750,000 gallons). Chemical Cleaning adds 8 wt % oxalic acid to the carbon steel tank to dissolve the remaining sludge heel. The resulting acidic waste solution is transferred to Tank 7 where it is pH adjusted to minimize corrosion of the carbon steel tank. The Chemical Cleaning flowsheet includes multiple strikes of acid in each tank. Acid is delivered by tanker truck and is added to the tanks through a hose assembly connected to a pipe penetration through the tank top. The flowsheet also includes spray washing with acid and water. This paper includes an overview of the configuration required for Chemical Cleaning, the planned flowsheet, and an overview of technical concerns associated with the process. In addition, the current status of the Chemical Cleaning process in Tanks 5 and 6, lessons learned from the execution of the process, and the path forward for completion of cleaning in Tanks 5 and 6 will also be discussed.

36 MATERIALS SCIENCE↗

ILC Marx Modulator Development Program Status

Development of a first generation prototype (P1) Marx-topology klystron modulator for the International Linear Collider is nearing completion at the Stanford Linear Accelerator Center. It is envisioned as a smaller, lower cost, and higher reliability alternative to the present, bouncer-topology, 'Baseline Conceptual Design'. The Marx presents several advantages over conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at ILC parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. The P1-Marx employs all solid state elements; IGBTs and diodes, to control the charge, discharge and isolation of the cells. A general overview of the modulator design and the program status are presented.

43 PARTICLE ACCELERATORS↗

Status of LHC crab activity simulations and beam studies

The LHC crab cavity program is advancing rapidly towards a first prototype which is anticipated to be tested during the early stages of the LHC phase I upgrade and commissioning. The general project status and some aspects related to crab optics, collimation, aperture constraints, impedances, noise effects. beam transparency and machine protection critical for a safe and robust operation of LHC beams with crab cavities are addressed here.

43 PARTICLE ACCELERATORS↗

Overview and Status Update of the Fermilab HINS Linac R&D Program

The Fermilab High Intensity Neutrino Source (HINS) Linac R&D program is continuing efforts to construct a first-of-a-kind superconducting H{sup -} linac. The goal of the HINS linac is to demonstrate, for the first time, acceleration of high intensity beam with superconducting spoke cavities, control of beam halo growth by use of solenoidal focusing optics throughout, and operation of many cavities from a single high-power RF source for acceleration of non-relativistic particles. The HINS effort is relevant to any future high brightness, high intensity linac and, in particular, to the linac proposed as part of Fermilab Project X to serve the next generation of neutrino physics and future muon storage ring/collider experiments. This paper updates the technical status of the various components being developed, built, and commissioned as a part of HINS and presents the outlook for the HINS program.

43 PARTICLE ACCELERATORS↗

STATUS OF THE DIELECTRIC WALL ACCELERATOR

The dielectric wall accelerator (DWA) system being developed at the Lawrence Livermore National Laboratory (LLNL) uses fast switched high voltage transmission lines to generate pulsed electric fields on the inside of a high gradient insulating (HGI) acceleration tube. High electric field gradients are achieved by the use of alternating insulators and conductors and short pulse times. The system is capable of accelerating any charge to mass ratio particle. Applications of high gradient proton and electron versions of this accelerator will be discussed. The status of the developmental new technologies that make the compact system possible will be reviewed. These include, high gradient vacuum insulators, solid dielectric materials, photoconductive switches and compact proton sources.

43 PARTICLE ACCELERATORS↗

Autocollimators for Deflectometry: Current Status and Future Progress

The proliferation of autocollimator-based surface profilometers at synchrotron metrology laboratories worldwide necessitates a detailed understanding of the parameters influencing their angular response. A comprehensive overview of the current status of autocollimator characterization and calibration at the Physikalisch-Technische Bundesanstalt (PTB) and its implications for their optimal application are provided, as well as information on future challenges and expected progress. Autocollimator-based deflectometric profilometers are in operation at the PTB, the Advanced Light Source (ALS), Lawrence Berkeley National Laboratory, USA, the BESSY II, Helmholtz-Zentrum Berlin fuer Materialien und Energie GmbH, Germany, and the Diamond Light Source Ltd (DLS), UK. A continuous topic of research at the PTB is to investigate the factors influencing the angular response of autocollimators and to provide the most accurate calibration of the instruments to aid users in their application and manufacturers in their improvements [1-3]. At the PTB, the calibration of autocollimators is realized by a direct comparison of the devices with the primary angle reference standard [1]. With highly stable autocollimators, calibrations with standard measurement uncertainties of u = 0.003 arcsec (15 nrad) have been achieved [2,3]. The influence of a number of parameters on the angle measurement with autocollimators have been investigated in detail, such as the reflectivity of the surface under test (SUT), the diameter and shape of the aperture stop, its position both along the autocollimator's optical axis and perpendicular to it [2], as well as the optical path length of the autocollimator beam [3]. Extensive information on these errors and their minimization will be presented.

47 OTHER INSTRUMENTATION↗

Status of Transuranic Bearing Metallic Fuel Development

This paper summarizes the status of the metallic fuel development under the Advanced Fuel Cycle Initiative (AFCI). The metallic fuel development program includes fuel fabrication, characterization, advanced cladding research, irradiation testing and post-irradiation examination (PIE). The focus of this paper is on the recent irradiation experiments conducted in the Advanced Test Reactor and some PIE results from these tests.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of the SNS Ring Power Ramp UP

Beam was first circulated in the Spallation Neutron Source (SNS) ring in January 2006. Since that time we have been working to raise the beam power to the design value of 1.4 MW. In general the power ramp up has been proceeding very well, but several issues have been uncovered. Examples include poor transmission of the waste beams in the injection dump beam line, and cross-plane coupling in the ring to target beam transport line. In this paper we will discuss these issues and present an overall status of the ring and the transport beam lines.

43 PARTICLE ACCELERATORS↗

Development Status of The ILC Marx Modulator

The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-}0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

43 PARTICLE ACCELERATORS↗

Conversion of research and test reactors to low enriched uranium fuel : technical overview and program status.

Many of the nuclear research and test reactors worldwide operate with high enriched uranium fuel. In response to worries over the potential use of HEU from research reactors in nuclear weapons, the U.S Department of Energy (DOE) initiated a program - the Reduced Enrichment for Research and Test Reactors (RERTR) - in 1978 to develop the technology necessary to reduce the use of HEU fuel by converting research reactors to low enriched uranium (LEU) fuel. The Reactor Conversion program is currently under the DOE's National Nuclear Security Administration's Global Threat Reduction Initiative (GTRI). 55 of the 129 reactors included in the scope have been already converted to LEU fuel or have shutdown prior to conversion. The major technical activities of the Conversion Program include: (1) the development of advanced LEU fuels; (2) conversion analysis and conversion support; and (3) technology development for the production of Molybdenum-99 (Mo{sup 99}) with LEU targets. The paper provides an overview of the status of the program, the technical challenges and accomplishments, and the role of international collaborations in the accomplishment of the Conversion Program objectives. Nuclear research and test reactors worldwide have been in operation for over 60 years. Many of these facilities operate with high enriched uranium fuel. In response to increased worries over the potential use of HEU from research reactors in the manufacturing of nuclear weapons, the U.S Department of Energy (DOE) initiated a program - the Reduced Enrichment for Research and Test Reactors (RERTR) - in 1978 to develop the technology necessary to reduce the use of HEU fuel in research reactors by converting them to low enriched uranium (LEU) fuel. The reactor conversion program was initially focused on U.S.-supplied reactors, but in the early 1990s it expanded and began to collaborate with Russian institutes with the objective of converting Russian supplied reactors to the use of LEU fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of Activities to Implement a Sustainable System of MC&A Equipment and Methodological Support at Rosatom Facilities

Under the U.S.-Russian Material Protection, Control and Accounting (MPC&A) Program, the Material Control and Accounting Measurements (MCAM) Project has supported a joint U.S.-Russian effort to coordinate improvements of the Russian MC&A measurement system. These efforts have resulted in the development of a MC&A Equipment and Methodological Support (MEMS) Strategic Plan (SP), developed by the Russian MEM Working Group. The MEMS SP covers implementation of MC&A measurement equipment, as well as the development, attestation and implementation of measurement methodologies and reference materials at the facility and industry levels. This paper provides an overview of the activities conducted under the MEMS SP, as well as a status on current efforts to develop reference materials, implement destructive and nondestructive assay measurement methodologies, and implement sample exchange, scrap and holdup measurement programs across Russian nuclear facilities.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Status of the Tavatron CDF and D0 experiments

The status of the Tevatron Collider is reviewed and highlights of the rich physics program carried out by the CDF and D0 experiments are presented. The Tevatron Collider has been performing remarkably well in the past few years and it is continuing to deliver record luminosity. The machine collides proton and anti-proton beams at an energy in the center of mass of 1.96 TeV, with average peak luminosity of 300E30 cm{sup -2}s{sup -1}. The total delivered luminosity is slightly above 9 fb{sup -1}. The CDF and D0 experiments have been collecting data with an average efficiency of 90%, while the experiments have enjoyed an annual doubling of the integrated luminosity delivered and recorded. This has led to an avalanche of new results from areas as diverse as QCD, top, searches for new physics and the area of electroweak symmetry breaking with particular focus on direct searches for the Higgs boson. The physics reach of the Tevatron is built on a mountain of measurements that confirm the ability of the Tevatron collaborations to use their detectors to discover new particles. Each measurement is of itself a significant result. Measurements begin with the largest cross section processes, those of B physics, but move on to processes with small branching ratios and backgrounds that are hard to distinguish from the signal. The measurement of Bs oscillations demonstrates the performance of the silicon tracking and vertexing. Discovery of single top production, WZ production, and evidence for the ZZ production in both leptonic and now hadronic modes provide the final base camp from which the Higgs summit is in sight. Processes such as single top and ZZ act as important messengers heralding the impending arrival of the Higgs. This journey through lower and lower cross section processes represents our approach to provide convincing evidence of these processes, first as discovery then as measurements that constrain the Standard Model.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status Update on the Second-Generation ILC Marx Modulator Prototype

This paper is a status update of the SLAC P2 Marx. This Marx-topology klystron modulator is a second-generation modulator which builds upon experience gained from the SLAC P1 Marx. There are several fundamental differences between these modulators including the correction scheme, bus voltages, and the control system architecture. These differences, along with preliminary experimental results and the schedule for further development, are detailed in this paper.

43 PARTICLE ACCELERATORS↗

ILC MARX MODULATOR DEVELOPMENT PROGRAM STATUS

A Marx-topology klystron modulator is under development for the International Linear Collider (ILC) project. It is envisioned as a lower cost, smaller footprint, and higher reliability alternative to the present, bouncer-topology, baseline design. The application requires 120 kV (+/-0.5%), 140 A, 1.6 ms pulses at a rate of 5 Hz. The Marx constructs the high voltage pulse by combining, in series, a number of lower voltage cells. The Marx employs solid state elements; IGBTs and diodes, to control the charge, discharge and disolation of the cells. Active compensation of the output is used to achieve the voltage regulation while minimizing the stored energy. The developmental testing of a first generation prototype, P1, has been completed. This modulator has been integrated into a test stand with a 10 MW L-band klystron, where each is undergoing life testing. Development of a second generation prototype, P2, is underway. The P2 is based on the P1 topology but incorporates an alternative cell configuration to increase redundancy and improve availability. Status updates for both prototypes are presented.

43 PARTICLE ACCELERATORS↗

Fuel Cycle Research and Development Accident Tolerant Fuels Series 1 (ATF-1) Irradiation Testing FY 2016 Status Report

This report contains a summary of irradiation testing of Fuel Cycle Research and Development (FCRD) Accident Tolerant Fuels Series 1 (ATF 1) experiments performed at Idaho National Laboratory (INL) in FY 2016. ATF 1 irradiation testing work performed in FY 2016 included design, analysis, and fabrication of ATF-1B drop in capsule ATF 1 series experiments and irradiation testing of ATF-1 capsules in the ATR.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status Report on Pressure Resistance Weld Development for FeCrAl Thin-Wall Cladding

This report summarizes the recent development on the weld techniques of joining the thin walled FeCrAl cladding to the endplug as a part of accident tolerant fuels (ATF) program for advanced light water reactor (LWR) systems. The FeCrAl alloy has been considered as the top candidate cladding materials for ATF fuels largely due to its high oxidation resistance in high temperature steam relevant to the loss of coolant accident (LOCA) conditions. The two primary techniques for the thin-walled cladding weld development are laser beam weld (fusion based) and pressure resistance weld (solid state without melting). This report focuses on the progress made on the pressure resistance weld (PRW) development for a commercial FeCrAl alloy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status Report on Development of MARCH Module Designs

The Transient Reactor Test (TREAT) facility was constructed in the late 1950’s, provided thousands of transient irradiations before being placed in standby in 1994, and was restarted in 2017 in order to resume its crucial role in nuclear heated safety research. Advances in modern computational capabilities and a resurgence of interest in novel reactor technology have created an opportunity for emphasizing modern science-based and separate effects test capabilities at TREAT. An innovative approach to this type of testing leverages the relatively low radioisotope accumulation during brief TREAT irradiations by arranging small fresh fuel specimens in low activation hardware “modules” so that they can be easily extracted and shipped for examination within weeks. The concept was termed the Minimal Activation Retrievable Capsule Holder (MARCH) irradiation vehicle system, and its maturation began under a Lab Directed Research and Development (LDRD) project starting in fiscal year 2017. Within the first year of this project, enough design and predictive modeling had been performed to prove the principle and ascertain support from major direct-funded DOE fuel development programs including the Accident Tolerant Fuels (ATF) program that sponsored the first modern fueled test to be performed in TREAT using the MARCH system. Since the design was modular in nature, it was straightforward for other sources to adopt and mature viable test modules while the LDRD project continued concurrently for two more years in conceptualizing and demonstrating the viability of other innovative modules. Many of these modules were adopted for continued development and irradiation under the Advanced Fuels Campaign and other direct sources. This report summarizes the MARCH modules that were conceptualized, designed, and deployed to date with the primary aim of providing reference information to future experiment designers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗