Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Assessment of CO 2 Storage Resources in Depleted Oil and Gas Fields in the Ship Shoal Area, Gulf of Mexico

The Gulf of Mexico is one of the most important regions in the United States for energy resources and infrastructure. Gulf of Mexico federal offshore oil and gas production accounts for 17% of total U.S. crude oil production and 5% of total U.S. gas production (EIA Gulf of Mexico Fact Sheet). This region presents an excellent combination of high need and significant opportunity for large scale geologic storage of CO 2 . The Ship Shoal Area is located about 20 miles offshore Louisiana within the Gulf Coast federal waters. Miocene and Pliocene sediments in the Ship Shoal Area are proven to provide excellent and secure traps for oil and gas. The Ship Shoal Area contains a large number of depleted oil and gas fields either currently abandoned, or planned for abandonment by 2025, which may provide very significant potential CO 2 storage capacity. GeoMechanics Technologies conducted a comprehensive research project to better characterize Neogene sediments in the Ship Shoal Area for high volume CO 2 storage. The data generated from literature, well data, well log, and formation evaluation were input into Rockwork 16 geologic software to create a detailed geologic model for the Ship Shoal study area. The geologic grids were then fed into TOUGH2, the gas migration model software and FLAC 3D, the geomechanical model software. The fluid flow modeling for both the Miocene and Pliocene simulation from both Block 107 and Block 84 indicated that Pliocene and Miocene are a good reservoir for the CO 2 sequestration. Thirty years of CO 2 injection (at a rate of 1 million metric tons CO 2 per year) and 30 years of observation simulations were run with the fluid flow modeling. The 3D geomechanical modeling for Ship Shoal Block 107 and Block 84 were developed to evaluate induced surface deformation and potential fault reactivation after 30 years CO 2 injection at base of Pliocene and at upper Miocene injection locations. Evaluation results indicate low to no risks for fault slips or fault reactivation. Twelve well bores and 76 well bores for Ship Shoal Blocks 84 and 107 respectively were reviewed for their cement history. Most wells (57 out of 76 and 7 out of 12 wells in Ship Shoal Block 107 and 84 respectively) have good integrity. Nineteen and 5 wells (in Ship Shoal Block 107 and 84 respectively) with no top plug, incomplete cement or Plug and Abandonment information are given yellow cautionary indicators. These cautionary wells may provide leakage paths of CO 2 through the well bores to the USDWs. Using our Quantitative Risk & Decision Analysis Tool (QRDAT) for caprock integrity evaluation, we compared Ship Shoal’s risk to that of In Salah, Sleipner, Kevin Dome, Loudon, Illinois Industrial CCS and Wilmington Graben. We found the risk at the Ship Shoal Blocks 84 and 107 fields are similar to the known CO 2 active sequestration sites, but lower than the Wilmington Graben turbidities offshore California studied site. The risk of natural seismicity in the Gulf of Mexico is relatively low. Geomechanics Technologies has documented the top 25 CO 2 emission sources within the close proximity of the Ship Shoal Block 84 and 107 fields. All the offshore and onshore pipelines have been digitized and can be viewed in an interactive website (http://www.geomechanicstech.com/shipshoal.html). We also performed a feasibility study on the potential for converting existing oil or gas pipelines for CO 2 transport. There are abandoned, idled and retired onshore and offshore pipelines. However, there is no standard specification for maximum pipeline pressures needed for CO 2 transport. It is a function of design, materials, and testing provided; thus it will be the responsibility of the pipeline operator to correctly determine, maintain and operate within the limits of the pipelines. There are a few transit corridors extending from onshore Louisiana (Cailou Bay) to offshore trunk-lines. The cost for constructing a pipeline has increased about 46% from 2015 to an average cost of $5,064,046 per mile in 2016. We use the NETL CO 2 storage resource mass estimate to calculate the potential resources for Ship Shoal Block 84 and 107 fields using the depleted oil and gas reservoir volume and sand volume generated from our geologic modeling. The estimated storage resource results are greater when using the sand volumes derived through geologic modeling than the oil and gas reservoir data. The difference is due to the depleted oil and gas reservoir information not accounting for the water-flooded sand located below the oil/gas-water contact or unproductive sand units. Resource calculation using the sand volume obtained through geologic modeling overestimate the storage capacity as the model accounts for all sand within the formation, not just the interconnected sand.

02 PETROLEUM↗

Smart Meters Enabling Voltage Monitoring and Control Functionalities: The Last-Mile Voltage Stability Issue

It is a demanding yet challenging task to design the next generation of smart meters. This work investigates the new voltage monitoring and control function for the next-generation smart meters, and identifies its added values for power system voltage stability issues. In terms of voltage monitoring, the risk benefit analysis for adding voltage magnitudes to smart meter measurements is presented, and the risk mitigation strategies along with the co-simulation validation via GridLAB-D and NS-3 are proposed, all providing insight into the new function evaluation. In terms of voltage control, a new voltage stability control scheme is developed, which uses voltage measurements from smart meters and utilizes the observability and controllability of distributed energy resources and controllable loads. Different from traditional voltage control schemes focusing on voltage regulation and power quality monitoring from the utility perspective, the proposed control scheme can achieve the maximum real power transfer margin at the end user side, enabling the voltage stability issues being solved at the grid edge, i.e. the last-mile segment. It is the first work that considers voltage monitoring and control collectively for smart meter investment. It can help power engineering community supplement smart meter applications and shape the next-generation smart meters.

42 ENGINEERING↗

Evaluations of Risks from the Lunar and Mars Radiation Environments

Protecting astronauts from the space radiation environments requires accurate projections of radiation in future space missions. Characterization of the ionizing radiation environment is challenging because the interplanetary plasma and radiation fields are modulated by solar disturbances and the radiation doses received by astronauts in interplanetary space are likewise influenced. The galactic cosmic radiation (GCR) flux for the next solar cycle was estimated as a function of interplanetary deceleration potential, which has been derived from GCR flux and Climax neutron monitor rate measurements over the last 4 decades. For the chaotic nature of solar particle event (SPE) occurrence, the mean frequency of SPE at any given proton fluence threshold during a defined mission duration was obtained from a Poisson process model using proton fluence measurements of SPEs during the past 5 solar cycles (19-23). Analytic energy spectra of 34 historically large SPEs were constructed over broad energy ranges extending to GeV. Using an integrated space radiation model (which includes the transport codes HZETRN [1] and BRYNTRN [2], and the quantum nuclear interaction model QMSFRG[3]), the propagation and interaction properties of the energetic nucleons through various media were predicted. Risk assessment from GCR and SPE was evaluated at the specific organs inside a typical spacecraft using CAM [4] model. The representative risk level at each event size and their standard deviation were obtained from the analysis of 34 SPEs. Risks from different event sizes and their frequency of occurrences in a specified mission period were evaluated for the concern of acute health effects especially during extra-vehicular activities (EVA). The results will be useful for the development of an integrated strategy of optimizing radiation protection on the lunar and Mars missions. Keywords: Space Radiation Environments; Galactic Cosmic Radiation; Solar Particle Event; Radiation Risk; Risk Analysis; Radiation Protection.

Kim, Myung-Hee↗

Phase III Multi-Institutional Trial of Adjuvant Chemotherapy With Paclitaxel, Estramustine, and Oral Etoposide Combined With Long-Term Androgen Suppression Therapy and Radiotherapy Versus Long-Term Androgen Suppression Plus Radiotherapy Alone for High-Risk Prostate Cancer: Preliminary Toxicity Analysis of RTOG 99-02

Purpose: Long-term androgen suppression plus radiotherapy (AS+RT) is standard treatment of high-risk prostate cancer. A randomized trial, Radiation Therapy Oncology Group trial 9902, was undertaken to determine whether adjuvant chemotherapy with paclitaxel, estramustine, and etoposide (TEE) plus AS+RT would improve disease outcomes with acceptable toxicity. Methods and Materials: High-risk (prostate-specific antigen 20-100 ng/mL and Gleason score {>=}7; or Stage T2 or greater, Gleason score 8, prostate-specific antigen level <100 ng/mL) nonmetastatic prostate cancer patients were randomized to AS+RT (Arm 1) vs. AS+RT plus four cycles of TEE (Arm 2). TEE was delivered 4 weeks after RT. AS continued for 2 years for both treatment arms. RT began after 8 weeks of AS began. Results: The Radiation Therapy Oncology Group 9902 trial opened January 11, 2000. Excess thromboembolic toxicity was noted, leading to study closure October 4, 2004. A total of 397 patients were accrued, and the data for 381 were analyzable. An acute and long-term toxicity analysis was performed. The worst overall toxicities during treatment were increased for Arm 2. Of the 192 patients, 136 (71%) on Arm 2 had RTOG Grade 3 or greater toxicity compared with 70 (37%) of 189 patients on Arm 1. Statistically significant increases in hematologic toxicity (p < 0.0001) and gastrointestinal toxicity (p = 0.017) but not genitourinary toxicity (p = 0.07) were noted during treatment. Two Grade 5 complications related to neutropenic infection occurred in Arm 2. Three cases of myelodysplasia/acute myelogenous leukemia were noted in Arm 2. At 2 and 3 years after therapy completion, excess long-term toxicity was not observed in Arm 2. Conclusion: TEE was associated with significantly increased toxicity during treatment. The toxicity profiles did not differ at 2 and 3 years after therapy. Toxicity is an important consideration in the design of trials using adjuvant chemotherapy for prostate cancer.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Dose-Escalated Stereotactic Body Radiation Therapy for Patients With Intermediate- and High-Risk Prostate Cancer: Initial Dosimetry Analysis and Patient Outcomes

Purpose: To report the short-term clinical outcomes and acute and late treatment-related genitourinary (GU) and gastrointestinal (GI) toxicities in patients with intermediate- and high-risk prostate cancer treated with dose-escalated stereotactic body radiation therapy (SBRT). Methods and Materials: Between 2011 and 2014, 24 patients with prostate cancer were treated with SBRT to the prostate gland and proximal seminal vesicles. A high-dose avoidance zone (HDAZ) was created by a 3-mm expansion around the rectum, urethra, and bladder. Patients were treated to a minimum dose of 36.25 Gy in 5 fractions, with a simultaneous dose escalation to a dose of 50 Gy to the target volume away from the HDAZ. Acute and late GU and GI toxicity outcomes were measured according to the National Cancer Institute Common Terminology Criteria for Adverse Events toxicity scale, version 4. Results: The median follow-up was 25 months (range, 18-45 months). Nine patients (38%) experienced an acute grade 2 GU toxicity, which was medically managed, and no patients experienced an acute grade 2 GI toxicity. Two patients (8%) experienced late grade 2 GU toxicity, and 2 patients (8%) experienced late grade 2 GI toxicity. No acute or late grade ≥3 GU or GI toxicities were observed. The 24-month prostate-specific antigen relapse-free survival outcome for all patients was 95.8% (95% confidence interval 75.6%-99.4%), and both biochemical failures occurred in patients with high-risk disease. All patients are currently alive at the time of this analysis and continue to be followed. Conclusions: A heterogeneous prostate SBRT planning technique with differential treatment volumes (low dose: 36.25 Gy; and high dose: 50 Gy) with an HDAZ provides a safe method of dose escalation. Favorable rates of biochemical control and acceptably low rates of acute and long-term GU and GI toxicity can be achieved in patients with intermediate- and high-risk prostate cancer treated with SBRT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Association of female reproductive and hormonal factors with gallbladder cancer risk in Asia: A pooled analysis of the Asia Cohort Consortium

Abstract The female predominance of gallbladder cancer (GBC) has led to a hypothesis regarding the hormone‐related aetiology of GBC. We aimed to investigate the association between female reproductive factors and GBC risk, considering birth cohorts of Asian women. We conducted a pooled analysis of 331,323 women from 12 cohorts across 4 countries (China, Japan, Korea, and Singapore) in the Asia Cohort Consortium. Cox proportional hazard models were used to estimate the hazard ratios (HRs) and corresponding 95% confidence intervals (CIs) to assess the association between reproductive factors (age at menarche, parity, age at first delivery, breastfeeding, and age at menopause) and GBC risk. We observed that a later age at menarche was associated with an increased risk of GBC (HR 1.4, 95% CI 1.16–1.70 for 17 years and older vs. 13–14 years), especially among the cohort born in 1940 and later (HR 2.5, 95% CI 1.50–4.35). Among the cohort born before 1940, women with a later age at first delivery showed an increased risk of GBC (HR 1.56, 95% CI 1.08–2.24 for 31 years of age and older vs. 20 years of age and younger). Other reproductive factors did not show a clear association with GBC risk. Later ages at menarche and at first delivery were associated with a higher risk of GBC, and these associations varied by birth cohort.

Shin, Aesun↗

Breast Cancer Risk Estimation Using Parenchymal Texture Analysis in Digital Breast Tomosynthesis

Mammographic parenchymal texture has been shown to correlate with genetic markers of developing breast cancer. Digital breast tomosynthesis (DBT) is a novel x-ray imaging technique in which tomographic images of the breast are reconstructed from multiple source projections acquired at different angles of the x-ray tube. Compared to digital mammography (DM), DBT eliminates breast tissue overlap, offering superior parenchymal tissue visualization. We hypothesize that texture analysis in DBT could potentially provide a better assessment of parenchymal texture and ultimately result in more accurate assessment of breast cancer risk. As a first step towards validating this hypothesis, we investigated the association between DBT parenchymal texture and breast percent density (PD), a known breast cancer risk factor, and compared it to DM. Bilateral DBT and DM images from 71 women participating in a breast cancer screening trial were analyzed. Filtered-backprojection was used to reconstruct DBT tomographic planes in 1 mm increments with 0.22 mm in-plane resolution. Corresponding DM images were acquired at 0.1 mm pixel resolution. Retroareolar regions of interest (ROIs) equivalent to 2.5 cm{sup 3} were segmented from the DBT images and corresponding 2.5 cm{sup 2} ROIs were segmented from the DM images. Breast PD was mammographically estimated using the Cumulus scale. Overall, DBT texture features demonstrated a stronger correlation than DM to PD. The Pearson correlation coefficients for DBT were r = 0.40 (p<0.001) for contrast and r = -0.52 (p<0.001) for homogeneity; the corresponding DM correlations were r = 0.26 (p = 0.002) and r = -0.33 (p<0.001). Multiple linear regression of the texture features versus breast PD also demonstrated significantly stronger associations in DBT (R{sup 2} = 0.39) compared to DM (R{sup 2} = 0.33). We attribute these observations to the superior parenchymal tissue visualization in DBT. Our study is the first to perform DBT texture analysis in a screening population of women, showing that DBT could potentially provide better breast cancer risk assessment in the future.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Root Source Analysis/ValuStream[Trade Mark] - A Methodology for Identifying and Managing Risks

Root Source Analysis (RoSA) is a systems engineering methodology that has been developed at NASA over the past five years. It is designed to reduce costs, schedule, and technical risks by systematically examining critical assumptions and the state of the knowledge needed to bring to fruition the products that satisfy mission-driven requirements, as defined for each element of the Work (or Product) Breakdown Structure (WBS or PBS). This methodology is sometimes referred to as the ValuStream method, as inherent in the process is the linking and prioritizing of uncertainties arising from knowledge shortfalls directly to the customer's mission driven requirements. RoSA and ValuStream are synonymous terms. RoSA is not simply an alternate or improved method for identifying risks. It represents a paradigm shift. The emphasis is placed on identifying very specific knowledge shortfalls and assumptions that are the root sources of the risk (the why), rather than on assessing the WBS product(s) themselves (the what). In so doing RoSA looks forward to anticipate, identify, and prioritize knowledge shortfalls and assumptions that are likely to create significant uncertainties/ risks (as compared to Root Cause Analysis, which is most often used to look back to discover what was not known, or was assumed, that caused the failure). Experience indicates that RoSA, with its primary focus on assumptions and the state of the underlying knowledge needed to define, design, build, verify, and operate the products, can identify critical risks that historically have been missed by the usual approaches (i.e., design review process and classical risk identification methods). Further, the methodology answers four critical questions for decision makers and risk managers: 1. What s been included? 2. What's been left out? 3. How has it been validated? 4. Has the real source of the uncertainty/ risk been identified, i.e., is the perceived problem the real problem? Users of the RoSA methodology have characterized it as a true bottoms up risk assessment.

Brown, Richard Lee↗

Design Considerations for Financing a National Trust to Advance the Deployment of Geologic CO2 Storage and Motivate Best Practices

This paper explores how the flawed, widely held public policy view of an ever growing risk associated with long-term carbon dioxide (CO2) storage profoundly influences the public policy dialogue about how to best address the long term risk profile for geologic storage. In order to accomplish this, the authors present evidence from the rapidly emerging science and engineering of CO2 storage which demonstrates that, with proper site characterization and sound operating practices, retention of stored CO2 will increase with time thus invalidating the premise of an ever growing risk. The authors focus on key issues of fit, interplay, and scalability associated with a trust fund funded by a hypothetical $1/tonCO2 tipping fee for each ton of CO2 stored in the United States under WRE450 and WRE550 climate policies. The authors conclude there is no intrinsic value in creating a trust fund predicated solely on collecting a fixed fee that is not mapped to site-specific risk profiles. If left to grow unchecked, a trust fund that is predicated on a constant stream of annual payments unrelated to the site’s risk profile could result in the accumulation of hundreds of billions to more than a trillion dollars in real terms contributing to significant opportunity cost of capital. Further, rather than mitigating the financial consequences of long-term CCS risks, this analysis suggests a blanket $1/tonCO2 tipping fee may increase the probability and frequency of long-term risk by eliminating financial incentives for sound operating behavior and site selection criteria – contribute to moral hazard. At a minimum, effective use of a trust fund requires: (1) strong oversight regarding site selection and fund management, and (2) a clear process by which the fund is periodically valued and funds collected are mapped to the risk profile of the pool of covered CCS sites. Without appropriate checks and balances, there is no a priori reason to believe that the amount of funds held in trust will map to the actual amount of funds needed to address long-term care expenses and delimited compensatory damages. For this reason, the authors conclude that the financing of a trust fund or other risk management instrument should be based on a site delimited estimate of future expected financial consequences rather than on the random adoption of a fixed funding stream, e.g., a blanket $1/ton , because it ‘sounds’ reasonable.

carbon dioxide capture and storage↗

Risk-Informed Safety Margin Characterization Methods Development Work

This report summarizes the research activity developed during the Fiscal year 2014 within the Risk Informed Safety Margin and Characterization (RISMC) pathway within the Light Water Reactor Sustainability (LWRS) campaign. This research activity is complementary to the one presented in the INL/EXT-??? report which shows advances Probabilistic Risk Assessment Analysis using RAVEN and RELAP-7 in conjunction to novel flooding simulation tools. Here we present several analyses that prove the values of the RISMC approach in order to assess risk associated to nuclear power plants (NPPs). We focus on simulation based PRA which, in contrast to classical PRA, heavily employs system simulator codes. Firstly we compare, these two types of analyses, classical and RISMC, for a Boiling water reactor (BWR) station black out (SBO) initiating event. Secondly we present an extended BWR SBO analysis using RAVEN and RELAP-5 which address the comments and suggestions received about he original analysis presented in INL/EXT-???. This time we focus more on the stochastic analysis such probability of core damage and on the determination of the most risk-relevant factors. We also show some preliminary results regarding the comparison between RELAP5-3D and the new code RELAP-7 for a simplified Pressurized Water Reactors system. Lastly we present some conceptual ideas regarding the possibility to extended the RISMC capabilities from an off-line tool (i.e., as PRA analysis tool) to an online-tool. In this new configuration, RISMC capabilities can be used to assist and inform reactor operator during real accident scenarios.

97 MATHEMATICS AND COMPUTING↗

A systematic risk management approach employed on the CloudSat project

The CloudSat Project has developed a simplified approach for fault tree analysis and probabilistic risk assessment. A system-level fault tree has been constructed to identify credible fault scenarios and failure modes leading up to a potential failure to meet the nominal mission success criteria.

risk management fault tree analysis probabilistic ↗

Reliability Assessment of Safety-Critical Network Communication in a Digitalized Nuclear Power Plant

In analog instrumentation and control (I and C) systems for nuclear power plants (NPPs), most connections are comprised of hardwired point-to-point types. Since they are based on analog technologies, they are fragile to noise and require analog-to-digital conversion time. Therefore, many NPPs have adopted communication network for the exchange of safety-critical data between programmable logic controllers (PLCs) in digital I and C systems to effectively accommodate a huge number of field controllers. However, the primary issue of digital network communication in a safety-critical system involves potential hazards, such as partial or total loss of communication between PLCs, which may result in a failure of safety critical signal generation when it is needed. Therefore, the probability that a safety-critical system in digitalized NPP becomes unsafe due to a network failure must be evaluated to quantify the risk of digital I and C system. In Korea, the Engineered Safety Feature-Component Control System (ESF-CCS) was developed as one of the digital safety-critical system in Advanced Power Reactor- 1400 (APR-1400). The function of a digital engineered safety feature (ESF) actuation system and field actuator controllers of conventional NPPs are performed by the ESF-CCS. In this system, safety-critical network, High Reliable- Safety Data Network (HR-SDN), was employed for the safety-critical data transmission from group controllers (GCs) to loop controllers (LCs). In this study, a framework for assessing the reliability of a HR-SDN network communication between GCs and LCs in the ESF-CCS in addition to a fault-tree model for ESF components considering network failure between GCs and LCs were developed to assess the plant risk effect of a newly developed digitalized ESF-CCS. Based on the case studies and cut set analysis, the risk effect of network failure on plant risk and the important risk contributors of network failure were quantitatively addressed. A framework for identifying the potential hazardous states of network communication in the ESFCCS was proposed. In addition, a fault-tree model for network communication failure was developed to estimate the risk effects of network failure between the GCs and LCs on ESF-CCS signal failure. The developed fault-tree model was then applied to several case studies. The fault-tree model of ESF-CCS signal failure for ESF components required for various mitigation actions regarding NPP DBAs was designed by considering the identified hazardous states of network failure that would result in a failure to provide input signals to the corresponding LC. As a sensitivity study, three case studies were performed based on the periodic test methods for hardware components in HR-SDN module and their test intervals in this study. The quantitative results for three case studies demonstrated that the probability of overall network communication failure, which was calculated as the sum of the failure probability associated with each failure cause, contributed up to 1.58% on the Small-LOCA CD frequency. The results also revealed the important basic events related to network failure in the case studies which included CCF of hardware and software in HR-SDN module. This study is expected to provide insight into the development of the fault-tree model for the network failure in digital I and C system and into the quantification of the risk effect of network failure for safety-critical data transmission in NPPs. As a further study, the risk effects of network failure in the ESF-CCS on the plant risk can be estimated in a more detailed manner by analyzing the failure modes and causes in a sub-component level and the fault detection coverage of the fault tolerance techniques for network failure implemented in ESF-CCS after the detailed configuration of ESF-CCS is decided. In terms of the failure of manual ESF actuation, the relationship among the human action failures must be investigated to consider multiple human error condition since ESF-CCS provides multiple manual actuation to assure the diversity of the system. Since the conventional HEP method cannot accommodate the multiple conditions in a fault tree, condition-based human reliability assessment (CBHRA) method or the dynamic human reliability modeling approach can be applied to include a complex relationship among the automated safety signal generation and the human operator's manual actuation, avoiding the optimistic estimation of HEP of the human action failure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

De-risking fault leakage risk and containment integrity for subsurface storage applications

The subsurface is pivotal in the energy transition, for the sequestration of CO 2 and energy storage. It is crucial to understand to what extent geological faults may form leakage pathways that threaten the containment integrity of these projects. Fault flow behavior has been studied in the context of hydrocarbon development, supported by observations from wells drilled through faults, but such observations are rare in geoenergy projects. Focusing on mechanical behavior as early indicator of potential leakage risks, a probabilistic Coulomb Failure Stress workflow is developed and demonstrated using data from the Decatur CO 2 sequestration project to rank faults based on their containment risk. The analysis emphasizes the importance of fault throw relative to reservoir thickness and pore pressure change in assessing reactivation risks. Integrating this mechanical assessment with geological and dynamic fault analyses contributes to derisking fault containment for geoenergy applications, providing valuable insights for the successful development of subsurface storage projects.

58 GEOSCIENCES↗

Data Analysis Approaches for the Risk-Informed Safety Margins Characterization Toolkit

In the past decades, several numerical simulation codes have been employed to simulate accident dynamics (e.g., RELAP5-3D, RELAP-7, MELCOR, MAAP). In order to evaluate the impact of uncertainties into accident dynamics, several stochastic methodologies have been coupled with these codes. These stochastic methods range from classical Monte-Carlo and Latin Hypercube sampling to stochastic polynomial methods. Similar approaches have been introduced into the risk and safety community where stochastic methods (such as RAVEN, ADAPT, MCDET, ADS) have been coupled with safety analysis codes in order to evaluate the safety impact of timing and sequencing of events. These approaches are usually called Dynamic PRA or simulation-based PRA methods. These uncertainties and safety methods usually generate a large number of simulation runs (database storage may be on the order of gigabytes or higher). The scope of this paper is to present a broad overview of methods and algorithms that can be used to analyze and extract information from large data sets containing time dependent data. In this context, “extracting information” means constructing input-output correlations, finding commonalities, and identifying outliers. Some of the algorithms presented here have been developed or are under development within the RAVEN statistical framework.

97 MATHEMATICS AND COMPUTING↗

Filtration of Spaceflight Propulsion and Pressurant Systems

NASA has provided little guidance for determining and implementing appropriate filtration of spaceflight propulsion and pressurant systems. Additionally, industry standards typically used for building and verifying filter performance are antiquated and lack applicability to propulsion systems. The NASA Engineering and Safety Center (NESC) was requested to perform a gap analysis, identify risks, and develop a mitigation plan for spaceflight propulsion filtration. This report contains the outcome of the NESC analysis.

Propulsion System↗

Mass and Reliability System (MaRS)

The Safety and Mission Assurance (S&MA) Directorate is responsible for mitigating risk, providing system safety, and lowering risk for space programs from ground to space. The S&MA is divided into 4 divisions: The Space Exploration Division (NC), the International Space Station Division (NE), the Safety & Test Operations Division (NS), and the Quality and Flight Equipment Division (NT). The interns, myself and Arun Aruljothi, will be working with the Risk & Reliability Analysis Branch under the NC Division's. The mission of this division is to identify, characterize, diminish, and communicate risk by implementing an efficient and effective assurance model. The team utilizes Reliability and Maintainability (R&M) and Probabilistic Risk Assessment (PRA) to ensure decisions concerning risks are informed, vehicles are safe and reliable, and program/project requirements are realistic and realized. This project pertains to the Orion mission, so it is geared toward a long duration Human Space Flight Program(s). For space missions, payload is a critical concept; balancing what hardware can be replaced by components verse by Orbital Replacement Units (ORU) or subassemblies is key. For this effort a database was created that combines mass and reliability data, called Mass and Reliability System or MaRS. The U.S. International Space Station (ISS) components are used as reference parts in the MaRS database. Using ISS components as a platform is beneficial because of the historical context and the environment similarities to a space flight mission. MaRS uses a combination of systems: International Space Station PART for failure data, Vehicle Master Database (VMDB) for ORU & components, Maintenance & Analysis Data Set (MADS) for operation hours and other pertinent data, & Hardware History Retrieval System (HHRS) for unit weights. MaRS is populated using a Visual Basic Application. Once populated, the excel spreadsheet is comprised of information on ISS components including: operation hours, random/nonrandom failures, software/hardware failures, quantity, orbital replaceable units (ORU), date of placement, unit weight, frequency of part, etc. The motivation for creating such a database will be the development of a mass/reliability parametric model to estimate mass required for replacement parts. Once complete, engineers working on future space flight missions will have access a mean time to failures and on parts along with their mass, this will be used to make proper decisions for long duration space flight missions

Barnes, Sarah↗