Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Lessons Learned from FUSRAP

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970s, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM’s inventory of sites for long-term surveillance and maintenance (LTS&M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for “unrestricted” industrial use or remediated to the “cleanup standards” at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE’s LTS&M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS&M requirements for the sites, and (3) greater involvement in the transition process.

54 ENVIRONMENTAL SCIENCES↗

3D Characterization and Time-Lapse Imaging of the Desiccation Treatability Test at the Hanford BC-Cribs and Trenches Site using High Performance Electrical Resistivity Imaging

Contaminated vadose zone materials are a potential source of long-term groundwater contamination at many sites across the Department of Energy (DOE) complex. Deep vadose zone contamination presents a particularly challenging remedial problem due to the difficultly of locating contaminants and the expense of access and ex situ treatment. In situ remediation techniques, whereby remedial amendments must be delivered to contaminated soils, have been identified as a potential alternative. However, amendment delivery is typically uncertain and post delivery remedial performance is often not well understood due to limited information available from sparsely spaced boreholes. Recent advancements in electrical resistivity tomography (ERT) are being used to address these challenges at the Hanford site by providing remote, three-dimensional images of contaminant distribution and four-dimensional (three spatial dimensions plus the time dimension) images of in-situ vadose zone remediation processes. These capabilities were recently demonstrated with a large scale surface characterization effort and during a smaller scale desiccation treatability test at the Hanford BC-Cribs area. The results of these efforts demonstrate the utility of leveraging high-performance computing resources to process ERT data for 3D reconnaissance mapping of subsurface contaminants and for detailed 3D monitoring of vadose zone remediation efforts.

contamination↗

Implementation of Enhanced Attenuation at the DOE Mound Site OU-1 Landfill: Accelerating Progress and Reducing Costs - 16270

A field demonstration of enhanced attenuation (EA) was initiated in 2014 to expedite the remediation of industrial solvents in the groundwater impacted by the former landfill Operable Unit 1 (OU-1) at the US Department of Energy (DOE) Mound, Ohio, Site. EA uses active engineering solutions to alter the target site so that the contaminant plume will passively stabilize and shrink. For OU-1, the EA was implemented by targeted injection of an electron donor (vegetable oil) to create 'structured geochemical zones'. Volatile organic compounds (VOCs) in the altered subsurface system encounter alternating anaerobic and aerobic environments along the plume flow path. The effect of these structured geochemical zones is effective and rapid degradation of parent compounds such as trichloroethene (TCE) and tetrachloroethene (PCE), and daughter compounds such as cis-1,2-dichloroethene and vinyl chloride. EA at Mound OU-1 provides a transition to natural attenuation and is an alternative to the baseline pump-and-treat (P and T) system. Industrial solvents (primarily TCE) and other VOCs that originated from the former solid-waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound site. A groundwater P and T system was initiated in 1996 to control the plume, and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,100 cubic meters (99,500 cubic yards) of material were removed from the OU-1 landfill area. Operation of the groundwater P and T system continued throughout this period. The principles and technical basis of the ongoing EA field demonstration were developed by the Interstate Technology and Regulatory Council. The goal of the EA implementation is to provide a bridge between active groundwater treatments and monitored natural attenuation. EA relies on understanding and manipulating the contaminant mass balance. Technologies are applied to sustainably reduce the contaminant loading from the source and/or increase the rate of natural attenuation processes within the plume. In 2014, a core team that included DOE, the US Environmental Protection Agency (EPA), the Ohio EPA, and technical support organizations evaluated remedial options for OU-1. During the 2014 evaluation, the team projected a cleanup time frame for the baseline P and T system of 26 additional years and a cleanup time frame for the EA remedy of 13 years. On the basis of that evaluation, EPA approved the implementation of the EA remedy that required the shutdown of the P and T system. The combination of technologies implemented for OU-1 EA included (a) neat vegetable oil in the vadose zone in the former landfill and (b) emulsified vegetable oil within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation anaerobic treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient aerobic plume (via co-metabolism). The results from the first year of the field demonstration indicate that the dissolved TCE and PCE plumes have decreased in size and mass. Statistical tests indicate that the VOC concentrations in the majority of the source-area wells are decreasing. The VOC concentrations throughout the plume are projected to be below the target maximum contaminant level of 2 to 5 μg/L within 5 to 10 years-sooner than the design projection of 13 years. The biogeochemistry and microbial community within the structured geochemical zones are consistent with the design and appear to be stable. At Mound OU-1, EA has accelerated progress toward the remedial action objectives and reduced costs. Ongoing monitoring will determine whether the EA remedy has transitioned the site into monitored natural attenuation status and whether the EA will continue to be effective, timely, and sustainable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ENVIRONMENTAL PROBLEMS ASSOCIATED WITH DECOMMISSIONING THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND

Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A suggestion to assess spilled hydrocarbons as a greenhouse gas source

Petroleum-contaminated site management typically counts destruction of hydrocarbons by either natural or engineered processes as a beneficial component of remediation. While such oxidation of spilled hydrocarbons is often necessary for achieving risk reduction for nearby human and ecological receptors, site assessments tend to neglect that this also means that the pollutants are converted to greenhouse gases and emitted to the atmosphere. This article presents a suggestion that the current and long term greenhouse gas emissions from spilled hydrocarbons be incorporated to petroleum site assessments. This would provide a more complete picture of pollutant effects that could then be incorporated to remedial objectives. At some sites, this additional information may affect remedy selection. Possible examples include a shift in emphasis to remedial technologies that reduce pollutant greenhouse gas effects (e.g., by conversion of methane to carbon dioxide in the subsurface), and a more holistic context for considering remedial technologies with low emission footprints.

54 ENVIRONMENTAL SCIENCES↗

2016 Los Alamos National Laboratory Hazardous Waste Minimization Report

Waste minimization and pollution prevention are goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE), inclusive of the National Nuclear Security Administration (NNSA) and the Office of Environmental Management, and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program, which is a component of the overall Pollution Prevention (P2) Program, administered by the Environmental Stewardship Group (EPC-ES). This report also supports the waste minimization and P2 goals of the Associate Directorate of Environmental Management (ADEM) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. This report includes data for all waste shipped offsite from LANL during fiscal year (FY) 2016 (October 1, 2015 – September 30, 2016). LANS was active during FY2016 in waste minimization and P2 efforts. Multiple projects were funded that specifically related to reduction of hazardous waste. In FY2016, there was no hazardous, mixed-transuranic (MTRU), or mixed low-level (MLLW) remediation waste shipped offsite from the Laboratory. More non-remediation hazardous waste and MLLW was shipped offsite from the Laboratory in FY2016 compared to FY2015. Non-remediation MTRU waste was not shipped offsite during FY2016. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND

This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Closure Strategy for Operable Unit III of the Monticello Mill Tailings Site

Multiple strategies and scenarios were evaluated to advance Operable Unit (OU) III of the Monticello Mill Tailings Site (MMTS) towards closure. MMTS is a former mill site that was used to process uranium and vanadium ore in southeastern Utah until 1960. Uranium is the primary contaminant of concern in OU III, which includes surface water in Montezuma Creek and groundwater present in a shallow alluvial aquifer along the creek valley for several miles downgradient of the former mill site. Surface remedial actions were completed in 2000. In 2004, the selected final remedy was monitored natural attenuation (MNA) and institutional controls, and a pump-and-treat system installed in the highest-concentration area as a contingency remedy. The pump-and-treat system was expanded in 2015, and average uranium concentrations have declined locally over time. However, monitoring data and column studies suggest that the system effectiveness will continue to decrease over time. Three closure strategies were considered: restoration of MNA; alternate concentration limits; and a technical impracticability (TI) waiver. The preferred closure strategy is to restore MNA and maintain institutional controls, without active remediation. The strategy includes demonstrating criteria for MNA acceptance, pump-and-treat termination, long-term monitoring, and eventual site delisting. Several potential scenarios for transitioning to the preferred closure strategy were identified. Recommended actions over the next few years include updating the conceptual site model, conducting numerical modeling to predict remedial performance and time frames, geochemical analyses to assess uranium transport, and summarizing the lines of evidence and basis for MNA.

remediation, uranium, groundwater, monitored natur↗

Risk-Quantified Decision-Making at Rocky Flats

Surface soils in the 903 Pad Lip Area of the Rocky Flats Environmental Technology Site (RFETS) were contaminated with {sup 239/240}Pu by site operations. To meet remediation goals, accurate definition of areas where {sup 239/240}Pu activity exceeded the threshold level of 50 pCi/g and those below 50- pCi/g needed definition. In addition, the confidence for remedial decisions needed to be quantified and displayed visually. Remedial objectives needed to achieve a 90 percent certainty that unremediated soils had less than a 10 percent chance of {sup 239/240}Pu activity exceeding 50-pCi/g. Removing areas where the chance of exceedance is greater than 10 percent creates a 90 percent confidence in the remedial effort results. To achieve the stipulated goals, the geostatistical approach of probability kriging (Myers 1997) was implemented. Lessons learnt: Geostatistical techniques provided a risk-quantified approach to remedial decision-making and provided visualizations of the excavation area. Error analysis demonstrated compliance and confirmed that more than sufficient soils were removed. Error analysis also illustrated that any soils above the threshold that were not removed would be of nominal activity. These quantitative approaches were useful from a regulatory, engineering, and stakeholder satisfaction perspective.

54 ENVIRONMENTAL SCIENCES↗

Optimization of Waste Disposal - 13338

From 2009 through 2011, remediation of areas of a former fuel cycle facility used for government contract work was conducted. Remediation efforts were focused on building demolition, underground pipeline removal, contaminated soil removal and removal of contaminated sediments from portions of an on-site stream. Prior to conducting the remediation field effort, planning and preparation for remediation (including strategic planning for waste characterization and disposal) was conducted during the design phase. During the remediation field effort, waste characterization and disposal practices were continuously reviewed and refined to optimize waste disposal practices. This paper discusses strategic planning for waste characterization and disposal that was employed in the design phase, and continuously reviewed and refined to optimize efficiency. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Radium Canada's Original Radium/Uranium Mine, The Complete Story of Canada's Historic Radium/Uranium Mine, 1932 to 2012 - 13159

This paper provides the life story of Canada's original radium/uranium mine. In addition to the history of operations, it discusses the unique and successful approach used to identify the key issues and concerns associated with the former radium, uranium and silver mining property and the activities undertaken to define the remedial actions and subsequent remedial plan. The Port Radium Mine site, situated approximately 275 km north of Yellowknife on the east shore of Great Bear Lake, Northwest Territories, was discovered in 1930 and underground mining began in 1932. The mine operated almost continuously from 1932 to 1982, initially for recovery of radium, then uranium and finally, for recovery of silver. Tailings production totaled an estimated 900,000 tons and 800,000 tons from uranium and silver processing operations respectively. In the early days of mining, Port Radium miners were exposed to radon and associated decay product levels (in Working Level Months of exposure - WLM) hundreds of times greater than modern standards. The experience of the Port Radium miners provides important contribution to understanding the risks from radon. While the uranium mine was originally decommissioned in the early 1960's, to the standards of the day, the community of Deline (formerly Fort Franklin) had concerns about residual contamination at the mine site and the potential effects arising from use of traditional lands. The Deline people were also concerned about the possible risks to Deline Dene arising from their work as ore carriers. In the late 1990's, the community of Deline brought these concerns to national attention and consequently, the Government of Canada and the community of Deline agreed to move forward in a collaborative manner to address these concerns. The approach agreed to was to establish the Canada-Deline Uranium Table (CDUT) to provide a joint process by which the people of Deline could have their concerns expressed and addressed. A great deal of work was done through the CDUT, including efforts to assess site environment and safety issues in the context of modern reclamation standards. In addition to the environmental and remediation studies, an assessment of historic exposures of Deline ore carriers to radiation and a follow-up epidemiological feasibility study were performed. SENES Consultants Limited (SENES) carried out the dose reconstruction for the Port Radium miners in the 1990's, was the environmental consultant to the CDUT from 2000 to 2005, developed the Remedial Action Plan (RAP), engineering plans and specifications for decommissioning the Port Radium mine and vicinity sites in 2005/6, supervised the remedial works in 2007 and carried out the long term post closure monitoring from 2008 to 2012. Our firsthand experience from working cooperatively with the CDUT provides insights into effective decommissioning of historic contaminated sites. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with waste unit remediation activities to streamline regulatory approval and execution. Achieving footprint reduction fulfills the Government's responsibility to address legacy contamination; allows earlier completion of legally enforceable compliance agreement milestones; and enables future potential reuse of DOE resources, including land and infrastructure for other missions. Over the last 3.5 years significant achievements were met that contributed to footprint reduction, including the closure of 41 waste units (including 20 miles of radiologically contaminated stream) and decommissioning of 30 facilities (including the precedent setting in situ closure of two former production reactors, the first in the DOE Complex). Other notable achievements included the removal of over 39,750 cubic meters of debris and 68,810 cubic meters of contaminated soils, including 9175 cubic meters of lead-contaminated soil from a former site small arms testing range and treatment of 1,262 cubic meters of tritium-laden soils and concrete using a thermal treatment system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soil Segregation Methods for Reducing Transportation and Disposal Costs - 13544

At Formerly Utilized Sites Remedial Action Program (FUSRAP) sites where the selected alternative for contaminated soil is excavation and off-site disposal, the most significant budget items of the remedial action are the costs for transportation and disposal of soil at an off-site facility. At these sites, the objective is to excavate and dispose of only those soils that exceed derived concentration guideline levels. In situ soil segregation using gross gamma detectors to guide the excavation is often challenging at sites where the soil contamination is overlain by clean soil or where the contaminated soil is located in isolated, subsurface pockets. In addition, data gaps are often identified during the alternative evaluation and selection process, resulting in increased uncertainty in the extent of subsurface contamination. In response, the U.S. Army Corps of Engineers, Buffalo District is implementing ex situ soil segregation methods. At the remediated Painesville Site, soils were excavated and fed through a conveyor-belt system, which automatically segregated them into above- and below-cleanup criteria discharge piles utilizing gamma spectroscopy. At the Linde Site and the Shallow Land Disposal Area (SLDA) Site, which are both in the remediation phase, soils are initially segregated during the excavation process using gross gamma detectors and then transported to a pad for confirmatory manual surveying and sampling. At the Linde Site, the ex situ soils are analyzed on the basis of a site-specific method, to establish compliance with beneficial reuse criteria that were developed for the Linde remediation. At the SLDA Site, the ex situ soils are surveyed and sampled based on Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) final status survey guidance to demonstrate compliance with the derived concentration guideline levels. At all three sites, the ex situ soils that meet the site- specific DCGLs are retained on-site and used as backfill material. This paper describes the ex situ soil segregation methods, the considerations of each method, and the estimated cost savings from minimizing the volume of soil requiring transportation and off-site disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removal of the Plutonium Recycle Test Reactor - 13031

The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associated underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the core drill bit. A redesign is being completed to extract the 309 PRTR and entire Bio-Shield structure together as one monolith weighing 1100 Ton by cutting structural concrete supports. In addition, the PRTR has hundreds of contaminated process tubes and pipes that have to be severed to allow for a uniformly flush fit with a lower lifting frame. Thirty-two 50 mm (2 in) core drills must be connected with thirty-two wire saw cuts to allow for lifting columns to be inserted. Then eight primary saw cuts must be completed to severe the PRTR from the 309 Facility. Once the weight of the PRTR is transferred to the lifting frame, then the PRTR may be lifted out of the facility. The critical lift will be executed using four 450 Ton strand jacks mounted on a 9 m (30 LF) tall mobile lifting frame that will allow the PRTR to be transported by eight 600 mm (24 in) Slide Shoes. The PRTR will then be placed on a twenty-four line, double wide, self powered Goldhofer for transfer to the onsite CERCLA Disposal Cell (ERDF Facility), approximately 33 km (20 miles) away. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Year Work Plan to De-Inventory TRU Waste Stored at LANL - 12121

The Los Alamos National Laboratory (LANL) continues to accelerate disposition of transuranic (TRU) waste stored at its Technical Area 54 (TA-54) Area G waste management facility. The current focus is on complete removal of all non-cemented above-grade Legacy and newly-generated TRU waste that was in storage on October 1, 2011, by no later than June 30, 2014. This inventory of above-grade TRU is defined as 3,706 m{sup 3} of material. Legacy TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory are largely in place, but two additional oversize box processing lines are being implemented in 2012. Multiple work shifts are planned for most remediation lines in 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 70 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Processing of the 3,706 m{sup 3} is projected to result in about 4,500 55-gallon (208 L) drums and 1,000 standard waste boxes that will be shipped to WIPP. About 385 shipments from LANL to WIPP are projected before June 30, 2014, to ship these containers, at a rate of 5 to 6 shipments a week. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Treatment at the Fernald Preserve: Status and Path Forward for the Water Treatment Facility - 12320

Operating a water treatment facility at the Fernald Preserve in Cincinnati, Ohio-to support groundwater remediation and other wastewater treatment needs-has become increasingly unnecessary. The Fernald Preserve became a U.S. Department of Energy Office of Legacy Management (LM) site in November 2006, once most of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration had been completed. Groundwater remediation is anticipated to continue beyond 2020. A portion of the wastewater treatment facility that operated during the CERCLA cleanup continued to operate after the site was transferred to LM, to support the remaining groundwater remediation effort. The treatment facility handles the site's remaining water treatment needs (for groundwater, storm water, and wastewater) as necessary, to ensure that uranium discharge limits specified in the Operable Unit 5 Record of Decision are met. As anticipated, the need to treat groundwater to meet uranium discharge limits has greatly diminished over the last several years. Data indicate that the groundwater treatment facility is no longer needed to support the ongoing aquifer remediation effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

River Corridor Closure at DOE's Hanford Site - 12503

The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permitted low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phyto-screening for Volatile Organic Compounds in a Clay-based Glacial Till at the Niagara Falls Storage Site, New York - 17372

The Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs) occupy approximately 607 hectares (1,500 acres) of the original 3,035-hectare (7,500-acre) Lake Ontario Ordnance Works (LOOW). The NFSS was used to store radioactive materials, residues and waste from uranium ore processing between 1944 and 1952. The waste-handling practices produced an array of groundwater impacts throughout the site. Although the groundwater at the NFSS is naturally high in total dissolved solids that preclude untreated consumption, the groundwater contaminant levels in some areas of the site are very high and may pose risk to a Construction Worker receptor, as well as limit the options for future site re-use. Volatile organic compound (VOC) impacted soil in the northern portion of the site has produced a groundwater plume with significant concentrations of tetrachloroethene (PCE) and associated daughter compounds. Active groundwater remediation is impractical due to the clayey soils, as evident from adjacent property owners who have unsuccessfully attempted active remediation of their VOC plumes. Consequently, the Buffalo District may evaluate excavation options, with secondary phyto-remediative approaches as passive alternatives to lessen the groundwater impacts during the project's life cycle. A preliminary field-study in the VOC plume area sampled the interior of a Black Locust (Robinia pseudoacacia) tree using a Haglof tree corer. Detectable levels of tetrachloroethene (PCE), trichloroethene (TCE), and cis-1,2,-dichloroethene (cis-DCE) were found in the woody interior of the tree. Subsequent sampling and analyses were performed on proximal trees of varying species in and around the currently delineated VOC plume. The results indicate that poplar and native cottonwood variants preferentially contain the VOCs, whereas collocated hardwood trees produced non-detectable results. Additional sampling of Cottonwoods in the VOC-impacted area promoted further delineations of the impacts. The tree-sampling data can be considered a broad surrogate for soil sampling to optimally delineate the VOC plume without performing additional invasive sampling of the subsurface (e.g., drilling). The results also will be used to determine which native tree species preferentially uptake the VOCs from soil and groundwater. These species, and possibly other hybrid species known for VOC uptake and transpiration, would be propagated to promote interim phyto-extraction of the VOCs during the maintenance period between decision-document completion and likely remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗