Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operating systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Demonstrating system for servicing satellites

NASA has initiated a program to demonstrate a Satellite Servicer System prototype in a series of flight tests with the Space Shuttle. When the commitment to an operational system has been demonstrated, it is anticipated that a variety of missions will develop that can productively use the servicing capability. Rendezvous and proximity operations contain key enabling technologies needed for an effective operational system. Guidance, navigation and control hardware and operational techniques must be integrated into the program. Supporting sensor technology may limit or enhance the capability of the system depending on its readiness. Requirements for docking the spacecraft in the system concept development and technology requirements are reviewed. Examples of the initial assessment of technology readiness and applications opportunities are discussed. The degree of autonomy is of particular interest.

Jenkins, Lyle M.↗

Data-Intensive Memory-Map simulator and runtime

DI-MMAP is a simulator for modeling the performance of next generation non-volatile random access memory technologies (NVRAM) and a high-perfromance memory-map runtime for the Linux operating system. It is implemented as a device driver for the Linux operating system. It will be used by algorithm designers to unserstand the impact of future NVRAM on their algorithms and will be used by application developers for high-performance access to NVRAM storage.

Essen, B.B.↗

MOSS, an evaluation of software engineering techniques

An evaluation of the software engineering techniques used for the development of a Modular Operating System (MOSS) was described. MOSS is a general purpose real time operating system which was developed for the Concept Verification Test (CVT) program. Each of the software engineering techniques was described and evaluated based on the experience of the MOSS project. Recommendations for the use of these techniques on future software projects were also given.

Bounds, J. R.↗

Reliable broadcast protocols

A number of broadcast protocols that are reliable subject to a variety of ordering and delivery guarantees are considered. Developing applications that are distributed over a number of sites and/or must tolerate the failures of some of them becomes a considerably simpler task when such protocols are available for communication. Without such protocols the kinds of distributed applications that can reasonably be built will have a very limited scope. As the trend towards distribution and decentralization continues, it will not be surprising if reliable broadcast protocols have the same role in distributed operating systems of the future that message passing mechanisms have in the operating systems of today. On the other hand, the problems of engineering such a system remain large. For example, deciding which protocol is the most appropriate to use in a certain situation or how to balance the latency-communication-storage costs is not an easy question.

Joseph, T. A.↗

Data-Intensive Memory-Map simulator and runtime

DI-MMAP is a simulator for modeling the performance of next generation non-volatile random access memory technologies (NVRAM) and a high-perfromance memory-map runtime for the Linux operating system. It is implemented as a device driver for the Linux operating system. It will be used by algorithm designers to unserstand the impact of future NVRAM on their algorithms and will be used by application developers for high-performance access to NVRAM storage.

Essen, B. B.↗

Stochastic Cooling with Strong Band Overlap

Up to present time the stochastic cooling was only tested and used at the microwave frequencies. Majority of these stochastic cooling systems operate without Schottky band overlap which greatly simplifies tuning of cooling systems and removes unwanted coupling between different cooling systems. A transition from the microwave stochastic cooling to the optical stochastic cooling or to the coherent electron cooling increases the central frequency of cooling systems by orders of magnitude and makes impossible a cooling system operation without overlap of Schottky bands. In this paper we consider how the band overlap affects the maximum cooling rate and the optimal gain.

43 PARTICLE ACCELERATORS↗

Design and qualification of an UHV system for operation on sounding rockets

The sounding rocket mission MAIUS-1 has the objective to create the first Bose–Einstein condensate in space; therefore, its scientific payload is a complete cold atom experiment built to be launched on a VSB-30 sounding rocket. An essential part of the setup is an ultrahigh vacuum system needed in order to sufficiently suppress interactions of the cooled atoms with the residual background gas. Contrary to vacuum systems on missions aboard satellites or the international space station, the required vacuum environment has to be reached within 47 s after motor burn-out. This paper contains a detailed description of the MAIUS-1 vacuum system, as well as a description of its qualification process for the operation under vibrational loads of up to 8.1 g{sub RMS} (where RMS is root mean square). Even though a pressure rise dependent on the level of vibration was observed, the design presented herein is capable of regaining a pressure of below 5 × 10{sup −10} mbar in less than 40 s when tested at 5.4 g{sub RMS}. To the authors' best knowledge, it is the first UHV system qualified for operation on a sounding rocket.

42 ENGINEERING↗

High Value Opportunities to Advance Automation in Electric Grid Control Rooms

Grid operators and electric utilities are increasingly driven to develop automated processes and introduce decision support tools to reduce cognitive demand on System Operations staff and aid in the operational decision-making process. However, System Operation staff are traditionally hesitant to implement and accept new solutions, automation processes, and tools within the control room. This paper explores high-value opportunities to advance automation in electric grid control rooms for the purpose of improving grid safety, reliability, and resiliency during normal and emergency operating conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A synoptic-scale overview of the TOGA COARE intensive observing period November 1992 to February 1993 based on analyses from US operational global data assimilation systems

The operational global analyses from the two major U.S. numerical weather prediction centers, the Navy's Fleet Numerical Oceanography Center and the National Meteorological Center, are used to describe the synoptic-scale features of the 1 Nov. 1992 to 28 Feb. 1993 TOGA COARE intensive observing period (IOP). TOGA COARE is an international field experiment in which a large number of research scientists from the Goddard Laboratory for Atmospheres (Code 910) and the Laboratory for Hydrospheres (Code 970) participated. Two high-amplitude intraseasonal (30-60 day) oscillations passed through the TOGA COARE observational network located in the equatorial western Pacific. Associated with the oscillations were two 6-10 day periods of persistent westerly surface winds at the equator or 'westerly wind bursts.' These events are depicted through time series and time-longitude cross sections of divergence/velocity potential, surface winds, precipitation, ocean mixed-layer depth, and sea surface temperature. The high and low frequency components of the flow in which the intraseasonal oscillations were embedded are shown using seasonal, monthly, and 5-day averages of the surface, 850 and 200 mb winds, precipitation, and sea-level pressure, and a time-longitude cross section of tropical cyclone activity. Independent verification of precipitation comes from near real-time satellite estimates, and a reference climatology is given based on 9 years of ECMWF analyses. Daily 00 UTC analyses of surface winds and sea-level pressure for the entire western Pacific and Indian Ocean are provided to trace the evolution of individual synoptic events.

Fiorino, M.↗

Water turbine system and method of operation

A system for providing electrical power from a current turbine is provided. The system includes a floatation device and a mooring. A water turbine structure is provided having an upper and lower portion wherein the lower portion includes a water fillable chamber. A plurality of cables are used to couple the system where a first cable couples the water turbine to the mooring and a second cable couples the floatation device to the first cable. The system is arranged to allow the turbine structure to be deployed and retrieved for service, repair, maintenance and redeployment.

13 HYDRO ENERGY↗

Water turbine system and method of operation

A system for providing electrical power from a current turbine is provided. The system includes a floatation device and a mooring. A water turbine structure is provided having an upper and lower portion wherein the lower portion includes a water fillable chamber. A plurality of cables are used to couple the system where a first cable couples the water turbine to the mooring and a second cable couples the floatation device to the first cable. The system is arranged to allow the turbine structure to be deployed and retrieved for service, repair, maintenance and redeployment.

16 TIDAL AND WAVE POWER↗

Measurement and Analysis of Failures in Computer Systems

This thesis presents a study of software failures spanning several different releases of Tandem's NonStop-UX operating system running on Tandem Integrity S2(TMR) systems. NonStop-UX is based on UNIX System V and is fully compliant with industry standards, such as the X/Open Portability Guide, the IEEE POSIX standards, and the System V Interface Definition (SVID) extensions. In addition to providing a general UNIX interface to the hardware, the operating system has built-in recovery mechanisms and audit routines that check the consistency of the kernel data structures. The analysis is based on data on software failures and repairs collected from Tandem's product report (TPR) logs for a period exceeding three years. A TPR log is created when a customer or an internal developer observes a failure in a Tandem Integrity system. This study concentrates primarily on those TPRs that report a UNIX panic that subsequently crashes the system. Approximately 200 of the TPRs fall into this category. Approximately 50% of the failures reported are from field systems, and the rest are from the testing and development sites. It has been observed by Tandem developers that fewer cases are encountered from the field than from the test centers. Thus, the data selection mechanism has introduced a slight skew.

Thakur, Anshuman↗

TDRSS-user orbit determination using batch least-squares and sequential methods

The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), and operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the January 17-23, 1991, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were less than 40 meters after the filter had reached steady state.

Oza, D. H.↗

Ubiquitous Power Electronics in Future Power Systems: Recommendations to fully utilize fast control capabilities

Power electronics is becoming ubiquitous in power systems because the rapid growth of variable renewable generation such as wind and solar, responsive load, electric vehicles, energy storage, as well as DC transmission. As a result, a high percentage of electricity will be generated, transmitted or consumed by power electronics in the future power system. Such a high penetration of power electronics is changing power system operation landscapes and dynamic characteristics. Two major kinds of impact are reduced system mechanical inertia by inverter-based resources displacing conventional generation and active participation of many distributed energy resources through inverters. This has caused significant reliability challenges for power system operation. The mitigation approach so far has mostly focused on accommodating power electronics inverters as passive devices or creating synthetic inertias to make inverter-based generation behaving as conventional generators. However, the high-speed control capabilities of power electronics present new opportunities for achieving an optimal performance beyond conventional power systems. A lower-inertia system can be more responsive for improving reliability, and distributed small resources can be more adaptive and scalable for better flexibility and resilience. Power electronic inverters are capable of multiple fast control functions. To fully utilized the ubiquitous power electronics in power systems requires technology advancements in the following areas: data and communications to capture the new dynamic behaviors introduced by power electronics; modeling and simulation to understand the behaviors of power electronics and its interactions with other components in the context of power systems; control and optimization methods for fully utilizing the capabilities of power electronics for a new paradigm of performance beyond the traditional inertia-heavy system; and significant upgrades in power electronics hardware to cater to the new control capabilities. If properly controlled and optimized, power electronics can help transform the power system to be responsive, adaptive, and scalable.

Huang, Zhenyu↗

Quiet Short-Haul Research Airplane (QSRA) model select panel functional description

The QSRA, when equipped with programmable color cathode ray tube displays, a head up display, a general purpose digital computer and a microwave landing system receiver, will provide a capability to do handling qualities studies and terminal area operating systems experiments as well as to enhance an experimenter's ability to obtain repeatable aircraft performance data. The operating systems experiments include the capability to generate minimum fuel approach and departure paths and to conduct precision approaches to a STOLport runway. The mode select panel is designed to provide both the flexibility needed for a variety of flight test experiments and the minimum workload operation required by pilots flying into congested terminal traffic areas.

Watson, D. M.↗

Economic viability of using thermal energy storage for flexible carbon capture on natural gas power plants

Fossil fuel-based power plants generate 80% of the electricity in the United States and provide a reliable generation source for both base and peak power demands. These plants are expected to adapt to changes in environmental policies that will require carbon management with carbon capture and storage (CCS) representing a possible solution. Current solvent-based CCS has a detrimental impact on a power plant's performance due to large heat loads required for carbon capture solvent regeneration. This parasitic load restricts the power plant's output and operation flexibility. Therefore, this study evaluates the feasibility of using thermal storage technologies for natural gas combined cycle (NGCC) power plants coupled with CCS to minimize the impact of solvent regeneration and enable the plant to operate at peak power output. Thermal storage can minimize the impact of CCS on the power plant by providing the heat load required for solvent regeneration during times of peak demand which will allow the plant to operate unrestricted and at full power. In total, fifteen unique thermal storage configurations were evaluated from three thermal storage categories: Brayton cycle heat pump, vapor compression heat pump, and heat recovery steam generator steam extraction for storage. The viability of these systems was determined by evaluating each configuration on thousands of real-world Locational Marginal Pricing (LMP) profiles from the New York Independent System Operator and California Independent System Operator electricity markets using a techno-economic analysis. Afterwards, results were compared to the performance of a base power plant (NGCC with CCS and no thermal storage) to determine the impact of thermal storage on power plant economics. Overall, six of the thermal storage configurations performed better than base CCS enabled power plant on between 11.5% and 38.7% of the LMP signals evaluated. The best performing configuration was a vapor compression heat pump that used flue gas as the working fluid and had both hot and cold thermal storage units. This configuration performed better than the base CCS power plant on 38.7% of the LMP profiles. The results of this study show thermal storage can mitigate the economic impact of carbon capture solvent regeneration on NGCC power plants. Discussion focuses on the impact of electricity pricing on the optimal thermal storage system, the advantages and disadvantages of the systems evaluated, and identifies limitations with the study.

25 ENERGY STORAGE↗

Using probabilistic solar power forecasts to inform flexible ramp product procurement for the California ISO

How can independent system operators (ISOs) take advantage of probabilistic solar forecasts to lower generation costs and improve reliability of power systems? We discuss one three-step approach for doing so, focusing on how such forecasts might help the California Independent System Operator (CAISO) prepare unexpected net load ramps, where net load equals gross demand minus wind and solar production. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty reflected in the forecasted prediction intervals (independent variables) to error distributions for net load ramp forecasts for the CAISO real-time market (dependent variable) using machine learning and quantile regression. Projected ramp forecast errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Detailed descriptions are provided on the quantile regression and kth-nearest neighbor categorization methods for accomplishing that translation. Finally, a multiple time-scale look-ahead market simulation model is applied to a 118-bus IEEE Reliability Test System, modified to represent the CAISO generation mix and demand distributions. The model runs quantify how solar-conditioned ramp requirements can, first, decrease operating costs by reducing requirements compared to often conservative unconditional methods and, second, decrease generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. Solar-conditioned ramp requirements are found to reduce generation operating costs by about 2% for the test system (which would be equivalent to over $\$100$ million per year for a CAISO-size system).

14 SOLAR ENERGY↗