Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Saltstone Facility Operating Experience with Mega-Vault Disposal Units - 19497

The Saltstone Production Facility (SPF) has been treating low-level waste aqueous salt solution at the Savannah River Site (SRS) since 1990. Salt solutions are transferred from a large-volume, underground storage tank via underground waste transfer line into the SPF. The waste is received into one of two receipt tanks and then transferred to a twin-shaft mixer where dry feeds are introduced to create a fresh grout slurry. The grout exits the mixer into a hold tank, which has a residence time of approximately two minutes. The slurry is then pumped via peristaltic pump through a grout transfer line to one of several disposal units in the Saltstone Disposal Facility (SDF). The transfer line length varies from 0.4 km to 0.8 km depending on disposal location. With the salt disposal mission at SRS accelerating via the operation of the Modular Caustic Side Solvent Extraction (MCU) facility and the anticipated startup of the Salt Waste Processing Facility (SWPF), it is important that the SPF and SDF operate with minimal outage time and maximum facility availability. To this end, the design of the newest disposal units has incorporated the benefits of commercially available cylindrical concrete tank design on a very large scale to maximize economies of scale. This new design has been placed into radioactive service and the initial operational data will be compared with previous disposal operations along with an overview of how disposal unit design has significantly evolved since the initial construction in the early 1990's. Additionally, several processing facility modifications have either been implemented or developed in recent years to improve operating reliability and ensure facility availability once the SWPF becomes the primary waste generator providing feed for the SPF. These modifications, the issues driving their development, and an assessment of their effectiveness will also be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrolytically Assisted Surface Decontamination (EASD{sup TM}) for POCO Operations - 20282

NNL in collaboration with C-Tech Innovation Ltd and Sellafield Ltd has been exploring innovative technologies to enable a significant reduction of radiological hazards within facilities during the Post Operational Clean Out (POCO) phase of a nuclear plant's life cycle. Reducing the hazard by effectively decontaminating plants in-situ during POCO delivers huge cost reductions for future decommissioning operations. These cost reduction benefits are realized by reducing the number and complexity of remote operations as well as lowering the long-term waste disposal costs. Whilst chemical decontamination can achieve the desired level of decontamination, applying aggressive chemical reagents is hazardous, potentially difficult to control and requires there to be complimentary effluent treatment and waste routes. This work has aimed to develop flexible and controllable decontamination processes which could be operated without the additional complexity and issues associated with chemical decontamination. The processes needed to be relatively fast and effective to minimize the time operators would spend in an active area. In addition, there was a driver to produce decontamination methodologies which generated a secondary waste compatible with current routes and which takes advantage of current waste capacity. The strategy therefore was to come up with a solution that works with, rather than against, the science and engineering behind process plants at Sellafield. Electrolytically Assisted Surface Decontamination (EASD{sup TM}) is an innovative electrochemical decontamination process (developed by NNL and C-Tech Innovation Ltd) that can remove activity from contaminated metal in very short time periods. Application of the patented electric waveform to the surface when treating contaminated metal with nitric acid has been shown to significantly enhance the decontamination performance. When compared to proposed baseline washout procedures at Sellafield, the only change to the process is the applied electrical waveform which is temporary and controllable. The current causes dissolution of the metal surface being decontaminated which leads to activity transferring from the plant item into the nitric acid effluent stream. This innovation has the potential to transform the POCO process and allow a nitric acid based washout approach to deliver POCO quickly and cost effectively within the existing infrastructure. Several devices have now been designed that incorporate this EASD{sup TM} technology and enable the decontamination process to be applied to a range items commonly identified as being contaminated during nuclear decommissioning programmes such as pipework, tanks and hotspots of walls/floors. Inactive and active laboratory-scale testing has been completed using both simulated and 'real-life' contaminated (low level waste) metallic items retrieved from different nuclear sites. Active trials demonstrated that contaminated items could be treated to free release levels within minutes. Engineering scale tests are currently being performed, with guidance from Sellafield's system engineers and plant managers, to provide the necessary re-assurance the designed devices could be successfully deployed in an on-plant scenario. The final stage of this development work is to carry out an active demonstration of the decontamination technology on Thorp at Sellafield. This paper aims to highlight progress made to date with the EASD{sup TM} technology and, more specifically, the development of an in-situ decontamination device for deployment within radioactive pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computerized operator support system and human performance in the control room - 262

An operator aid technology to assist nuclear plant operators maintain situation awareness and detect faults earlier than would be possible using conventional control room technologies is described. Coined the Computerized Operator Support System (COSS), this technology is aimed at the human-machine interface. The COSS has been implemented as a prototype system operating in the control room environment of a full-scale simulator for a commercial nuclear power plant. A human factors assessment that involved two licensed reactor crews was performed to evaluate crew performance. This paper describes the development of the COSS, the underlying fault-detection architecture, and feedback received based on operator-in-the-loop studies. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimal operations of a nuclear-based integrated energy system: A mixed integer program approach

A nuclear-based integrated energy system (IES), consisting of multiple carbon-free energy generation and conversion technologies to meet heterogeneous end-use demands, offers a promising approach to decarbonizing the U.S. economy. Operating such an IES is challenging due to its complexity and the diverse end-use demands, such as heating and electricity. This paper aims to address the optimal operation of an IES composed of a small modular reactor (SMR), a steam manifold, a balance of plant (BOP), a high-temperature steam electrolysis (HTSE) system, a district heating (DH) network, and electrical grids. We formulate the system’s operation as a mixed integer linear programming (MILP) problem to maximize net revenues from sales of electricity and hydrogen. To evaluate the efficacy of the proposed model, we conduct a 24-hour simulation considering day-ahead (DA) electricity prices from CAISO and a varying DH demand profile with hourly resolution. The simulation results show that our model effectively optimizes the operation by selling electricity during on-peak periods and purchasing electricity for hydrogen production during off-peak periods, while satisfying operating constraints within the IES.

08 HYDROGEN↗

OPERATION OF FT4000® SINGLE NOZZLE COMBUSTOR WITH HIGH HYDROGEN

This paper reports initial results from an effort to develop a retrofittable fuel/air injector for the FT4000® aeroderivative gas turbine that enables use of hydrogen as a carbon-free fuel for efficient power generation. The FT4000 engine’s low-NOx combustor was developed by Pratt & Whitney and RTX Technology Research Center with core technology from the Pratt & Whitney PW4000 turbofan aircraft engine. The work reported here advances the technology readiness level of the FT4000 combustor for operation with hydrogen, starting with an experimental assessment of the current production hardware with increasing hydrogen content mixed with natural gas. High-pressure single-sector combustor rig tests have been completed, demonstrating the ability for the dual fuel nozzle to operate an FT4000 combustor on 100% hydrogen with low nitrogen oxide (NOx) missions. Metal temperature measurements and video images of the flame structure from zero to 100% hydrogen highlight opportunities to improve the fuel nozzle robustness for high hydrogen conditions. The current FT4000 production engine operates on either natural gas or No. 2 fuel oil with water injection to achieve high thermal efficiency and low emissions. This engine is fielded by Mitsubishi Power Aero and delivers 70 MW of power with a simple-cycle efficiency of over 41% when operating with wet compression. Results from this study have cleared the current production FT4000 engines with dual fuel nozzles to operate at baseload power on blends of hydrogen mixed with natural gas and water.

power generation↗

Physics-Informed Recurrent Neural Networks to Predict Reactor Operations of the AGN-201 Nuclear Reactor

4 page paper submitted to ANS Student conference. Summary of paper similar to the following abstract: The ability to predict how a reactor will operate, understand when anomalous conditions arise, and ensure a reactor is being operated as expected is crucial for deploying new nuclear facilities. Digital twins serve as a unique solution to recognizing reactor behavior; however, they require data to be useful. For next-generation reactors, this data may not currently be available. To explore how synthetic physics-informed reactor data can be used to predict reactor operations, a recurrent neural network was implemented for the Idaho State University AGN-201 digital twin. The goal of this work is to determine how synthetic data can be used to train a recurrent neural network model for predicting the reactor power of the AGN-201. The recurrent neural network was validated using both synthetic and real operational data. We envision this approach will help bridge the gap between the virtual and physical sides of a digital twin, where reactor physics models based on as-built data can be corrected for actual operating parameters to ensure the virtual model mirrors reality.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Integrating Safety, Security, and Nuclear Operations for Advanced Reactors

The traditional separation between safety, security, and operations teams has created significant barriers to achieving optimal outcomes. When security considerations are introduced late in the design process, they often conflict with already-established architectural, operational, or engineering parameters. Retrofitting security measures can lead to increased costs, schedule delays, and compromises in security effectiveness. For instance, the need to retrofit physical barriers or surveillance systems often results in trade-offs that could have been avoided with earlier input from security professionals. Delayed integration can also affect regulatory processes and result in licensing delays. Security reviews conducted at later stages frequently identify gaps that necessitate significant redesign efforts, impacting not only scope, schedule, and budget, but also adding risk and lowering stakeholder confidence in the project. This paper aims to address these challenges by identifying practical opportunities for integrating security considerations seamlessly with design and operations teams throughout the entire lifecycle of nuclear facilities—from conceptual design to commissioning and beyond. The research emphasizes the value of early and continuous collaboration among stakeholders to ensure that security measures are robust, operationally effective, and cost-efficient. By examining case studies, analyzing past incidents, and leveraging best practices from other high-security industries, this study highlights actionable strategies for bridging the gap between safety, security, and operations teams.

Zineddin, Dr. Z. [ORNL] (ORCID:0009000848740725)↗

Archi: Agentic Operations at the CMS Experiment

We present Archi, an open-source, end-to-end framework for scientific collaborations that combines the systematic ingestion and organization of heterogeneous data sources with the deployment of configurable, private, and extensible agents that retrieve and reason over them. An instance of Archi has been deployed for the Computing Operations team of the CMS experiment at CERN's LHC since February 2026 as a support agent for technical operators, offering retrieval and analysis capabilities by combining documentation, historical data, and live monitoring systems. We evaluate the system on operator feedback and a question set collected from production usage, graded by human and automated panels. The system proves effective at operational tasks, resolving real-world queries posed by CMS operators. We also observe that locally-hosted, open-weight models perform competitively, enabling fully private management of sensitive data.

Lugato, Pietro [MIT; CERN]↗

Method and apparatus to predict the remaining service life of an operating system

A method and computer-based apparatus for monitoring the degradation of, predicting the remaining service life of, and/or planning maintenance for, an operating system are disclosed. Diagnostic information on degradation of the operating system is obtained through measurement of one or more performance characteristics by one or more sensors onboard and/or proximate the operating system. Though not required, it is preferred that the sensor data are validated to improve the accuracy and reliability of the service life predictions. The condition or degree of degradation of the operating system is presented to a user by way of one or more calculated, numeric degradation figures of merit that are trended against one or more independent variables using one or more mathematical techniques. Furthermore, more than one trendline and uncertainty interval may be generated for a given degradation figure of merit/independent variable data set. The trendline(s) and uncertainty interval(s) are subsequently compared to one or more degradation figure of merit thresholds to predict the remaining service life of the operating system. The present invention enables multiple mathematical approaches in determining which trendline(s) to use to provide the best estimate of the remaining service life.

Greitzer, Frank L↗

Operational Radiation Protection in Synchrotron Light and Free Electron Laser Facilities

The 3rd generation synchrotron radiation (SR) facilities are storage ring based facilities with many insertion devices and photon beamlines, and have low injection beam power (< few tens of watts), but extremely high stored beam power ({approx} 1 GW). The 4th generation x-ray free electron laser (FEL) facilities are based on an electron Linac with a long undulator and have high injection beam power (a few kW). Due to its electron and photon beam characteristics and modes of operation, storage ring and photon beamlines have unique safety aspects, which are the main subjects of this paper. The shielding design limits, operational modes, and beam losses are first reviewed. Shielding analysis (source terms and methodologies) and interlocked safety systems for storage ring and photon beamlines (including SR and gas bremsstrahlung) are described. Specific safety issues for storage ring top-off injection operation and FEL facilities are discussed. The operational safety program, e.g., operation authorization, commissioning, training, and radiation measurements, for SR facilities is also presented.

43 PARTICLE ACCELERATORS↗

SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Training new operators - the first six months

The Fermilab Operations Department takes about two years to train a new Operator. The Operator's introductory (Concepts) On-the-Job-Training (OJT) gives him or her an overview of the laboratory, teaches the basic facts about all the accelerators, and it also teaches the new operator the training process used for all the rest of their OJT training. The Concepts OJT takes about four to six months for most people to complete. This paper will explain how this first six months of training sets the new employee on their path to becoming a fully trained Operator.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Installation and Initial Operation of an On-line Target Imaging System for SNS

After several years of operation, the SNS now enters an era of megawatt class operation. At this intensity level, the target will be operating closer to its engineering limits and the beam profile on target must be carefully controlled. During commissioning and early operations, a temporary imaging system was used to measure the proton density on target. This system was not designed to survive the increasing power levels and it had to be removed in the second half of 2006. Since then, no direct measurement of beam properties at the target has been available. A collaboration was forged to remedy this situation, and has resulted in a new imaging system consisting of three major components: a thermal-sprayed luminescent coating deposited on the target nose, a radiation-tolerant optical system installed upstream of the target, and an image acquisition system integrated with the accelerator controls network. The design, installation, and integration of these components will be described. Initial beam measurements and image analysis results will be presented. Lessons learned during this initial operating experience have been documented and will guide the collaboration s future plans.

43 PARTICLE ACCELERATORS↗

Microchannel apparatus comprising plural microchannels and methods of conducting unit operations

Microchannel apparatus comprising a header and plural flow microchannels is described in which orifices connect the header and the flow microchannels. The orifices constrict flow. The ratio of the cross-sectional area of each of the orifices to the cross-sectional area of the flow microchannels connected to the orifices is between 0.0005 and 0.1. Also described is microchannel apparatus for conducting unit operations in which a device comprises two arrays of microchannels, and a unit operation is conducted on a fluid as it passes through the first set of microchannels and into a header where a second unit operation is performed, and then the fluid stream passes into the second array of microchannels where the first unit operation is again performed. Methods of conducting unit operations in the apparatuses are also described.

47 OTHER INSTRUMENTATION↗

Perturbation theory for the logarithm of a positive operator

In various contexts in mathematical physics, such as out-of-equilibrium physics and the asymptotic information theory of many-body quantum systems, one needs to compute the logarithm of a positive unbounded operator. Examples include the von Neumann entropy of a density matrix and the flow of operators with the modular Hamiltonian in the Tomita-Takesaki theory. Often, one encounters the situation where the operator under consideration, which we denote by ∆, can be related by a perturbative series to another operator ∆ 0 , whose logarithm is known. We set up a perturbation theory for the logarithm log ∆. It turns out that the terms in the series possess a remarkable algebraic structure, which enables us to write them in the form of nested commutators plus some “contact terms”.

97 MATHEMATICS AND COMPUTING↗

Multifidelity deep operator networks for data-driven and physics-informed problems

Operator learning for complex nonlinear systems is increasingly common in modeling multi-physics and multi-scale systems. However, training such high-dimensional operators requires a large amount of expensive, high-fidelity data, either from experiments or simulations. In this work, we present a composite Deep Operator Network (DeepONet) for learning using two datasets with different levels of fidelity to accurately learn complex operators when sufficient high-fidelity data is not available. Additionally, we demonstrate that the presence of low-fidelity data can improve the predictions of physics-informed learning with DeepONets. We demonstrate the new multi-fidelity training in diverse examples, including modeling of the ice-sheet dynamics of the Humboldt glacier, Greenland, using two different fidelity models and also using the same physical model at two different resolutions.

97 MATHEMATICS AND COMPUTING↗