Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Finance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

2022 GETEM Geothermal Drilling Cost Curve Update

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and levelized cost of energy (LCOE) of hydrothermal geothermal systems and enhanced geothermal systems (EGS), and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) to weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and the O&G sector, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Although drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves at this time.

API↗

Black gold: return of the king

The coal industry has woken from its slumber and finds itself ill-prepared for the demands being made upon it. Exporters are proving slow to expand their capacities and overcome infrastructural bottlenecks. The financial crisis may cause a hiatus in demand growth, but it will also limit finance for investment. 3 figs.

01 COAL, LIGNITE, AND PEAT↗

International trade and waste and fuel management issue, 2009

The focus of the January-February issue is on international trade and waste and fuel managment. Major articles/reports in this issue include: Innovative financing and workforce planning, by Donna Jacobs, Entergy Nuclear; Nuclear power - a long-term need, by John C. Devine, Gerald Goldsmith and Michael DeLallo, WorleyParsons; Importance of loan guarantee program, by Donald Hintz; EPC contracts for new plants, by Dave Barry, Shaw Power Group; GNEP and fuel recycling, by Alan Hanson, AREVA NC Inc.; Safe and reliable reactor, by Kiyoshi Yamauchi, Mitsubishi Heavy Industries, Ltd.; Safe, small and simple reactors, by Yoshi Sakashita, Toshiba Corporation; Nuclear power in Thailand, by Tatchai Sumitra, Thailand Institute of Nuclear Technology; and, Nuclear power in Vietnam, by Tran Huu Phat, Vietnam Atomic Energy Commission. The Industry Innovation article this issue is Rectifying axial-offset-anomaly problems, by Don Adams, Tennessee Valley Authority. The Plant Profile article is Star of Stars Excellence, by Tyler Lamberts, Entergy Nuclear Operations, Inc.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Common challenge, collaborative response: a roadmap for US-China cooperation on energy and climate change

This Report which was produced in partnership between Asia Society's Center on U.S.-China Relations and Pew Center on Global Climate Change, in collaboration with The Brookings Institution, Council on Foreign Relations, National Committee on U.S.-China Relations, and Environmental Defense Fund presents both a vision and a concrete Roadmap for such Sino-U.S. collaboration. With input from scores of experts and other stakeholders from the worlds of science, business, civil society, policy, and politics in both China and the United States, the Report, or 'Roadmap', explores the climate and energy challenges facing both nations and recommends a concrete program for sustained, high-level, bilateral engagement and on-the-ground action. The Report recommends that, as a first step in forging this new partnership, the leaders of the two countries should convene a leaders summit as soon as practically possible following the inauguration of Barack Obama to launch a 'U.S.-China Partnership on Energy and Climate Change'. This presidential summit should outline a major plan of joint-action and empower relevant officials in each country to take the necessary actions to ensure its implementation. Priority areas of collaboration include: deploying low-emissions coal technologies; improving energy efficiency and conservation; developing an advanced electric grid; promoting renewable energy; and quantifying emissions and financing low-carbon technologies. 5 figs., 1 tab., 2 apps.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Recent Improvement Of The Institutional Radioactive Waste Management System In Slovenia

The task of managing institutional radioactive waste was assigned to the Slovenian National Agency for Radwaste Management by the Governmental Decree of May 1999. This task ranges from the collection of waste at users' premises to the storage in the Central Storage Facility in (CSF) and afterwards to the planned Low and Intermediate Level Waste (LILW) repository. By this Decree ARAO also became the operator of the CSF. The CSF has been in operation since 1986. Recent improvements of the institutional radioactive waste management system in Slovenia are presented in this paper. ARAO has been working on the reestablishment of institutional radioactive waste management since 1999. The Agency has managed to prepare the most important documents and carry out the basic activities required by the legislation to assure a safe and environmentally acceptable management of the institutional radioactive waste. With the aim to achieve a better organized operational system, ARAO took the advantage of the European Union Transition Facility (EU TF) financing support and applied for the project named 'Improvement of the management of institutional radioactive waste in Slovenia via the design and implementation of an Information Business System'. Through a public invitation for tenders one of the Slovenian largest software company gained the contract. Two international radwaste experts from Belgium were part of their project team. The optimization of the operational system has been carried out in 2007. The project was executed in ten months and it was divided into two phases. The first phase of the project was related with the detection of weaknesses and implementation of the necessary improvements in the current ARAO operational system. With the evaluation of the existing system, possible improvements were identified. In the second phase of the project the software system Information Business System (IBS) was developed and implemented by the group of IT experts. As a software development life-cycle methodology the Waterfall methodology was used. The reason for choosing this methodology lied in its simple approach: analyze the problem, design the solution, implement the code, test the code, integrate and deploy. ARAO's institutional radioactive waste management process was improved in the way that it is more efficient, better organized, allowing traceability and availability of all documents and operational procedures within the field of institutional radioactive waste. The tailored made IBS system links all activities of the institutional radioactive waste management process: collection, transportation, takeover, acceptance, storing, treatment, radiation protection, etc. into one management system. All existing and newly designed evidences, operational procedures and other documents can be searched and viewed via secured Internet access from different locations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal of Large Reactor Components - Rulemaking to Address Funding of Disposal Costs

The paper will explore the current challenges of financing the disposal costs for disposing of large reactor components such as reactor pressure vessel heads and steam generators and the resulting delays in disposal caused by the current regulatory requirements. The paper also will discuss a recent rulemaking petition submitted by EnergySolutions to the US Nuclear Regulatory Commission designed to improve the regulatory process by providing a process to permit funds from decommissioning trust funds to be used to fund disposal of large reactor components. If granted, the disposal of these large components could be expedited where reactor licensees have sufficient decommissioning trust funds available. Perspectives on the rulemaking will be addressed. In conclusion: NRC should provide serious consideration to this Petition. There is support in the industry for granting this Petition. As of the date this paper was submitted, there have been no negative comments. Granting this Petition is prudent and consistent with the underlying purpose of 10 C.F.R. 50.82(a)(8) and 10 CFR 20.1406. It provides flexibility without any adverse impact on the public health and safety. It should facilitate the decommissioning process by providing a regulatory framework to allow removing MRCs from sites, resulting in (1) the source term at the site being reduced, (2) the site workers being exposed to less radiation, (3) eliminating an unnecessary regulatory burden as the costs associated with maintaining the MRCs on-site and providing protection to the workers as a result of those components can be avoided, (4) the overall cost to decommission the site being reduced, and (5) more funds being made available to decommission the reactor at the time the reactor ceases operation. Finally, the framework would provide the demonstration by a site-specific decommissioning cost estimate and the associated funding program that adequate funds are available to dispose of these components as well as complete site decommissioning for unrestricted release consistent with the NRC requirements. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Euratom-Rosatom ERCOSAM-SAMARA projects on containment thermal-hydraulics of current and future LWRs for severe accident management

During a postulated severe accident with core degradation, hydrogen would form in the reactor pressure vessel mainly due to high temperatures zirconium-steam reaction and flow together with steam into the containment where it will mix with the containment atmosphere (steam-air). The hydrogen transport into the containment is a safety concern because it can lead to explosive mixtures through the associated phenomena of condensation, mixing and stratification. The ERCOSAM and SAMARA projects, co-financed by the European Union and the Russia, include various experiments addressing accident scenarios scaled down from existing plant calculations to different thermal-hydraulics facilities (TOSQAN, MISTRA, PANDA, SPOT). The tests sequences aim to investigate hydrogen concentration build-up and stratification during a postulated accident and the effect of the activation of Severe Accident Management systems (SAMs), e.g. sprays, coolers and Passive Auto-catalytic Recombiners (PARs). Analytical activities, performed by the project participants, are an essential component of the projects, as they aim to improve and validate various computational methods. They accompany the projects in the various phases; plant calculations, scaling to generic containment and to the different facilities, planning pre-test and post-test simulations are performed. Code benchmark activities on the basis of conceptual near full scale HYMIX facility will finally provide a further opportunity to evaluate the applicability of the various methods to the study of scaling issues. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety and Security of Radioactive Sealed and Disused/Orphan Sources in Ukraine - German Contribution - 13359

Within the scope of 'Nuclear Security of Radioactive Sources', the German government implemented the modernization of Ukrainian State Production Company's transport and storage facility for radioactive sources (TSF) in Kiev. The overall management of optimizing the physical protection of the storage facility (including the construction of a hot cell for handling the radioactive sources) is currently carried out by the German Federal Foreign Office (AA). AA jointly have assigned Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Germany's leading expert institution in the area of nuclear safety and waste management, to implement the project and to ensure transparency by financial and technical monitoring. Sealed radioactive sources are widely used in industry, medicine and research. Their life cycle starts with the production and finally ends with the interim/long-term storage of the disused sources. In Ukraine, IZOTOP is responsible for all radioactive sources throughout their life cycle. IZOTOP's transport and storage facility (TSF) is the only Ukrainian storage facility for factory-fresh radioactive sources up to an activity of about 1 million Ci (3.7 1016 Bq). The TSF is specially designed for the storage and handling of radioactive sources. Storage began in 1968, and is licensed by the Ukrainian state authorities. Beside the outdated state of TSF's physical protection and the vulnerability of the facility linked with it, the lack of a hot cell for handling and repacking radioactive sources on the site itself represents an additional potential hazard. The project, financed by the German Federal Foreign Office, aims to significantly improve the security of radioactive sources during their storage and handling at the TSF site. Main tasks of the project are a) the modernization of the physical protection of the TSF itself in order to prevent any unauthorized access to radioactive sources as well as b) the construction of a hot cell to reduce the number of transports of radioactive sources within the city of Kiev. In future, the new established hot cell at IZOTOP's transport and storage facility will be useful for identification and characterization of orphan/disused radioactive sources. The projects implemented are performed in accordance with international recommendations (e. g. IAEA) and national normative documents and will make a crucial contribution towards an improved safety and security management of radioactive sources in Ukraine. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Global recycling services for short and long term risk reduction

New schemes are being developed by AREVA in order to provide global solutions for safe and non-proliferating management of used fuels, thereby significantly contributing to overall risks reduction and sustainable nuclear development. Utilities are thereby provided with a service through which they will be able to send their used fuels and only get returned vitrified and compacted waste, the only waste remaining after reprocessing. This waste is stable, standard and has demonstrated capability for very long term interim storage. They are provided as well with associated facilities and all necessary services for storage in a demonstrated safely manner. Recycled fuels, in particular MOX, would be used either in existing LWRs or in a very limited number of full MOX reactors (like the EPR reactor), located in selected countries, that will recycle MOX so as to downgrade the isotopic quality of the Pu inventories in a significant manner. Reprocessed uranium also can be recycled. These schemes, on top of offering demonstrated operational advantages and a responsible approach, result into optimized economics for all shareholders of the scheme, as part of reactor financing (under Opex or Capex form) will be secured thanks to the value of the recycled flows. It also increases fuel cost predictability as recycled fuel is not subject to market fluctuations as much and allows, in a limited span of time, for clear risk mitigation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise the PRACLAY gallery equipped to simulate a disposal gallery for heat-generating high-level waste evaluating fibre-optic based sensing techniques, including distributed sensing for thermal distribution and long-term reliability in harsh conditions. It also includes the potential to improve the treatment of signals from micro-seismic monitoring to enable enhanced understanding of the evolution around the gallery following its excavation due to ventilation, saturation and heating, and to image a water-bearing concretion layer. HADES URL will also be used to test wireless techniques to transmit monitoring data from the underground to the surface. The main focus of this contribution is to evaluate magneto-inductive data transmission; and to optimise energy usage. At the Bure underground facility in France, monitoring systems have been developed and will be embedded into the steel liner for the mock-up high-level waste disposal tunnel. The aim of this programme is to establish the capacity to conduct integrated monitoring activities inside the disposal cell, on the cell liner and in the near-field and to assess the capability of the monitoring to withstand construction and liner emplacement procedures. These projects, which are supported by focused development and testing of the monitoring systems, will allow the testing of both the effectiveness of these techniques applied to disposal situations and to understand the limits of these monitoring technologies. This approach should also enhance the confidence of key stakeholders in the ability to understand/confirm the changes occurring within a disposal cell. In addition, remote or 'non-intrusive' monitoring technologies are evaluated to provide a means of enhancing understanding of what is occurring in an isolated disposal cell. The projects also test solutions for embedded monitoring systems in challenging (risk of damage) situations. The outputs from this work will lead to improved understanding of these state-of-the-art techniques and allow focused development of those techniques beneficial to future monitoring programmes. It is also planned, as part of the MoDeRn programme of stakeholder engagement to show some of these monitoring demonstrations to lay stakeholders in order to receive their feed-back on the approach taken and their views on the value of this work. This feedback will help improve our understanding of how this work and future work on monitoring can be more effectively communicated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chernobyl NPP: Completion of LRW Treatment Plant and LRW Management on Site - 12568

Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m3 of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010 SIA RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. Currently, the LRTP is getting ready to perform the following activities: 1. retrieval of waste from tanks stored at ChNPP LWS using waste retrieval system with existing equipment involved; 2. transfer of retrieved waste into LRTP reception tanks with partial use of existing transfer pipelines; 3. laboratory chemical and radiochemical analysis of reception tanks contest to define the full spectrum of characteristics before processing, to acknowledge the necessity of preliminary processing and to select end product recipe; 4. preliminary processing of the waste to meet the requirements for further stages of the process; 5. shrinkage (concentrating) of preliminary processed waste; 6. solidification of preliminary processed waste with concrete to make a solid-state (end product) and load of concrete compound into 200-l drums; 7. curing of end product drums in LRTP curing hall; 8. radiologic monitoring of end product drums and their loading into special overpacks; 9. overpack radiological monitoring; 10. send for disposal (ICSRM Lot 3); The current technical decisions allow to control and return to ChNPP of process media and supporting systems outputs until they satisfy the following quality norms: salt content: < 100 g/l; pH: 1 - 11; anionic surface-active agent: < 25 mg/l; oil dissipated in the liquid: < 2 mg/l; overall gamma-activity: < 3,7 x10{sup 5} Bq/l. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unlocking the Value of Deep Energy Retrofits

This publication is based on an extensive study conducted on behalf of the New York State Energy Research and Development Authority (NYSERDA) and the U S Department of Energy (DOE) to explore financial and risk products to accelerate the implementation of deep energy retrofit (DER) solutions to reduce costs These financial products are intended to speed market development via three fundamental themes: reallocating risk from building owners and lenders to insurers, quantifying and monetizing previously unrecognized value associated with DERs, and providing building owners and lenders with confidence in the performance of building systems Findings are based on a comprehensive analysis and characterization of 100+ existing DER case studies, and more than 40 qualitative interviews with industry experts, including insurers, researchers, building owners, and policymakers In addition, a quantitative model of overall project economics with baseline, high, and low cases was developed This data informed the analysis that resulted in three recommended financial product solutions, which were evaluated for their potential to raise projected cash flows and finance DERs: 1) Building System Performance and Energy Savings Guarantee; 2) Trade Credit Insurance; 3) Ancillary Revenue Contracts. This report identifies many value streams associated with DERs and introduces these three potential financial products, which aim to reallocate risks and reduce barriers to the adoption of advanced envelope DERs.

ancillary renenue contracts↗

A complete dosimetry experimental program in support to the core characterization and to the power calibration of the CABRI reactor. A complete dosimetry experimental program in support of the core characterization and of the power calibration of the CABRI reactor

CABRI is an experimental pulse reactor operated by CEA at the Cadarache research center. Since 1978 the experimental programs have aimed at studying the fuel behavior under Reactivity Initiated Accident (RIA) conditions. Since 2003, it has been refurbished in order to be able to provide RIA and LOCA (Loss Of Coolant Accident) experiments in prototypical PWR conditions (155 bar, 300 deg. C). This project is part of a broader scope including an overall facility refurbishment and a safety review. The global modification is conducted by the CEA project team. It is funded by IRSN, which is conducting the CIP experimental program, in the framework of the OECD/NEA project CIP. It is financed in the framework of an international collaboration. During the reactor restart, commissioning tests are realized for all equipment, systems and circuits of the reactor. In particular neutronics and power commissioning tests will be performed respectively in 2015 and 2016. This paper focuses on the design of a complete and original dosimetry program that was built in support to the CABRI core characterization and to the power calibration. Each one of the above experimental goals will be fully described, as well as the target uncertainties and the forecasted experimental techniques and data treatment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

French Atomic and alternative energies commission decommissioning policy and strategies: What is at stake lessons learned and feedback experience - 15013

Since its creation in 1945, the French Atomic Energy and Alternative Energies Commission has carried out research programmes on civil use of nuclear, and its application. CEA has set up and run various types of installations from research (accelerators, pond reactors, fast reactors, laboratories) to industry (power reactor, processing facilities). There are currently more than several tens of facilities which are presently closed down pending dismantling or in the process of being dismantled by CEA, the governmental body for research and development in nuclear and renewable energies. When operating, all these installations have generated radioactive waste. When they are shutdown, either as a result of the programmes for which they were set up, or due to equipment wearing out or being obsolete, these installations must be cleaned up, dismantled and decommissioned, taking into account their nuclear nature and requirements related to safety and environment. During the decommissioning process, the implementer has to deal with safety and site remediation issues. Dealing with these installations is a long-term programme which must be carefully planned and financed in order to optimise its management. The paper will describe the CEA's decommissioning policy, strategies adopted, and draw up lessons learned and feedback experience, showing that: - Safety is guaranteed, - Dismantling is a technically controllable operation, but R and D actions are to be developed for specific problems as characterization or operation in hostile environment. Moreover all the methods and techniques improve as a result of feedback experience, - The amount of material and waste produced by the dismantling are manageable. The very low, low and intermediate level waste can be stored on existing shallow land burial centres, some new repositories have to be created for specific waste (graphite, radium,...) and for high and intermediate level long live waste, which are stored in interim storage , - The dismantling must be optimized, especially by appliance of a good strategy based on rational industrial choices. - Communication and transparency with stakeholders is essential for global process acceptance, - The lessons learned and how feedback experience could benefit for future decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Licensing of the national repository for LILW waste in Bulgaria - 15609

Radioactive waste arises from the operation and decommissioning of the Bulgarian nuclear power plants and from other sources in research, medical applications and industry. The need for building the National Disposal Facility (NDF) is recognized by the Bulgarian government, and described and justified in the Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low and intermediate level radioactive waste (SL-LILW). The European Union finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund. The Bulgarian government has defined the NDF as a Project of National Importance. At the conclusion of an international tendering process, SERAW awarded the contract for development of the NDF design, including Intermediate Safety Analysis Report (ISAR), to the Consortium of Westinghouse Electric Spain S.A.U, DBE Technology GmbH of Germany, and ENRESA, the Spanish National Waste Management Agency. Two Bulgarian companies also participate in the project as subcontractors;KK-Project and EQE-Bulgaria. The project 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria' is identified within SERAW as 'R-Project 5'. Since obtaining SERAW's approval for the preferred repository design variant, R Project 5 has focused on the development of the Technical Design and on preparation of the ISAR, which demonstrates the safety and suitability of the proposed NDF design. The Consortium submitted to SERAW the Technical Design for revision on March 2013. SERAW's experts immediately started the review of the design. In addition, SERAW invited independent, highly qualified Bulgarian experts and scientists to participate in the review. In November 2013, SERAW approved the Technical Design. The Consortium submitted the Intermediate Safety Analysis Report to SERAW for review following a similar process in July 2014. Both documents were meanwhile handed over to the appropriate Bulgarian licensing authorities. SERAW's goal is to receive a license for construction of the NDF in early 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The completion of the construction and commissioning of the liquid radwaste treatment plant at ChNPP - 15685

Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m{sup 3} of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010, FSUE RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a New National Programme and Implementation Plan for the Management and Disposal of Spent Fuel and Radioactive Wastes in Romania - 16391

The European 'Waste Directive' (2011/70/Euratom) required each Member State to report by August 2015 on their National Programme for management of spent fuel and radioactive wastes. In Romania, the Nuclear Agency (ANDR) was responsible for preparing the National Programme report, and this was done in a step-wise manner that involved the regulators and waste producers. The starting point for the process was an assessment of existing policy against the evolving situation in the nuclear sector in the country, most notably the decision to progress with the construction of two new CANDU reactors. The final agreed National Programme report submitted to the European Commission describes the activities currently undertaken to manage spent fuel and radioactive wastes in Romania. The report also sets out, at a high-level, the additional activities that will need to be taken in the future (and an indicative timeline), including those steps that will be required to implement a new surface repository for short-lived wastes, and a geological repository for spent fuel and long-lived wastes. Additional, on-going work is intended to lead to a revision of Government policy and the development of a more detailed implementation strategy, underpinned by a programme of R and D and robust financing plans. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SURF: Advances in the Incorporation of Sustainability Into Remedial Approaches - 16451

The inclusion of sustainability considerations in remediation cleanup process (investigation through site closure) benefits site owners, including Federal agencies such as the Department of Defense (DOD) and Department of Energy (DOE), through development of more efficient and cost-effective remedies as well as communities by considering socio-economic impacts and redevelopment into remedial decisions. The incorporation of social, environmental, and economic considerations early in the remedial process often enables achievement of regulatory site closure sooner and with broader community acceptance. In order to achieve these objectives, stakeholders, including federal facilities, regulators, contractors, and consultants, have expressed the need for case studies demonstrating successful implementation of sustainable practices. The Sustainable Remediation Forum emerged in 2006 and was established as a non-profit organization in 2010. Through exploration of technical issues such as groundwater conservation and reuse at remediation sites to life cycle assessment approaches, subject matter experts have led discussions across the industry of how the incorporation of sustainability into the remediation process can provide benefits through: - Consideration of socioeconomic impacts and drivers for remediation and redevelopment; - Reduced environmental impacts of remedial actions; and - Enhanced economic value through partnerships and informed decision making. Incorporation of sustainable remediation concepts provides distinct and recognizable value, as demonstrated through the technical initiatives of the Sustainable Remediation Forum, remediation industry conferences and events, and the prevalence of government agency and corporate sustainable remediation programs, such as the DOE's Cross-Programmatic Work Group. Sustainable remediation has evolved from discussions of environmental impacts of cleanups (with considerable green-washing), to quantifying and minimizing the environmental footprint and subsequent long term global impacts of a remedy, and currently, incorporating strategies to address all three components of sustainability - environmental, social, and economic. However, the practice of sustainability must continue to advance and new approaches should be adopted to holistically evaluate beneficial and detrimental impacts from the remedial process and incorporate sustainability concepts throughout the project life cycle. A more holistic and comprehensive approach, beyond the traditional paradigm of sustainable remediation, will lead a project team to achieve social and economic sustainability objectives of the community while protecting human health and the environment. This 'advanced' approach is where the most significant benefits will be achieved. Practitioners need documented, peer-reviewed, technically sound concepts and examples of sustainable remediation as supporting material to gain acceptance and approval of incorporation of best management practices and evaluation techniques. Reviewing the advancements of sustainable remediation over the last 5-10 years and the identification of lessons learned has great merit. This discussion of case studies will highlight successful incorporation of social impacts, economic analysis, and site redevelopment into the remedial process to provide a roadmap for site owners in developing sustainable approaches for their sites. Specifically, benefits were achieved in these case studies through promotion of economic development, innovative financing, incorporation of risk-based approaches, and consideration of social value of a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗