Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “External events”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Emerging contact force heterogeneity in ordered soft granular media

Under external perturbations, inter-particle forces in disordered granular media are well known to form a heterogeneous distribution with filamentary patterns. Better understanding these forces and the distribution is important for predicting the collective behavior of granular media, the media second only to water as the most manipulated material in global industry. However, studies in this regard so far have been largely confined to granular media exhibiting only geometric heterogeneity, leaving the dimension of mechanical heterogeneity a rather uncharted area. In this work, through a FEM contact mechanics model, we show that a heterogeneous inter-particle force distribution can also emerge from the dimension of mechanical heterogeneity alone. Specifically, we numerically study inter-particle forces in packing of mechanically heterogeneous disks arranged over either a square or a hexagonal lattice and under quasi-static isotropic compression. Our results show that, at the system scale, a hexagonal packing exhibit a more heterogeneous inter-particle force distribution than a square packing does; At the particle scale, for both packing lattices, preliminary analysis shows the consistent coexistence of outliers (i.e., softer disks sustaining larger forces while stiffer disks sustaining smaller forces) in comparison to their homogeneous counterparts, which implies the existence of nonlocal effect. Further analysis on the portion of outliers and on spatial contact force correlations suggest that the hexagonal packing shows more pronounced nonlocal effect over the square packing under small mechanical heterogeneity. However, such trend is reversed when assemblies becomes more mechanically heterogeneous. Lastly, we confirm that, in the absence of particle reorganization events, contact friction merely plays the role of packing stabilization while its variation has little effect on inter-particle forces and their distribution.

36 MATERIALS SCIENCE↗

THE DYNAMICS, APPEARANCE, AND DEMOGRAPHICS OF RELATIVISTIC JETS TRIGGERED BY TIDAL DISRUPTION OF STARS IN QUIESCENT SUPERMASSIVE BLACK HOLES

We examine the consequences of a model in which relativistic jets can be triggered in quiescent massive black holes when a geometrically thick and hot accretion disk forms as a result of the tidal disruption of a star. To estimate the power, thrust, and lifetime of the jet, we use the mass accretion history onto the black hole as calculated by detailed hydrodynamic simulations of the tidal disruption of stars. We go on to determine the states of the interstellar medium in various types of quiescent galactic nuclei, and describe how this external matter can affect jets propagating through it. We use this information, together with a two-dimensional hydrodynamic model of the structure of the relativistic flow, to study the dynamics of the jet, the propagation of which is regulated by the density stratification of the environment and by its injection history. The breaking of symmetry involved in transitioning from one to two dimensions is crucial and leads to qualitatively new phenomena. At early times, as the jet power increases, the high pressure of the cocoon collimates the jet, increasing its shock velocity as compared to that of spherical models. We show that small velocity gradients, induced near or at the source, steepen into internal shocks and provide a source of free energy for particle acceleration and radiation along the jet's channel. The jets terminate at a working surface where they interact strongly with the surrounding medium through a combination of shock waves and instabilities; a continuous flow of relativistic fluid emanating from the nucleus supplies this region with mass, momentum, and energy. Information about the t {sup -5/3} decrease in power supply propagates within the jet at the internal sound speed. As a result, the internal energy at the jet head continues to accumulate until long after the peak feeding rate is reached. An appreciable time delay is thus expected between peaks in the short-wavelength radiation emanating near the jet's origin and the long-wavelength emission produced at the head of the jet. Many of the observed properties of the Swift 1644+57/GRB 110328A event can be understood as resulting from accretion onto and jets driven by a 10{sup 6} M {sub Sun} central mass black hole following the disruption of a sun-like star. With the inclusion of a stochastic contribution to the luminosity due to variations in the feeding rate driven by instabilities near the tidal radius, we find that our model can explain the X-ray light curve without invoking a rarely occurring deep encounter. In conjunction with the number density of black holes in the local universe, we hypothesize that the conditions required to produce the Swift event are not anomalous, but are in fact representative of the jet-driven flare population arising from tidal disruptions.

79 ASTRONOMY AND ASTROPHYSICS↗

Aerospace News: Space Shuttle Commemoration. Volume 2, No. 7

The complex space shuttle design was comprised of four components: the external tank, two solid rocket boosters (SRB), and the orbiter vehicle. Six orbiters were used during the life of the program. In order of introduction into the fleet, they were: Enterprise (a test vehicle), Columbia, Challenger, Discovery, Atlantis and Endeavour. The space shuttle had the unique ability to launch into orbit, perform on-orbit tasks, return to earth and land on a runway. It was an orbiting laboratory, International Space Station crew delivery and supply replenisher, satellite launcher and payload delivery vehicle, all in one. Except for the external tank, all components of the space shuttle were designed to be reusable for many flights. ATK s reusable solid rocket motors (RSRM) were designed to be flown, recovered, and the metal components reused 20 times. Following each space shuttle launch, the SRBs would parachute into the ocean and be recovered by the Liberty Star and Freedom Star recovery ships. The recovered boosters would then be received at the Cape Canaveral Air Force Station Hangar AF facility for disassembly and engineering post-flight evaluation. At Hangar AF, the RSRM field joints were demated and the segments prepared to be returned to Utah by railcar. The segments were then shipped to ATK s facilities in Clearfield for additional evaluation prior to washout, disassembly and refurbishment. Later the refurbished metal components would be transported to ATK s Promontory facilities to begin a new cycle. ATK s RSRMs were manufactured in Promontory, Utah. During the Space Shuttle Program, ATK supported NASA s Marshall Space Flight Center whose responsibility was for all propulsion elements on the program, including the main engines and solid rocket motors. On launch day for the space shuttle, ATK s Launch Site Operations employees at Kennedy Space Center (KSC) provided lead engineering support for ground operations and NASA s chief engineer. It was ATK s responsibility to have a representative in Firing Room 2 at KSC in case of potential motor problems. However, the last time ATK was responsible for a space shuttle launch slip was 1989. During launch, engineers were also stationed in Promontory on teleconference with counterparts at KSC in the event their support was required.

Source record↗

Overview of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

Solar particle events (SPEs) pose the risk of acute radiation sickness (ARS) to astronauts, because organ doses from large SPEs may reach critical levels during extra vehicular activities (EVAs) or lightly shielded spacecraft. NASA has developed an organ dose projection model of Baryon transport code (BRYNTRN) with an output data processing module of SUMDOSE, and a probabilistic model of acute radiation risk (ARR). BRYNTRN code operation requires extensive input preparation, and the risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, these response models can be connected easily and correctly to BRYNTRN in a user friendly way. The GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. Assessment of astronauts organ doses and ARS from the exposure to historically large SPEs is in support of mission design and operation planning to avoid ARS and stay within the current NASA short-term dose limits. The ARRBOD GUI will serve as a proof-of-concept for future integration of other risk projection models for human space applications. We present an overview of the ARRBOD GUI product, which is a new self-contained product, for the major components of the overall system, subsystem interconnections, and external interfaces.

Kim, Myung-Hee Y.↗

Three years of observations from the International Space Station (ISS) by the Stratospheric Aerosol and Gas Experiment III (SAGE III/ISS)

After completion of the robot installation on the International Space Station (ISS) in early March 2017 as an external hosted science payload, the Stratospheric Aerosol and Gas Experiment (SAGE) III became the newest member to the family of space-based solar occultation instruments operated by NASA to investigate the Earth’s upper atmosphere since the late 1970s. One of three identical instruments, the SAGE III/ISS mission was revived in the early 2010s with a primary objective to monitor the vertical distribution of aerosol, ozone and other trace gases to enhance understanding of ozone recovery and climate change processes in the upper atmosphere. Presented here is the mission architecture, its implementation, and data produced by SAGE III/ISS, including their precision and coverage. The 51.6-degree inclined orbit of the ISS is well-suited for solar occultation and provides near-global observations on a monthly basis with coverage of low and mid-latitudes similar to that of the SAGE II mission, which operated over two decades. The nominal science products, derived from sampling spectra covering 290nm to 1030nm and a photo-diode near 1550 nm, include high resolution vertical profiles of ozone, nitrogen dioxide and water vapor, along with multi-wavelength aerosol extinction. Although in the visible portion of the spectrum the brightness of the Sun is a million times that of the full Moon, the SAGE III instrument design covers this large dynamic range, performing lunar occultations on a routine basis to augment the solar products. The standard lunar products include ozone and nitrogen trioxide. Routine observations began June 2017 and continue to the present. This has enabled observations of significant perturbations of the stratosphere induced by three different wildfire events (two of which were record setting), four volcanic eruptions and two changes of the Quasi-Biennial Oscillation (QBO) phase, as represented in the standard data products.

ozone↗

Operator Action Time Evaluation of Emergency Water Injection Strategy for Extreme SGTR Accidents

In terms of severe accidents caused by earthquakes or tsunamis that are beyond expectation, a special safety inspection for operating plants, following the Fukushima accident, has been conducted by the government of Korea to verify that nation's nuclear power plants have been adequately designed to respond to extreme accidents. The inspection results show that Korean nuclear power plants in operation have no imminent risk for an expected maximum potential earthquake or coastal flooding based on the up-to-date investigation. However, there is a need to implement long- and short-term safety improvements in order to secure the level of safety for natural beyond-design-basis events. One of the measures to increase the mitigation capability during extreme accidents is installing the injection flow paths to provide emergency cooling water of extemal sources using fire engines to the steam generators (SGs) or reactor cooling system (RCS). An emergency cooling water system consists of a fixed pipe connected from the RCS or SGs to the outside of the containment. A standby valve is installed on the pipe. Following the occurrence of an extreme accident, movable equipment (for example, a fire truck hose) can be connected to the pipe hole at the opening of the isolation valve. The emergency cooling water injection strategy was not taken into account for the steam generator tube rupture (SGTR) accident management strategy of the OPR-1000. Therefore, it is necessary to develop some guidelines or strategies to cope with an extreme SGTR scenarios using the newly installed injection flow paths and fire engines. As long as the fission products released from the core during severe accidents are kept inside the containment, there may be several ways to reduce the radionuclide release into the environment, for example, by using plant safety features. The containment bypass sequences, however, allow the fission products to be released into the environment or directly to the auxiliary building. The SGTR accidents, which are one of the containment bypass sequences, have shown during various probabilistic safety assessments (PSAs) to be contributors to plant risk, mainly because of their potential for causing a release outside containment. This paper is intended to be an investigation of the characteristics of accident progressions and assessments for the mitigative effectiveness of the external cooling water injection strategies during extreme SGTR accidents in a typical OPR-1000 plant. Analyses were performed using a MAAP computer code version 5.03. The MAAP code is a system-level computer code capable of conducting integral analyses of potential severe accident progressions in nuclear power plants, whose main purpose is to support a level 2 PSA or severe accident management strategy developments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

In-Sodium Testing of a Prototype Thermoacoustic Power Sensor for Sodium-Cooled Fast Reactors

The ultimate goal of this project is to develop and demonstrate a thermoacoustic power sensor (TAPS) for Sodium-Cooled Fast Reactors (SFRs), with potential application also envisioned to other nuclear technologies such as Lead-Cooled Fast Reactors (LFRs), Molten Salt Reactors (MSRs), in addition to Light Water Reactors (LWRs). The project was led by Westinghouse Electric Company, LLC (Westinghouse) and carried out in collaboration with Argonne National Laboratory (ANL) and the University of Pittsburgh. A TAPS is a passive (self-powered), non-invasive (wireless) sensor envisioned for measuring key parameters, such as local temperature and neutron flux, in a nuclear reactor core. The sensor generates pressure waves (i.e., sound waves) with a frequency and amplitude dependent upon nuclear operating conditions (coolant temperature or power changes). The acoustic waves are able to travel through the core and associated structures, and reach to the sensor network placed outside and/or inside of the reactor vessel. These sensors require a very small amount of power which, during loss of power events, can be provided, for example, by harvesting gamma radiation energy, thus resulting in a monitoring system that can function both during normal operation and during loss of power events. Westinghouse and the University of Pittsburgh designed and fabricated TAPS prototypes for Argonne National Laboratory (ANL) to carry out in-sodium testing to evaluate the effects of sodium on the TAPS and the performance of the TAPS technique in sodium. Argonne received a TAPS prototype from Westinghouse, and the prototype was modified such that it can be installed into a test vessel and function in sodium at elevated temperature without potentially leaking. A water mockup test apparatus was constructed to validate proper working of the prototype. An instrumentation and control (I&C) system, running on the National Instruments (NI) LabView platform, was developed to: 1) operate both the water mockup test and the in-sodium test facility; and 2) process and analyze the received acoustic signals from an array of accelerometers and the Argonne sodium-submersible high-temperature acoustic sensor. The prototype was successfully tested in a water bath at different temperatures. Water mockup tests demonstrated that the TAPS prototype is working properly and its resonance frequency changes linearly with the coolant (water) temperature. A TAPS test apparatus was constructed and integrated with the upgraded Under-Sodium Viewing (USV) sodium test facility. The integrated USV-TAPS sodium test facility has been operational. The TAPS prototype and a high-temperature sodium-submersible acoustic sensor (SSAS) developed by Argonne were both installed inside the TAPS test vessel. Being operated within argon cover gas under ambient conditions, the TAPS prototype demonstrated that it was functioning properly with a resonance frequency at 1407.2 Hz, which was successfully detected by the accelerometers mounted on the external wall of the vessel and the high-temperature SSAS installed inside the vessel. After successfully transferring sodium into the vessel, in-sodium tests of the prototype were conducted. Tests of the TAPS prototype demonstrated that the resonance frequency of the TAPS changes linearly with respect to the temperature difference between the interior of the TAPS and bulk sodium. The early tests showed that the TAPS prototype could not establish a continuous and consistent resonance in sodium. The resonance diminished before the prototype reached its operating temperature. A signal postprocessor was added to the DAQ module latterly to isolate interferences, enhance signal conditioning, improve peak detection, and generate resonance frequency versus temperature plots. After testing in molten sodium and immersion at higher temperature for several weeks, the TAPS prototype was able to establish a continuous resonance. Performance evaluation of the TAPS prototype was then conducted in sodium. The tests included the investigation of 1) the effects of the temperature difference between the TAPS and bulk sodium, 2) the effects of sodium flowrate; and 3) the performance of the different sensor-receiver systems positioned inside or outside the vessel. Results of a test demonstrated that, with limited sodium circulation, a continuous and consistent resonance of the TAPS prototype was established occasionally. The tests also demonstrated that, because of the nature of detection principles and mounting methods, the high temperature SSAS is more affected by acoustic noise, while accelerometers are more affected by vibrations, in the test environment. It is unknown why the TAPS prototype only occasionally established a continuous and consistent resonance when the TAPS temperature reached its operating temperature in molten sodium, and why it ultimately failed to resonate at all. A failure modes assessment was conducted and a few potential causes of failure were identified. Different post in-sodium tests were conducted to obtain additional information potentially relevant to the cause of the failure. Nondestructive evaluation techniques are suggested to examine the internal integrity as well as the gas mixture of the prototype. If they prove inconclusive, the prototype should be cut open to conduct a thorough inspection of its internal integrity and determine the state of the gas mixture.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Severe Pulmonary Toxicity After Myeloablative Conditioning Using Total Body Irradiation: An Assessment of Risk Factors

Purpose: To assess factors associated with severe pulmonary toxicity after myeloablative conditioning using total body irradiation (TBI) followed by allogeneic stem cell transplantation. Methods and Materials: A total of 101 adult patients who underwent TBI-based myeloablative conditioning for hematologic malignancies at Duke University between 1998 and 2008 were reviewed. TBI was combined with high-dose cyclophosphamide, melphalan, fludarabine, or etoposide, depending on the underlying disease. Acute pulmonary toxicity, occurring within 90 days of transplantation, was scored using Common Terminology Criteria for Adverse Events version 3.0. Actuarial overall survival and the cumulative incidence of acute pulmonary toxicity were calculated via the Kaplan-Meier method and compared using a log-rank test. A binary logistic regression analysis was performed to assess factors independently associated with acute severe pulmonary toxicity. Results: The 90-day actuarial risk of developing severe (Grade 3-5) pulmonary toxicity was 33%. Actuarial survival at 90 days was 49% in patients with severe pulmonary toxicity vs. 94% in patients without (p < 0.001). On multivariate analysis, the number of prior chemotherapy regimens was the only factor independently associated with development of severe pulmonary toxicity (odds ratio, 2.7 per regimen). Conclusions: Severe acute pulmonary toxicity is prevalent after TBI-based myeloablative conditioning regimens, occurring in approximately 33% of patients. The number of prior chemotherapy regimens appears to be an important risk factor.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

STS-78 Space Shuttle Mission Report

The STS-78 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-eighth flight of the Space Shuttle Program, the fifty-third flight since the return-to-flight, and the twentieth flight of the Orbiter Columbia (OV-102). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-79; three SSME's that were designated as serial numbers 2041, 2039, and 2036 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-081. The RSRM's, designated RSRM-55, were installed in each SRB and the individual RSRM's were designated as 360L055A for the left SRB, and 360L055B for the right SRB. The STS-78 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 7, Appendix E. The requirement stated in that document is that each organizational element supporting the Program will report the results of their hardware (and software) evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of this flight was to successfully perform the planned operations of the Life and Microgravity Spacelab experiments. The secondary objectives of this flight were to complete the operations of the Orbital Acceleration Research Experiment (OARE), Biological Research in Canister Unit-Block II (BRIC), and the Shuttle Amateur Radio Experiment II-Configuration C (SAREX-II). The STS-78 mission was planned as a 16-day, plus one day flight plus two contingency days, which were available for weather avoidance or Orbiter contingency operations. The sequence of events for the STS-78 mission is shown in Table 1, and the Space Shuttle Vehicle Management Office Problem Tracking List is shown in Table 2. The Government Furnished Equipment/Flight Crew Equipment (GFE/FCE) Problem Tracking List is shown in Table 3. The Marshall Space Flight Center (MSFC) Problem Tracking List is shown in Table 4. Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (G.m.t.) and mission elapsed time (MET).

Fricke, Robert W., Jr.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Native frames: An approach for separating sequential and concerted three-body fragmentation

Disentangling sequential and concerted three-body fragmentation has been a longstanding endeavor in studies of molecular dynamics. To accomplish this goal, we recently introduced a novel method to separate sequential from concerted breakup, where the sequential events are analyzed in their native frames [J. Rajput et al., Phys. Rev. Lett. 120, 103001 (2018)]. The essence of this method is the use of the Jacobi coordinates' conjugate momenta to reduce the dimensionality of the multibody fragmentation in combination with a clear signature for sequential breakup. To demonstrate this method, we employ coincidence momentum imaging to study the strong-field dissociative ionization of OCS into O + +C + + S + , which typically undergoes concerted fragmentation or sequential breakup involving either a metastable CO 2+ or CS 2+ molecule. We identify sequential breakup using a uniform distribution as a function of the angle between the conjugate momenta, associated with the first and second fragmentation steps, which is due to the rotation of the intermediate molecule in the fragmentation plane. Furthermore, by exploiting this uniform distribution, we separate the sequential and concerted distributions in any plot created from the measured momenta.

Atomic & molecular processes in external fields↗

Software Architecture to Support the Evolution of the ISRU RESOLVE Engineering Breadboard Unit 2 (EBU2)

The In-Situ Resource Utilization (ISRU) Regolith & Environmental Science and Oxygen & Lunar Volatiles Extraction (RESOLVE) software provides operation of the physical plant from a remote location with a high-level interface that can access and control the data from external software applications of other subsystems. This software allows autonomous control over the entire system with manual computer control of individual system/process components. It gives non-programmer operators the capability to easily modify the high-level autonomous sequencing while the software is in operation, as well as the ability to modify the low-level, file-based sequences prior to the system operation. Local automated control in a distributed system is also enabled where component control is maintained during the loss of network connectivity with the remote workstation. This innovation also minimizes network traffic. The software architecture commands and controls the latest generation of RESOLVE processes used to obtain, process, and quantify lunar regolith. The system is grouped into six sub-processes: Drill, Crush, Reactor, Lunar Water Resource Demonstration (LWRD), Regolith Volatiles Characterization (RVC) (see example), and Regolith Oxygen Extraction (ROE). Some processes are independent, some are dependent on other processes, and some are independent but run concurrently with other processes. The first goal is to analyze the volatiles emanating from lunar regolith, such as water, carbon monoxide, carbon dioxide, ammonia, hydrogen, and others. This is done by heating the soil and analyzing and capturing the volatilized product. The second goal is to produce water by reducing the soil at high temperatures with hydrogen. This is done by raising the reactor temperature in the range of 800 to 900 C, causing the reaction to progress by adding hydrogen, and then capturing the water product in a desiccant bed. The software needs to run the entire unit and all sub-processes; however, throughout testing, many variables and parameters need to be changed as more is learned about the system operation. The Master Events Controller (MEC) is run on a standard laptop PC using Windows XP. This PC runs in parallel to another laptop that monitors the GC, and a third PC that monitors the drilling/ crushing operation. These three PCs interface to the process through a CompactRIO, OPC Servers, and modems.

Moss, Thomas↗

Study of Microphonic Effects on the C100 Cryomodule for High Energy Electron Beam Accelerators

The Continuous Electron Beam Accelerator Facility (CEBAF) at Thomas Jefferson National Laboratory (JLab) is a particle accelerator which can accelerate an electron beam to relativistic speeds and apply the beam onto target samples. The C100 superconducting radio frequency (SRF) cavity is the primary accelerating structure of the C100 cryomodule, one of the many cryomodules which compose the CEBAF linear accelerator. SRF cavities are particularly sensitive to internal and external vibrations that can result in a phenomenon called microphonics which degrade the operational stability of a cryomodule. The purpose of this thesis is to investigate the significance of mechanical disturbances on the electromagnetic resonant frequency of a C100 SRF cavity. Knowledge of the mechanical resonance of the cavities and cryomodule sheds light into how these disturbances are most easily realized as deformation which causes radio frequency (RF) detuning. Three studies were conducted: the development and hammer test calibration of a Finite Element Analysis (FEA) model of a C100 cavity, the development and hammer test calibration of an FEA model of a C100 cavity string, and the hammer test of the C100-10R cryomodule at the Cryomodule Test Facility (CMTF). The cavity FEA model was found to accurately predict two modes found in two real cavities in a simply supported configuration. The cavity string FEA model leveraged the calibrated cavity FEA model but was not found to accurately predict the modal behavior of a real cavity string. Even so, the modal behavior of the cavity string inside the C100-10R cryomodule was captured during a hammer test while it was partially assembled. Finally, the C100-10R cryomodule was placed in the CMTF to study RF detuning. The RF detuning spectra during hammer hits and background noise was captured. The results of the hammer testing indicate two strong peaks at low frequencies (9-10 Hz and 22-23 Hz). These two frequencies were found to be nearly coincident to four instances of mechanical resonance found during the hammer testing done on the partially-assembled C100-10R. Because of this, these two modes are believed to contribute to RF detuning of the cryomodule. This test event also included the testing of the effectiveness of a configuration of BNNT canisters designed to act as dampers. While these tests show promising results, the lurking variables render these tests somewhat inconclusive.

Hull, Caleb James↗

Development of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

The space radiation environment, particularly solar particle events (SPEs), poses the risk of acute radiation sickness (ARS) to humans; and organ doses from SPE exposure may reach critical levels during extra vehicular activities (EVAs) or within lightly shielded spacecraft. NASA has developed an organ dose projection model using the BRYNTRN with SUMDOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUMDOSE, written in FORTRAN, are a Baryon transport code and an output data processing code, respectively. The ARR code is written in C. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. BRYNTRN code operation requires extensive input preparation. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN in friendly way. A GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. The ARRBOD GUI will serve as a proof-of-concept example for future integration of other human space applications risk projection models. The current version of the ARRBOD GUI is a new self-contained product and will have follow-on versions, as options are added: 1) human geometries of MAX/FAX in addition to CAM/CAF; 2) shielding distributions for spacecraft, Mars surface and atmosphere; 3) various space environmental and biophysical models; and 4) other response models to be connected to the BRYNTRN. The major components of the overall system, the subsystem interconnections, and external interfaces are described in this report; and the ARRBOD GUI product is explained step by step in order to serve as a tutorial.

Kim, Myung-Hee↗

Dosimetric comparison of partial and whole breast external beam irradiation in the treatment of early stage breast cancer

A dosimetric comparison was performed on external-beam three-dimensional conformal partial breast irradiation (PBI) and whole breast irradiation (WBI) plans for patients enrolled in the National Surgical Adjuvant Breast and Bowel Project (NSABP) B-39/Radiation Therapy Oncology Group (RTOG) 0413 protocol at our institution. Twenty-four consecutive patients were treated with either PBI (12 patients) or WBI (12 patients). In the PBI arm, the lumpectomy cavity was treated to a total dose of 38.5 Gy at 3.85 Gy per fraction twice daily using a four-field noncoplanar beam setup. A minimum 6 h interval was required between fractions. In the WBI arm, the whole breast including the entirety of the lumpectomy cavity was treated to a total dose of 50.4 Gy at 1.8 Gy per fraction daily using opposed tangential beams. The lumpectomy cavity volume, planning target volume for evaluation (PTV{sub E}VAL), and critical structure volumes were contoured for both the PBI and WBI patients. Dosimetric parameters, dose volume histograms (DVHs), and generalized equivalent uniform dose (gEUD) for target and critical structures were compared. Dosimetric results show the PBI plans, compared to the WBI plans, have smaller hot spots in the PTV{sub E}VAL (maximum dose: 104.2% versus 110.9%) and reduced dose to the ipsilateral breast (V50: 48.6% versus 92.1% and V100: 10.2% versus 50.5%), contralateral breast (V3: 0.16% versus 2.04%), ipsilateral lung (V30: 5.8% versus 12.7%), and thyroid (maximum dose: 0.5% versus 2.0%) with p values {<=}0.01. However, similar dose coverage of the PTV{sub E}VAL (98% for PBI and 99% for WBI, on average) was observed and the dose difference for other critical structures was clinically insignificant in both arms. The gEUD data analysis showed the reduction of dose to the ipsilateral breast and lung, contralateral breast and thyroid. In addition, preliminary dermatologic adverse event assessment data suggested reduced skin toxicity for patients treated with the PBI technique.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Automation of POST Cases via External Optimizer and "Artificial p2" Calculation

During early conceptual design of complex systems, speed and accuracy are often at odds with one another. While many characteristics of the design are fluctuating rapidly during this phase there is nonetheless a need to acquire accurate data from which to down-select designs as these decisions will have a large impact upon program life-cycle cost. Therefore enabling the conceptual designer to produce accurate data in a timely manner is tantamount to program viability. For conceptual design of launch vehicles, trajectory analysis and optimization is a large hurdle. Tools such as the industry standard Program to Optimize Simulated Trajectories (POST) have traditionally required an expert in the loop for setting up inputs, running the program, and analyzing the output. The solution space for trajectory analysis is in general non-linear and multi-modal requiring an experienced analyst to weed out sub-optimal designs in pursuit of the global optimum. While an experienced analyst presented with a vehicle similar to one which they have already worked on can likely produce optimal performance figures in a timely manner, as soon as the "experienced" or "similar" adjectives are invalid the process can become lengthy. In addition, an experienced analyst working on a similar vehicle may go into the analysis with preconceived ideas about what the vehicle's trajectory should look like which can result in sub-optimal performance being recorded. Thus, in any case but the ideal either time or accuracy can be sacrificed. In the authors' previous work a tool called multiPOST was created which captures the heuristics of a human analyst over the process of executing trajectory analysis with POST. However without the instincts of a human in the loop, this method relied upon Monte Carlo simulation to find successful trajectories. Overall the method has mixed results, and in the context of optimizing multiple vehicles it is inefficient in comparison to the method presented POST's internal optimizer functions like any other gradient-based optimizer. It has a specified variable to optimize whose value is represented as optval, a set of dependent constraints to meet with associated forms and tolerances whose value is represented as p2, and a set of independent variables known as the u-vector to modify in pursuit of optimality. Each of these quantities are calculated or manipulated at a certain phase within the trajectory. The optimizer is further constrained by the requirement that the input u-vector must result in a trajectory which proceeds through each of the prescribed events in the input file. For example, if the input u-vector causes the vehicle to crash before it can achieve the orbital parameters required for a parking orbit, then the run will fail without engaging the optimizer, and a p2 value of exactly zero is returned. This poses a problem, as this "non-connecting" region of the u-vector space is far larger than the "connecting" region which returns a non-zero value of p2 and can be worked on by the internal optimizer. Finding this connecting region and more specifically the global optimum within this region has traditionally required the use of an expert analyst.

Dees, Patrick D.↗

Hierarchical model for distributed seismicity

A cellular automata model for the interaction between seismic faults in an extended region is presented. Faults are represented by boxes formed by a different number of sites and located in the nodes of a fractal tree. Both the distribution of box sizes and the interaction between them is assumed to be hierarchical. Load particles are randomly added to the system, simulating the action of external tectonic forces. These particles fill the sites of the boxes progressively. When a box is full it topples, some of the particles are redistributed to other boxes and some of them are lost. A box relaxation simulates the occurrence of an earthquake in the region. The particle redistributions mostly occur upwards (to larger faults) and downwards (to smaller faults) in the hierarchy producing new relaxations. A simple and efficient bookkeeping of the information allows the running of systems with more than fifty million faults. This model is consistent with the definition of magnitude, i.e., earthquakes of magnitude m take place in boxes with a number of sites ten times bigger than those boxes responsible for earthquakes with a magnitude m-1 which are placed in the immediate lower level of the hierarchy. The three parameters of the model have a geometrical nature: the height or number of levels of the fractal tree, the coordination of the tree and the ratio of areas between boxes in two consecutive levels. Besides reproducing several seismicity properties and regularities, this model is used to test the performance of some precursory patterns.

58 GEOSCIENCES↗