Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Electrical Power System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Multi-Agent Graph-Attention Deep Reinforcement Learning for Post-Contingency Grid Emergency Voltage Control

Grid emergency voltage control (GEVC) is paramount in electric power systems to improve voltage stability and prevent cascading outages and blackouts in case of contingencies. While most deep reinforcement learning (DRL)-based paradigms perform single agents in a static environment, real-world agents for GEVC are expected to cooperate in a dynamically shifting grid. Moreover, due to high uncertainties from combinatory natures of various contingencies and load consumption, along with the complexity of dynamic grid operation, the data efficiency and control performance of the existing DRL-based methods are challenged. To address these limitations, we propose a multi-agent graph-attention (GATT)-based DRL algorithm for GEVC in multi-area power systems. Here, we develop graph convolutional network (GCN)-based agents for feature representation of the graph-structured voltages to improve the decision accuracy in a data-efficient manner. Furthermore, a cutting-edge attention mechanism concentrates on effective information sharing among multiple agents, synergizing different-sized subnetworks in the grid for cooperative learning. We address several key challenges in the existing DRL-based GEVC approaches, including low scalability and poor stability against high uncertainties. Test results in the IEEE benchmark system verify the advantages of the proposed method over several recent multi-agent DRL-based algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Decomposition Approach for Solving Seasonal Transmission Switching

Economic transmission switching has been proposed as a new control paradigm to improve the economics of electric power systems. In practice, the transmission switching operation itself is a disruptive action to the system. Frequently switching lines into or out of service can create undesirable effects on the security and reliability of power systems and may require new investments in the automation and control systems. In this paper, we formulate an economic seasonal transmission switching model where transmission switching occurs once at the beginning of a time period (season) and then the transmission topology remains unchanged during that period. The proposed seasonal transmission switching model is a large-scale mixed integer programming problem. The objective of the optimization model is to minimize the total energy generation cost over the season subject to loads and N-1 reliability requirements. We develop a novel decomposition method that decomposes the seasonal problem into one-hour problems which are then solved efficiently. We demonstrate our model and the decomposition approach on the 14-bus, 39-bus, and 118-bus power systems and show potential cost savings in each case.

Decomposition↗

Computing the Feasible Spaces of Optimal Power Flow Problems

The solution to an optimal power flow (OPF) problem provides a minimum cost operating point for an electric power system. The performance of OPF solution techniques strongly depends on the problem’s feasible space. This paper presents an algorithm that is guaranteed to compute the entire feasible spaces of small OPF problems to within a specified discretization tolerance. Specifically, the feasible space is computed by discretizing certain of the OPF problem’s inequality constraints to obtain a set of power flow equations. All solutions to the power flow equations at each discretization point are obtained using the Numerical Polynomial Homotopy Continuation (NPHC) algorithm. To improve computational tractability, “bound tightening” and “grid pruning” algorithms use convex relaxations to preclude consideration of many discretization points that are infeasible for the OPF problem. Here, the proposed algorithm is used to generate the feasible spaces of two small test cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Representing Operational Flexibility in Generation Expansion Planning Through Convex Relaxation of Unit Commitment

Large shares of renewable generation in electric power systems increase the need for operational flexibility. Consideration of operational flexibility in generation expansion planning (GEP) necessitates the modeling of unit commitment (UC) in system operations. However, the UC problem itself is computationally challenging. We present a GEP model in which the embedded operational problem is a convex relaxation of the UC problem. Through a large-scale example based on the Texas system, we show the tightness and tractability of our relaxation, as well as the impact of operational flexibility on GEP.

convex optimization↗

Optimal Transmission Line Switching under Geomagnetic Disturbances

Recently, there have been increasing concerns about how geomagnetic disturbances (GMDs) impact electrical power systems. Geomagnetically-induced currents (GICs) can saturate transformers, induce hot spot heating and increase reactive power losses. These effects can potentially cause catastrophic damage to transformers and severely impact the ability of a power system to deliver power. To address this problem, we develop a model of GIC impacts to power systems that includes 1) GIC thermal capacity of transformers as a function of normal Alternating Current (AC) and 2) reactive power losses as a function of GIC. We also use this model to derive an optimization problem that protects power systems from GIC impacts through line switching, generator dispatch, and load shedding. We then employ state-of-the-art convex relaxations of AC power flow equations to lower bound the objective. We demonstrate the approach on a modified RTS96 system and UIUC 150-bus system and show that line switching is an effective means to mitigate GIC impacts. We also provide a sensitivity analysis of decisions with respect to GMD direction.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling and Rapid Prototyping of Integrated Transmission-Distribution OPF Formulations with PowerModelsITD.jl

Conventional electric power systems are composed of different unidirectional power flow stages of generation, transmission, and distribution, managed independently by transmission system and distribution system operators. However, as distribution systems increase in complexity due to the integration of distributed energy resources, coordination between transmission and distribution networks will be imperative for the optimal operation of the power grid. However, coupling models and formulations between transmission and distribution is non-trivial, in particular due to the common practice of modeling transmission systems as single-phase, and distribution systems as multi-conductor phase-unbalanced. To enable the rapid prototyping of power flow formulations, in particular in the modeling of the boundary conditions between these two seemingly incompatible data models, we introduce PowerModelsITD.jl, a free, open-source toolkit written in Julia for integrated transmission-distribution (ITD) optimization that leverages mature optimization libraries from the InfrastructureModels.jl-ecosystem. The primary objective of the proposed framework is to provide baseline implementations of steady-state ITD optimization problems, while providing a common platform for the evaluation of emerging formulations and optimization problems. In this work, we introduce the nonlinear formulations currently supported in PowerModelsITD.jl, which include AC-polar, AC-rectangular, current-voltage, and a linear network transportation model. Results are validated using combinations of IEEE transmission and distribution networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed MPC for Efficient Coordination of Storage and Renewable Energy Sources Across Control Areas

In electric power systems, multiple entities are responsible for ensuring an economic and reliable way of delivering power from producers to consumers. With the increase of variable renewable generation it is becoming increasingly important to take advantage of the individual entities' (and their areas') capabilities for balancing variability. Hence, in this paper, we employ and extend the approximate Newton directions method to optimally coordinate control areas leveraging storage available in one area to balance variable resources in another area with only minimal information exchange among the areas. The problem to be decomposed is a model predictive control problem including generation constraints, energy storage constraints, and AC power flow constraints. Singularity issues encountered when formulating the respective Newton-Raphson steps due to intertemporal constraints are addressed and extensions to the original decomposition method are proposed to improve the convergence rate and required communication of the method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Forming Fast Frequency Response for PMSG-Based Wind Turbines

Electric power systems are undergoing a rapid transition from fuel-based generation using synchronous generators to renewable generation interfaced by power electronics. In this context, a key challenge is using renewable generation with limited controllability to contribute to power system stability. In this work, we investigate grid-forming control of permanent magnet synchronous generator (PMSG) wind turbines. The proposed control and curtailment strategy supports the entire spectrum of standard functions of grid-following (e.g. maximum power point tracking (MPPT) and grid-forming control (e.g., primary frequency control) without explicit mode switching. A detailed case study is used to compare the performance of the proposed control at operating points corresponding to MPPT and frequency control with standard grid-forming and grid-following controls. Further, the results demonstrate that (i) the proposed energy balancing grid forming control is self-synchronizing in MPPT mode, (ii) the (limited) energy storage and controllability of wind turbines can be adequately utilized to provide grid support, and (ii) the proposed control exhibits good performance under variable wind speeds and does not result in a significant increase of wind turbine fatigue loads.

17 WIND ENERGY↗

Ultrahigh capacitive energy density in ion-bombarded relaxor ferroelectric films

Dielectric capacitors can store and release electric energy at ultrafast rates and are extensively studied for applications in electronics and electric power systems. Among various candidates, thin films based on relaxor ferroelectrics, a special kind of ferroelectric with nanometer-sized domains, have attracted special attention because of their high energy densities and efficiencies. We show that high-energy ion bombardment improves the energy storage performance of relaxor ferroelectric thin films. Intrinsic point defects created by ion bombardment reduce leakage, delay low-field polarization saturation, enhance high-field polarizability, and improve breakdown strength. We demonstrate energy storage densities as high as ~133 joules per cubic centimeter with efficiencies exceeding 75%. Deterministic control of defects by means of postsynthesis processing methods such as ion bombardment can be used to overcome the trade-off between high polarizability and breakdown strength.

Kim, Jieun↗

Hiearchical Engine for Large Scale Infrastructure Simulation

HELICS ls a new open-source, cyber-physlcal-energy co-simulation framework for electric power systems. HELICS Is designed to support very-large-scale (100,000+ federates) co­simulations with off-the-shelf power-system, communication, market, and end-use tools. Other key features Include cross platform operating system support, the integration of both eventdrlven (e.g., packetlzed communication) and time-series (e.g.,power flow) simulations, and the ability to co-Iterate among federates to ensure physical model convergence at each time step.

Top, Philip↗

POWER DATA PIPELINE

SF-25-081 Utility software for creating high-performance data pipelines to extract, load, and transform raw electric power systems measurements. For use with anomaly detection models training workflows. The software supports the project: Adaptive Cybersecurity for DER: A Game-Theoretic and Machine Learning approach for Real-Time Threat Detection and Mitigation

Plathottam, Silby Jose [Argonne National Laborator↗

GridSTIX

SF-25-112 Grid-STIX is a comprehensive extension of the STIX (Structured Threat Information Expression) 2.1 ontology specifically designed for electrical grid cybersecurity applications. This ontology provides a standardized, machine-readable framework for modeling grid assets, operational technology devices, threats, vulnerabilities, supply chain risks, and security relationships in electrical power systems. ## Key Features - **Comprehensive Grid Coverage**: Physical assets, OT devices, grid components, sensors, and energy storage systems - **Zero Trust Architecture**: Policy decision points, enforcement points, trust brokers, and continuous monitoring - **AMI Infrastructure**: Advanced metering networks, head-end systems, mesh gateways, and MDM systems - **Advanced Security Modeling**: Attack patterns, vulnerabilities, mitigations, and supply chain risks - **Critical Grid Relationships**: Power flow, protection, control, and synchronization relationships - **Supply Chain Security**: Supplier modeling, country of origin tracking, and risk assessment - **Protocol Support**: DNP3, Modbus, IEC 61850, IEC 60870-5-104, OPC-UA, and IEEE standards - **Python Code Generation**: Automated STIX-compliant Python class generation from ontologies - **Interactive Visualization**: Enhanced HTML network graphs with grid-specific categorization - **STIX 2.1 Compliance**: Full compatibility with STIX threat intelligence ecosystem

Blakely, Benjamin [Argonne National Laboratory (AN↗

Western Wind and Solar Integration Study (Fact Sheet)

Initiated in 2007 to examine the operational impact of up to 35% penetration of wind, photovoltaic (PV), and concentrating solar power (CSP) energy on the electric power system, the Western Wind and Solar Integration Study (WWSIS) is one of the largest regional wind and solar integration studies to date. The goal is to understand the effects of variability and uncertainty of wind, PV, and CSP onthe grid. In the Western Wind and Solar Integration Study Phase 1, solar penetration was limited to 5%. Utility-scale PV was not included because of limited capability to model sub-hourly, utility-scale PV output . New techniques allow the Western Wind and Solar Integration Study Phase 2 to include high penetrations of solar - not only CSP and rooftop PV but also utility-scale PV plants.

14 SOLAR ENERGY↗

Operation of Concentrating Solar Power Plants in the Western Wind and Solar Integration Phase 2 Study

The Western Wind and Solar Integration Study (WWSIS) explores various aspects of the challenges and impacts of integrating large amounts of wind and solar energy into the electric power system of the West. The phase 2 study (WWSIS-2) is one of the first to include dispatchable concentrating solar power (CSP) with thermal energy storage (TES) in multiple scenarios of renewable penetration and mix. As a result, it provides unique insights into CSP plant operation, grid benefits, and how CSP operation and configuration may need to change under scenarios of increased renewable penetration. Examination of the WWSIS-2 results indicates that in all scenarios, CSP plants with TES provides firm system capacity, reducing the net demand and the need for conventional thermal capacity. The plants also reduced demand during periods of short-duration, high ramping requirements that often require use of lower efficiency peaking units. Changes in CSP operation are driven largely by the presence of other solar generation, particularly PV. Use of storage by the CSP plants increases in the higher solar scenarios, with operation of the plant often shifted to later in the day. CSP operation also becomes more variable, including more frequent starts. Finally, CSP output is often very low during the day in scenarios with significant PV, which helps decrease overall renewable curtailment (over-generation). However, the configuration studied is likely not optimal for High Solar Scenario implying further analysis of CSP plant configuration is needed to understand its role in enabling high renewable scenarios in the Western United States.

14 SOLAR ENERGY↗

Capricious Cables: Understanding the Key Concepts in Transmission Expansion Planning and Its Models

The extra-high-voltage transmission network is the bulk transport network of the electric power system. To understand how the future power system may react to planning decisions today, wide-area transmission models are increasingly used to aid decision makers and stakeholders. The goal of this work is to illuminate these models for a broader audience that may include policy makers or relative newcomers to the field of transmission planning. This paper explains the basic transmission expansion planning model formulation. It highlights six of the major simplifications made in transmission expansion planning models and the resulting need to contextualize model results using knowledge from other models and knowledge not captured in the modeling process.

14 SOLAR ENERGY↗

Improved Modeling Tools Development for High Penetration Solar

One of the significant objectives of the High Penetration solar research is to help the DOE understand, anticipate, and minimize grid operation impacts as more solar resources are added to the electric power system. For Task 2.2, an effective, reliable approach to predicting solar energy availability for energy generation forecasts using the University of California, San Diego (UCSD) Sky Imager technology has been demonstrated. Granular cloud and ramp forecasts for the next 5 to 20 minutes over an area of 10 square miles were developed. Sky images taken every 30 seconds are processed to determine cloud locations and cloud motion vectors yielding future cloud shadow locations respective to distributed generation or utility solar power plants in the area. The performance of the method depends on cloud characteristics. On days with more advective cloud conditions, the developed method outperforms persistence forecasts by up to 30% (based on mean absolute error). On days with dynamic conditions, the method performs worse than persistence. Sky Imagers hold promise for ramp forecasting and ramp mitigation in conjunction with inverter controls and energy storage. The pre-commercial Sky Imager solar forecasting algorithm was documented with licensing information and was a Sunshot website highlight.

14 SOLAR ENERGY↗