Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Distributed Computing Resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Design and implementation of I/O performance prediction scheme on HPC systems through large-scale log analysis

Abstract Large-scale high performance computing (HPC) systems typically consist of many thousands of CPUs and storage units used by hundreds to thousands of users simultaneously. Applications from large numbers of users have diverse characteristics, such as varying computation, communication, memory, and I/O intensity. A good understanding of the performance characteristics of each user application is important for job scheduling and resource provisioning. Among these performance characteristics, I/O performance is becoming increasingly important as data sizes rapidly increase and large-scale applications, such as simulation and model training, are widely adopted. However, predicting I/O performance is difficult because I/O systems are shared among all users and involve many layers of software and hardware stack, including the application, network interconnect, operating system, file system, and storage devices. Furthermore, updates to these layers and changes in system management policy can significantly alter the I/O behavior of applications and the entire system. To improve the prediction of the I/O performance on HPC systems, we propose integrating information from several different system logs and developing a regression-based approach to predict the I/O performance. Our proposed scheme can dynamically select the most relevant features from the log entries using various feature selection algorithms and scoring functions, and can automatically select the regression algorithm with the best accuracy for the prediction task. The evaluation results show that our proposed scheme can predict the write performance with up to 90% prediction accuracy and the read performance with up to 99% prediction accuracy using the real logs from the Cori supercomputer system at NERSC.

97 MATHEMATICS AND COMPUTING↗

Proof-of-concept chemometric approach for environmental forensic sourcing of crude oil samples using SPME-GC-MS

Environmental exposure to crude oil through seepage and spillage poses risks to the immediate environment and the broader ecosystem as areas along the oil distribution path are affected by the influx of crude petroleum as well as the environmental, economic, and civil unrest that accompanies it. There is a large financial burden associated with the lost resources, including the cost of rehabilitation, and the affected sources of revenue for communities affected by oil spills. As such, it is crucial to determine the responsible parties. This work outlines an environmental forensics approach to determining the source of an un-weathered crude oil sample. The researchers employed solid phase microextraction coupled with gas chromatography mass spectrometry (SPME-GC-MS) to capture and analyze the gaseous components emitted by crude oil samples sourced from five locations. Samples were analyzed using Spearman's rank correlation and 3D covariance analysis. Both chemometric approaches yielded optimal performance results with no misclassifications, true positive rate (TPR) = 100 % and false positive rate (FPR) = 0 %. The similarity metrics calculated by each test noted clear delineations between the values of same-source and differently sourced samples. The Spearman's rank correlation test and 3D covariance calculations both demonstrated the ability to correctly identify sample source origin in this dataset. Finally, the authors outline an approach to the future application of these tests and suggest their joint use in future crude oil sourcing endeavors.

3D covariance mapping↗

Second-generation downscaled earth system model data using generative machine learning

The second-generation Sup3rCC dataset provides high-resolution meteorological data generated through the downscaling of multiple earth system models (ESMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6). This downscaling is performed through application of a generative machine learning approach called Super-Resolution for Renewable Resource Data (sup3r). This dataset builds on the first-generation Sup3rCC data by applying improved bias correction methods and adding downscaled precipitation to the output variables. As with the first Sup3rCC version, the data still include temperature, wind speed and direction at multiple heights, pressure, three components of downwelling solar radiation, and relative humidity—all at 4-kilometer (km) hourly resolution over the contiguous United States. This is a 25x spatial enhancement and 24x temporal enhancement of the source 100-km daily-average ESM data. This extension of the Sup3rCC dataset includes data from six ESMs from two shared socioeconomic pathways (SSPs) totaling 400 years of data with multiple future projections of changing meteorological conditions. The scenario selection was based on a structured evaluation of historical ESM skill and comprehensive representation of possible trajectories of future climate change in temperature, humidity, precipitation, solar irradiance, and near-surface wind speeds. The inclusion of multiple future projections is intended to enable users to assess key drivers of un 36 certainty and variability. All data are double-bias corrected, resulting in a product that can be used out-of-the-box for energy system analysis with minimal historical bias. The potential applications of Sup3rCC data extend to various topics in renewable energy resource assessment, energy systems modeling, and grid resilience studies. High-resolution future meteorological projections are critical for evaluating the effects of changing meteorological conditions on renewable energy generation, energy demand, and for optimizing energy storage and grid infrastructure. The 4-km hourly resolution of the downscaled data enables understanding of spatial and temporal variability at the scales necessary for energy system operational planning. In addition, the dataset can support risk assessments by providing detailed information on possible future extreme weather events and long-term meteorological variability at scales relevant to energy infrastructure. By offering an enhanced representation of possible future meteorological conditions, the second-generation Sup3rCC dataset enables more precise modeling of energy resilience and adaptation strategies in response to changing meteorological conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Real-Time Testbed for Smart Inverter Cyber Security Studies

Distributed energy resources (DER) have become a popular solution to modern-day issues surrounding the efficiency and reliability of power generation, as well as climate change concerns. Energy centers are shifting towards incorporating smart inverters with embedded functionalities such as high voltage ride through (HVRT), low voltage ride through (LVRT), active and reactive power compensation. However, the integration of smart inverters leave DER systems highly vulnerable to cybersecurity threats. The distributed network protocol 3 (DNP3) is a common method of communication between grid-tied hardware. Despite its popularity, the level of security leaves all hardware connected to the grid at risk of severe cyber-attacks. Thus, it is important to study any potential cybersecurity threats towards grid-tied smart inverters to mitigate cybersecurity vulnerabilities and refine existing cyber-security protections. This report describes the proposed testbed design to study cybersecurity threats to smart inverters. The testbed utilizes a real-time simulation case in RSCAD that includes a grid-tied wind turbine (WT) topology featuring two back-to-back two-level voltage source converters (BTB,2L-VSCs) and a permanent magnet synchronous machine (PMSM). The simulated case runs within the NovaCor real time digital simulator (RTDS). This report focuses on the design and implementation of a single module of the GTNETx2 card as a distributed network protocol and the configuration of an IEEE 1518 DNP database file that includes input and output variables mapped to different connection points in the grid that transmit and receive discrete, analog, and binary signals on command. This allows realistic emulation of the communication between the smart inverter and the grid for cybersecurity studies.

97 MATHEMATICS AND COMPUTING↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool

This report provides an example of designing, developing, and running a power plant suitability model in the Energy Zones Mapping Tool (EZMT), a public, web-based mapping tool with a large spatial database focused on energy infrastructure, energy resources, and related siting factors. The example focuses on natural gas combined cycle (NGCC) power plants, which have several unique and interesting characteristics. NGCC plants typically provide peaking power to the electrical grid. Such plants can be started or stopped relatively quickly and are often used to supplement base load plants (such as nuclear or coal) during times of peak electrical consumption or to counterbalance lulls in variable power generation (such as wind or solar). Due to these and other factors, NGCC plants have been projected to increase in number under energy planning studies such as Hadley et al. The scope of the Hadley et. al. study is the Eastern Interconnection (EI), the electrical transmission grid serving much of the United States and Canada east of the Rocky Mountains. Results in the study are organized according to 22 Multi-region National—North American Electricity and Environment Model (NEEM) regions within the EI. NGCC plants usually have lower water requirements than other thermoelectric power plants they may replace; therefore, they are expected to have an interesting role in reducing the overall water requirements of energy generation.

20 FOSSIL-FUELED POWER PLANTS↗

VADER: A Tool for Criticality Safety Validation

The purpose of criticality safety is to prevent any inadvertent criticality from occurring during the handling or storage of fissile material. Calculations are frequently used to demonstrate that a sufficient subcritical margin exists. Validation is a key aspect of the evaluation process, establishing the suitability, accuracy, and associated uncertainty of the computational method and data to be used for the intended application. The validation process is performed by comparing the results of critical experiments with the calculated results from models of the experiments using the computational method to be validated. Laboratory critical experiments are controlled systems that achieve a k eff of approximately 1 in order to investigate the parameters at which such a critical condition is achieved. The validation parameters that are traditionally applied to safety analysis calculations are the bias and the bias uncertainty . The bias is the deviation of the average k eff of the validation suite from unity. The bias uncertainty accounts for the statistical uncertainty in the bias based on the standard deviation, sample size, and distribution of k eff values of the validation suite. The values of bias and bias uncertainty ensure that the systems predicted to be subcritical by the computational method will indeed be subcritical. The bias and bias uncertainty are often combined to determine an upper subcritical limit (USL) or computational margin that can then be applied to safety analysis calculations. Many methods have been developed by different organizations to calculate the bias and bias uncertainty for various types of criticality analyses. Each of these methods typically requires that the validity of various underpinning statistical assumptions be confirmed to demonstrate that the method is appropriate for the analysis of a given validation suite. An example of the validation decision making flow is shown in Fig.1. As shown in Fig. 1, the analyst performing the validation fits a trend line to the data and performs a test to determine if the trend was a statistically better representation of the data than if it were treated as an uncorrelated sample. If the trend line is a better representation of the data, then the analyst uses any one of a number of trending techniques to determine the bias and bias uncertainty. If a trend is not an appropriate representation of the data, then the analyst proceeds to perform a normality assessment for the data. If the normal assumption can be shown to be acceptable, then the analyst calculates the bias and bias uncertainty with the parametric technique. If the assumption of normality cannot be justified, then the nonparametric technique is used. Once the decision flow has been followed and the appropriate technique has been selected, the bias and bias uncertainty is typically combined with an administrative margin to determine a USL below which calculated values of k eff for safety analysis models can be considered subcritical. The calculations used in each decision are often performed with spreadsheets or with small programs available at various sites performing criticality analyses. Expertise in understanding and interpreting the results must be maintained to perform these calculations. This can often be an error-prone process. Oak Ridge National Laboratory (ORNL) is currently developing the Validation and Data Evaluation Resource (VADER) to simplify and automate the criticality safety validation process and to provide a software quality assurance pedigree to the calculational methods used. This paper discusses the use of the Fulcrum user interface with VADER, the anticipated initial capabilities of VADER to perform validation analyses, and the output from the code.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

DEReliction: A Cybersecurity Vulnerability Assessment Methodology for Distributed Energy Resources

With the increasing integration of Distributed Energy Resources (DER) into the electric grid, maintaining grid reliability and resilience requires that these devices remain secure. This paper discusses a cybersecurity vulnerability assessment methodology that incorporates best practices from Sandia National Laboratories, SANS Institute, OWASP Foundation, and other web and Internet of Things (IoT) penetration testing (“pen testing”) programs, courses, and frameworks for assessing the security posture of devices. The methodology involves five sequential steps: (1) Collect Public Information, (2) Extract Hardware Details, (3) Inventory Software Components, (4) Identify Vulnerabilities, and (5) Test Vulnerabilities. Each step uncovers potential weaknesses in both hardware and software components of DER devices, considering adversary tactics, techniques, and procedures (TTPs), and potential attack vectors along the way. The results from the execution of this method on multiple residential- and small commercial-scale photovoltaic (PV) inverters reveled hardware and software vulnerabilities, which highlight the benefit of taking a methodical approach to discover vulnerabilities. While the specific vulnerability details are not shared here, a generalized overview of findings underscore the importance of robust security assessments for DER devices. Adoption of an assessment framework of this kind will identify and mitigate cybersecurity threats and bolster the resilience of DER-integrated electric grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impedance Scan of Inverter-Based Resources and Diesel Generator for Stability Analysis: Preprint

Impedance-based methods are widely used for power system stability analysis with inverter-based resources (IBRs), e.g., assessing dynamic interactions between the power grid and an IBR, control interactions between multiple IBRs, and the sub-synchronous oscillation and damping phenomenon. Since it is difficult to get a numerical model 100% matching with the hardware IBR, using the hardware inverter directly to obtain its output impedance has become a prominent approach nowadays. Therefore, this article presents the impedance scan using hardware IBRs, and also a hardware diesel generator as it still stays with the grid before the grid completely goes to renewable. The devices under test (DuTs) for the impedance scan includes two 3-..phi.., 480 V, 60 Hz commercial grid-forming IBRs (one of 250 kVA and another of 125 kVA rating) in series with ..delta..-Y transformers, one 3-..phi.., 480 V, 60 Hz commercial grid-following IBR (of 125 kVA rating), and a 3-..phi.., 480 V, 60 Hz commercial diesel generator (of 187.5 kVA rating). Using voltage signals perturbed with sub-, inter-, and higher harmonic components, and measuring the current response, the positive-sequence impedances are computed via an offline- based post-analysis. Moreover, best-fit transfer functions are estimated that closely resemble the measured data points of the positive-sequence impedances. Based on the observations from various outcomes of the hardware experiments, this article also provides some fundamental insights on the equivalent positive- sequence impedance of a combination of multiple hardware components by comparing the estimated and the empirically computed impedances. A comparative insight on the damping capability of the DuTs using the positive-sequence impedances of the hardware is also discussed.

grid following inverter↗

Blockchain based Communication Architectures with Applications to Private Security Networks

Existing communication protocols in high consequence security networks are highly centralized. While this naively makes the controls easier to physically secure, external actors require fewer resources to disrupt the system because there are fewer points in the system can be destroyed or interrupted without the entire system failing. We present a solution to this problem using a proof-of-work-based blockchain implementation built on MultiChain. We construct a test-bed network containing two types of data input: visual imagers and microwave sensor information. These data types are ubiquitous in perimeter intrusion detection security systems and allow a realistic representation of a real-world network architecture. The cameras in this system use an object detection algorithm to nd important targets in the scene. The raw data from the camera and the outputs from the detection algorithm are then placed in a transaction on the distributed ledger. Similarly, microwave data is used to detect relevant events and are placed in a transaction. These transactions are then bundled into blocks and broadcast to the rest of the network using the Bitcoin-based MultiChain protocol. We develop five tests to examine the security metrics of our network. We performed the five security metric test using different sized networks from 7 to 39 nodes to determine how the metrics scale with respect to size. We nd that when compared to a centralized architecture our implementation provides a resiliency increase that is expected from a blockchain-based protocol without slowing the system so much that a human operator would notice. Furthermore, our approach is able to detect tampering in real time. Based on these results, we theorize that security networks in general could use a blockchain-based approach in a meaningful way.

97 MATHEMATICS AND COMPUTING↗

Cyber–physical vulnerability and resiliency analysis for DER integration: A review, challenges and research needs

High penetration of renewable and sustainable Distributed Energy Resources (DER) into the traditional distribution system requires a well-coordinated control strategy for the improvement of system-wide reliability and resiliency. Implementation of such a holistic control architecture requires a flexible, near real-time, and bi-directional communication framework for facilitating the participation of various agents in a multi-vendor heterogeneous smart grid. While the sustainability of energy generation is ensured, this exposes the smart grid to extrinsic cyber threats, and appropriate defense mechanism(s) must be deployed to guarantee continued reliability and resiliency of the power grid. Further, the comprehensive literature review presented in this paper discusses the latest trends in the DER control schemes with fast communication requirements and their accompanying cyber–physical vulnerabilities. These control schemes are compared and contrasted for various traits. A three-level DER system architecture has been depicted, facilitating the deployment of these control schemes. The current developments of standard communication protocols, key security mechanisms, and best practices along major standards and guidelines are explored. The impacts of different attack types with miscellaneous DER functions based on various control schemes and associated mitigation solutions are also provided. Finally, challenges and future research directions for limiting cyber-power susceptibility to enhance resiliency are summarized. The work presented here will help us enabling a cyber-resilient and sustainable smart electric grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ReNew100: Reliable Power System Operation with 100% Renewable Generation

The ReNew100 project has developed and demonstrated an operator support system (OSS) to operate power systems with 100% renewable power generation from inverter-based resources (IBRs) like wind and solar that significantly reduces the risk of widespread power outages in a simulated operational environment at Technology Readiness Level (TRL) 6. The OSS achieves resilient operation for power systems under changing operation modes including varying combinations of conventional and renewable generation, including cases with 100% renewable generation from wind and solar IBRs. The OSS continuously monitors the N-1 security of the power system, which refers to the ability of the power systems to survive single outages of power system elements, like the loss of a generator or a power line, without causing widespread power outages beyond those expected and planned for. If the OSS identifies that the system is not N-1 secure, an automatic Controller Parameter Optimization (CoPO) developed within Renew100 is activated to optimize the N-1 security of the system by tuning controller parameters within different assets like batteries, wind, and solar plants. The core innovation of ReNew100 is the development of this CoPO as well as the demonstration of the OSS for a real-time simulation of the Hawai'i Island power system. Moreover, Renew100 has developed new model calibration techniques for dynamic power system models and demonstrated them for Hawai'i Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

HybridSystemsSimulations.jl - Solving the Merchant Collocated Facilities with JuMP

The development of new clean-generation technologies also leads to new plant-level architectures that combine several generation and storage assets behind the point of connection. These co-located generation resources (Hybrid Systems) primarily operate as merchant assets that employ automated market bidding models and internal Energy Management Systems (EMS) to comply with the operator's signals. Formulating an optimal bidding model requires embedding the EMS control model into the bidding algorithm, resulting in a bi-level optimization problem. In this presentation, we first showcase using JuMP to formulate and solve this problem effectively for multiple merchant systems and the bidding outcomes considering different model formulations. Second, the bidding outcomes are later integrated into a PowerSimulations.jl (also built with JuMP) simulation to study the system-level effects of the various merchant bidding and the interactions between market-clearing models and the embedded EMS model. We will showcase simulations conducted in the RTS system considering different levels of merchant hybrid systems participation. The presentation provides the following specific insights on JuMP usage: 1) the Formulation of specialized bi-level problems with custom cuts to solve the merchant hybrid system bidding problem; 2) the integration of a modular model within a complex simulation workflow supported by JuMP in PowerSimulations.jl; 3) Accelerating the solution of power systems operations simulation that employ agent optimization problems using JuMP.

energy markets↗

Coordinated Ramping Product and Regulation Reserve Procurements in CAISO and MISO using Multi-Scale Probabilistic Solar Power Forecasts (Pro2R)

How can probabilistic solar forecasts lower costs and improve reliability for independent system operator (ISO) markets? We tackle this question in three steps. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty in those forecasts to error distributions for net load ramps for the California ISO (CAISO) using statistical and machine learning methods. Projected net load errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Finally, a multi-period look-ahead production cost model quantifies how conditional ramp requirements can a) decrease operating costs by lowering requirements compared to often conservative unconditional methods, and b) reduce generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. In addition to the products just described (quantification of solar uncertainty, its translation into requirements for ramp capability product, and quantification of the benefits of more accurate ramp requirements), this project also developed a visualization system that alerts system operators of ramp and uncertainty conditions within the network based on solar forecasts. The system is called Resource Forecast and Ramp Visualization for Situational Awareness (RaVIS). These four products represent significant advances in the state-of-the-art of probabilistic solar forecasting, development of weather-informed reserve requirements, production costing methods for estimating the benefits of more accurate reserve requirements, and visualization of system status, respectively. Yet the products are also practical and can be immediately implemented, potentially enabling system operators to save millions of dollars in ramp product procurement costs per year.

14 SOLAR ENERGY↗

Framework for optimization of long-term, multi-period investment planning of integrated urban energy systems

In order to achieve stringent greenhouse gas emission reductions, a transition of our entire energy system from fossil to renewable resources needs to be designed. Such an energy transition brings two main challenges: most renewables generate variable electric energy, yet most demand is currently not electric (carrier mismatch) and does not always manifest at the same time as supply (temporal mismatch). Integrating multiple energy infrastructures can address both challenges by using the synergy between different energy carriers; building on existing infrastructure, while allowing a robust and flexible integration of the new. This paper proposes an optimization framework for long-term, multi-period investment planning of urban energy systems in an integrated manner. We formulate it as a mixed-integer linear program, combining a capacitated facility location with a multi-dimensional, capacitated network design problem. It includes generation and network expansion planning as well as interconnections between networks and storage infrastructure for each energy system. It can incorporate pathway effects like techno-economic developments, policy measures, and weather variations. The intended use is to support urban decision makers with long-term investment planning, though it can be tailored to fit other geographical or temporal scales. We demonstrate the model using two cases based on an average city in The Netherlands, which wants to reduce its CO 2 -emissions with 95% by 2050. In the first case, we include explicit carbon-emission constraints to study the effects of the carrier mismatch. In the second case, we implement interannual weather variations to analyze the temporal mismatch. The results give valuable insights into the energy transition design strategy for urban decision makers. They also show the future potential, as well as the computational challenges of the optimization framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An interregional optimization approach for time series aggregation in continent-scale electricity system models

Modeling electric power systems with high shares of weather-dependent resources requires tradeoffs between temporal, spatial, and operational resolution. Many studies perform time series aggregation using clustering algorithms to reduce the temporal dimension, but when modeling continent-scale electricity systems that are large enough to contain multiple independent weather systems, this approach requires large numbers of representative periods to minimize errors in regional wind and solar capacity factors. Here, a new optimization-based approach for representative period selection and weighting is introduced that minimizes regional errors in average renewable capacity factors and electricity demand. The method delivers higher regional fidelity with fewer representative periods than alternative clustering methods when applied to wind, solar, and demand profiles for the contiguous United States. When representative periods are selected from multiple weather years, the optimized method reproduces regional averages with lower error than a complete 365-day time series from any single weather year. The method identifies only representative (as opposed to outlying) periods but can be combined with an iterative "stress period" identification approach to guide efficient decision-making considering both average and high-risk weather conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Agent Hierarchical Deep Reinforcement Learning for HVAC Control With Flexible DERs

As electricity consumption in commercial and residential buildings continues to rise, reducing energy costs presents an increasing challenge. Heating, ventilating, and air-conditioning (HVAC) systems, which typically account for 40%-50% of a building's energy use, are prime targets for energy savings. Intelligent control of HVAC temperature through the exploitation of HVAC load flexibility brings significant potential to reduce energy consumption and electricity expenses. The nonlinear models of HVAC systems challenge traditional control methods, while the uncertainty introduced by HVAC load flexibility complicates distributed energy resource (DER) management using conventional optimal dispatch techniques. In response to these challenges, we propose a hierarchical multi-agent deep reinforcement learning (DRL) approach. The lower-level agents focus on balancing comfort and energy conservation, while the upper-level DRL agents optimize the use of DERs to reduce peak demand based on the control outcomes of the HVAC by the lower-level agents. Here, in the upper-level agents, we incorporate a multi-agent structure based on ensemble learning, which acts based on historical and current data without relying on precise load forecasting to address the delayed rewarding issue in DRL. This allows for the effective reduction of energy costs. The proposed method is tested using a real-world microgrid comprising 413 buildings in Southern California, and the results demonstrate that our approach can significantly reduce overall electricity bills while ensuring the comfort of consumers and residents.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Fault Detection, Power Quality, Distributed Energy Resource Use Cases, and Cyber Event Applications with the Cyber Grid Guard System Using Distributed Ledger Technology

Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substation and are associated with distributed energy resources (DERs). The integrity and confidentiality of data from IEDs is crucial, and distributed ledger technology (DLT) could improve the resilience of microgrids by helping to make these data more secure. The most popular applications using blockchain technology for electrical utilities is in the field is based on energy trading. However, the dynamism of the penetration of customer owned DERs and the deployment of sensors with IEDs have led to the identification of new applications using DLT that are focused on other areas, such as monitoring, operation and management of the grid and its assets. In addition, the majority of studies on electrical grid applications with blockchain were validated with software simulations. Although general monitoring of power systems for using DLT could be evaluated in operational electric grids, other DLT research applications such as defense against cyber-attacks and/or electrical fault detection are not likely to be performed in a real infrastructure because of possible risks to the network/equipment security. This report summarizes the application of power system applications using distributed ledger technology (DLT), providing a secure DLT framework for collecting data from IEDs like power meters and protective relays inside and outside of an electrical substation and/or between two different electrical utilities. In this study, the use case scenarios were created and assessed for different power system application by using DLT. The electrical fault detection for faulted phases (1), power quality monitoring of phase voltage magnitudes, frequency levels and load power factor (2), DERs use case monitoring (3), and cyber-event applications (4) were performed in a test bed with a Cyber-Grid Guard (CGG) system using DLT. It had a real-time simulator with power meters and protective relays in-the-loop. The first section of this report presents a literature review of power system applications using blockchain at research level. The second section shows the theory and equations used on this report. The third section shows the description of the test bed, equipment, architecture, and electrical grid diagrams. The fourth section shows the experimental models and use case scenarios that were performed for the electrical fault detection, power quality, DERs use case, and cyber event applications with the CGG system using DLT. The fifth section shows the results collected from the tests based on comparing the time stamped events of the analog signals from the IEDs, DLT computer and real time simulator. The sixth section performed the discussion of the results for the use case scenarios. Finally, section seven presents the conclusions for this report were presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗