At least 1,081 records · Page 60

Demonstration of SuperLig{sup R} 605 and SuperLig{sup R} 644 in a Regeneration Flow Sheet to Remove Radioactive Strontium and Cesium from Seawater - 16236

Remediation techniques are needed for efficient removal of radioactive strontium and cesium from seawater. Molecular Recognition Technology, using selective SuperLig{sup R} resins, demonstrates a clean chemistry approach to solving this problem. Molecular Recognition Technology offers high levels of separation of chemically pure metal contaminants, whose subsequent disposal is compatible with simple waste forms (grout and glass). SuperLig{sup R} resins can be regenerated with common reagents and used many times, limited by a dose of 1 E+9 Rad, which assures low volumes of secondary solid waste. The metal selectivity of the SuperLig{sup R} resin ensures that the solid waste is of low residual activity. These properties of sustainability are illustrated in a project that demonstrated the ability of two SuperLig{sup R} resins to selectively remove Cs and Sr from a seawater mimic representative of the contaminated seawater in Fukushima, Dai'ichi, Japan harbor. Removal of radioactive Sr-90 and Cs-134/Cs-137 from seawater using conventional ion exchange or a complexing agent is complicated by the presence of large excesses of competing ions such as Na, K, Ca, and Mg, which can be co-extracted. These competing ions, if co-extracted, reduce the capacity of a single pass resin with the consequent increase in volume of spent resin or decrease in capacity of a regenerable resin. The successful demonstration reported in this study has shown the ability of two proprietary resins, SuperLig{sup R} 605 and SuperLig{sup R} 644, to remove Sr and Cs, respectively, with high selectivity from simulated solutions containing these metal ions together with major constituents of seawater at their normal concentrations. This effort was part of a demonstration project to investigate methods for removal of Sr-90 and Cs-134/Cs-137 from 160,000 cubic meters of seawater impounded at Fukushima, Dai'ichi, Japan harbor. SuperLig{sup R} resins can be regenerated by elution with small volumes of simple acid solutions. SuperLig{sup R} resins have a high tolerance to radiation, with their performance not being degraded by doses of 1.0 E+9 Rad. Estimates, based on the results obtained, are that Cs and Sr levels in the volume of seawater in the Fukushima, Dai'ichi, Japan harbor could be reduced to desired discharge limits in 200 days with some 30 cubic meters of the two SuperLig{sup R} resins and that decontamination factors of 10 or more could be achieved. Results of the demonstration, together with advantages of the Molecular Recognition Technology process over conventional procedures for these separations are presented and discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assay-based background projection for the Majorana Demonstrator using Monte Carlo uncertainty propagation

The background index (BI) is an important quantity to project and calculate the half-life sensitivity of neutrinoless double-𝛽 decay (0⁢𝜈⁢𝛽⁢𝛽) experiments. An analysis framework is presented to calculate the BI using the specific activities, masses, and simulated efficiencies of an experiments components as distributions. This Bayesian framework includes a unified approach to combine specific activities from assay. Monte Carlo uncertainty propagation is used to build a BI distribution from the specific activity, mass, and efficiency distributions. This method is applied to the M AJORANA D EMONSTRATOR , which deployed arrays of high-purity Ge detectors enriched in 76 Ge to search for 0⁢𝜈⁢𝛽⁢𝛽. The original assay-based projection is requantified in the new framework, using the as-built geometry of the Demonstrator and additional assay information. While 47% higher than the original projection, the resulting BI of [8.95±0.36]×10 −4 cts/(keVkgyr) from the 232 Th and 238 U decay chains does not account for the higher-than-expected BI observed by the D EMONSTRATOR . Finally, this method enables us to demonstrate the statistical incompatibility between the D EMONSTRATOR 's observed background and the assay results.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Overview of an Integrated Medical System for Exploration Missions

The Exploration Medical Capability (ExMC) element of the NASA Human Research Program (HRP) is charged with addressing the risk of unacceptable health and mission outcomes due to limitations of inflight medical capabilities. The Exploration Medical System Demonstration (EMSD) is a project within the ExMC element aimed at reducing this risk by improving the medical capabilities available for exploration missions. The EMSD project will demonstrate, on the ground and on ISS, the integration of several components felt to be essential to the delivery of medical care during long ]duration missions outside of low Earth orbit. The components of the EMSD include the electronic medical record, assisted medical procedure software, medical consumables tracking technology and RFID ] tagged consumables, video conferencing capability, ultrasound device and probes (ground demonstration only), peripheral biosensors, and the software to allow communication among the various components (middleware). This presentation seeks to inform our international partners of the goals and objectives of the EMSD and to foster collaboration opportunities related to this and future projects.

Watkins, Sharmila↗

Bandwidth Enabled Flight Operations: Examining the Possibilities

The Bandwidth Enabled Flight Operations project is a research effort at the NASA Ames Research Center to investigate the use of satellite communications to improve aviation safety and capacity. This project is a follow on to the AeroSAPIENT Project, which demonstrated methods for transmitting high bandwidth data in various configurations. For this research, we set a goal to nominally use only 10 percent of the available bandwidth demonstrated by AeroSAPIENT or projected by near-term technology advances. This paper describes the results of our research, including available satellite bandwidth, commercial and research efforts to provide these services, and some of the limiting factors inherent with this communications medium. It also describes our investigation into the needs of the stakeholders (Airlines, Pilots, Cabin Crews, ATC, Maintenance, etc). The paper also describes our development of low-cost networked flight deck and airline operations center simulations that were used to demonstrate two application areas: Providing real time weather information to the commercial flight deck, and enhanced crew monitoring and control for airline operations centers.

Pisanich, Greg↗

BioSIGHT: Interactive Visualization Modules for Science Education

Redefining science education to harness emerging integrated media technologies with innovative pedagogical goals represents a unique challenge. The Integrated Media Systems Center (IMSC) is the only engineering research center in the area of multimedia and creative technologies sponsored by the National Science Foundation. The research program at IMSC is focused on developing advanced technologies that address human-computer interfaces, database management, and high-speed network capabilities. The BioSIGHT project at is a demonstration technology project in the area of education that seeks to address how such emerging multimedia technologies can make an impact on science education. The scope of this project will help solidify NASA's commitment for the development of innovative educational resources that promotes science literacy for our students and the general population as well. These issues must be addressed as NASA marches toward the goal of enabling human space exploration that requires an understanding of life sciences in space. The IMSC BioSIGHT lab was established with the purpose of developing a novel methodology that will map a high school biology curriculum into a series of interactive visualization modules that can be easily incorporated into a space biology curriculum. Fundamental concepts in general biology must be mastered in order to allow a better understanding and application for space biology. Interactive visualization is a powerful component that can capture the students' imagination, facilitate their assimilation of complex ideas, and help them develop integrated views of biology. These modules will augment the role of the teacher and will establish the value of student-centered interactivity, both in an individual setting as well as in a collaborative learning environment. Students will be able to interact with the content material, explore new challenges, and perform virtual laboratory simulations. The BioSIGHT effort is truly cross-disciplinary in nature and requires expertise from many areas including Biology, Computer Science Electrical Engineering, Education, and the Cognitive Sciences. The BioSIGHT team includes a scientific illustrator, educational software designer, computer programmers as well as IMSC graduate and undergraduate students.

Wong, Wee Ling↗

Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

Simon, Tom↗

Airborne Spacing for Terminal Arrival Routes (ASTAR) Proof-of-Concept Flight Test

The Airborne Spacing for Terminal Arrival Routes (ASTAR) Flight Test was conducted by the NASA Air Traffic Management Technology Demonstration – 1 (ATD- 1) project to demonstrate the use of NASA’s ASTAR algorithm beyond a simulated environment and assess the operational risks of performing a multi-aircraft flight test of Flight-deck Interval Management (FIM). Utilizing contemporary tools of the Federal Aviation Administration’s Next Generation Air Transportation System (NextGen) such as ADS-B, the ASTAR algorithm calculated speeds that the flight crew flew to achieve a precise spacing interval behind another aircraft at the final approach fix. Airspeed commands issued by the algorithm were flown by the flight crew of the FIM-equipped aircraft to achieve or maintain an assigned spacing goal from a target vehicle. The ASTAR algorithm was integrated with the Boeing supplied B-787 ecoDemonstrator aircraft, and five flight trials were conducted as a joint effort between NASA and Boeing on December 12, 2014. Initial results indicated arrival times within several seconds of accuracy of the planned termination point between two aircraft performing FIM in a real world environment. This flight test opened the way for the much more expansive ATD-1 Avionics Phase II flight test which occurred in early 2017. The flight trials under Phase II preceded further testing by the community in preparation for inclusion of the Interval Management concept as a part of the NextGen environment.

Roper, Roy D.↗

Deep Space Habitat Concept Demonstrator

This project will develop, integrate, test, and evaluate Habitation Systems that will be utilized as technology testbeds and will advance NASA's understanding of alternative deep space mission architectures, requirements, and operations concepts. Rapid prototyping and existing hardware will be utilized to develop full-scale habitat demonstrators. FY 2014 focused on the development of a large volume Space Launch System (SLS) class habitat (Skylab Gen 2) based on the SLS hydrogen tank components. Similar to the original Skylab, a tank section of the SLS rocket can be outfitted with a deep space habitat configuration and launched as a payload on an SLS rocket. This concept can be used to support extended stay at the Lunar Distant Retrograde Orbit to support the Asteroid Retrieval Mission and provide a habitat suitable for human missions to Mars.

Bookout, Paul S.↗

Beneficial Use of Harvested Ponded Fly Ash and Landfilled FGD Materials for High-Volume Surface Mine Reclamation

The overall motivation of this project was to demonstrate at laboratory, bench-scale, and full-scale demonstration levels that (a) coal ash surface impoundments can go through closure by removal as per USEPA and state regulations so that the material can be used as is (other than draining free water using CCRs piles) in high-volume beneficial applications, (b) FGD material from closed out FGD facilities can be excavated and recompacted for coal mine reclamation, and (c) harvested CCRs can be beneficially utilized (providing a net environmental gain) in large-volumes for reclamation at abandoned coal mine sites across the US, especially in the Eastern and Midwest coal mining regions. The objectives of this project were to: 1) promote the safe and cost-effective closure by removal of coal ash impoundments, 2) harvest landfilled FGD, and 3) promote the high-volume beneficial use of these harvested CCRs in the reclamation of abandoned surface coal mine sites across the eastern and midwestern coal mining regions of the United States. The major tasks carried out for this project are summarized below: 1) Conesville Full-Scale Demonstration Project: About 2 million tons of harvested CCR materials from the closure by removal of an inactive fly ash pond and an adjacent old FGD landfill were used for the full-scale demonstration project to fully reclaim a nearby partially completed abandoned surface coal mine. Site monitoring for the project duration was carried out and results are discussed. 2) Laboratory Testing: Geotechnical and environmental testing of harvested ponded fly ash and landfilled FGD material at the former Conesville power plant were carried out. Completing the laboratory testing allowed for QA/QC for the full-scale site construction and informed the formulation of the risk analysis. 3) Risk Analysis: We developed a reliable computational model for fate and transport. We used these models and the rich set of monitored data for the Conesville site to analyze risks to human health and ecological risks associated with high-volume surface mine reclamation using harvested CCRs. 4) GIS Siting Study: A Geographic Information System (GIS) study was carried out for three states in the Eastern coal mining region and two states in the Midwest coal region. This effort provided site specific GIS information for five states and allowed us to establish protocols that other states can follow in implementing their own state specific GIS study.

01 COAL, LIGNITE, AND PEAT↗

A Disruptive Approach to Electric Vehicle Power Electronics Final Report

This project developed and demonstrated a new power electronics technology for electric vehicle drivetrains, that achieved significant improvements in power density and efficiency over standard drive cycles, relative to the commercial state of the art. In particular, the prototype measured loss and efficiency curves demonstrated a reduction in total loss over the US EPA US06 drive cycle by a factor of four. Similar reductions are observed for urban (UDDS) and highway (HWFET) drive cycles. Further, the project demonstrated a significant reduction in the total film capacitor requirements, by over an order of magnitude; this was achieved through fundamental improvements in converter circuit topologies. These nonincremental technology advances can lead to significant improvements in temperature rise, reliability, cost, and cooling system size and weight. These results were achieved through a new proposed composite converter architecture, and were demonstrated in a boost-type system similar to that employed by Toyota, Ford, and Honda. A 30 kW silicon prototype achieved a US06 average efficiency of 97.5%, which represents a reduction in average loss by a factor of approximately four relative to the 92.5% average efficiency of the commercial state of the art. A silicon carbide prototype achieved similar efficiency, while also achieving power densities of 23 kW/L (volumetric) and 20 kW/kg (gravimetric) in a boost dc-dc system including magnetics and film capacitors. This was achieved with a SiC switching frequency of 240 kHz, which allowed employment of planar magnetics. These power densities are roughly four times better than the commercial state of the art, and significantly exceed the DOE APEEM 2020 goals. In addition to the composite boost system, a SiC inverter was demonstrated at the 800 V 30 kW level. This inverter was demonstrated driving a permanent magnet machine over the US 06 drive cycle. The replacement of 1200 V Si IGBTs with 1200 V SiC MOSFETs led to improvement of CAFE average efficiency from 98.7% to 99.5%, which corresponds to a reduction of average loss by a factor of approximately two. The modular nature of the composite converter architecture opens the possibility of reuse of one or more converter modules during charging operations, providing a path for onboard charging capability at significant power levels while significantly reducing the volume and weight of the added charger module. This project demonstrated an integrated Level II charger whose add-on specific weight was approximately four times better than the DOE PHEV charger 2022 targets.

33 ADVANCED PROPULSION SYSTEMS↗

The AGATA Demonstrator Array at Laboratori Nazionali di Legnaro: Status of the Project

The AGATA Demonstrator Array is presently under installation at Laboratori Nazionali di Legnaro, Italy, where it will replace the CLARA array at the target position of the PRISMA magnetic spectrometer. In the present contribution, the details of the installation will be reviewed. Preliminary results from the first in-beam commissioning test will be given.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Reliable Protection for an Inverter-Based Resources Dominant Grid: Technology Development and Field Demonstration

The project aimed to address the challenges posed by the rapid growth of inverter-based resources (IBR) such as solar, wind, and battery storage, which have fundamentally changed fault behavior, system strength, and protection performance in bulk power systems. Traditional protection schemes, designed for synchronous generator-dominated grids, are inadequate under high IBR penetration. Overall, the project materially advances protection modeling and simulation capabilities needed to maintain reliable grid protection under high IBR penetration. The results build utility confidence in operating power systems safely and reliably across a wide range of generation mixes, supporting grid modernization goals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Far-Field Electro-Magnetic Tractor Beam Project

To demonstrate and model a long range-co-operative attractive force between a pair of satellites in order to fly satellite formations for future interferometer and telescope applications

Technology Portfolio System↗

Advanced Flywheel Composite Rotors: Low-Cost, High-Energy Density Flywheel Storage Grid Demonstration

GRIDS Project: Boeing is developing a new material for use in the rotor of a low-cost, high-energy flywheel storage technology. Flywheels store energy by increasing the speed of an internal rotor —slowing the rotor releases the energy back to the grid when needed. The faster the rotor spins, the more energy it can store. Boeing’s new material could drastically improve the energy stored in the rotor. The team will work to improve the storage capacity of their flywheels and increase the duration over which they store energy. The ultimate goal of this project is to create a flywheel system that can be scaled up for use by electric utility companies and produce power for a full hour at a cost of $100 per kilowatt hour.

ARPA-E↗

NREL/SCE High-Penetration PV Integration Project: Report on Field Demonstration of Advanced Inverter Functionality in Fontana, CA

The National Renewable Energy Laboratory/Southern California Edison High-Penetration PV Integration Project is (1) researching the distribution system level impacts of high-penetration photovoltaic (PV) integration, (2) determining mitigation methods to reduce or eliminate those impacts, and (3) seeking to demonstrate these mitigation methods on actual high-penetration PV distribution circuits. This report describes a field demonstration completed during the fall of 2013 on the Fontana, California, study circuit, which includes a total of 4.5 MW of interconnected utility-scale rooftop PV systems. The demonstration included operating a 2-MW PV system at an off-unity power factor that had been determined during previously completed distribution system modeling and PV impact assessment analyses. Data on the distribution circuit and PV system operations were collected during the 2-week demonstration period. This demonstration reinforces the findings of previous laboratory testing that showed that utility-scale PV inverters are capable of operating at off-unity power factor to mitigate PV impacts; however, because of difficulties setting and retaining PV inverter power factor set points during the field demonstration, it was not possible to demonstrate the effectiveness of off-unity power factor operation to mitigate the voltage impacts of high-penetration PV integration. Lessons learned from this field demonstration are presented to inform future field demonstration efforts.

14 SOLAR ENERGY↗

Comparison of Waste Feed Delivery Small Scale Mixing Demonstration Simulant to Hanford Waste

The Hanford double-shell tank (DST) system provides the staging location for waste feed delivery to the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Hall (2008) includes WTP acceptance criteria that describe physical and chemical characteristics of the waste that must be certified as acceptable before the waste is transferred from the DSTs to the WTP. One of the more challenging requirements relates to the sampling and characterization of the undissolved solids (UDS) in a waste feed DST. The objectives of Washington River Protection Solutions' (WRPS) Small Scale Mixing Demonstration (SSMD) project are to understand and demonstrate the DST sampling and batch transfer performance at multiple scales using slurry simulants comprised of UDS particles and liquid (Townson 2009). The SSMD project utilizes geometrically scaled DST feed tanks to generate mixing, sampling, and transfer test data. In Phase 2 of the testing, RPP-49740, the 5-part simulant defined in RPP-48358 was used as the waste slurry simulant. The Phase 2 test data are being used to estimate the expected performance of the prototypic systems in the full-scale DSTs. As such, understanding of the how the small-scale systems as well as the simulant relate to the full-scale DSTs and actual waste is required. The focus of this report is comparison of the size and density of the 5-part SSMD simulant to that of the Hanford waste. This is accomplished by computing metrics for particle mobilization, suspension, settling, transfer line intake, and pipeline transfer from the characterization of the 5-part SSMD simulant and characterizations of the Hanford waste. In addition, the effects of the suspending fluid characteristics on the test results are considered, and a computational fluid dynamics tool useful to quantify uncertainties from simulant selections is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Air Sealing Demonstration: Denver Federal Center Building 40

This project aimed to demonstrate building airtightness achieved by automated air sealing in a commercial building setting. The automated air sealing demonstrated in this project uses a modified blower door to pressurize and distribute the sealing aerosol to achieve the required building airtightness. To demonstrate this technology, Building 40 at the Denver Federal Center, a federally owned campus under the jurisdiction, custody and control of the U.S. General Services Administration (GSA), was selected for testing (Figure 2). This building is currently undergoing several retrofit projects, including increasing insulation, installing high-performance windows, and adding advanced equipment, control systems, and automated air sealing. This demonstration project involved installing automated air sealing and measuring the improvements in the building's airtightness. The automated air sealing was installed over two days by AeroBarrier, the vendor. An external blower door test contractor measured the airtightness of the demonstration space before and after air sealing. The new airtightness value and the percentage increase in airtightness were used to evaluate the energy savings potential of automated air sealing. These airtightness values were used to compute the energy savings and CO 2 emissions reduction for different climate zones, building types, and initial airtightness conditions. In addition, the heating, ventilation and air conditioning (HVAC) load reduction attributable to the reduced building air leakage was studied. This study included research to determine the cost and time reduction of automated air sealing. Finally, the automated air sealing performance was evaluated qualitatively using a focus group discussion that included GSA and Bristol, the general contractor. The installation has shown the demonstration site, with a floor size of 4,462 ft 2 , air leakage has reduced by more than 50% in less than 7 hours, including preparation, site sealing, and cleanup. The performance objectives were classified as quantitative or qualitative based on the evaluation metrics used to assess the project’s success. The key performance objectives for this project were the level of airtightness achieved, the time and cost required to perform the sealing, and the HVAC load reduction attributable to air sealing. Table 1 shows the quantitative performance objectives.

42 ENGINEERING↗

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Systems Integration and Operationalization (SIO) Demonstration

The UAS-NAS Project hosted a Systems Integration Operationalization (SIO) Industry Day for the SIO Request for Information (RFI) on November 30, 2017 in San Diego, California. This presentation is being presented to the same group as a follow up regarding the progress that the UAS-NAS project has made on the SIO RFI. The presentation will be virtual with a teleconference