Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Orion European Structural Test Article Propellant Tank Fill and Drain Carts

Environmental testing of the Orion European Structural Test Article (E-STA), which contains the Orion European Service Module (ESM), required that the onboard propellant tanks be filled and drained with fuel and oxidizer simulant fluids as well as pressurized and depressurized with an ullage gas. This conference paper will elaborate on how these objectives were fulfilled by presenting the development of derived requirements definition, initial fill and drain concepts, selection of simulant fluids, finalization of pump and pressurization design, selection of components, and selection of transfer hoses and interface connections as well as development and maintenance of budgets, schedules, reviews, construction, documentation, and test procedures. This paper also describes the implementation of checkout and commissioning activities leading to successful fluid cart pumping and pressurization operations for the test campaign. The development, construction, and operation of the fluid cart pumping and pressurization systems for the environmental testing of the Orion E-STA, took place at NASA's Plum Brook Station Space Environments Complex (SEC) during 2015 and 2016.

FLUID TRANSFER↗

Orion Heat Shield Manufacturing Producibility Improvements for the EM-1 Flight Test Program

This paper describes how the Orion program is incorporating improvements in the heat shield design and manufacturing processes reducing programmatic risk and ensuring crew safety in support of NASA’s Exploration Missions. The Orion program successfully completed the EFT-1 flight test in 2014 and is currently developing the EM-1 spacecraft to meet the test objectives of an orbital mission to the moon and return to earth in 2019. Lessons learned from the EFT-1 manufacturing and flight test experience are being incorporated into a wide variety of vehicle systems and manufacturing processes to reduce risk to the Orion missions and flight crew. A critical contributor to crew safety is the heat shield that protects the crew capsule during re-entry through the earth’s atmosphere for return from deep space. The first flight test vehicle, EFT-1, was manufactured and tested in the Neil Armstrong Operations and Checkout (O&C) facility at KSC to demonstrate early risk reduction including the functionality of the Thermal Protection Systems (TPS) for capsule safe return to earth. The approach for the EFT-1 heat shield utilized a low risk approach using Apollo heritage design and manufacturing processes using an Avcoat TPS ablator with a honeycomb substrate to provide a one piece heat shield to meet the mission re-entry heating environments. The manufacturing processes used honeycomb cell injection guns which were redeveloped from the Apollo Lunar Program processes to build the EFT-1 heat shield. The completed heat shield was transported across the country by aircraft to the O&C at KSC for installation onto the capsule. The EFT-1 heat shield successfully performed its mission and experienced ~80% of the re-entry velocity (50% heating rate) for a lunar return for an Exploration Mission. The second flight test vehicle is the EM-1 mission which will have additional flight systems installed to fly to the moon and return. Heat shield design and producibility improvements have been incorporated in the EM-1 vehicle to meet deep space mission and programmatic requirements. The design continues to use the Avcoat material, but in a “block” configuration to enable improvements in the application processes as well as additional improvements in the carrier structure design and manufacturing operations. Incorporating flight test results and producibility improvements from EFT-1 for the heat shield system design and processes have improved the thermal protection capability, improved the producibility, and cost for EM-1 flight test.

Producibility↗

GOES-16 ABI Navigation Assessment

The US Geostationary Operational Environmental Satellite – R Series (GOES-R) was launched on November 19, 2016and was designated GOES-16 upon reaching geostationary orbit ten days later. After checkout and calibration, GOES-16 was relocated to its operational location of 75.2 degrees west and officially became GOES East on December 18, 2017. The Advanced Baseline Imager (ABI) is the primary instrument on the GOES-R series for imaging Earth's surface and atmosphere to significantly improve the detection and observation of severe environmental phenomena. A team supporting the GOES-R Flight Project at NASA's Goddard Space Flight Center developed algorithms and software for independent verification of ABI Image Navigation and Registration (INR), which became known as the INR Performance Assessment Tool Set (IPATS). In this paper, we will briefly describe IPATS on top concept level, and then introduce the Landsat chips, chip registration algorithms, and how IPATS measurements are filtered. We present GOES-16 navigation (NAV) errors from flight data from January 2017 to May 2018. The results show a) IPATS characterized INR variations throughout the post-launch test phase; and b) ABI INR has improved over time as post-launch tests were performed and corrections applied. Finally, we will describe how estimated NAV errors have been used to assess and understand satellite attitude anomalies and scale errors etc. This paper shows that IPATS is an effective tool for assessing and improving GOES-16 ABI INR and is also useful for INR long-term monitoring.

GOES-R↗

Command and Control System Automated Testing

The Kennedy Space Center (KSC) has developed its own Command and Control System for the launch of the Space Launch System (SLS) and Orion capsule. The Command and Control System (CCS) is used by console engineers for the launch and system checkout of aerospace vehicles. The CCS allows console engineers to read data from the flight hardware on the launch pad and from the ground control systems and allows console engineers to issue commands, like opening a valve, to the flight hardware and ground control systems. The CCS needs to interact with thousands of devices and hardware controllers for the spacecraft and ground systems, receive data from these devices, distribute the data to console engineers in real-time, and allow console engineers to issue commands to manipulate hardware on the launch pad. The system needs to be robust, fault tolerant, responsive, and fast. In order to keep up with the pace of development of the CCS, a Test Automation System (TAS) is needed to validate the integrity of the system as a whole along with its individual components. Automated tests allow for faster development time, since tests can be ran through a Continuous Integration system and allow developers to check their code faster. Currently, the different modules, classes, and functions that make up the CCS are tested at the unit level, and the system level, with all the modules working together. My project was to implement a system for the data protocol layer of the Command Control System to be tested as a complete functional unit, with all of its classes and functions working together, but independent of the other modules of the CCS.

Automated TestingTest Automation↗

Assessment of TLE-Based Orbit Determination and Prediction for Cubesats

The IceCube satellite is a 3U cubesat which was deployed from the International Space Station Nanoracks in May 2017. IceCube uses onboard Global Positioning System (GPS) measurements for both science data processing and orbit determination; additionally, IceCube uses Two Line Element (TLE) sets provided by USSTRATCOM through Space Track for ground station acquisition. Once acquired, GPS measurements are downlinked and can be verified against nearby TLE states.TLE sets are typically used for cubesat acquisition data, however the accuracy of their propagation has a limited lifespan which can cause issues when using an older TLE to attempt spacecraft acquisition. This presentation details the merits of TLE-based orbit determination and prediction and discusses techniques for improving both. These refinements allow for improved cubesat acquisition as well as calibration and on-orbit checkout of the GPS. Using IceCube data as representative of a typical cubesat, TLE states are simulated as tracking data and processed through an Extended Kalman Filter. This filtered solution provides not only an ongoing estimate of spacecraft drag state parameters, but also improves the definitive orbit determination estimation as well as the propagation accuracy and therefore spacecraft acquisition. Next, using the definitive TLE-based solution, raw GPS measurements are introduced into the filter where the combined measurement types allow the GPS measurements to be subsequently calibrated with respect to an unknown timing bias. These analyses provide a more accurate state estimation and prediction of cubesats during early orbit operations. Additionally, these techniques showcase methods for TLE-based state estimation and GPS calibration when other methods of tracking are unavailable.

Smith, Alexander↗

Designing and Building a Crew-Centric Mobile Scheduling and Planning Tool for Exploring Crew Autonomy Concepts Onboard the International Space Station

During 2015, as part of our ongoing research on crew autonomy, our team adapted and extended the plan viewing tool, Playbook, into a mobile tool for exploring crew autonomy onboard the International Space Station (ISS). This work enables crewmembers to intuitively re-plan and schedule on their own with limited input from mission control. Designed for ease of use, re-planning is composed of simple drag and drop interactions and learning the tool requires little to no training. Playbook was successfully uplinked onto ISS as a technology demonstration and completed its onboard ground and crew checkouts in August and September 2015, respectively. We will discuss and describe how Playbook was able to integrate with actual ISS operational plans and operational procedures without disrupting real mission operations. This work will also outline the design and technical constraints required to build a collaborative tool that allows multiple users to simultaneously self-schedule and synchronize during communication dropouts in the restricted networking and computing environment onboard ISS. Finally, we will explore the aspects of crew autonomy that this technology enables as well as discuss our next steps and possible extensions.

ISS↗

Correlation of Full-Scale Isolated Proprotor Performance and Loads

A full-scale isolated proprotor test is currently being conducted in the USAF National Full-Scale Aerodynamics Complex (NFAC) 40- by 80-Foot Wind Tunnel at NASA Ames. The test article is a 3-bladed research rotor derived from the right-hand rotor of the AW609; this rotor was manufactured by Bell Helicopter under contract to NASA. In this paper, this research rotor is referred to as "699". The test, nearly completed, is an integral part of the initial checkout test of the newly developed Tiltrotor Test Rig (TTR), whose purpose is to test advanced, full-scale proprotors in the NFAC. Figure 1 shows the TTR/699 installed in the 40- by 80-Foot test section. The TTR rotor axis is horizontal and the rig rotates in yaw on the wind tunnel turntable for conversion (transition) and helicopter mode testing. To date, a substantial amount of wind tunnel test data has already been acquired. The completed operational conditions include hover, airplane mode (cruise, wind tunnel airspeed V=61 to 267 knots), and the helicopter and conversion conditions (with a comprehensive sweep of the TTR yaw angle ranging, to date, from 90-deg yaw helicopter mode to 30-deg yaw conversion mode, at varying airspeeds). This 699 proprotor performance and loads correlation study uses these newly acquired wind tunnel test data. This paper represents the third analytical study, coming after two earlier analytical studies on the TTR/699; that is, a 2018 paper on pre-test predictions of 699 performance and loads, Ref. 1, and an upcoming January 2019 paper on aeroelastic stability analysis of the TTR/699 installed in the 40- by 80-Foot Wind Tunnel, Ref. 2. Reference 8 will present an overview of the entire TTR/699 test program. For completeness, Ref. 3 addresses the development and initial testing of the TTR. Background information on the TTR effort at NASA Ames can be found at the Aeromechanics website: https://rotorcraft.arc.nasa.gov/Research/Facilities/ttr.html. To the authors' knowledge, the full-scale results presented in this paper are the first of their kind. A literature survey brought up several existing correlation studies, but these were either based on small-scale test data (for example, the studies performed by the University of Maryland) or full-scale aircraft flight test data (for example, flight tests conducted by Bell Helicopter). Separately, the 2009 NASA study involving the JVX rotor is relevant (see Ref.4). The JVX is closely similar to the 699 in size and aerodynamics, and is accordingly a good reference for performance calculations. In Ref. 1 (as mentioned above), pre-test reality checks of the current analytical model were made by comparing JVX and 699 predictions in hover and forward flight (airplane mode).

Isolated Proprotor Performance↗

High-Speed Wind Tunnel Tests of a Full-Scale Proprotor on the Tiltrotor Test Rig

The Tiltrotor Test Rig (TTR) is a NASA project, joint with the U.S. Army and Air Force, to develop a new, large scale proprotor test system for the National Full-Scale Aerodynamics Complex (NFAC). The first wind-tunnel entry was completed in November 2018 with a modern, 26-ft diameter proprotor. The primary purpose was to complete the development of the TTR, including systems integration with the NFAC. The TTR and rotor were tested up to 273 knots in axial flow. This is the highest airspeed ever achieved by a full-scale proprotor in any wind tunnel. Extensive conversion-mode data were also acquired, and hover/climb conditions were explored. Additional testing included aerodynamic tares, motor tests, thermal tests, modal vibration tests, and other checkout activities. This paper summarizes the results of the test, including examples of the most significant data.

Wind Tunnel Tests↗

Operations of the Optical Communications Demonstration for the Orion EM-2 Mission

The GSFC implementation of an Optical Communication System to demonstrate an operational optical communication link for Orion EM-2. It will serve as a base for providing an operational optical communications capability for future Orion missions. GSFC plans to maintain a development path for the optical communication flight terminal to allow commercialization and implementation on future Orion missions. The Orion optical module part of the optical communications flight terminal and its control electronics have a common architecture with the ILLUMA-T optical terminal provided by GSFC for use on the ISS. The plan is to flow data from Orion through the Optical Communication Fight Terminal to the Optical Communication Ground Terminal and reverse. NASA's Orion spacecraft is an exploratory vehicle designed for longer-duration flights beyond the Moon. Following Orion's Exploration Mission-1 (EM-1), during which the spacecraft will travel beyond the Moon, enter a distant retrograde orbit around the Moon and return to Earth unmanned, Exploration Mission-2 (EM-2) will see a crewed spacecraft complete a slightly different flight path. First crewed test flight of the Orion spacecraft, currently targeting a June 30, 2022 launch. The mission involves: One revolution in Low Earth Orbit (LEO) parking orbit to verify basic Orion systems functionality and deploy solar arrays. A single 42-hour Highly Elliptical Orbit (HEO) intermediate checkout orbit allows characterization of the Orion vehicle system performance prior to committing to a cis-lunar flight. Trans Lunar Injection (TLI) burn using Orion Service Module (SM) main engine, which sends Orion on a lunar flyby and free return. Skip reentry at lunar return velocities to splashdown off the coast of San Diego. Total mission duration is approximately 10 days. EM-2 is the first crewed mission of the Orion Spacecraft that crew brings more video up/downloads, file transfers, and real-time chats with family back home and high-rate communications enables live HD streaming for Crew conferences, Public Affairs Office (PAO) events, and significant mission events. Also still collecting vehicle data on numerous Orion subsystems via Development Flight Instrumentation (DFI) allows large data volume returns sooner for DFI and future science payloads, as opposed to waiting for end-of-mission. O2O is a demonstration of operational utility system tested as a Developmental Test Objective (DTO) and not required to meet mission requirements/success/ Flight Test Objectives (FTO). EM-2 architecture is as close to future mission operational architecture as possible.Orion subsystems (video, DFI, etc.) expected to generate ~250 GB of data in the first 24 hours of flight. Total data generated over the mission estimated to be more than 400 GBUsing S-Band alone, Orion limited to ~ 6GB of data downlink per day. Because of this limitation, Orion is planning to limit live video downlinks on EM-1 in order to downlink high priority fileswith 1 hour/day of Optical Communication, Orion could downlink ~6x more data per day (~ 36GB/day).The optical communication system is capable of multiple data rates up to at least 80 Mbps downlink for the transfer of Orion data to Earth while Orion is operating in the lunar vicinity.

Optical Communication↗

The International Space Station (ISS) Port 1 (P1) External Active Thermal Control System (EATCS) Ammonia Leak

From 2011 to 2017, the crew onboard the International Space Station (ISS) was at risk of dire consequences due to an external ammonia leak. Ammonia is used in the External Active Thermal Control System (EATCS) to cool the pressurized modules and external electrical systems. Engineers at NASA's Johnson Space Center (JSC) initially detected the leak in one of two cooling loops by monitoring the system ammonia inventory decay over time. White flakes seen on High Definition (HD) cameras were also thought to be associated with the leakage but not confirmed. Initially, the leak was small enough that the ammonia inventory and system operations were not in jeopardy. However, the leak began to accelerate to the point where troubleshooting and corrective action were vital to the sustainability of the ISS. Therefore, it became imperative that the leak be located and repaired for ISS operations to continue. No tools were readily available on the ISS to locate such a leak when it was initially detected, however NASA engineers were already in the process of developing a new device for this purpose called the Robotic External Leak Locator (RELL). The RELL is a robotic instrument package with a mass spectrometer and an ion pressure gauge. Initial checkout operations with RELL happened to coincide with the increasing leak, and ammonia vapors were measured around the P1 EATCS Radiator #3 flexible jumper hoses. The leak stopped after the radiator and its flexible hoses were remotely isolated from the loop and the ammonia from the isolated segment was vented to space. Astronauts conducted a spacewalk that successfully removed the hoses, which were returned to ground for further investigation. The purpose of this paper is to review the leak detection and isolation efforts, investigation results, lessons learned and the recovery plan.

Cowan, Darnell T.↗

The International Space Station (ISS) Port 1 (P1) External Active Thermal Control System (EATCS) Ammonia Leak

From 2011 to 2017, the crew onboard the International Space Station (ISS) was at risk of dire consequences due to an external ammonia leak. Ammonia is used in the External Active Thermal Control System (EATCS) to cool the pressurized modules and external electrical systems. Engineers at NASA's Johnson Space Center (JSC) initially detected the leak in one of two cooling loops by monitoring the system ammonia inventory decay over time. White flakes seen on High Definition (HD) cameras were also thought to be associated with the leakage but not confirmed. Initially, the leak was small enough that the ammonia inventory and system operations were not in jeopardy. However, the leak began to accelerate to the point where troubleshooting and corrective action were vital to the sustainability of the ISS. Therefore, it became imperative that the leak be located and repaired for ISS operations to continue. No tools were readily available on the ISS to locate such a leak when it was initially detected, however NASA engineers were already in the process of developing a new device for this purpose called the Robotic External Leak Locator (RELL). The RELL is a robotic instrument package with a mass spectrometer and an ion pressure gauge. Initial checkout operations with RELL happened to coincide with the increasing leak, and ammonia vapors were measured around the P1 EATCS Radiator #3 flexible jumper hoses. The leak stopped after the radiator and its flexible hoses were remotely isolated from the loop and the ammonia from the isolated segment was vented to space. Astronauts conducted a spacewalk that successfully removed the hoses, which were returned to ground for further investigation. The purpose of this paper is to review the leak detection and isolation efforts, investigation results, lessons learned and the recovery plan.

Cowan, Darnell T.↗

Assembly and Integrated Systems Testing for the Flow Boiling and Condensation Experiment (FBCE)

The Flow Boiling and Condensation Experiment (FBCE) is a flight experiment that is designed to operate in the Fluids Integrated Rack (FIR) on the International Space Station (ISS). The objective of the FBCE is to develop an integrated two-phase flow experiment that will serve as a primary platform for obtaining flow boiling and condensation heat transfer data in microgravity. This data will enable the design and analysis of two-phase thermal management systems for future NASA missions that require increased efficiency beyond the current single-phase systems. The FBCE consists of seven modules, each of which must link together mechanically, electrically, and fluidically upon final integration. Five of the modules provide the fluidic and electronic components required to bring the test fluid to the inlet conditions required by the test module, where the primary science is conducted. These inlet conditions encompass fluid quality ranging from a superheated vapor to a subcooled liquid at a variety of flow rates and pressures. The FBCE is currently manufacturing two test modules, each of which has its own separate test campaign with the five support modules. Each of the modules presents a unique challenge in its assembly and checkout, particularly related to ensuring the final hardware configuration can meet the fluid and thermal requirements levied upon them. Following assembly, a series of flight verification tests will be performed, including thermal testing, EMI testing, and final integration in a FIR Ground Integration Unit. This presentation discusses the status of the FBCE as it continues through final verification testing, including current test results and lessons learned throughout the assembly and integration phase of the project. In addition, future options for additional flight test sections will be explored that will benefit the broader NASA thermal and fluids community.

deFiebre, Jesse↗

Near Earth Asteroid Scout: Exploring Asteroid 1991VG Using A Smallsat

After its deployment from NASA’s Space Launch System (SLS) in 2020, the Near Earth Asteroid (NEA) Scout mission will image an asteroid on a close flyby using an 86m2 solar sail as its primary propulsion. NEA Scout, with a 6U CubeSat form factor, is one of several secondary CubeSat payloads to be deployed from the SLS on its maiden flight. The NEA Scout will be ejected from the SLS on a trajectory toward the moon and will use its onboard cold gas propulsion system to attain an elliptical lunar orbit. Once the spacecraft is in orbit, the solar sail will deploy and spacecraft checkout will begin. The NEA Scout will remain in the lunar vicinity until the low-thrust trajectory to the destination asteroid, 1991VG, or another NEA of interest, can be attained. The spacecraft will then begin its 2.0 – 2.5 year journey to the asteroid. About one month before the asteroid flyby, NEA Scout will search for the target and start its Approach Phase, using a combination of radio tracking and optical navigation. The solar sail will provide continuous low thrust to enable a relatively slow flyby (10-20 m/s) of the target asteroid under lighting conditions favorable to geological imaging (<50 degree phase angle). Once the flyby is complete, and if the system is still fully functioning, an extended mission will be considered – the reconnaissance of another asteroid or a re-flyby of the first asteroid several months later are both options. NEA Scout is funded by the NASA Human Exploration and Operations Mission Directorate.

In-Space Propulsion↗

NASA’s Space Launch System Progress Report

NASA’s Space Launch System (SLS) continues to achieve assembly and testing milestones on its way to the launch of the first human-rated spacecraft to the Moon since the Apollo Program. Major flight hardware for Artemis I (see Fig. 1), formerly known as Exploration Mission 1 (EM-1), is complete, including the liquid and solid main propulsion systems. The Artemis I core stage is fully assembled and engine integration and checkout is underway. Structural testing on the core stage engine and payload sections and intertank are complete. Liquid hydrogen tank structural testing is under way, and liquid oxygen tank structural testing will begin in fall 2019. Major structural components for the second and third flights are also in production; hardware has been fabricated for each element of the Artemis II vehicle. SLS and the Orion crew vehicle along with the Exploration Ground Systems (EGS) launch facilities at Kennedy Space Center are critical to the nation’s plans to return to the Moon to stay in a measured, sustainable fashion. Lunar exploration will expand our understanding of Earth’s formation, serve as a proving ground for technologies for pushing deeper into the solar system, and inspire a new generation. This paper will discuss details of 2018-2019 progress and the work ahead to ready SLS for launch.

Honeycutt, John↗

Acoustic Testing of the Bell 699 Rotor on the Tiltrotor Test Rig (TTR) in the National Full-Scale Aerodynamics Complex 40- by 80- Foot Wind Tunnel in Conversion and Airplane Configuration

The Tiltrotor Test Rig (TTR) provides new proprotor testing capabilities to the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD). A checkout test for the TTR with the 699 proprotor was performed in the National Full-Scale Aerodynamics Complex (NFAC) 40- by 80 Foot Wind Tunnel from 2017 to 2018. Four microphones were placed around the rotor to capture acoustic data. Revolution based acoustic data processing techniques are evaluated for appropriateness in both helicopter and airplane configurations. This paper presents the acoustic data acquired for the rotor in conversion and airplane configuration.

Shelts, Kelly↗

Characterization and Commissioning of a Ka-Band Ground Station for Cognitive Algorithm Development

In 2018, the Cognitive Communications and Propagation projects completed installation and checkout testing of a new Ka-Band ground station at the NASA Glenn Research Center in Cleveland, Ohio. The Cognitive Algorithms Demonstration Testbed (CADeT) was developed to provide a fully characterized and controllable dynamic link environment to researchers looking to demonstrate hardware and software aligned with atmospheric sensing and cognitive algorithms. CADeT integrates a host of precision control and measurement systems in addition to repurposing a 5.5 meter beam-waveguide dish platform previously used with the Advanced Communications Technology Satellite (ACTS). This paper will discuss the laboratory testing of ground station components with a emphasis on elements vital to achieving link budget requirements including characterization of the new Gallium Nitride (GaN) Solid State Power Amplifier (SSPA) and far-field measurements of the new antenna feed. Finally, the paper discusses in-situ tests conducted with CADeT and the Tracking and Data Relay Satellite System (TDRSS) to validate laboratory results and make necessary link budget adjustments before reviewing the lessons learned.

Cameron M Seidl↗

Feasibility Study of SDAS Instrumentation's Ability to Identify Mobile Launcher (ML)/Crawler-Transporter (CT) Modes During Rollout Operations

The Space Launch System (SLS) and its Mobile Launcher (ML) will be transported to the launch pad via the Crawler-Transporter (CT) system. Rollout (i.e., transportation) loads produce structural loads on the integrated SLS/Orion Multi-Purpose Crew Vehicle (MPCV) launch vehicle which are of a concern with respect to fatigue. As part of the risk reduction process and in addition to the modal building block test approach that has been adopted by the SLS Program, acceleration data will be obtained during rollout for use in modal parameter estimation. There are several occurrences where the ML/CT will be transported either into the Vertical Assembly Building (VAB) or to the launch pad and back without the SLS stack as part of the Kennedy Space Center (KSC) Exploration Ground Systems (EGS) Integrated Test and Checkout (ITCO). NASA KSC EGS has instrumentation installed on both the ML and CT to record data during rollout, at the launch pad, and during liftoff. The EGS instrumentation on the ML, which includes accelerometers, is referred to as the Sensor Data Acquisition System (SDAS). The EGS instrumentation on the CT, which also includes accelerometers, is referred to as the CT Data Acquisition System (CTDAS). The forces and accelerations applied to the ML and CT during a rollout event will be higher than any of the planned building block modal tests. This can be very beneficial in helping identify nonlinear behavior in the structure. Developing modal parameters from the same test hardware in multiple boundary conditions and under multiple levels of excitation is a key step in developing a well correlated FEM. The purpose of this study was three fold. First, determine the target modes of the ML/CT in its rollout configuration. Second, determine if the test degrees of freedom (DOF) corresponding to the layout of the SDAS/CTDAS accelerometers (i.e. position and orientation) is sufficient to identify the target modes. Third, determine if the Generic Rollout Forcing Functions (GRFF's) is sufficient for identifying the ML/CT target modes accounting for variations in CT speed, modal damping, and sensor/ambient background noise levels. The finding from the first part of this study identified 28 target modes of the ML/CT rollout configuration based upon Modal Effective Mass Fractions (MEFF) and engineering judgement. The finding from the second part of this study showed that the SDAS/CTDAS accelerometers (i.e. position and orientation) are able to identify a sufficient number of the target modes to support model correlation of the ML/CT FEM. The finding from the third part of this study confirms the GRFFs sufficiently excite the ML/CT such that varying quantities of the defined target modes should be able to be extracted when utilizing an Experimental Modal Analysis (EMA) Multi-Input Multi-Output (MIMO) analysis approach. An EMA analysis approach was used because Operational Modal Analysis (OMA) tools were not available and the GRFFs were sufficiently uncorrelated. Two key findings from this third part of the study are that the CT speed does not show a significant impact on the ability to extract the modal parameters and that keeping the ambient background noise observed at each accelerometer location at or below 30 µgrms is essential to the success of this approach.

Winkel, James P.↗

NASA’s Space Launch System: New Launch Capability for Artemis Lunar and Deep Space Science Missions

With stacking and integration of the initial Block 1 Space Launch System (SLS) expected to begin in 2020, NASA’s powerful new launch vehicle is ready to take center stage in the agency’s Artemis program to return astronauts to the Moon. Combining the highest launch thrust and largest payload capacity ever developed, SLS also enables a new generation of high-C3 science missions to destinations such as the gas and ice giants, the Kuiper Belt, and even beyond the solar system. Block 1 is only the beginning, as the vehicle has a planned evolution path to progressively more powerful variants. In addition to these block upgrades providing increased lift capability, the vehicle can be configured to fly in crew configuration with the Orion spacecraft or in cargo configuration with payload fairings for launching science mission or large infrastructure, providing a flexible launch option. For Artemis I, the first SLS flight, the Block 1 vehicle in the crew configuration will send an uncrewed Orion spacecraft to lunar orbit for a thorough systems checkout before the crewed Artemis II flight. The Block 1 vehicle uses a proven propulsion system consisting of solid rocket boosters and RS-25 engines to lift more than 27 metric tons [t] to trans-lunar injection (TLI). In its cargo configuration, Block 1 can be fitted with a 5 m payload fairing. The second variant, Block 1B, uses a more powerful upper stage to increase payload mass to TLI to 38-42 t, depending on crew or cargo configuration. In the crew configuration, a co-manifested payload of up to 10 t can ride along in the Universal Stage Adapter (USA), which has as much volume for payloads as a 5 m-class payload fairing. The Block 2 evolved variant will lift 43-46 t to TLI, depending on crew or cargo configuration. The Block 1B and Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing, available in 19.1 m and 27.4 m lengths, providing unprecedented volume for payloads. Larger-diameter 10 m fairings may also be an option in the future on the Block 2 vehicle. The unrivalled mass, volume and high-energy launches of SLS can provide significant mission flexibility for payloads and/or additional upper stages to open trade space for a new generation of exploration missions. SLS was designed to meet requirements for launching large-volume infrastructure as outlined in numerous studies of missions to cislunar space or Mars. Mission concept studies from the science community also point toward new possibilities enabled by SLS. Probes with more robust science packages can be sent to the gas giants. Dual spacecraft can be manifested for missions to Uranus and Neptune. Additional third or fourth payload stages can be encapsulated in the payload fairings to achieve missions to the Kuiper Belt or beyond. In addition, the large volume can be used to design and deploy wide-aperture mirrors on future space telescopes and to enable nuclear-thermal propulsion missions. At AIAA Ascend, the SLS Program will provide technical information on vehicle capabilities as well as descriptions of ongoing discussions with mission planners for utilizing the vehicle for an array of deep space missions.

Stephen Creech↗