What have we learned from the LCLS injector?

The LCLS injector reliably delivered a high quality electron beam since it started operations three years ago. Some initial commissioning results were described in Ref. [1]. This note is to summarize what we have understood from the LCLS injector including drive laser, cathode, RF gun, injector beam line elements, beam modeling and operations. What we have learned during the LCLS injector commissioning and operation has lead to modified specifications for the UV drive laser system. A flat temporal profile originally required in the LCLS design is not necessary to achieve a low emittance electron beam for the LCLS operations. According to our recent studies, a laser pulse with 3 ps Gaussian temporal profile (FWHM) can achieve a similar emittance compared to a flat temporal profile laser. The sensitivity of the emittance to the laser pulse length at 250 pC of bunch charge was studied, as shown in Figure 1. Only slight variations were observed for both projected and time-sliced emittances with laser pulses from 2.2 ps to 4.5 ps FWHM. Space charge forces certainly become weak but RF emittance which is proportional to the bunch length square increases due to the longer laser pulse. Thus, the projected emittance optimum may be a trade-off between space charge forces and RF emittance, while the time-sliced emittance determined by space charge forces may be slightly improved with a longer laser pulse length. Simulations and theory also show that spatial Gaussian-cut laser profile produces a better emittance compared to uniform profiles due to increased linearity of the space charge forces. Preliminary experimental data show that the emittance with a Gaussian-cut is almost as good as the one with uniform although not better than. In addition, the laser transmission through the iris for spatial Gaussian-cut is about twice the one for spatial uniform. More experimental studies with the new Coherent laser system are needed to make a more solid conclusion.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Holbrook Substation Superconductor Cable System, Long Island, New York: Final Report ~ Volume 1 [Slides]

The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and safer since it is now a programmed procedure versus the former written procedure that was still subject to human variation in the process.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Analysis of failed ramps during the RHIC FY09 run

The Relativistic Heavy Ion Collider (RHIC) is a versatile accelerator that supports operation with polarized protons of up to 250 GeV and ions with up to 100 GeV/nucleon. During any running period, various operating scenarios with different particle species, beam energies or accelerator optics are commissioned. In this report the beam commissioning periods for establishing full energy beams (ramp development periods) from the FY09 run are summarized and, for the purpose of motivating further developments, we analyze the reasons for all failed ramps.

43 PARTICLE ACCELERATORS↗

Experimental particle physics research at Texas Tech University

The high energy physics group at Texas Tech University (TTU) concentrates its research efforts on the Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) and on generic detector R&D for future applications. Our research programs have been continuously supported by the US Department of Energy for over two decades, and this final report summarizes our achievements during the last grant period from May 1, 2012 to March 31, 2016. After having completed the Run 1 data analyses from the CMS detector, including the discovery of the Higgs boson in July 2012, we concentrated on commissioning the CMS hadron calorimeter (HCAL) for Run 2, performing analyses of Run 2 data, and making initial studies and plans for the second phase of upgrades in CMS. Our research has primarily focused on searches for Beyond Standard Model (BSM) physics via dijets, monophotons, and monojets. We also made significant contributions to the analyses of the semileptonic Higgs decays and Standard Model (SM) measurements in Run 1. Our work on the operations of the CMS detector, especially the performance monitoring of the HCAL in Run 1, was indispensable to the experiment. Our team members, holding leadership positions in HCAL, have played key roles in the R&D, construction, and commissioning of these detectors in the last decade. We also maintained an active program in jet studies that builds on our expertise in calorimetry and algorithm development. In Run 2, we extended some of our analyses at 8 TeV to 13 TeV, and we also started to investigate new territory, e.g., dark matter searches with unexplored signatures. The objective of dual-readout calorimetry R&D was intended to explore (and, if possible, eliminate) the obstacles that prevent calorimetric detection of hadrons and jets with a comparable level of precision as we have grown accustomed to for electrons and photons. The initial prototype detector was successfully tested at the SPS/CERN in 2003-2004 and evolved over the last decade. In 2012-2015, several other prototypes were built to further reduce leakage fluctuations, improve Cherenkov light yield, increase fiber attenuation length, and other related phenomena. During this grant period, we graduated two students with Ph.D. degrees, and five undergraduate students from our labs went on to prestigious graduate programs in the US and Europe. Also, the TTU HEP team has participated in the QuarkNet program every year since 2001. We are dedicated to working with area teachers and students at all levels and to training the next generation of scientists. Over 20 high school teachers have participated in our program since its inception.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Distributed Solar Adoption in Orlando: A Household-Level Model for Distribution Resource Planning

Potential for rooftop solar in Florida is massive (47% of retail sales, 3rd overall nationally), yet adoption lags (12th nationally). A 2018 Florida Public Service Commission ruling authorizing solar third-party ownership (leasing) has substantially increased attention on distributed solar in the state. The city of Orlando has committed to a 100% clean-energy target by 2050 and deployment of solar and storage are expected to contribute significantly to reaching the goal. Deployment of customer-adopted solar, unlike utility-procured solar, is uncertain, but known to be spatially correlated with demographic factors and existing adoption. We develop a new method to adapt NREL's dGen model in order to represent building-level agents in adoption forecasts for the Orlando Utility Commission (OUC) service territory. Using the agent-based model we develop projections of solar adoption, subject to scenarios varying future solar costs and valuation, and aggregate adoption predictions by OUC distribution feeder. We find substantial spatial heterogeneity in the projected level of adoption by OUC distribution feeder. For instance, 25% of all projected adoption through 2050 would be concentrated on just 5% of feeders and 88% of projected adoption on 50% of feeders. Because of the uncertainty in adoption, bottoms-up solar adoption forecasting methods at the household-level are integral to long-term resource planning by anticipating system needs as customers increasingly adopt distributed solar, storage, electric vehicles, and other distributed energy resources.

14 SOLAR ENERGY↗

The Physics of the Accelerating Universe Camera

The Physics of the Accelerating Universe (PAU) Survey goal is to obtain photometric redshifts (photo-z) and spectral energy distributions (SEDs) of astronomical objects with a resolution roughly one order of magnitude better than current broadband (BB) photometric surveys. To accomplish this, a new large field-of-view (FoV) camera (PAUCam) has been designed, built, and commissioned and is now operated at the William Herschel Telescope (WHT). With the current WHT prime focus corrector, the camera covers an ∼1° diameter FoV, of which only the inner ∼40′ diameter is unvignetted. The focal plane consists of a mosaic of 18 2k × 4k Hamamatsu fully depleted CCDs, with high quantum efficiency up to 1 μm in wavelength. To maximize the detector coverage within the FoV, filters are placed in front of the CCDs inside the camera cryostat (made out of carbon fiber) using a challenging movable tray system. The camera uses a set of 40 narrowband filters ranging from ∼4500 to ∼8500 Å complemented with six standard BB filters, ugrizY. The PAU Survey aims to cover roughly 100 deg{sup 2} over fields with existing deep photometry and galaxy shapes to obtain accurate photometric redshifts for galaxies down to i {sub AB} ∼ 22.5, also detecting galaxies down to i {sub AB} ∼ 24 with less precision in redshift. With this data set, we will be able to measure intrinsic alignments and galaxy clustering and perform galaxy evolution studies in a new range of densities and redshifts. Here we describe the PAU camera, its first commissioning results, and its performance.

79 ASTRONOMY AND ASTROPHYSICS↗

The Future of Laboratory Astrophysics

A Round Table discussion on the future of Laboratory Astrophysics and the role of IAU Commission B5 was held on the fourth day of the conference to discuss how the IAU Laboratory Astrophysics Commission (B5) can best support the astronomy community and help promote laboratory astrophysics.

Panel Discussion↗

NSLS-II INJECTION STRAIGHT DIAGNOSTICS

The ultra-bright light source being developed by the NSLS-II project will utilize top-up injection and fine tuning of the injection process is mandatory. In this paper we present the diagnostics installed in the injection straight. Its use for commissioning and tuning of the injection cycle is also described. The NSLS-II storage ring will utilize a 9.3 meter long injection straight section shown in Fig. 1. Injection will be preformed with two septa (one pulsed, one DC) and four kickers. The stored beam will be shifted towards the pulsed septum up to IS mm and the nominal distance between centers of the injected and the bumped beam is 9.5mm. The NSLS-II beam position monitors will have turn-by-turn and first-turn capabilities and will be used for the commissioning and tuning the injection process. However, there are three additional BPMs and two beam intercepting OTR screens (flags) installed in the injection straight.

43 PARTICLE ACCELERATORS↗

NSLS-II HIGH LEVEL APPLICATION INFRASTRUCTURE AND CLIENT API DESIGN

The beam commissioning software framework of NSLS-II project adopts a client/server based architecture to replace the more traditional monolithic high level application approach. It is an open structure platform, and we try to provide a narrow API set for client application. With this narrow API, existing applications developed in different language under different architecture could be ported to our platform with small modification. This paper describes system infrastructure design, client API and system integration, and latest progress. As a new 3rd generation synchrotron light source with ultra low emittance, there are new requirements and challenges to control and manipulate the beam. A use case study and a theoretical analysis have been performed to clarify requirements and challenges to the high level applications (HLA) software environment. To satisfy those requirements and challenges, adequate system architecture of the software framework is critical for beam commissioning, study and operation. The existing traditional approaches are self-consistent, and monolithic. Some of them have adopted a concept of middle layer to separate low level hardware processing from numerical algorithm computing, physics modelling, data manipulating, plotting, and error handling. However, none of the existing approaches can satisfy the requirement. A new design has been proposed by introducing service oriented architecture technology. The HLA is combination of tools for accelerator physicists and operators, which is same as traditional approach. In NSLS-II, they include monitoring applications and control routines. Scripting environment is very important for the later part of HLA and both parts are designed based on a common set of APIs. Physicists and operators are users of these APIs, while control system engineers and a few accelerator physicists are the developers of these APIs. With our Client/Server mode based approach, we leave how to retrieve information to the developers of APIs and how to use them to form a physics application to the users. For example, how the channels are related to magnet and what the current real-time setting of a magnet is in physics unit are the internals of APIs. Measuring chromaticities are the users of APIs. All the users of APIs are working with magnet and instrument names in a physics unit. The low level communications in current or voltage unit are minimized. In this paper, we discussed our recent progress of our infrastructure development, and client API.

43 PARTICLE ACCELERATORS↗

Instrumentation status of the low-b magnet systems at the Large Hadron Collider (LHC)

The low-{beta} magnet systems are located in the Large Hadron Collider (LHC) insertion regions around the four interaction points. They are the key elements in the beams focusing/defocusing process allowing proton collisions at luminosity up to 10{sup 34}cm{sup -2}s{sup -1}. Those systems are a contribution of the US-LHC Accelerator project. The systems are mainly composed of the quadrupole magnets (triplets), the separation dipoles and their respective electrical feed-boxes (DFBX). The low-{beta} magnet systems operate in an environment of extreme radiation, high gradient magnetic field and high heat load to the cryogenic system due to the beam dynamic effect. Due to the severe environment, the robustness of the diagnostics is primordial for the operation of the triplets. The hardware commissioning phase of the LHC was completed in February 2010. In the sake of a safer and more user-friendly operation, several consolidations and instrumentation modifications were implemented during this commissioning phase. This paper presents the instrumentation used to optimize the engineering process and operation of the final focusing/defocusing quadrupole magnets for the first years of operation.

43 PARTICLE ACCELERATORS↗

Recent Developments on ALICE (Accelerators and Lasers In Combined Experiments) at Daresbury Laboratory

Progress made in ALICE (Accelerators and Lasers In Combined Experiments) commissioning and a summary of the latest experimental results are presented in this paper. After an extensive work on beam loading effects in SC RF linac (booster) and linac cavities conditioning, ALICE can now operate in full energy recovery mode at the bunch charge of 40pC, the beam energy of 30MeV and train lengths of up to 100us. This improved operation of the machine resulted in generation of coherently enhanced broadband THz radiation with the energy of several tens of uJ per pulse and in successful demonstration of the Compton Backscattering x-ray source experiment. The next steps in the ALICE scientific programme are commissioning of the IR FEL and start of the research on the first non-scaling FFAG accelerator EMMA. Results from both projects will be also reported.

43 PARTICLE ACCELERATORS↗

Performance of the new EBIS preinjector

The construction and initial commissioning phase of a new heavy ion preinjector was completed at Brookhaven in September, 2010, and the preinjector is now operational. This preinjector, using an EBIS source to produce high charge state heavy ions, provided helium and neon ion beams for use at the NASA Space Radiation Laboratory in the Fall of 2010, and gold and uranium beams are being commissioned during the 2011 run cycle for use in RHIC. The EBIS operates with an electron beam current of up to 10 A, to produce mA level currents in 10-40 {micro}s beam pulses. The source is followed by an RFQ and IH linac to accelerate ions with q/m > 0.16 to an energy of 2 MeV/amu, for injection into the Booster synchrotron. The performance of the preinjector is presented, including initial operational experience for the NASA and RHIC programs.

43 PARTICLE ACCELERATORS↗

Status of the Linac Coherent Light Source

The Linac Coherent Light Source (LCLS) is a free electron laser facility in construction at Stanford Linear Accelerator Center. It is designed to operate in the wavelength range 0.15-1.5 nanometers. At the time of this conference, civil construction of new tunnels and buildings is complete, the necessary modifications to the SLAC linac are complete, and the undulator system and x-ray optics/diagnostics are being installed. The electron gun, 135 MeV injector linac and 250 MeV bunch compressor were commissioned in 2007. Accelerator commissioning activities are presently devoted to the achievement of performance goals for the completed 14 GeV linac.

43 PARTICLE ACCELERATORS↗

Neutron spectrometry - An essential tool for diagnosing implosions at the National Ignition Facility

DT neutron yield (Y{sub n}), ion temperature (T{sub i}) and down-scatter ratio (dsr) determined from measured neutron spectra are essential metrics for diagnosing the performance of Inertial Confinement Fusion (ICF) implosions at the National Ignition Facility (NIF). A suite of neutron-Time-Of-Flight (nTOF) spectrometers and a Magnetic Recoil Spectrometer (MRS) have been implemented in different locations around the NIF target chamber, providing good implosion coverage and the redundancy required for reliable measurements of Yn, Ti and dsr. From the measured dsr value, an areal density ({rho}R) is determined from the relationship {rho}R{sub tot} (g/cm{sup 2}) = (20.4 {+-} 0.6) x dsr{sub 10-12 MeV}. The proportionality constant is determined considering implosion geometry, neutron attenuation and energy range used for the dsr measurement. To ensure high accuracy in the measurements, a series of commissioning experiments using exploding pushers have been used for in situ calibration. The spectrometers are now performing to the required accuracy, as indicated by the good agreement between the different measurements over several commissioning shots. In addition, recent data obtained with the MRS and nTOFs indicate that the implosion performance of cryogenically layered DT implosions, characterized by the experimental Ignition Threshold Factor (ITFx) which is a function of dsr (or fuel {rho}R) and Y{sub n}, has improved almost two orders of magnitude since the first shot in September, 2010.

42 ENGINEERING↗

Ultracompact Accelerator Technology for a Next-Generation Gamma-Ray Source

This presentation reported on the technology choices and progress manufacturing and testing the injector and accelerator of the 250 MeV ultra-compact Compton Scattering gamma-ray Source under development at LLNL for homeland security applications. This paper summarizes the status of various facets of current accelerator activities at LLNL. The major components for the X-band test station have been designed, fabricated, and await installation. The XL-4 klystron has been delivered, and will shortly be dressed and installed in the ScandiNova modulator. High power testing of the klystron into RF loads will follow, including adjustment of the modulator for the klystron load as necessary. Assembly of RF transport, test station supports, and accelerator components will follow. Commissioning will focus on processing the RF gun to full operating power, which corresponds to 200 MV/m peak electric field on the cathode surface. Single bunch benchmarking of the Mark 1 design will provide confidence that this first structure operates as designed, and will serve as a solid starting point for subsequent changes, such as a removable photocathode, and the use of various cathode materials for enhanced quantum efficiency. Charge scaling experiments will follow, partly to confirm predictions, as well as to identify important causes of emittance growth, and their scaling with charge. Multi-bunch operation will conclude testing of the Mark 1 RF gun, and allow verification of code predictions, direct measurement of bunch-to-bunch effects, and initial implementation compensation mechanisms. Modeling will continue and focus on supporting the commissioning and experimental program, as well as seeking to improve all facets of linac produced Compton gamma-rays.

42 ENGINEERING↗

Integration of the Trigger and Data Acquisition Systems in ATLAS

During 2006 and the first half of 2007, the installation, integration and commissioning of trigger and data acquisition (TDAQ) equipment in the ATLAS experimental area have progressed. There have been a series of technical runs using the final components of the system already installed in the experimental area. Various tests have been run including ones where level 1 preselected simulated proton-proton events have been processed in a loop mode through the trigger and dataflow chains. The system included the readout buffers containing the events, event building, level 2 and event filter trigger algorithms. The scalability of the system with respect to the number of event building nodes used has been studied and quantities critical for the final system, such as trigger rates and event processing times, have been measured using different trigger algorithms as well as different TDAQ components. This paper presents the TDAQ architecture, the current status of the installation and commissioning and highlights the main test results that validate the system.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Multilayer Laue Lens Growth at NSLS-II

The new NSLS-II deposition laboratory has been commissioned to include a variety of thin-film characterization equipment and a next-generation deposition system. The primary goal for this effort is R&D on the multilayer Laue lens (MLL), which is a new type of x-ray optic with the potential for an unprecedented level of x-ray nano-focusing. This unique deposition system contains many design features in order to facilitate growth of combined depth-graded and laterally graded multilayers with precise thickness control over many thousands of layers, providing total film growth in one run of up to 100 {micro}m thick or greater. A precision in-vacuum linear motor servo system raster scans a substrate over an array of magnetrons with shaped apertures at well-defined velocities to affect a multilayer coating. The design, commissioning, and performance metrics of the NSLS-II deposition system will be discussed. Latest growth results of both MLL and reflective multilayers in this machine will be presented.

36 MATERIALS SCIENCE↗

RHIC polarized proton-proton operation at 100 GeV in Run 15

The first part of RHIC Run 15 consisted of ten weeks of polarized proton on proton collisions at a beam energy of 100 GeV at two interaction points. In this paper we discuss several of the upgrades to the collider complex that allowed for improved performance. The largest effort consisted in commissioning of the electron lenses, one in each ring, which are designed to compensate one of the two beam-beam interactions experienced by the proton bunches. The e-lenses raise the per bunch intensity at which luminosity becomes beam-beam limited. A new lattice was designed to create the phase advances necessary for a beam-beam compensation with the e-lens, which also has an improved off-momentum dynamic aperture relative to previous runs. In order to take advantage of the new, higher intensity limit without suffering intensity driven emittance deterioration, other features were commissioned including a continuous transverse bunch-by-bunch damper in RHIC and a double harmonic RF cature scheme in the Booster. Other high intensity protections include improvements to the abort system and the installation of masks to intercept beam lost due to abort kicker pre-fires.

43 PARTICLE ACCELERATORS↗