Small Scale Tests to Determine the Divergence and Spreading of Explosive Booster Materials
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The measurement of beam emittances by extracting the quadrupole mode signal from a 4 plate beam position monitor (BPM) was published at least 40 years ago. Unfortunately, in practice, this method suffers from poor signal to noise ratio and requires a lot of tuning to extract out the emittances. In this paper, an improved method where multiple BPMs are used together with better mathematical analysis is described. The BPM derived emittances are then compared with those measured by the Ion Profile Monitor (IPM). Surprisingly, the BPM measured emittances behave very well and are more realistic than those measured by the IPM.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
No abstract prepared.
A series of trade studies are presented on a complementary architecture of launch vehicles as a part of a study often referred to as Shuttle-2. The results of the trade studies performed on the vehicles of a reference Shuttle-2 mixed fleet architecture have provided an increased understanding of the relative importance of each of the major vehicle parameters. As a result of trades on the reference booster-orbiter configuration with a methane booster, the study showed that 60 percent of the total liftoff thrust should be on the booster and 40 percent on the orbiter. It was also found that the liftoff thrust to weight ratio (T/W) on the booster-orbiter should be 1.3. This leads to a low dry weight and still provides enough thrust to allow the design of a heavy lift architecture. As a result of another trade study, the dry weight of the reference booster-orbiter was chosen for a variety of operational considerations. Other trade studies on the booster-orbiter demonstrate that the cross feeding of propellant during boost phase is desirable and that engine-out capability from launch to orbit is worth the performance penalty. Technology assumptions made during the Shuttle-2 design were shown to be approx. equivalent to a 25 percent across the board weight reduction over the Space Shuttle technology. The vehicles of the Shuttle-2 architecture were also sized for a wide variety of payloads and missions to different orbits. Many of these same parametric trades were also performed on completely liquid hydrogen fueled fully reusable concepts. If a booster-orbiter is designed using liquid hydrogen engines on both the booster and orbiter, the total vehicle dry weight is only 3.0 percent higher than the reference dual-fuel booster-orbiter, and the gross weight is 3.8 percent less. For this booster-orbiter vehicle, a liftoff T/W of 1.3, a thrust of about 60 percent on the booster, and a Mach staging number of 3 all proved to be desirable. This modest dry weight increase for a liquid hydrogen fueled Shuttle-2 system should be more than offset by the elimination of the entire hydrocarbon engine development program and the savings in operation cost realized by the elimination of an entire fuel type.
In order to study the flight dynamics of the cluster configuration of two first stage boosters and upper-stage, flight-testing of subsonic sub-scale models has been undertaken using two glideback boosters launched on a center upper-stage. Three high power rockets clustered together were built and flown to demonstrate vertical launch, separation and horizontal recovery of the boosters. Although the boosters fly to conventional aircraft landing, the centerstage comes down separately under its own parachute. The goal of the project has been to collect data during separation and flight for comparison with a six degree of freedom simulation. The configuration for the delta wing canard boosters comes from a design by Starcraft Boosters, Inc. The subscale rockets were constructed of foam covered in carbon or fiberglass and were launched with commercially available solid rocket motors. The first set of boosters built were 3-ft tall with a 4-ft tall centerstage, and two additional sets of boosters were made that were each over 5-ft tall with a 7.5 ft centerstage. The rocket cluster is launched vertically, then after motor bum out the boosters are separated and flown to a horizontal landing under radio-control. An on-board data acquisition system recorded data during both the launch and glide phases of flight.
The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.
RHIC Run 23 used Gold beam from Tandem with an AGS extraction energy of 9.8 GeV. The same basic setup, 8 single bunch transfers from the Booster and a 12-6 merge in the AGS to provide 4 bunches at extraction, had been used before to deliver Tandem Au to RHIC. But in those cases, it was used for low energy runs (3.85 GeV in 2021 and 5.75 GeV in 2020) where extraction was below transition energy (7.9 GeV). Tandem beam was used for this run because the intensity and stability of EBIS Au did not meet the requirements for RHIC. Physics was first declared in RHIC on May 22 nd and on August 1 st the run was cut short by about 2 months due to a major failure in RHIC. Prior to the advent of EBIS as the preinjector in 2012, 9.8 GeV Tandem Au was regularly delivered to RHIC but the setup in the Booster and AGS was quite different: Four Booster transfers of 6 bunches each were merged into 4 bunches using a 24-12-4 merge scheme. The supercycle length was 6.0 sec before June 29 th when it was extended to 6.6 sec to accommodate EBIS commissioning. The Tandem, Booster, and AGS were on user 1 for the 9.8 GeV setup. Some work with EBIS Au 32+ took place on EBIS, Booster, and AGS user 5 using the standard 9.8 GeV injector setup with a 4 to 1 merge in Booster and a 6-3-1 type merge in AGS. The Siemens motor generator was used for the entire run. An intensity limit of 8.0e9 Au 77+ ions in the AGS was in effect during the run to protect the J7 plunging stripping foil and the Copper absorber of the AGS beam dump. This corresponds to a merged bunch intensity limit of 2.0e9 Au 77+ ions for 4 equal intensity bunches. The per bunch intensity limit can be increased to 2.67e9 by reducing the number of BtA transfers from 8 to 6. There was also a Booster Late intensity limit of 16e9 Au ions in effect to protect the BtA stripping foil from damage due to overheating. Lowering the number of transfers also makes this limit less of a constraint. BtA foil 5, which was installed in 2020 and had not been used regularly prior to this run was used all run and showed no obvious signs of deterioration. In May, a Tandem Au 3.85 GeV setup from 2021 was also re-established on AGS user 2. It was used for APEX on May 24 and July 26. Initial work with 3.85 GeV beam was on May 19. Proton beam was also set up during the run and extracted to W dump on July 10. It was used for APEX on July 12. Although the OPPIS source was used the AGS setup was without snakes.
A study was conducted to analyze the characteristics and performance data for the booster vehicles to be used with the space shuttle operations. It was determined that the single pressure-fed booster offered the lowest program cost per flight of the pressure-fed booster arrangements studied. The fly back booster required the highest peak annual funding and highest program cost. It was recommended that the pressure-fed booster, series burn with liquid oxygen phase, be continued for further study. The flyback booster study was discontinued. Both solid and liquid propelled booster vehicles with 14 by 45 foot and 15 by 60 foot payload orbiters were considered.
A concept design study was performed to configure two sizes of hybrid boosters; one which duplicates the advanced shuttle rocket motor vacuum thrust time curve and a smaller, quarter thrust level booster. Two sizes of hybrid boosters were configured for either pump-fed or pressure-fed oxygen feed systems. Performance analyses show improved payload capability relative to a solid propellant booster. Size optimization and fuel safety considerations resulted in a 4.57 m (180 inch) diameter large booster with an inert hydrocarbon fuel. The preferred diameter for the quarter thrust level booster is 2.53 m (96 inches). The demonstration plan would culminate with test firings of a 3.05 m (120 inch) diameter hybrid booster.
Future launch systems of the United States will require improvements in booster safety, reliability, and cost. In order to increase payload capabilities, performance improvements are also desirable. The hybrid rocket motor (HRM) offers the potential for improvements in all of these areas. The designs are presented for two sizes of hybrid boosters, a large 4.57 m (180 in.) diameter booster duplicating the Advanced Solid Rocket Motor (ASRM) vacuum thrust-time profile and smaller 2.44 m (96 in.), one-quater thrust level booster. The large booster would be used in tandem, while eight small boosters would be used to achieve the same total thrust. These preliminary designs were generated as part of the NASA Hybrid Propulsion Technology Program. This program is the first phase of an eventual three-phaes program culminating in the demonstration of a large subscale engine. The initial trade and sizing studies resulted in preferred motor diameters, operating pressures, nozzle geometry, and fuel grain systems for both the large and small boosters. The data were then used for specific performance predictions in terms of payload and the definition and selection of the requirements for the major components: the oxidizer feed system, nozzle, and thrust vector system. All of the parametric studies were performed using realistic fuel regression models based upon specific experimental data.
Metallized propellant propulsion systems are considered as replacements for the solid rocket boosters and liquid sustainer stages on the current launch vehicles: both the Space Transportation System (STS) and the Titan 4. Liquid rocket boosters for the STS were analyzed as replacements for current solid rocket boosters. These boosters can provide a liquid propulsion system within the volume constraints of a solid rocket booster. A replacement for the Space Shuttle Main Engines using metallized O2/H2/Al was studied. The liquid stages of the Titan 4 were also investigated; the Aerozine-50 (A-50) fuel was replaced with metallized storable A-50/Al. A metallized propellant is similar to a traditional liquid propellant. However, it has metal particles, such as aluminum, that are suspended in a gelled fuel, such as hydrogen, RP-1, A-50 or monomethyl hydrazine (MMH). The fuels then undergo combustion with liquid oxygen or nitrogen tetroxide (NTO). These propellants provide options for increasing the performance of existing launch vehicle chemical propulsion systems by increasing fuel density or specific impulse or both. These increases in density and specific impulse can significantly reduce the propulsion system liftoff weight and allow a liquid rocket booster to fit into the same volume as an existing solid rocket booster. Also, because gelled fuels are akin to liquid propellants, metallized systems can provide enhanced controllability over solid propulsion systems. Gelling of the propellant also reduces the sensitivity to impacts and consequently reduces the propellant explosion hazard.
Metallized propellant propulsion systems are considered as replacements for the solid rocket boosters and liquid sustainer stages on the current launch vehicles: both the Space Transportation System (STS) and the Titan 4. Liquid rocket boosters for the STS were analyzed as replacements for current solid rocket boosters. These boosters can provide a liquid propulsion system within the volume constraints of a solid rocket booster. A replacement for the Space Shuttle Main Engines using metallized 02/H2/A1 was studied. The liquid stages of the Titan 4 were also investigated; the Aerozine-50 (A-50) fuel was replaced with metallized storable A-50/A1. A metallized propellant is similar to a traditional liquid propellant. However, it has metal particles, such as aluminum, that are suspended in a gelled fuel, such as hydrogen, RP-1, A-50 or monomethyl hydrazine (MMH). The fuels then undergo combustion with liquid oxygen or nitrogen tetroxide (NTO). These propellants provide options for increasing the performance of existing launch vehicle chemical propulsion systems by increasing fuel density or specific impulse or both. These increases in density and specific impulse can significantly reduce the propulsion system liftoff weight and allow a liquid rocket booster to fit into the same volume as an existing solid rocket booster. Also, because gelled fuels are akin to liquid propellants, metallized systems can provide enhanced controllability over solid propulsion systems. Gelling of the propellant also reduces the sensitivity to impacts and consequently reduces the propellant explosion hazard.
Current V-shaped stainless steel pyrovalve initiators have rectified many of the deficiencies of the heritage Y-shaped aluminum design. However, a credible failure mode still exists for dual simultaneous initiator (NSI) firings in which low temperatures were detected at the booster cap and less consistent ignition was observed than when a single initiator was fired. In order to asses this issue, a numerical framework has been developed for predicting the flow through pyrotechnically actuated valves. This framework includes a fully coupled solution of the gas-phase equation with a non-equilibrium dispersed phase for solid particles as well as the capability to model conjugate gradient heat transfer to the booster cap. Through a hierarchy of increasingly complex simulations, a hypothesis for the failure mode of the nearly simultaneous dual NSI firings has been proven. The simulations indicate that the failure mode for simultaneous dual NSI firings may be caused by flow interactions between the flame channels. The shock waves from each initiator interact in the booster cavity resulting in a high pressure that prevents the gas and particulate velocity from rising in the booster cap region. This impedes the bulk of the particulate phase from impacting the booster cap and reduces the heat transfer to the booster cap since the particles do not impact it. Heat transfer calculations to the solid metal indicate that gas-phase convective heat transfer may not be adequate by itself and that energy transfer from the particulate phase may be crucial for the booster cap burn through.