SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Deskbook. The TRA consists of three parts: (1) Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. (2) Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. (3) Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CYBER/PHYSICAL SECURITY VULNERABILITY ASSESSMENT INTEGRATION

This internally funded Laboratory-Directed R&D project by the Pacific Northwest National Laboratory, in conjunction with QinetiQ North America, is intended to identify and properly assess areas of overlap (and interaction) in the vulnerability assessment process between cyber security and physical protection. Existing vulnerability analysis (VA) processes and software tools exist, and these are heavily utilized in the determination of predicted vulnerability within the physical and cyber security domains. These determinations are normally performed independently of one another, and only interact on a superficial level. Both physical and cyber security subject matter experts have come to realize that though the various interactive elements exist, they are not currently quantified in most periodic security assessments. This endeavor aims to evaluate both physical and cyber VA techniques and provide a strategic approach to integrate the interdependent relationships of each into a single VA capability. This effort will also transform the existing suite of software currently utilized in the physical protection world to more accurately quantify the risk associated with a blended attack scenario. Performance databases will be created to support the characterization of the cyber security elements, and roll them into prototype software tools. This new methodology and software capability will enable analysts to better identify and assess the overall risk during a vulnerability analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Autonomous Magnetometer Rotorcraft For Wide Area Assessment

Large areas across the United States and internationally are potentially contaminated with unexploded ordinance (UXO), with some ranges encompassing tens to hundreds of thousands of acres. Technologies are needed which will allow for cost effective wide area scanning with (1) near 100% coverage and (2) near 100% detection of subsurface ordnance or features indicative of subsurface ordnance. The current approach to wide area assessment is a multi-level one, in which medium - altitude fixed wing optical imaging is used for an initial site assessment. This assessment is followed with low altitude manned helicopter based magnetometry. Subsequent to this wide area assessment targeted surface investigations are performed using either towed geophysical sensor arrays or man portable sensors. In order to be an effective tool for small UXO detection, the sensing altitude for magnetic site investigations needs to be on the order of 1 to 3 meters. These altitude requirements mean that manned helicopter surveys will generally only be feasible in large, open and relatively flat terrains. While such surveys are effective in mapping large areas relatively fast there are substantial mobilization/demobilization, staffing and equipment costs associated with these surveys, resulting in costs of approximately $100-$150/acre. In addition, due to the low altitude there are substantial risks to pilots and equipment. Surface towed arrays provide highresolution maps but have other limitations, e.g. in their ability to navigate rough terrain effectively. Thus there is a need for other systems, which can be used for effective data collection. An Unmanned Aerial Vehicle (UAV) magnetometer platform is an obvious alternative. The motivation behind such a system is that it reduces risk to operators, is lower in initial and Operational and Maintenance (O&M) costs (and can thus potentially be applied to smaller sites) and has the potential of being more effective in terms of detection and possibly characterization (through the use of dynamic acquisition, i.e. survey mission in-flight reprioritization).

58 GEOSCIENCES↗

Rapid Damage Assessment Using High-resolution Remote Sensing Imagery: Tools and Techniques

Accurate damage assessment caused by major natural and anthropogenic disasters is becoming critical due to increases in human and economic loss. This increase in loss of life and severe damages can be attributed to growing population, as well as human migration to disaster prone regions of the world. Rapid damage assessment and dissemination of accurate information is critical for creating an effective emergency response. Remote sensing and geographic information systems (GIS) based techniques and tools are important in disaster damage assessment and reporting activities. In this review, we will look into the state of the art techniques in damage assessment using remote sensing and GIS.

99 GENERAL AND MISCELLANEOUS↗

Quality assurance and reliability sub-committee W88-0/Mk5 weapon assessment NSA lab test results (u)

The purpose of this report is to gather appropriate level of relevant stockpile surveillance data to assess trends in the NEP quality, reliability, performance, and safety over the life of the system. The objectives are to gather relevant stockpile data to assess NEP quality and trends and to develop metrics to assess the suitability of the surveillance sampling regime to meet assessment process requirements.

99 GENERAL AND MISCELLANEOUS↗

SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

ABSTRACT One of U.S. Department of Energy’s (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents – approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes – are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC’s ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates – WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Deskbook. The TRA consists of three parts: • Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. • Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. • Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy.

Harmon, Harry D↗

Long-Term Assessment of Critical Radionuclides and Associated Environmental Media at the Savannah River Site

During the operational history of the Savannah River Site (SRS), many different radionuclides have been released from site facilities. However, only a relatively small number of the released radionuclides have been significant contributors to doses and risks to the public. At SRS dose and risk assessments indicate tritium oxide in air and surface water, and Cs-137 in fish and deer have been, and continue to be, the critical radionuclides and pathways. In this assessment, indepth statistical analyses of the long-term trends of tritium oxide in atmospheric and surface water releases and Cs-137 concentrations in fish and deer are provided. Correlations also are provided with 1) operational changes and improvements, 2) geopolitical events (Cold War cessation), and 3) recent environmental remediation projects and decommissioning of excess facilities. For example, environmental remediation of the F- and H-Area Seepage Basins and the Solid Waste Disposal Facility have resulted in a measurable impact on the tritium oxide flux to the onsite Fourmile Branch stream. Airborne releases of tritium oxide have been greatly affected by operational improvements and the end of the Cold War in 1991. However, the effects of SRS environmental remediation activities and ongoing tritium operations on tritium concentrations in the environment are measurable and documented in this assessment. Controlled hunts of deer and feral hogs are conducted at SRS for approximately six weeks each year. Before any harvested animal is released to a hunter, SRS personnel perform a field analysis for Cs-137 concentrations to ensure the hunter's dose does not exceed the SRS administrative game limit of 0.22 millisievert (22 mrem). However, most of the Cs-137 found in SRS onsite deer is not from site operations but is from nuclear weapons testing fallout from the 1950's and early 1960's. This legacy source term is trended in the SRS deer, and an assessment of the ''effective'' half-life of Cs-137 in deer (including the physical decay half-life and the environmental dispersion half-life) is provided. The ''creek mouth'' fisherman is the next most critical pathway at SRS. On an annual basis, three species of fish (panfish, catfish, and bass) are sampled from the mouths of the five SRS streams. Three composites of up to five fish of each species are analyzed from each sampling location. Long-term trending of the Cs-137 concentrations in fish and the subsequent doses from consumption of SRS fish is provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methodology and Process for Condition Assessment at Existing Hydropower Plants

Hydropower Advancement Project was initiated by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy to develop and implement a systematic process with a standard methodology to identify the opportunities of performance improvement at existing hydropower facilities and to predict and trend the overall condition and improvement opportunity within the U.S. hydropower fleet. The concept of performance for the HAP focuses on water use efficiency how well a plant or individual unit converts potential energy to electrical energy over a long-term averaging period of a year or more. The performance improvement involves not only optimization of plant dispatch and scheduling but also enhancement of efficiency and availability through advanced technology and asset upgrades, and thus requires inspection and condition assessment for equipment, control system, and other generating assets. This paper discusses the standard methodology and process for condition assessment of approximately 50 nationwide facilities, including sampling techniques to ensure valid expansion of the 50 assessment results to the entire hydropower fleet. The application and refining process and the results from three demonstration assessments are also presented in this paper.

Zhang, Qin Fen↗

Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment

The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment [Poster]

The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ARAM-W Automated Risk Assessment Methodology for Water and Wastewater

The Automated Risk Assessment Methodology for Water and Wastewater Utilities, ARAM-W, is a systematic, risk-based approach used to evaluate water and wastewater utilities from a range of threats that could cause an undesired event. It leverages the automated RAM-CI (critical infrastructure) prototype tool completed in September 2008, the manual RC RAM-W (RAMCAP compliant) approach completed in September 2007, the manual RAM-W, version 2, approach completed in 2002, and the requirements and needs of the Water Sector, EPA and DHS. The ARAM-W tool is a user-friendly tool which provides a sound scientific and technical framework to look at the total protection system. The ARAM-W tool provides the user the ability to determine a relative risk based on the threat, consequences and protection system effectiveness/vulnerability. It is a stand-alone PC-based tool which is compatible with the NIPP risk assessment methodology criteria as well as RAMPCAP. The ARAM-W process provides through a series of steps the ability to plan for the risk assessment; characterize the utility, facilities and assets; define the threat; identify undesired events and consequences; evaluate protection system effectiveness; determine risk; propose and evaluate upgrades if the risk is not acceptable and report on the assessment results.

Dang, Tam↗

System-level risk assessment of carbon sequestration into a naturally fractured aquifer at Kevin Dome, Montana

As actual CO2 injection is unlikely to take place at Kevin Dome, Montana, the Big Sky Carbon Sequestration Partnership has turned to maximizing the value of existing data acquired at the site. We present the risk assessment work done using the National Risk Assessment Partnership (NRAP) to Kevin Dome, Montana. Geologic CO2 sequestration in saline aquifers poses certain risks including CO2/brine leakage through wells or non-sealing faults into ground water or land surface. These risks are difficult to quantify due to data availability and uncertainty. One solution is running large numbers of numerical simulations on the primary CO2 injection reservoir, shallow reservoirs/aquifers, faults, and wells to assess leakage risks and uncertainties. However, a full-physics simulation is usually too computationally expensive. NRAP integrated assessment model (NRAP-IAM) uses reduced order models (ROMs) developed from numerical reservoir simulations of a primary CO2 injection reservoir to address this issue. A powerful stochastic framework allows NRAP-IAM to explore complex interactions among many uncertain variables and evaluate the likely performance of potential sequestration sites. In this study, we investigate the sensitivity of a variety of uncertain parameters to CO2/brine leakage through (1) legacy wellbore and (2) fault pathways. We found major uncertain parameters to which the potential CO2 leakage through legacy wellbore is sensitive including values of fracture permeability, end-point CO2 relative permeability, capillary pressure, and permeability of confining rocks. CO2 and brine leakage through fault pathways is sensitive to fracture permeability, length of the faults, and fault displacement.

Nguyen, Minh↗

Assessment and Use of State-Specific Factors in the Implementation of Safeguards

The use of safeguards-relevant features and characteristics of a State in the implementation of safeguards has been a long-standing practice of the International Atomic Energy Agency (IAEA). These ‘State-specific factors’ can affect the development of State-level safeguards approaches and the planning, conduct and evaluation of safeguards activities. The IAEA has identified six State-specific factors for systematic consideration and use in the application of the State-level concept. These factors are: (i) the type of safeguards agreement in force for the State and the nature of the safeguards conclusion drawn by the IAEA; (ii) the nuclear fuel cycle and related technical capabilities of the State; (iii) the technical capabilities of the State or regional system of accounting for and control of nuclear material; (iv) the ability of the IAEA to implement certain safeguards measures in the State; (v) the nature and scope of cooperation between the State and the IAEA in the implementation of safeguards; and (vi) the IAEA’s experience in implementing safeguards in the State. State-specific factors are not to be used for rating or grading a State’s safeguards credentials but to identify issues that could affect the effectiveness or efficiency of safeguards implementation for the State. IAEA reports and presentations on the State-level concept have described these factors and have given examples of information that could be considered in assessing each factor. This paper expands upon the IAEA examples and makes recommendations as to how State-specific factors could be assessed by the IAEA and how these factors might affect safeguards implementation. Although quantitative metrics were considered for assessing the State-specific factors, it was determined that the general State characteristics comprising the factors cannot be meaningfully quantified; however, performance indicators can be developed for some elements comprising some factors. The paper thus discusses ‘considerations’ that the IAEA should assess with respect to the State-specific factors (iii), (v), and (vi) and how those considerations could affect safeguards implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of a State-Level Integrated Assessment Model for Policy Analysis: An Uncertainty Analysis of Energy and Water

This presentation discusses some recent uncertainty assessment work being done on climate policy issues at the state level. The work is being done with the Platform for Regional Integrated Modeling and Analysis (PRIMA), a new climate change policy assessment framework developed at Pacific Northwest National Laboratory in Richland and Seattle, Washington and College Park, Maryland. The central computaional engine of PRIMA is the Global Change Assessment Model (GCAM), a dynamic-recursive integrated assessment model of the world economy, climate policy, and climate change that that has been regionalized to provide policy analysis down to the level of U.S. states. The PRIMA framework also includes detailed sectoral models that address issues in the energy-land-water interface geospatially at the sub-national level as the climate change and socioeconomic change occur. This presentation illustrates two uncertainty analyses conducted with GCAM and with water demand and supply components of PRIMA. The energy uncertainty analysis was conducted with GCAM alone and examines the impact of aggressive residential and commercial building equipment standards across the United States in the context of socioeconomic and climate uncertainty. The analysis focuses on the impact on future net energy service costs under aggressive standards in the residential and commercial building sectors from 2005 to 2050. The analysis uses a combination of discrete scenarios and Monte Carlo sampling approaches to address uncertainties. Results for Arizona and Florida are used to illustrate whether aggressive building equipment standards save energy and reduce net energy service costs when compared with current standards. Analysis of the output indicates a robust result under a broad range of future socioeconomic, policy, and climate scenarios. The water uncertainty analysis demonstrates a multi-model approach used to bound the prospects for future water shortages in Florida, given socioeconomic uncertainty and future water supply under a future climate. In this analysis, water demands from GCAM are coupled with a water management model that simulates regulated streamflows and water supply deficits given naturalized streamflows, water demands, and reservoir operating rules. The naturalized streamflows are simulated with a regional earth system model coupled to a river routing model. The climate is obtained from a regional climate projection of the Intergovernmental Panel on Climate Change (IPCC) Representative Concentration Pathway 8.5 (RCP 8.5) for all of the river basins in the United States. GCAM is used in Monte Carlo mode to estimate the outer bounds of water demand given socioeconomic uncertainty and RCP 8.5 climate. Future water demand is downscaled to a river basin level for Florida in high, low, and middle cases and is compared with available water supply for the same region for RCP 8.5 climate to identify the potential location and severity of water shortages.

Climate change, policy, mitigation, impacts, uncer↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

An Assessment of U.S.-Based Electron-Ion Collider Science

The Committee on U.S.-Based Electron-Ion Collider Science Assessment was asked by the Department of Energy (DOE), in its statement of task, to assess the scientific justification for a U.S. domestic electron-ion collider (EIC) facility and to evaluate the importance and urgency of the science that an EIC would address to both nuclear science and the physical sciences more broadly. The committee’s task also included assessing the role of an EIC in the global context, including its relationship to other facilities within the United States and around the world. Lastly, the committee was asked to assess the broader impacts of an EIC, including on U.S. science leadership. The full statement of task is included in Appendix A. In summary, the committee finds a compelling scientific case for such a facility. The science questions that an EIC will answer are central to completing an understanding of atoms as well as being integral to the agenda of nuclear physics today. In addition, the development of an EIC would advance accelerator science and technology in nuclear science; it would also benefit other fields of accelerator-based science and society, from medicine through materials science to elementary particle physics.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Design Readiness And Maturity Assessment (DRAMA) Tool for Advanced Reactors

Abstract – This research is developing a formal, repeatable method to assess the readiness and maturity of an advanced nuclear reactor design for licensing and deployment. This design readiness and maturity assessment (DRAMA) tool will be capable of determining the readiness of the design and of all parties needed to bring a particular advanced reactor design to fruition. Beneficiaries and stakeholders include the design team, research organizations (required to collect needed data and develop design tools), standards organizations, research facilities to support gathering of needed data, supply chain and construction organizations, and everyone responsible for legal and regulatory infrastructure (including defining import-export requirements). Recent experience has shown that even the most experienced engineering and construction organizations, with decades of experience in the nuclear power business, have had significant challenges in bringing designs to completion, licensing the designs, and constructing new plants. For new entries into the field, simply understanding the unique environmental and regulatory requirements have been daunting. A significant part of the challenge is that new entries into the market do not know what they don't know. This tool will provide design teams a better understanding of their readiness to proceed to licensing (and other steps in the process), while at the same time providing a valuable metric for other interested organizations, such as funding agencies, national regulators, and international markets. The DRAMA tool will provide an assessment of the likelihood of successfully completing licensing and deployment and will also create the capability to assess the ability of regulatory infrastructure and the supply chain to support the deployment of any design or class of designs. It will also help prioritize research and policy efforts to improve the likelihood of deployment of the next generation of advanced reactors.

Arndt, Steven↗