Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utility planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploring the Utility of the Planned CYGNSS Mission for Investigating the Initiation and Development of the Madden-Julian Oscillation

CYGNSS is a planned constellation consisting of multiple micro-satellites that leverage the Global Positioning System (GPS) to provide rapidly updated, high resolution (approx. 15-50 km, approx. 4 h) surface wind speeds (via bi-static scatterometry) over the tropical oceans in any weather condition, including heavy rainfall. The approach of the work to be presented at this conference is to utilize a limited-domain, cloud-system resolving model (Weather Research and Forecasting or WRF) and its attendant data assimilation scheme (Three-Dimensional Variational Assimilation or 3DVAR) to investigate the utility of the CYGNSS mission for helping characterize key convectiveto- mesoscale processes - such as surface evaporation, moisture advection and convergence, and upscale development of precipitation systems - that help drive the initiation and development of the Madden-Julian Oscillation (MJO) in the equatorial Indian Ocean. The proposed work will focus on three scientific objectives. Objective 1 is to produce a high-resolution surface wind dataset resolution (approx. 0.5 h, approx. 1-4 km) for multiple MJO onsets using WRF-assimilated winds and other data from the DYNAmics of the MJO (DYNAMO) field campaign, which took place during October 2011 - March 2012. Objective 2 is to study the variability of surface winds during MJO onsets at temporal and spatial scales of finer resolution than future CYGNSS data. The goal is to understand how sub-CYGNSS-resolution processes will shape the observations made by the satellite constellation. Objective 3 is to ingest simulated CYGNSS data into the WRF model in order to perform observing system simulation experiments (OSSEs). These will be used to test and quantify the potential beneficial effects provided by CYGNSS, particularly for characterizing the physical processes driving convective organization and upscale development during the initiation and development of the MJO. The proposed research is ideal for answering important questions about the CYGNSS mission, such as the representativeness of surface wind retrievals in the context of the complex airflow processes that occur during heavy precipitation, as well as the tradeoffs in retrieval accuracy that result from finer spatial resolution of the CYGNSS winds versus increased errors/noisiness in those data. Research plans and initial progress toward these objectives will be presented.

Lang, Timothy↗

Current Best Practices on Wildfire Risk Reduction for Electric Transmission and Distribution Systems

This report provides a set of best practices in response to Section 4(d) of Executive Order 14308, Empowering Commonsense Wildfire Prevention and Response. The information contained herein is expected to be used in conjunction with other materials at the Federal Energy Regulatory Commission Wildfire Risk Mitigation Technical Conference (Docket No. AD25-16-000), with possible direction to the North American Electric Reliability Corporation to take action. The objective of this report is to provide an overview of existing and emerging best practices currently employed or planned by utilities for wildfire mitigation, demonstrating how these efforts align with the executive order’s emphasis on reducing electric utility–caused wildfires while also balancing cost-effectiveness. Additionally, while most practices in utility-developed wildfire mitigation plans focus on risk reduction through robustness and operational reliability, this report also discusses best practices for resilience. The best practices are adopted from publicly available utility wildfire mitigation plans from the United States and Canada, recent findings from wildfire risk reduction research, and industry engagement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Contingency plans for chromium utilization. Publication NMAB-335

The United States depends entirely on foreign sources for the critical material, chromium, making it very vulnerable to supply disruptions. The effectiveness of programs such as stockpiling, conservation, and research and development for substitutes to reduce the impact of disruption of imports of chromite and ferrochromium are discussed. Alternatives for decreasing chromium consumption also are identified for chromium-containing materials in the areas of design, processing, and substitution.

Source record↗

Payload Crew Training Complex (PCTC) utilization and training plan

The physical facilities that comprise the payload crew training complex (PCTC) are described including the host simulator; experiment simulators; Spacelab aft flight deck, experiment pallet, and experiment rack mockups; the simulation director's console; payload operations control center; classrooms; and supporting soft- and hardware. The parameters of a training philosophy for payload crew training at the PCTC are established. Finally the development of the training plan is addressed including discussions of preassessment, and evaluation options.

Self, M. R.↗

Planning for the utilization of the PCDS in studying the interaction of clouds (ISCCP-C data) and the Earth radiation budget (ERBE data)

The Pilot Climate Data System (PCDS) affords an opportunity to analyze data from different but highly complementary data sets. Two of these highly complementary data sets supported by the PCDS are the International Satellite Cloud Climatology Project (ISCCP) and the Earth Radiation Budget Experiment (ERBE). Both data set sponsors are aware of the utility of one data set to the other, and both projects utilize gridded data on a 2.5 deg by 2.5 deg grid. The ISCCP data have been collected since July 1983, and the NOAA-9 data for ERBE have been collected for more than a year. Therefore, there is a good chance to use these temporally overlapping data sets to investigate hypothesized relationships. Changes in cloudiness affect both cloud albedo feedback (shortwave) and the greenhouse effect (longwave). The relative importance of the effects of clouds on albedo versus outgoing longwave radiation (OLR) in determining the radiation balance has long been a matter of controversy. Now, however, changes in cloud amount as observed by the ISCCPO can be correlated to corresponding changes in the albedo and changes in the OLR from ERBE. Monthly means can be utilized in all instances.

Jacobowitz, H.↗

Japanese plan for SSF utilization

The Japanese Experiment Module (JEM) program has made significant progress. The JEM preliminary design review was completed in July 1992; construction of JEM operation facilities has begun; and the micro-G airplane, drop shaft, and micro-G experiment rocket are all operational. The national policy for JEM utilization was also established. The Space Experiment Laboratory (SEL) opened in June '92 and will function as a user support center. Eight JEM multiuser facilities are in phase B, and scientific requirements are being defined for 17 candidate multiuser facilities. The National Joint Research Program is about to start. Precursor missions and early Space Station utilization activities are being defined. This paper summarizes the program in outline and graphic form.

Mizuno, Toshio↗

A systems approach to water recovery testing for space life support - Initial biomedical results from the ECLSS Water Recovery Test and plans for testbed utilization

Among the challenges of designing and constructing Space Station Freedom is the development of the water system. A review of past efforts in reclaiming waste water in enclosed environments reveals that there are many gaps in the biomedical understanding of this process. Some of the key uncertainties of human interaction with a closed water system include determining potential contaminants and establishing safe levels of multiple compounds in the enclosed system of Space Station. Another uncertainty is the microbial constituency of such a system and what impact it could have on crew health and performance. The use of iodine as the passive biocide may have both an indirect and direct impact on the crew. In this paper the initial results of the Water Recovery Test are reviewed from a biomedical perspective, revealing areas where more information is needed to develop the ECLSS water system. By including the approach of 'man as a subsystem', consideration is given to how man interacts with the total water system. Taking this systems approach to providing the crew with a safe source of water gives useful insight into the most efficient design and utilization of closed system testbeds.

Aten, Laurie A.↗

Lunar Limb Observatory: An Incremental Plan for the Utilization, Exploration, and Settlement of the Moon

This paper proposes a comprehensive incremental program, Lunar Limb Observatory (LLO), for a return to the Moon, beginning with robotic missions and ending with a permanent lunar settlement. Several recent technological developments make such a program both affordable and scientifically valuable: robotic telescopes, the Internet, light-weight telescopes, shared- autonomy/predictive graphics telerobotic devices, and optical interferometry systems. Reasons for focussing new NASA programs on the Moon include public interest, Moon-based astronomy, renewed lunar exploration, lunar resources (especially helium-3), technological stimulus, accessibility of the Moon (compared to any planet), and dispersal of the human species to counter predictable natural catastrophes, asteroidal or cometary impacts in particular. The proposed Lunar Limb Observatory would be located in the crater Riccioli, with auxiliary robotic telescopes in M. Smythii and at the North and South Poles. The first phase of the program, after site certification, would be a series of 5 Delta-launched telerobotic missions to Riccioli (or Grimaldi if Riccioli proves unsuitable), emplacing robotic telescopes and carrying out surface exploration. The next phase would be 7 Delta-launched telerobotic missions to M. Smythii (2 missions), the South Pole (3 missions), and the North Pole (2 missions), emplacing robotic telescopes to provide continuous all-sky coverage. Lunar base establishment would begin with two unmanned Shuttle/Fitan-Centaur missions to Riccioli, for shelter emplacement, followed by the first manned return, also using the Shuttle/Fitan-Centaur mode. The main LLO at Riccioli would then be permanently or periodically inhabited, for surface exploration, telerobotic rover and telescope operation and maintenance, and support of Earth-based student projects. The LLO would evolve into a permanent human settlement, serving, among other functions, as a test area and staging base for the exploration, settlement, and terraforming of Mars.

Lowman, Paul. D., Jr.↗

Advancing Understanding of Geothermal Representation in the Power Sector to Accelerate Deployment

Driven mostly by decarbonization goals, geothermal interest in the US power sector has grown considerably, gradually evolving from being considered a niche technology, to being recognized as a viable source of clean, baseload, grid-balancing power, and renewable electric power generation. Furthermore, recent technical advances that could greatly accelerate deployment in the near future, and US federal incentives for low-carbon generation technologies, including geothermal, can enable opportunities for integrating geothermal into utilities resource planning portfolios. However, in general, utilities do not have in-house expertise to evaluate geothermal technologies and its potential role in helping decarbonize the grid as well as help them achieve their individual decarbonization goals. To date, geothermal is rarely included in Capacity Expansion Models (CEM) which utilities use in their planning activities and resource/technologies prioritization. To this end, EPRI and NREL are working together in a DOE-GTO funded research project to improve geothermal understanding (opportunities, value, risks) among the power industry to help accelerate geothermal deployment. In the present paper we describe the approach and preliminary findings of this work, focused on two topics: 1) Expand the degree of understanding on the value, opportunity, and risk of geothermal technologies among utilities and related companies/groups, specifically around geothermal for power generation. 2) Improve representation of geothermal power technologies in capacity expansion models (CEM).

capacity expansion models↗