Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utility distribution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Community Solar Project Models: An Introduction to Basic Financial and Administrative Relationships [Slides]

This resource is a collection of visual aids and descriptions to help explain the basic financial and administrative relationships underpinning common community solar project models. The graphics in this resource depict the flow of electricity from generation to consumption and the financial exchanges between the community solar project owner, subscribers, and distribution utility. Community solar models vary based on ownership (e.g., third party, utility), customer type (e.g., multifamily, single-household), and solar array location (e.g., on-site, off-site).

14 SOLAR ENERGY↗

Performance and usability enhancements for continuous subgraph matching queries on graph-structured data

A query graph, which includes vertices and edges, represents a query on graph-structured data. The query graph is decomposed into query subgraphs. A network analysis tool performs continuous subgraph matching queries to facilitate analysis of computer network traffic, social media events, or other streams of data represented as a dynamic data graph (graph-structured data). This can help identify emerging trends in the data. Some features of the network analysis tool enhance performance by effectively utilizing distributed computing resources (including processing cores and memory at different nodes of a cluster) to speed up the process of updating the dynamic data graph and detecting matches of query subgraphs. Features of a query graph building tool enhance usability by providing intuitive ways to specify query graphs and their subgraphs. Features of a results visualization tool enhance usability by providing an intuitive way to present the results of continuous subgraph matching queries.

Choudhury, Sutanay↗

South Asia Group for Energy - Bhutan

Bhutan's electricity system is already low-carbon through the use of hydropower. However, generation from hydroelectric plants is reduced during the dry winter months and will be impacted by climate change and other extreme weather events. Bhutan is mitigating these risks by diversifying their energy mix with clean energy resources. Bhutan is exploring photovoltaic (PV) solar energy development to enhance its energy system's overall resilience. To ensure efficient grid planning and solar integration, Bhutan's power generator, Druk Green Power Corporation, and the transmission and distribution utility, Bhutan Power Corporation, are partnering with the South Asia Group for Energy (SAGE) to develop their solar capabilities, integrate solar energy into the grid, and strengthen Bhutan's energy infrastructure and efficiency.

Bhutan↗

A Fast Dynamic Internal Predictive Power Scheduling Approach for Power Management in Microgrids: Preprint

This paper presents a Dynamic Internal Predictive Power Scheduling (DIPPS) approach for optimizing power management in microgrids, particularly focusing on external power exchanges among diverse prosumers. DIPPS utilizes a dynamic objective function with a time-varying binary parameter to control the timing of power transfers to the external grid, facilitated by efficient usage of energy storage for surplus renewable power. The microgrid power scheduling problem is modeled as a mixed-integer nonlinear programming (MINLP-PS) and subsequently transformed into a mixed-integer linear programming (MILPPS) optimization through McCormick's relaxation to reduce computational complexity. A predictive window window with 6 data points is solved at an average of 0.92s, a 97.6% improvement over the 38.27s required for the MINLP-PS formulation, implying the numerical feasibility of the DIPPS approach for real-time implementation. Finally, the approach is validated against a static objective using real-world load data across three case studies with different time-varying parameters, demonstrating the ability of DIPPS to optimize power exchanges and efficiently utilize distributed resources while shifting the external power transfers to specified time durations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization of distributed compute resources utilization in the CMS Global Pool

The CMS Submission Infrastructure is the primary system for managing computing resources for CMS workflows, including data processing, simulation, and analysis. It integrates geographically distributed resources from Grid, HPC, and cloud providers into federated pools managed by HTCondor and Glidein- WMS, for a total of around 500k CPU cores. This system dynamically manages workloads based on priorities defined by the collaboration. Additionally, CMS scheduling strategies must be flexible to handle multiple concurrent workloads while considering changing processing demands and resource availability from various providers.Efficient utilization of vast amounts of distributed compute resources is a key element for the success of the scientific programs of the LHC experiments. Optimizing the system is essential to maximize resource efficiency and fully utilize the distributed computing power. The CMS Submission Infrastructure team thus systematically investigates sources of inefficiency in workload scheduling to reduce their impact. In addition, a strategy of pilot overloading has been introduced to compensate for other inefficiency sources, thereby optimizing resource utilization and enhancing computational throughput.

Mascheroni, Marco [UC, San Diego (main)]↗

National Laboratory of the Rockies: Pennsylvania Public Utility Commission/ Technical Utility Services Bureau Distribution System Resilience Deep Dive 2025

The following is a summary of the National Laboratory of the Rockies (NLR) - Pennsylvania PUC/ Technical Utility Services Bureau (TUS) Distribution System Resiliency Deep-Dive project. This is work that NLR performed to provide the support that the TUS requested under the Resources and Support for State Energy Offices & Regulators (RASOR) program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Opportunities and Challenges to Capturing Distributed Battery Value via Retail Utility Rates and Programs

Distributed battery deployment is increasing with advanced metering, control, and communication technologies, leaving electric utilities with an under-utilized, flexible grid resource in aggregate. Rates can reflect locational and temporal prices while utility incentive-based programs allow DERs to provide direct grid services. However, utilities must balance accurately reflecting dynamic grid conditions versus simple and feasible design that encourages customer participation. Currently, most rates and incentive-based programs are simple, but as penetration of DER and advanced controls increase, dynamic designs could become prevalent. Utilities could encourage providing multiple services to optimize distributed battery dispatch and value streams, however, challenges persist when stacking services across distribution and bulk systems. A DER committed to multiple discrete services concurrently necessitates coordination between operators and a clear hierarchy of commitments. One way to address this is to separate commitments by time or capacity. For services that follow cyclic, predictable patterns, or those that are peak driven with predictability, an operator could ensure sufficient state of charge for participation, leaving time where a distributed battery could otherwise provide different services by segmenting participation temporally. To provide continuous or unexpected services, a battery operator may use state of charge management to reserve some percentage of the battery and segment participation by capacity. Macroeconomic trends, load patterns, generation profiles, and grid configurations drive variation in value and the subsequent implications for utility offerings and how a customer might participate. As distributed battery adoption increases, both regulators and utilities will need to ensure no adverse grid impacts and encourage provision of societal value beyond the customer domain.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Distribution of U.S. Electric Utility Revenue Decoupling Rate Impacts from 2005 to 2017

Investments in energy efficiency and distributed generation reduce electric utility retail sales. Since electric utilities have historically collected a large portion of revenues from volumetric energy rates (¢/kWh), such reductions in sales can impact the utility’s ability to sufficiently recover non-production costs. Regulatory mechanisms that “decouple” utility revenues from sales were implemented to help make the utility indifferent to energy efficiency and distributed generation by ensuring the utility is able to collect an allowed level of revenue each year regardless of its sales. However, noticeable and consistent surcharges over time may create the perception of an incorrectly designed or implemented decoupling mechanism. To date, there are limited quantitative analyses of the rate adjustments due to decoupling mechanisms implemented among U.S. electric utilities (see Morgan, 2013). Given the recent rapid increase in distributed energy resource (DER) adoption in some states and utility service territories, consumers may be facing more prevalent and ongoing decoupling surcharges. This, in turn, may undermine stakeholder support for implementation of decoupling mechanisms and the associated utility support for energy efficiency and DERs. To determine the size of retail rate adjustments associated with decoupling mechanisms and whether they have a tendency towards bill surcharges or credits, we analyzed a large dataset of historical annual decoupling rate adjustments for 21 electric utilities in 11 states between 2005 and 2017. We found that decoupling mechanisms adjusted rates, both up and down, between rate cases, and the majority of those adjustments (54 percent) are small (within a range of -1 to 1 percent). However, we also found that 64 percent of the rate adjustment observations in our sample showed a positive rate adjustment. Importantly, once a surcharge is applied there is an 86 percent chance that there will be a surcharge in the next year as well. While our analysis did not seek to understand the root causes for such results, some possible factors include the accuracy of revenue requirement forecasts, emerging structural changes in customer use and production of energy, misaligned financial motivation, and other factors that influence sales (e.g., economic recession).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying Distribution System Resilience From Utility Data: Large Event Risk and Benefits of Investments

We focus on blackouts in electric distribution systems that have a large cost to customers. To quantify resilience to these events, we show how to calculate risk metrics from the historical outage data routinely collected by utilities' outage management systems. Risk is defined using a customer cost exceedance curve. The exceedance curve has a heavy tail that implies large fluctuations in large blackout costs, and this makes estimating the mean large cost in the usual way impractical. To avoid this problem, we use new resilience metrics describing the large event risk; these metrics are the probability of a large cost event, the annual log cost resilience index, and the average of the logarithm of the cost of large-cost events or the slope magnitude of the tail on a log–log exceedance curve. Resilience can be improved by planned investments to upgrade system components or speed up restoration. The benefits that these investments would have had if they had been made in the past can be quantified by “rerunning history” with the effects of the investment included, and then recalculating the large event risk to find the improvement in resilience. An example using utility data shows a 2% reduction in the probability of a large cost event due to 10% wind hardening and 6%–7% reduction due to 10% faster restoration in two different areas of a distribution utility. This new data-driven approach to quantify resilience and resilience investments is realistic and much easier to apply than complicated approaches based on modeling all the phases of resilience. Moreover, an appeal to improvements to past lived experience may well be persuasive to customers and regulators in making the case for resilience investments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Least-cost Optimal Distribution Grid Expansion (LODGE): Utility Pilots

The Least-cost Optimal Distribution Grid Expansion (LODGE) model provides the optimal portfolio of distribution system upgrades—e.g., voltage regulators, feeder reconductoring, transformer upgrades and non-wires alternatives (NWA), such as strategic siting of storage and distributed generation—to interconnect distributed energy resources (DERs) and enable load growth. It can be used to assess grid infrastructure costs and explore policy and regulatory solutions for distribution planning and DER valuation.In 2025, Berkeley Lab conducted three pilot analyses to validate LODGE results with empirical utility data before the model’s first release in 2026. The pilots, done with utilities in Washington, Colorado, and New Mexico, provide examples that illustrate how the model works, what it can do, and the value of the analysis.

Heleno, Miguel↗

WTK-LED: The WIND Toolkit Long-Term Ensemble Dataset

To satisfy a wide group of stakeholders across various wind energy disciplines, including but not limited to stakeholders in the distributed and utility scale wind industry, the new emerging airborne wind energy field, grid integration, power systems modeling, environmental modeling, and researchers in academia, and to close some of the gaps that current public datasets have, we aimed at developing an updated version of the meteorological WIND Toolkit, named WIND Toolkit Long-term Ensemble Dataset (WTK-LED), which is a meteorological dataset providing time series every 5 min and 2 km, including model uncertainty of wind speed at every modeling grid point so that users are provided with a range of possible wind speeds every 2 km. The data were produced using the Weather Research and Forecasting Model (WRF). The vertical grid used in WTK-LED includes many vertical layers in the atmospheric boundary layer to provide information of atmospheric quantities across the rotor layer of utility scale and distributed wind turbines. The WTK-LED includes: 1) Numerical simulations covering the continental United States, Alaska, and Hawaii, with high-resolution data being available for 3 years (2018-2020). 2) Climate simulations from Argonne National Laboratories covering the North American continent, including Alaska, Canada, and most of Mexico and the Caribbean Islands. These simulations complement the new WTK-LED to offer a 4-km dataset covering 20 years, from 2001-2020. 3) Specific long-term,high-resolution offshore simulations have been conducted separately for the US coasts, Hawaii, and the Great Lakes, leading to the 2023 National Offshore Wind data set. This report focuses on a description of the land-based WTK-LED for CONUS, Hawaii, and Alaska, for the 3-year 2-km/5-min dataset and the 20-year 4-km/hourly dataset, as well as the uncertainty quantification method. We also provide limited validation results. Based on our results to date, we suggest use cases and applications for each dataset of the WTK-LED.

17 WIND ENERGY↗

Roadmap for Solar Photovoltaic (PV) Cybersecurity: A vision for improving cyber maturity of distributed and utility-scale solar energy installations

As the solar energy sector continues to expand, its integration into the broader energy infrastructure presents both unprecedented opportunities and new risks. The increasing reliance on digital technologies and interconnected systems in solar energy creates an expanded attack surface for motivated cyber adversaries. Cyberattacks have the potential to cause disruptions in energy production, damage to equipment, financial losses, and compromises in national security. Therefore, ensuring robust cybersecurity measures is paramount to protect the integrity, availability, confidentiality, and access control of solar energy systems. However, there are still key gaps and challenges to be addressed in industry and research, which stakeholders must race to address as they combat a growing number of real-world cyber incidents that affect solar energy systems and a growing number of vulnerabilities discovered and disclosed in key types of equipment. This roadmap explore the current state of solar PV cybersecurity and the gaps and challenges still to be addressed.

14 - SOLAR ENERGY↗

WIND Toolkit Long-Term Ensemble Dataset

WIND Toolkit Long-term Ensemble Dataset (WTK-LED), an updated version of the meteorological WIND Toolkit, is a meteorological dataset providing high-resolution time series, including interannual variability and model uncertainty of wind speed at every modeling grid point to indicate ranges of possible wind speeds. The data were produced using the Weather Research and Forecasting Model (WRF). The vertical grid used in WTK-LED includes many vertical layers in the atmospheric boundary layer to provide information of atmospheric quantities across the rotor layer of utility scale and distributed wind turbines. The WTK-LED includes: (1) Numerical simulations of wind speed and other meteorological variables covering the contiguous United States (CONUS) and Alaska, with high-resolution (5-minute [min], 2-kilometer [km]) data for 3 years (2018-2020): WTK-LED CONUS, WTK-LED Alaska. (2) Climate simulations from Argonne National Laboratory covering North America, including Alaska, Canada, and most of Mexico and the Caribbean islands. These simulations complement the new WTK-LED to offer a 4-km, hourly dataset covering 20 years (2001-2020): WTK-LED Climate. (3) Specific long-term, high-resolution offshore simulations have been conducted separately for the U.S. coasts, Hawaii, and the Great Lakes, leading to the 2023 National Offshore Wind dataset: NOW-23. The data for Hawaii include land-based data and are part of WTK-LED Hawaii. Because the accuracy of simulations from a mesoscale model, such as WRF, varies depending on the location and weather situation, and can reach up to several m/s for wind speed, we provide simulated wind speed uncertainty estimates to the community to be used in conjunction with the deterministic model simulations. This dataset was developed to satisfy a wide group of stakeholders across various wind energy disciplines, including but not limited to stakeholders in the distributed and utility scale wind industry, the new emerging airborne wind energy field, grid integration, power systems modeling, environmental modeling, and researchers in academia, and to close some of the gaps that current public datasets have. Based on our validation results to date, we suggest use cases and applications for each dataset of the WTK-LED as shown in "WTK-LED Use Cases" resource below.

Array↗

The distribution of U.S. electric utility revenue decoupling rate impacts from 2005 to 2017

Electric utilities have historically relied on volumetric energy rates. Reductions in sales can have an adverse effect on a utility's ability to sufficiently recover its costs. Decoupling mechanisms, when properly designed, diminish the link between revenues and sales. Additionally, analysis of annual rate adjustments from decoupling mechanisms indicate the majority of those adjustments are small. However, once a surcharge is applied there is an 86 percent chance there will be a surcharge in the next year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrating Transactive Energy into Reliability Evaluation for a Self-healing Distribution System with Microgrid

Non-utility owned distributed energy resources (DERs) are mostly untapped currently, but they can provide many grid services such as voltage regulation and service restoration, if properly controlled, and can improve the distribution systems reliability when coordinated with utility-owned assets such as self-healing control and microgrids. This paper integrates transactive energy control into the distribution system reliability evaluation to quantitatively assess the impact of non-utility owned DERs on reliability improvement. Here, a transactive reactive power control strategy is designed to incentivize the DERs to provide reactive power support for improving voltage profiles thus enabling additional customer load restoration during an outage. Also, an operational sequence to coordinate the non-utility owned DERs with the utility owned self-healing control and utility owned microgrids is designed and integrated into the service restoration process with the operational constraints guaranteed by checking the three-phase unbalanced power flow for post-fault network reconfiguration. The reliability indices are then calculated through a Monte Carlo simulation. The transactive reactive power control strategy is tested on a four-feeder distribution system operated by Duke Energy in the U.S. Results demonstrate that the non-utility owned DERs with the transactive control improve the reliability of both the system and critical loads by more than 30%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL's Advanced Distribution Management System (ADMS) Test Bed

Transform utility electric distribution management systems to enable the integration and management of all assets and functions across the utility enterprise regardless of vendor or technology. Four program areas: Platform: Develop an open-source platform; evaluate advanced applications. Test bed: Build a vendor-neutral test bed to evaluate existing and future advanced distribution management system (ADMS) functionalities in a realistic setting. Applications: Develop an initial suite of ADMS applications. Advanced control: Develop new integrated optimization and control solutions.

ADMS test bed↗