Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmission availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Optimization of a Mixed Fleet of Aerial Drones for Medical Supplies: A Case Study of Blood Delivery Logistics

Aerial drones have emerged as an innovative solution for faster transportation of time-sensitive items (e.g., emergency medical supplies), potentially reducing the transmission of contagious diseases and enhancing healthcare availability through contactless autonomous delivery. We study fleet sizing and efficient scheduling of a mixed fleet of drones for delivering time-sensitive medical items having distinct release and due times to minimize the required fleet size and fleet composition, the required number of additional batteries, and the total energy consumption. We continuously track the remaining battery energy of drones to determine the optimal timing for battery replacement, rather than replacing the battery at each node. Using actual drone flight test data, we employed a machine learning (ML) method to estimate the energy consumption of different drone types during flight segments for different operating parameters. We present a novel mixed-integer programming model to efficiently formulate the problem that integrates the estimated energy consumption functions from ML. We propose a new greedy heuristic (GH) algorithm and a customized genetic algorithm (GA) for solving large-scale instances of this problem faster. Results demonstrate that the GH algorithm is substantially faster than the accelerated CPLEX and the GA, while sacrificing the solution quality by a small amount. Results based on an actual blood sample delivery case study from Pendleton, Oregon, United States, show that using a mixed fleet of drones reduces the total cost and total energy consumption up to 18.18% and 28.7%, respectively, compared to using a homogeneous fleet.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

A Power Application Developer’s Guide to the Common Information Model: An Introduction for Power Systems Engineers and Application Developers – CIM17v40

A key issue in creating the next generation of energy management system (EMS) and advanced distribution management system (ADMS) platforms will be the ability to represent and exchange power system network model data in a consistent manner. To this end, the Common Information Model (CIM) stands out as the only standardized vocabulary (or ontology) for defining power system network models and asset data in a comprehensive, consistent manner across the generation-transmission-distribution boundary. The CIM is freely available to use and extend. The CIM is maintained by the UCAiug (informally known as the CIM User’s Group) under an Apache 2.0 license. The CIM Users Group collaborates with the IEC and other standards communities for the development of technical and informative specifications. Although portions of the information model are referred to by the corresponding IEC standards naming, it is not necessary to purchase any of the IEC standards to use the CIM information model. This document provides a roadmap for power system engineers and application developers not familiar with semantic modeling to start using the CIM for modeling, simulation, optimization, and development of advanced power applications. The key classes needed for defining power system topology and equipment are explained systematically. Key focus areas include modeling of lines, transformers, generators, switching equipment, loads, and distributed energy resources (DERs).

97 MATHEMATICS AND COMPUTING↗

ARES. V. No Evidence For Molecular Absorption in the HST WFC3 Spectrum of GJ 1132 b

We present a study on the spatially scanned spectroscopic observations of the transit of GJ 1132 b, a warm (∼500 K) super-Earth (1.13 R {sub ⊕}) that was obtained with the G141 grism (1.125–1.650 μm) of the Wide Field Camera 3 (WFC3) on board the Hubble Space Telescope. We used the publicly available Iraclis pipeline to extract the planetary transmission spectra from the five visits and produced a precise transmission spectrum. We analyzed the spectrum using the TauREx3 atmospheric retrieval code, with which we show that the measurements do not contain molecular signatures in the investigated wavelength range and are best fit with a flat-line model. Our results suggest that the planet does not have a clear primordial, hydrogen-dominated atmosphere. Instead, GJ 1132 b could have a cloudy hydrogen-dominated atmosphere, have a very enriched secondary atmosphere, be airless, or have a tenuous atmosphere that has not been detected. Due to the narrow wavelength coverage of WFC3, these scenarios cannot be distinguished yet, but the James Webb Space Telescope may be capable of detecting atmospheric features, although several observations may be required to provide useful constraints.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power HIL Validation of a MW-Scale Grid-Forming Inverter's Stabilization of Otherwise Unstable Cases of the Maui Transmission System

This presentation summarizes MW-scale power hardware-in-the-loop experiments using a 2.2 MW grid-forming inverter connected to a real-time electromagnetic transient simulation of the Maui transmission system. The hardware inverter used is a commercially available "off-the-shelf" inverter from a major manufacturer that is capable of operating in grid-forming mode or grid-following mode. The hardware inverter was connected via power hardware-in-the-loop to a real-time model of the year-2023 Maui power system, which consists of a networked transmission system with diverse generation sources. The results of the simulations indicate that with sufficient synchronous machines online, the system is stable without grid-forming inverters, but that as the amount of synchronous machines is reduced, the system becomes unstable. Changing the hardware inverter (scaled up to represent a 30 MW plant) into grid-forming mode mitigates the instability in various low-inertia cases, including a zero-inertia scenario with 100% of generation from PV and wind. This result broadly agrees with pure simulation results.

battery energy storage system↗

Real-Time Interactive 4D-STEM Phase-Contrast Imaging From Electron Event Representation Data: Less computation with the right representation

The arrival of direct electron detectors (DED) with high frame-rates in the field of scanning transmission electron microscopy has enabled many experimental techniques that require collection of a full diffraction pattern at each scan position, a field which is subsumed under the name four dimensional-scanning transmission electron microscopy (4D-STEM). DED frame rates approaching 100 kHz require data transmission rates and data storage capabilities that exceed commonly available computing infrastructure. Current commercial DEDs allow the user to make compromises in pixel bit depth, detector binning or windowing to reduce the per-frame file size and allow higher frame rates. This change in detector specifications requires decisions to be made before data acquisition that may reduce or lose information that could have been advantageous during data analysis. The 4D Camera, a DED with 87 kHz frame-rate developed at Lawrence Berkeley National Laboratory, reduces the raw data to a linear-index encoded electron event representation (EER). Here we show with experimental data from the 4D Camera that linear-index encoded EER and its direct use in 4D-STEM phase contrast imaging methods enables real-time, interactive phase-contrast from large-area 4D-STEM datasets. Furthermore, we detail the computational complexity advantages of the EER and the necessary computational steps to achieve real-time interactive ptychography and center-of-mass differential phase contrast using commonly available hardware accelerators.

4D-STEM↗

Powering Large Loads: Solutions Across Transmission, Utility, and Facility Scales

This report synthesizes current strategies for accommodating large load growth through a review of publicly available technical literature and media insights around the United States (U.S.). Solutions are organized across three implementation scales (transmission, utility, and facility) and categorized according to common implementation pathways (including structural expansion, operations and efficiency, upgrades, and planning and policy).

Valdez, Raquel Lynn [Sandia National Laboratories ↗

The Prospects for Pumped Storage Hydropower in Alaska

Key Takeaways: The resource mapping analysis confirmed that numerous locations in Alaska are suitable for the development of pumped storage hydropower (PSH) projects, both larger grid scale projects and smaller projects that could be suitable for remote communities; The resource assessment for larger, grid-scale projects showed the potential for more than 1,800 closed-loop systems in Alaska, with a total energy storage capacity of about 4 terawatt hours (TWh); Because of their small reservoir sizes and dam heights, many locations were identified as potentially suitable for small-scale PSH systems. Nearly 50% of the identified potentially suitable small-scale PSH sites are in Southeast Alaska; PSH candidate sites were part of the optimal capacity expansion solution in all scenarios analyzed for the Railbelt system. Depending on the scenario, the new PSH capacity that the model selected for the analysis period until 2046 ranged from 300 MW to 600 MW. The locations and timing of new PSH investments vary in different scenarios; Lithium-ion batteries were also selected a source of new generating capacity in all analyzed scenarios for the Railbelt system, indicating that the system will need a mix of short- and long-duration energy storage to support variable renewable energy sources and provide system reliability in the future; For rural communities, analysis results showed that PSH suitability is very site-specific; in addition to diesel fuel costs and PSH capital costs, suitability depends heavily on available renewable resources and existing infrastructure (e.g., reservoirs, transmission access and construction road access); The analysis for rural communities also showed that PSH projects with 10-hour energy storage are likely to be more economical for remote community applications in Alaska than those with larger reservoirs that could provide 10 days of energy storage; Lithium-ion batteries seem to be an economically more viable energy storage option for small, remote communities in Alaska.

13 HYDRO ENERGY↗