Warm Unit Stand Assembly and Testing for Proton Improvement Plan - II

The Proton Improvement Project II (PIP II), situated at Fermilab, signifies a critical advancement in the realm of high-energy physics. PIP II, a linear accelerator renovation endeavor, aspires to double the output of the existing proton beam, reinforcing Fermilab’ s position as a vanguard in this field. The proton beam's creation involves a series of high-frequency cryomodules, necessitating environmental temperature arrays of magnets and vacuum pumps henceforth described as ‘Warm Units.’ The Warm Units include design features of : 1. insertion between the cryomodules, 2. multi-stage adjustments in six degrees of freedom to ensure precise beam alignment; 3. Natural frequency modes that avoid specified ranges. In adherence to Fermilab’ s stringent safety standards, comprehensive testing procedures are slated to validate the Warm Units' capacity to simultaneously achieve local alignment adjustments while averting low-frequency oscillation less than 15 Hertz. The testing regimen will scrutinize the Warm Units' alignment adjustment capabilities and their resilience against low-frequency oscillations, with an overarching objective of satisfying the Final Design Review criteria specific to the PIP II initiative. This project works to furnish technicians responsible for the assembly of Warm Units with a comprehensive guide for successful installation, concurrently documenting any requisite design modifications essential for achieving a real-world configuration.

43 PARTICLE ACCELERATORS↗

Mini-Canister Radiolysis Testing of ASNF Materials and Surrogates

An experimental irradiation campaign to investigate radiolysis behavior of ASNF was conducted using in situ gas monitoring of small, sealed stainless-steel vessels (mini-canisters) containing aluminum samples with adherent (oxy)hydroxide films under helium backfill. The samples were irradiated with gamma radiation from a Co-60 irradiator. The samples tested included aluminum plate assemblies with lab-grown (oxy)hydroxides as surrogates for fuel as well as an end cropping from an actual ASNF assembly retrieved from long-term wet storage. These experiments enabled investigation of the impacts of various fuel drying approaches on the radiolytic generation rate and measurement of the H 2 yield associated with a reactor exposed sample with reactor-formed (oxy)hydroxide. The resulting data can be incorporated into model development for ASNF in dry storage. This report presents the cumulative results from four surrogate assemblies tested after application of different preparation (drying) conditions as well as the ASNF cropping; some post-irradiation testing was included. The mini-canister results are compared to data from related experimental campaigns that also tested the impact of drying conditions using samples irradiated in glass ampoules and discusses implications of the combined data

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CMG assembly life test and engineering evaluation test, M-509 experiment

The initial checkout of the control moment gyro system for the astronaut stabilizer maneuvering unit is described, and the test results are presented. The life test proceeded smoothly to its completion, and problem areas encountered in the engineering tests are described. These tests included command rate and torquer current transfer, cage and lock, static inverter and signal noise, dynamic response, closed loop drift rate, and gimbal disturbance torque evaluation tests.

Cramer, P. S.↗

Design, fabrication, assembly, and test of a liquid hydrogen acquisition subsystem

The development of a cryogenic fluid system to supply liquid hydrogen to a turbopump at flowrates up to 7.5 pounds per second for a period of approximately 5 seconds before refill, is discussed. Refill is accomplished in less than 10 seconds, during which a constant flowrate can be maintained to the pumps. Diagrams are provided to show the configuration of the system. Subsystem acceptance and functional tests, including acquisition subsystem expulsion, pressurization, and refill were performed. The tests included: (1) thermodynamic vent system operation, (2) warm-gas pressurization effects, (3) hydraulic pressure surge effects, (4) screen device operational limitations, (5) feedline vapor control, and (6) two-phase refill.

Blackman, J. B.↗

Assembly and testing of a 1.8 by 3.7 meter Fresnel lens solar concentrator

A project was initiated to establish a technical data base on line focusing acrylic Fresnel lenses for use in a solar collector system that could generate temperatures in the range of 200 C to 370 C. The effort was originally directed toward electric power generation in the 100 to 10,000 kWe range using a distributed collector approach. However, as the program progressed, it centered on the development of a concentrator/collector subsystem concept that could meet the general requirement of thermal delivery within the 200 C to 370 C range. The expanded list of possible applications includes commercial heating/cooling and industrial process heat as well as electric power generation.

Robertson, J. E.↗

Chronology: MSFC Space Shuttle program development, assembly, and testing major events (1969 - April, 1981)

Listings of major events directly related to the Space Shuttle Program at Marshall Space Flight Center (MSFC) are presented. This information will provide the researcher with a means of following the chronological progression of the program. The products that the historians have prepared are intended to provide supportive research essential to the writing of formal narrative histories of Marshall's contributions to the Space Shuttle and Space Station.

Whalen, Jessie E.↗

Mars Micro-Meteorology Station Electronic Design, Assembly and Test Project

The Micro-Met mission is a micro-meteorological experiment for Mars designed to take globally distributed pressure measurements for at least one martian year. A series of 16 landers equally spaced over the planet's surface will take pressure and temperature data and relay it to investigators on Earth. Measurements will be logged once every hour and transmitted to an orbiter once every thirty days using Mars Balloon Relay protocol. Micro-Met data will aid tremendously in the development and refinement of a global model of Martian weather.

Twiggs, Robert J.↗

Assembling and Testing NASA’s Space Launch System for First Flight

NASA is planning its next step toward human expansion into the solar system. The Space Launch System (SLS) (Figure 1) is a critical enabling component of that expansion. SLS payloads for its early missions include the Orion crew vehicle and components for Gateway, a lunar outpost orbiting the Moon that will facilitate research, technology and partnerships for eventual Mars missions. All major core stage hardware for test and flight completed structural manufacturing in 2018. The major components for the first flight vehicle are complete or approaching completion of internal equipment installation. The core stage forward join operation is also complete. The 10 booster segments needed for first flight have been cast and are ready to ship to NASA’s Kennedy Space Center (KSC) for mating and stacking. The four RS-25 core stage engines completed processing at NASA’s Stennis Space Center (SSC) and are ready for core stage integration. The Orion Stage Adapter (OSA) joined the Interim Cryogenic Propulsion Stage (ICPS) at KSC to await the rest of SLS flight hardware. Production and preparation of hardware for the second mission is also underway. Looking ahead to a busy 2019, liquid oxygen (LOX) tank, liquid hydrogen (LH2) tank and intertank structural testing will take place. This paper will discuss the current and planned status of SLS development in context of NASA’s overall exploration plans.

Askin, Bruce R.↗

TBIRD, a rapid prototyping approach for design, assembly, and test of a LEO-to-ground lasercom CubeSat

The TeraByte InfraRed Delivery (TBIRD) system is a 3U payload on a 6U CubeSat launched in May 2022 which has now demonstrated space to ground links of >1 Terabyte (TB) per pass at a max data rate of 200Gbps. As a CubeSat mission, the development of the TBIRD payload was focused on low SWaP and a “rapid prototyping” approach which accepted higher risks to accelerate the schedule and reduce costs. The optomechanical design process followed standard in-house processes to develop a system that would be robust to LEO environmental loads, with a focus on the stability of the transmit (Tx) and receive (Rx) channel performance metrics. The driving requirement of maintaining 20μrad pointing error between the TX and Rx channels forced specific attention to thermal and mechanical load changes over operational conditions, which drove major design decisions. This paper describes some of engineering challenges overcome and approaches used to make TBIRD a successful program, as well as some of the tradeoffs of rapid prototyping precision optical payloads. TBIRD successfully met and exceeded the total downlink requirements listed above, with a bandwidth of 200Gbps and a total downlink of 4.8TB of information in a single pass.

TBIRD↗

A mobile work station concept for mechanically aided astronaut assembly of large space trusses

This report presents results of a series of truss assembly tests conducted to evaluate a mobile work station concept intended to mechanically assist astronaut manual assembly of erectable space trusses. The tests involved assembly of a tetrahedral truss beam by a pair of test subjects with and without pressure (space) suits, both in Earth gravity and in simulated zero gravity (neutral buoyancy in water). The beam was assembled from 38 identical graphite-epoxy nestable struts, 5.4 m in length with aluminum quick-attachment structural joints. Struts and joints were designed to closely simulate flight hardware. The assembled beam was approximately 16.5 m long and 4.5 m on each of the four sides of its diamond-shaped cross section. The results show that average in-space assembly rates of approximately 38 seconds per strut can be expected for struts of comparable size. This result is virtually independent of the overall size of the structure being assembled. The mobile work station concept would improve astronaut efficiency for on-orbit manual assembly of truss structures, and also this assembly-line method is highly competitive with other construction methods being considered for large space structures.

Heard, W. L., Jr.↗

Neutral buoyancy test evaluation of hardware and extravehicular activity procedures for on-orbit assembly of a 14 meter precision reflector

A procedure that enables astronauts in extravehicular activity (EVA) to perform efficient on-orbit assembly of large paraboloidal precision reflectors is presented. The procedure and associated hardware are verified in simulated Og (neutral buoyancy) assembly tests of a 14 m diameter precision reflector mockup. The test article represents a precision reflector having a reflective surface which is segmented into 37 individual panels. The panels are supported on a doubly curved tetrahedral truss consisting of 315 struts. The entire truss and seven reflector panels were assembled in three hours and seven minutes by two pressure-suited test subjects. The average time to attach a panel was two minutes and three seconds. These efficient assembly times were achieved because all hardware and assembly procedures were designed to be compatible with EVA assembly capabilities.

Heard, Walter L., Jr.↗

NuMI Graphite Target Fin Removal Assembly

Materials scientists want to study the irradiated graphite target from the Neutrino at the Main Injector (NuMI) beam line. In order to gather these irradiated graphite fins from the target canister, it will have to be done remotely. Therefore, a removal assembly will need to be created in order to do this efficiently and well. This project aims to make progressive steps towards deploying the final target removal assembly. Furthermore, calculations related to the removal assembly design were done, and tests were planned to discover further information about the feasibility of this design. The main result from this project is the deflection of the cantilever arm, which is 0.354 inches due to the weight of the beam and cutting tool. Additionally, more results of this project are the testing assembly CAD model and the feasibility of design. This project concludes that there is still more work that needs to be done for the removal assembly to be deployed, but there were foundational steps that were made in the implementation of this design. Finally, there should be further steps and tests to determine the feasibility of this removal assembly.

Malovski, Azra [NIU, DeKalb]↗