Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical levels”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Controlled flexibility in technical editing - The levels-of-edit concept at JPL

The levels-of-edit concept, which can be used to specify the amount of editorial effort involved in the preparation of a manuscript for publication, is discussed. Nine types of editing are identified and described. These include coordination edit (preparing estimates, gathering cost data, monitoring production processes), policy edit, integrity edit (making sure that parts of a publication match in a physical or numerical sense), screening edit (ensuring that the quality of camera-ready copy is sufficient for external publication), copy clarification edit, format edit, mechanical style edit, language edit, and substantive edit (reviewing the manuscript for content coherence, emphasis, subordination and parallelism). These functions are grouped into five levels of edit. An edit-level number is assigned to each manuscript, providing a quantitative and qualitative indicator of the editing to be done which is clearly understood by authors, managers, and editors alike. In addition, clear boundaries are drawn between normal and extraordinary editing tasks. Individual organizations will group various edits in different ways to reflect their needs and priorities; the essential element of the system is unambiguous definition and coding of the types and amount of work to be done.

Buehler, M. F.↗

eddy Users Manual

eddy is a collection of tools - nonlinear solvers, meshing, post-processing, visualization, optimization, etc. - for performing scale-resolving simulations of multi-physics applications. The framework is designed to enable advanced R&D on a variety of topics by leveraging a mature capability for scale resolving simulations, and simultaneously be an appropriate tool for application analysis and support. Currently, eddy is at a relatively low technical readiness level (TRL), and users and developers should maintain appropriate expectations. The technical details behind eddy are outlined in several publications which can be consulted for more information [1–10]. The solvers are built around an unstructured high-order capability, and heavily utilize the tensor product sum-factorization approach for efficiency. The unsteady formulation utilizes a fully implicit space-time approach with a matrix-free Newton- Krylov method. A primitive steady-state solver is available for testing purposes, but is not expected to converge for all but simple verification cases. The Navier-Stokes fluid solvers do not support either RANS or hybrid-RANS capability, only LES and wall-modeled LES approaches. All of the solvers within eddy support three modes of operation: a primal solve of the full nonlinear problem, and two linearization approaches of the primal solve - the ad joint and the tangent solution. Details on how to select and use these three modes are outlined in Sec. 3.

Murman, Scott M.↗

Small Unmanned Aircraft System Communications and Navigation Performance

NASA performed research and development of technologies and requirements for traffic management of small Unmanned Aircraft Systems (UAS). In this effort, four measures of performance (MOPs) were developed to understand the performance of small UAS communications and navigation systems in urban operations. This Technical Memorandum (TM) describes UAS Traffic Management (UTM) operational architecture, UTM Technical Capability Level 4 (TCL4) flight tests that took place in two different urban settings, the four MOPs, and the TCL4 MOP results.

Unmanned Aviation Systems Traffic Management↗

Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward for 750–800°C Reactor Outlet Temperature

This document presents the NGNP Critical PASSCs and defines their technical maturation path through Technology Development Roadmaps (TDRMs) and their associated Technology Readiness Levels (TRLs). As the critical PASSCs advance through increasing levels of technical maturity, project risk is reduced and the likelihood of within-budget and on-schedule completion is enhanced. The current supplier-generated TRLs and TDRMs for a 750–800°C reactor outlet temperature (ROT) specific to each supplier are collected in Appendix A.

42 ENGINEERING↗

Analysis of the Tank 5f Final Characterization Samples-2011

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Tank 5F Final Characterization Samples-2011 (U)

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Tank 5F Final Characterization Samples-2011 (U)

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Wind Levelized Cost of Energy: A Comparison of Technical and Financing Input Variables

The expansion of wind power capacity in the United States has increased the demand for project development capital. In response, innovative approaches to financing wind projects have emerged and are proliferating in the U.S. renewable energy marketplace. Wind power developers and financiers have become more efficient and creative in structuring their financial relationships, and often tailor them to different investor types and objectives. As a result, two similar projects may use very different cash flows and financing arrangements, which can significantly vary the economic competitiveness of wind projects. This report assesses the relative impact of numerous financing, technical, and operating variables on the levelized cost of energy (LCOE) associated with a wind project under various financing structures in the U.S. marketplace. Under this analysis, the impacts of several financial and technical variables on the cost of wind electricity generation are first examined individually to better understand the relative importance of each. Then, analysts examine a low-cost and a high-cost financing scenario, where multiple variables are modified simultaneously. Lastly, the analysis also considers the impact of a suite of financial variables versus a suite of technical variables.

17 WIND ENERGY↗

Automated Management of Small Unmanned Aircraft System Communications and Navigation Contingency

The number of small Unmanned Aircraft System (sUAS) operating in the low-altitude of the National Airspace System (NAS) has been rapidly increasing in the past few years and this number is expected to grow in the future. However, aside from a few special cases, all sUAS must fly within visual line-of-sight (VLOS) of their operators and this limitation is blocking highly anticipated beyond visual line-of-sight (BVLOS) sUAS applications such as package delivery from practice. To enable routine low-altitude BVLOS operations, there needs to be a traffic management ecosystem that complements the FAA’s Air Traffic Management (ATM) system, which does not provide air traffic services under 400 feet above ground level (AGL). NASA has been pioneering research and development of this ecosystem under UAS Traffic Management (UTM) project since 2015 in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting, and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for BVLOS operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 is building on the earlier TCLs and focuses on technologies and requirements for operations in higher-density urban areas for tasks such as newsgathering and package delivery and for managing large-scale contingencies. To coordinate and facilitate the incremental implementation of the UTM ecosystem in the NAS, a Research Transition Team (RTT) has been formed between the FAA, NASA, and industry. The RTT is divided into four subgroups, concept and use case development, data exchange and information architecture, sense and avoid, and communications and navigation (C&N). This paper focuses on C&N subgroup activities, in particular about the development of automated sUAS communications and navigation contingency management. The goal of this development is to prepare sUAS to display predictable behavior while handling C&N off-nominal events. It is expected that the adoption of the presented automated contingency management by the sUAS community will accommodate and inform rulemaking towards governing low-altitude BVLOS operations.

Unmanned Aviation System (UAS) Traffic Management↗

Automated Management of Small Unmanned Aircraft System (UAS) Communications and Navigation Contingency

The number of small Unmanned Aircraft System (sUAS) operating in the low-altitude of the National Airspace System (NAS) has been rapidly increasing in the past few years and this number is expected to grow in the future. However, aside from a few special cases, all sUAS must fly within visual line-of-sight (VLOS) of their operators and this limitation is blocking highly anticipated beyond visual line-of-sight (BVLOS) sUAS applications such as package delivery from practice. To enable routine low-altitude BVLOS operations, there needs to be a traffic management ecosystem that complements the FAA’s Air Traffic Management (ATM) system, which does not provide air traffic services under 400 feet above ground level (AGL). NASA has been pioneering research and development of this ecosystem under UAS Traffic Management (UTM) project since 2015 in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting, and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for BVLOS operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 is building on the earlier TCLs and focuses on technologies and requirements for operations in higher-density urban areas for tasks such as newsgathering and package delivery and for managing large-scale contingencies. To coordinate and facilitate the incremental implementation of the UTM ecosystem in the NAS, a Research Transition Team (RTT) has been formed between the FAA, NASA, and industry. The RTT is divided into four subgroups, concept and use case development, data exchange and information architecture, sense and avoid, and communications and navigation (C&N). This paper focuses on C&N subgroup activities, in particular about the development of automated sUAS communications and navigation contingency management. The goal of this development is to prepare sUAS to display predictable behavior while handling C&N off-nominal events. It is expected that the adoption of the presented automated contingency management by the sUAS community will accommodate and inform rulemaking towards governing low-altitude BVLOS operations.

Unmanned Aviation Systems (UAS) Traffic Management↗

A Multi-Center Space Data System Prototype Based on CCSDS Standards

Deep space missions beyond earth orbit will require new methods of data communications in order to compensate for increasing RF propagation delay. The Consultative Committee for Space Data Systems (CCSDS) standard protocols Spacecraft Monitor & Control (SM&C), Asynchronous Message Service (AMS), and Delay/Disruption Tolerant Networking (DTN) provide such a method. The maturity level of this protocol set is, however, insufficient for mission inclusion at this time. This prototype is intended to provide experience which will raise the Technical Readiness Level (TRL) of these protocols..

Rich, Thomas M.↗

A Multi-Center Space Data System Prototype Based on CCSDS Standards

Deep space missions beyond earth orbit will require new methods of data communications in order to compensate for increasing Radio Frequency (RF) propagation delay. The Consultative Committee for Space Data Systems (CCSDS) standard protocols Spacecraft Monitor & Control (SM&C), Asynchronous Message Service (AMS), and Delay/Disruption Tolerant Networking (DTN) provide such a method. However, the maturity level of this protocol stack is insufficient for mission inclusion at this time. This Space Data System prototype is intended to provide experience which will raise the Technical Readiness Level (TRL) of this protocol set. In order to reduce costs, future missions can take advantage of these standard protocols, which will result in increased interoperability between control centers. This prototype demonstrates these capabilities by implementing a realistic space data system in which telemetry is published to control center applications at the Jet Propulsion Lab (JPL), the Marshall Space Flight Center (MSFC), and the Johnson Space Center (JSC). Reverse publishing paths for commanding from each control center are also implemented. The target vehicle consists of realistic flight computer hardware running Core Flight Software (CFS) in the integrated Power, Avionics, and Power (iPAS) Pathfinder Lab at JSC. This prototype demonstrates a potential upgrade path for future Deep Space Network (DSN) modification, in which the automatic error recovery and communication gap compensation capabilities of DTN would be exploited. In addition, SM&C provides architectural flexibility by allowing new service providers and consumers to be added efficiently anywhere in the network using the common interface provided by SM&C's Message Abstraction Layer (MAL). In FY 2015, this space data system was enhanced by adding telerobotic operations capability provided by the Robot API Delegate (RAPID) family of protocols developed at NASA. RAPID is one of several candidates for consideration and inclusion in a new international standard being developed by the CCSDS Telerobotic Operations Working Group. Software gateways for the purpose of interfacing RAPID messages with the existing SM&C based infrastructure were developed. Telerobotic monitor, control, and bridge applications were written in the RAPID framework, which were then tailored to the NAO telerobotic test article hardware, a product of Aldebaran Robotics.

Rich, Thomas M.↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗