Decarbonizing Industrial Heat and Electricity Applications Using Advanced Nuclear Energy

Idaho National Laboratory (INL) is investigating the technical pathways to assist industrial heat and electricity users to meet their decarbonization goals through integration with advanced nuclear power plants (NPPs). This project will deliver a library of process models and accompanying documents that guide specific industries in choosing potential nuclear technologies based on their needs. Considerations in providing this guidance include specific hazards from the industrial facility, heat transport requirements and associated technologies, and feasibility with site-specific demand profiles. The library of facility process models will be based on real data from industrial facilities in the United States. The industrial processes will be identified in this project based on the following: (1) operational heat characteristics that nuclear systems can provide, (2) sufficient energy requirements to merit the capital investment for nuclear plant construction, and (3) environmental benefits of replacing existing energy production with carbon-free nuclear power. Other decarbonization opportunities considered are the addition of nuclear-powered electrolysis processes or high-temperature electric heating where the thermal requirements exceed nuclear generation conditions. In addition to assessing the technical feasibility, INL is evaluating the impact of hazards introduced by the industrial facilities on the siting requirements of advanced NPPs. Site characterization of an industrial plant is essential to determine the feasibility and suitable integration methods for each industry. The assessment of siting and technical data will reveal opportunities for a single-use nuclear integration as well as integration of multiple industrial facilities with a single NPP.

02 PETROLEUM↗

The Technical, Economic, Risk, and Adoption Assessment for Evaluating Work Reduction Opportunities in the Nuclear Industry

Automation and cost-saving initiatives, such as process automation with advances in artificial intelligence, are gaining traction in modernization efforts across the nuclear industry. As these innovations are increasingly adopted, it becomes crucial to evaluate their impacts comprehensively. Various technical and economic attributes, along with risk and human readiness factors, must be achieved to ensure that innovative projects enabling automation and modernization are successful. However, no systematic or integrated framework exists that allows plants to evaluate these innovative projects. To address this gap, the Technical, Economic, Risk, and Adoption (TERA) assessment offers a structured method to evaluate innovative technologies, ensuring solutions meet both operational and safety standards. The TERA framework integrates the disparate perspectives to assess modernization opportunities in nuclear operations. It combines qualitative and quantitative models to evaluate the relationship between performance and business impacts, while also enabling continuous re-evaluation during project development. This approach helps plant owners identify high-priority opportunities, optimize cost savings, and minimize risks, ensuring projects remain on track to achieve desired returns. By providing a comprehensive, systematic methodology, TERA enables informed, data-driven decisions that support successful modernization efforts, enhancing efficiency, safety, and cost savings across nuclear operations. This paper explains the TERA framework and its benefits for the nuclear industry.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical Information Needs and Regulatory Considerations for Front-End Transportation Activities of HALEU Fuel Feed Material

This report fulfills task order number 31310022F0033 Task 1 Assessment of technical information needs and considerations for front-end transportation activities for HALEU fuel feed material. This assessment primarily focuses on the transportation outlook and packaging requirements for transporting high-assay low-enriched uranium (HALEU) fuel feed material. The regulatory framework is described in section 3.0. In section 4.0 the specific issues associated with reviewing HALEU feed material packages are discussed. The rest of the report discusses the need for new packages and Department of Energy progress on HALEU production. Through this evaluation it is shown that the 5% enrichment barrier between low-enriched uranium and HALEU is a significant challenge to transportation packaging. However, there are licensed designs and concepts that can be used to transport HALEU feedstock. No significant issues were identified through the HALEU range up to 20% enriched.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Estimating National-Scale Wind Potential Using Spatially Explicit Turbine Layout Optimization

National renewable energy potential assessments play a broad and critical role in analysis of the clean energy transition by providing foundational estimates of developable clean resources. Common to all past wind potential assessments is an assumption that wraps the complexity of wind plant layout (arrangement of turbines) into a single metric known as capacity density, or rated power capacity per unit of land area. Quite often, a singular capacity density or rotor-diameter driven capacity density is used in wind potential assessments across broad geographies despite the complexities of local drivers. Here, we present a new wind technical potential assessment for the United States, leveraging a spatial optimization approach in lieu of the traditional uniform capacity density. The optimization approach is a spatially explicit method for determining the potential locations of individual wind turbines-taking into account the turbine configuration, plant economics and losses, wind resource, and siting considerations. Our approach accounts for the interactions between wind technology design, wind plant layout, and the vast array of regulatory, land use and infrastructure conflicts with wind development. Our results highlight the potential ability of larger turbines to enable increased wind capacity, up to a point, and increased generation when siting turbines in and around spatial constraints; moreover, they demonstrate and capture the LCOE benefit of relatively lower capacity densities and reduced wake losses when land is relatively abundant. These insights provide foundational knowledge for the wind sector as it develops and pursues future turbine models and as wind energy markets expand in zero-carbon futures. Further, when applied in capacity expansion models, supply curves developed by these methods can provide detailed local insights about where wind turbines might be deployed in and among known siting constraints for those regions where wind energy is determined to be economic, providing critical nuance to local decision-makers and stakeholders.

17 WIND ENERGY↗

Simple Wins: Driving Effective Implementation of Energy Efficiency Projects

Small- and medium-sized manufacturers (SMMs) in the United States, making up over 98% of manufacturing firms, account for 48.3% of the sector’s energy consumption. Despite access to energy assessments and technical resources, such as those from the US Department of Energy’s Better Plants program and Industrial Training and Assessment Centers, implementation rates for identified energy-saving measures remain lower than expectations, averaging 47%. Some barriers were identified by other researchers as limited workforce capacity, inadequate training, and time constraints hinder progress. This article studied the development of customized checklists together with the energy assessment report as a practical solution to improve implementation rates for energy efficiency projects among SMMs. The framework for the checklists was grounded in five principles: short, precise, actionable, relevant, and codeveloped (SPARC). A case study of a 500,000-squarefoot SMM demonstrates how tailored checklists targeting significant energy users—such as heating, ventilating and air conditioning (HVAC), lighting, and compressed air systems for this facility—can simplify the process for staff to do facility walkthroughs to monitor best practices and track the progress of energy efficiency project implementation.

Guo, Wei [Oak Ridge National Laboratory (ORNL), Oa↗

Carbon Storage Technical Viability Approach (CS TVA) Database

The Carbon Storage Technical Viability Approach (CS TVA) database was developed to support the implementation of the CS TVA Matrix to a national data availability assessment for technically viable carbon storage. This database leverages the efforts of multiple adjacent and overlapping databases by non-redundantly combining the databases into a single database along with additionally providing tags facilitating the CS TVA. The non-redundant aspect of the database permits an accurate assessment of the concentration of available data, aiding in spatial and categorical data gaps analysis relative to the individual CS TVA Matrix Components. Version 2.0 of the database is an expansion of Version 1.0. Version 2.0 was created to include additional data gathered to fill gaps in the existing data set. Downloading the CS TVA v2.0 database will result in two separate databases, the version 1.0 original .gdb, and a second addendum .gdb with the new data gathered, together these two databases make up v2.0. Please see the ReadMe file below for full details, metadata information, use disclaimer, and attributions.

Coal↗

Assessment of the Performance of Hydrofluoroolefins, Hydrochlorofluoroolefins, and Halogen-Free Foam Blowing Agents in Cellular Plastic Foams

Oak Ridge National Laboratory has conducted a literature search to identify relevant information available on alternative materials and technologies that are proposed for foam blowing agents applications. For comparison, similar information was collected for available hydrofluorocarbons (HFC), hydrofluoroolefin (HFO), and hydrochlorofluoroolefins (HCFO) materials. The publicly available literature was analyzed and assessed for technical accuracy for each alternative, and a gap analysis was conducted to understand if additional studies are required to fully assess the viability of an alternative. In assessing these alternatives, this project focused on relevant performance and safety attributes. The performance attributes collected include insulation value per unit thickness, which impacts energy usage of buildings and insulated equipment such as refrigerators. We also assessed the impact of blowing agents on foam mechanical properties and flammability characteristics, and the ability of current processing equipment and techniques to utilize these alternatives. Diffusion of blowing agents through foam cells and its impact on foam aging was also examined. The applications covered in this study are spray foam, boardstock, panels, and appliances. Some of the most relevant findings are summarized below.

36 MATERIALS SCIENCE↗

Spatially-Explicit Prediction of Capacity Density Advances Geographic Characterization of Wind Power Technical Potential

Mounting interest in ambitious clean energy goals is exposing critical gaps in our understanding of onshore wind power potential. Conventional approaches to evaluating wind power technical potential at the national scale rely on coarse geographic representations of land area requirements for wind power. These methods overlook sizable spatial variation in real-world capacity densities (i.e., nameplate power capacity per unit area) and assume that potential installation densities are uniform across space. Here, we propose a data-driven approach to overcome persistent challenges in characterizing localized deployment potentials over broad extents. We use machine learning to develop predictive relationships between observed capacity densities and geospatial variables. The model is validated against a comprehensive data set of United States (U.S.) wind facilities and subjected to interrogation techniques to reveal that key explanatory features behind geographic variation of capacity density are related to wind resource as well as urban accessibility and forest cover. We demonstrate application of the model by producing a high-resolution (2 km × 2 km) national map of capacity density for use in technical potential assessments for the United States. Our findings illustrate that this methodology offers meaningful improvements in the characterization of spatial aspects of technical potential, which are increasingly critical to draw reliable and actionable planning and research insights from renewable energy scenarios.

17 WIND ENERGY↗

Building Battery Energy Storage System Performance Data into an Economic Assessment

Economic assessments of battery energy storage systems (BESSs) rely on optimal dispatch methods to capture temporal interdependency of BESS operations and coupling among different grid applications. Many existing BESS economic assessment studies are based on a simplified first-order scalar model using BESS nameplate numbers. Such a method cannot accurately capture varying capabilities and nonlinear dynamics of a BESS, leading to inaccurate assessment results. This paper presents a practical implementation of performance data into the economic assessment of the BESSs recently developed within the Snohomish Public Utility District system in Washington State. Extensive testing conducted over multiple seasons is used to assess the technical performance and develop high-fidelity models of the BESSs. A dynamic programming algorithm is proposed to optimally dispatch the BESSs and assess the potential benefits from stacked value streams. The proposed method can be adapted for the economic assessment of other BESSs with different applications.

Wu, Di↗

Public – Private Partnership to Promote Efficient Manufacturing and Workforce Development (IAC Final Technical Report)

Through delivering ninety (90) energy assessments to small- and medium-sized manufacturing facilities in and around Tennessee, significant understandings were gained through providing detailed energy assessment reports to manufacturers and training seventy-seven (77) engineering students in which thirty-five (35) certified IAC students were recognized by DOE. The robust involvement of Tennessee Valley Authority (TVA), local utility and Tennessee Tech’s Cybersecurity Education, Research, and Outreach Center (CEROC) in majority of assessments made the technical operation very effective where leaded to 40.5% implementation rate of energy recommendations. Other benefits of the award to the public are a dynamic modeling tool capable of analyzing existing cooling towers for energy use optimization was developed and presented to DOE IAC, providing technical assistance to non-participating manufacturers in the form of workshop and training, publishing fifteen (15) peer-reviewed conference and journal papers as well as a book chapter in the area of industrial energy efficiency field, assisting the TVA Magnolia Combined Cycle Power Plant to become the First 50001 Ready Certified Power Plant in the U.S. through briefing them on ISO 50001 and 50001 Ready as well as providing an energy assessment to the plant, assisted the new IAC center at Clemson University with on-site and remote support, and provided assessment and training in unique areas of water, waste water, cyber security and smart manufacturing to our clients, students and community.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.

43 PARTICLE ACCELERATORS↗

Assessment of Modeling and Simulation Technical Gaps in Safety Analysis of High Burnup Accident-Tolerant Fuels

The United States nuclear industry is facing a strong challenge to maintain regulatory-required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects related to the operation of light water reactor (LWR) nuclear power plants (NPPs), and it can be achieved more economically by using a risk-informed ecosystem, such as that being developed by the Risk-Informed Systems Analysis (RISA) Pathway under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. The LWRS Program is promoting a wide range of research and development activities to maximize both the safety and economically efficient performance of NPPs through improved scientific understanding, especially given that many plants are considering second license renewal. The RISA Pathway has two main goals: The deployment of methodologies and technologies that enable better representation of safety margins and the factors that contribute to cost and safety, and; The development of advanced applications that enable cost-effective plant operation. As part of the RISA Pathway, the Enhanced Resilient Plant (ERP) project refers to an NPP where safety is improved by implementing various measures, such as accident-tolerant fuels (ATF), diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, incorporation of augmented or new passive cooling systems, and utilization of advanced battery technologies. The objective of the ERP research is to use novel methods and computational tools to enhance existing reactors’ safety while reducing operational costs. Many U.S. utilities are targeting implementation of ATFs instead of traditional fuel in the near future since ATFs offer benefits in terms of improved performance and cost savings. The robust properties of ATF make it possible to extend the refueling cycle from 18 to 24 months in addition to the opportunity to use less of fuel. Extensive safety assessments are required to support regulatory requirements and obtain the approvals to use ATFs and the ERP project support the industry by developing novel effective methodologies for safety evaluations. In this project, the technical gaps in the modeling and simulation of the high burnup (HBU) ATF were assessed in terms of the fuel cladding behavior during the postulated accident events. The issues were identified in modeling the cladding deformation, the hydrodynamic change due to cladding deformation and the critical heat flux (CHF). The RELAP5-3D cladding deformation model was assessed by multiple verification tests and validation with the instrumented fuel assembly (IFA) experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Supporting Electric Vehicle Supply Equipment Deployment

FEMP assists federal agencies with the transition to zero-emission vehicles (ZEVs) by offering technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams. This fact sheet introduces the EVSE Tiger Team site assessment and technical assistance process.

ADVANCED PROPULSION SYSTEMS↗

District Geothermal Heating + Cooling Deployment in a CT Environmental Justice Community

The report marks the team’s completion of all required tasks and milestones. Work completed for Task 1 (Technical and Economic Feasibility Assessment & Procurement Drafting) included development of analysis and design model; completion of technical, economic, and environmental assessments; and technical outreach and coalition design. Components for Task 2 (Outreach & Community Engagement) involved broad outreach and community-engagement efforts (including stakeholder meetings and a webinar as well as development of a formal engagement plan) and development of a web page and a case study. For Task 3 (Workforce Transition, Development, & Training Plan), the team undertook a formal statewide geothermal workforce needs assessment, developed corresponding recommendations for both the state as a whole and the Wallingford project, and held several workshops. For Task 4 (Project Management & Data Sharing), the team drafted a data-sharing plan.

15 GEOTHERMAL ENERGY↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Techno-economic and environmental assessment of solar-based electrical vehicles charging stations integrated with hydrogen production

With the growing interest in adopting both commercial and residential electric vehicles (EVs) utilizing green renewable energy, the techno-economic assessment of EV charging stations with solar energy is a critical aspect of the transition to sustainable transportation. However, battery storage capacity for variable solar energy production is becoming increasingly less cost-effective due to the higher Lithium price. Complementing solar energy production and battery storage, the potential of combining green hydrogen fuel energy integration with solar energy for EV charging stations can provide a sustainable alternative to reach carbon-free transportation. This research aims to assess the technical and economic viability of grid-connected Photovoltaic (PV)-based EV charging stations across Kentucky based on existing EV load profiles. The study considers different PV system sizes, locations, orientations, and the impact of net metering policies and electricity tariffs on the profitability of the PV systems. Further, using excess PV energy, Lithium-Ion batteries will be charged, which will be assessed considering the techno-economic and environmental impacts of green EV charging stations. To further enhance green renewable energy production, we also investigated the feasibility of on-grid PV-based EV charging stations with Lithium-Ion batteries charged during low tariff periods. In comparison with these scenarios, we studied the potential benefits of integrating green hydrogen energy production using excess solar energy with and without governmental incentives. Furthermore, we assess the environmental impact of these green EV charging stations across Kentucky. Our study indicates that EV stations across Kentucky have similar techno-economic feasibility with insignificant deviation in the levelized cost of electricity, payback period, and PV energy fraction with/without Li-Ion batteries. However, with green hydrogen production, the marginal H 2 production cost indicates the first scenario (on-grid PV energy charging) is the most significant, roughly 10 USD/Kg, which is similar to 1.5 times higher than the second (charging during low-tariff periods) and the third scenarios (power grid to satisfy the demand deficit - approximately 6.5 USD/Kg). From the environmental perspective, the second scenario would be a good option for either hybrid EV/H 2 or EV charging stations in Kentucky, factoring in the hydrogen production cost and the carbon footprint.

08 HYDROGEN↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗