At least 109 records · Page 6

Impacts of Short-Term Solar Power Forecasts in System Operations

Solar generation is experiencing an exponential growth in power systems worldwide and, along with wind power, is posing new challenges to power system operations. Those challenges are characterized by an increase of system variability and uncertainty across many time scales: from days, down to hours, minutes, and seconds. Much of the research in the area has focused on the effect of solar forecasting across hours or days. This paper presents a methodology to capture the effect of short-term forecasting strategies and analyzes the economic and reliability implications of utilizing a simple, yet effective forecasting method for solar PV in intra-day operations.

14 SOLAR ENERGY↗

An assessment of flexibility reserves in stochastic modeling at multiple timescales

Due to recent technological achievements, stochastic optimization, which inherently captures the uncertainty of intermittent resources, is being used to capture the variability and uncertainty of wind and solar resources. However, due to persistent computational limitations, it is not practical to consider all possible variable generation scenarios. As a result, a reduced number of most likely scenarios is usually considered. While this helps reduce the computational burden, it also leaves the system operator vulnerable to some risk. In order to address this issue, this paper aims at providing insight into using an explicit reserve requirement in a stochastic modeling framework in order to provide system operators with greater confidence in stochastic dispatch solutions. This is accomplished by simulating a modified version of the IEEE 118 bus system in a fully stochastic, multi-timescale framework with flexibility reserve requirements. Results show that utilizing a stochastic flexibility reserve requirement within the stochastic modeling framework offers the most reliability benefit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Imperfect Generator Behavior in Power System Operation Models

A key component in power system operations is the use of computer models to quickly study and analyze different operating conditions and futures in an efficient manner. The output of these models are sensitive to the data used in them as well as the assumptions made during their execution. One typical assumption is that generators and load assets perfectly follow operator control signals. While this is a valid simulation assumption, generators may not always accurately follow control signals. This imperfect response of generators could impact cost and reliability metrics. This paper proposes a generator model that capture this imperfect behavior and examines its impact on production costs and reliability metrics using a steady-state power system operations model. Preliminary analysis shows that while costs remain relatively unchanged, there could be significant impacts on reliability metrics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Comprehensive Comparison of Current Operating Reserve Methodologies

Electric power systems are currently experiencing a paradigm shift from a traditionally static system to a system that is becoming increasingly more dynamic and variable. Emerging technologies are forcing power system operators to adapt to their performance characteristics. These technologies, such as distributed generation and energy storage systems, have changed the traditional idea of a distribution system with power flowing in one direction into a distribution system with bidirectional flows. Variable generation, in the form of wind and solar generation, also increases the variability and uncertainty in the system. As such, power system operators are revisiting the ways in which they treat this evolving power system, namely by modifying their operating reserve methodologies. This paper intends to show an in-depth analysis on different operating reserve methodologies and investigate their impacts on power system reliability and economic efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ARPA-E Grid Optimization (GO) Competition Challenge 2

The ARPA-E Grid Optimization (GO) Competition Challenge 2, from 2020 to 2021, expanded upon the problem posed in Challenge 1 by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment. Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. Specifically, the economic surplus, defined as the benefit of serving load minus the cost of generation, is being maximized. It was expected that the objective value of a given solution should be positive, representing economic gain, but negative objectives from poor solutions were possible. The two code submission feature of Challenge 1 was maintained. Additionally, Divisions 3 and 4 within the competition permitted on/off switching of transmission lines (Divisions 1 and 2 did not). After the initial release of the Problem Formulation on 7/20/2020, ARPA-E Director Lane Genatowski announced Challenge 2 on 9/12/2020. The final May 31, 2021, version of the Problem Formulation was 97 pages long with 299 equations. The Challenge proceeded with 2 non-prize Events and 2 prize Events. Teams receiving Challenge 1 FOA awards and prize money were required to use the prize money to fund their Challenge 2 efforts (Georgia Institute of Technology, Global Optimal Technology, Inc., Lawrence Livermore National Laboratory, Lehigh University, Northwestern University, Artelys, Columbia, Pearl Street Technologies, Pennsylvania State University, and University of Colorado Boulder). For more information on the competition and challenge 2 see the "GO Competition Challenge 2 Information" resource below. Challenge 1 and Challenge 3 information can be found in the resources linked below.

ACOPF↗

Proximal Occlusion of Medium-Sized Vessels with the Penumbra Occlusion Device: A Study of Safety and Efficacy

PurposeTo retrospectively investigate the safety and efficacy of hybrid proximal coiling of various medium-sized vessels (4 to 8 mm) using the Penumbra Occlusion Device (POD).Materials and MethodsFrom October 2014 to February 2016, 37 proximal embolizations were performed with PODs in 36 patients (mean age: 50.8, range: 10–86; 29 male, 7 female). Vessel occlusions were achieved under fluoroscopic guidance using a 2.7 French microcatheter. Among the 36 vessels targeted, 16 were splenic arteries, 11 renal arteries, 4 mesenteric arteries, 3 arteriovenous fistulae, 1 iliac artery, and 1 gonadal vein. Intermittent follow-up angiography was performed to assess the flow for final occlusion. Outcomes and complications were assessed by clinical and/or imaging follow-up.ResultsTo produce proximal occlusion of the intended vessels, the POD was used alone in 19 embolizations (51.4 %). In 12 procedures (32.4 %), POD was used as a coil constrainer to secure the coil construct. In 6 procedures (16.2 %), additional embolic devices were used to achieve vessel occlusion after initial POD deployment. After a mean follow-up of 3.2 months, no POD migration was observed but two complications occurred (5.4 %): one post embolic syndrome and one extensive infarction with splenic abscess.ConclusionThe POD system allows safe and effective proximal embolization of medium-sized vessels in a variety of clinical settings.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A Full Demand Response Model in Co-Optimized Energy and

It has been widely accepted that demand response will play an important role in reliable and economic operation of future power systems and electricity markets. Demand response can not only influence the prices in the energy market by demand shifting, but also participate in the reserve market. In this paper, we propose a full model of demand response in which demand flexibility is fully utilized by price responsive shiftable demand bids in energy market as well as spinning reserve bids in reserve market. A co-optimized day-ahead energy and spinning reserve market is proposed to minimize the expected net cost under all credible system states, i.e., expected total cost of operation minus total benefit of demand, and solved by mixed integer linear programming. Numerical simulation results on the IEEE Reliability Test System show effectiveness of this model. Compared to conventional demand shifting bids, the proposed full demand response model can further reduce committed capacity from generators, starting up and shutting down of units and the overall system operating costs.

bidding mechanism↗

Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration

This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

Balancing authorities, hurdle rates, economic disp↗

Probabilistic Zonal Reserve Requirements for Improved Energy Deliverability with Wind Power

In power systems with high penetration of renewable energy resources, uncertainty and variability of these stochastic resources introduce additional challenges for the operation of power systems. To improve the power system's reliability in the face of uncertainty, reserves are required as additional generation capacity to rebalance the power system following random disturbances. However, reserve deliverability is not guaranteed, because it may encounter potential transmission line congestion. Zonal reserve requirements can address this issue, but operators lack efficient ways to allocate reserves to zones while accounting for wind power forecast uncertainty. Herein we propose a methodology for probabilistic zonal reserve requirements to address wind power forecast uncertainties. This method estimates the probability distribution of line flows based on the system generation margin and injection shift factor. This estimate is then used to construct pre-defined and post-zonal reserve requirements. Case studies demonstrate that the proposed method efficiently schedules energy and reserves to balance energy and manage deliverability with wind power forecast uncertainty.We also discuss operational implications of the proposed method.

17 WIND ENERGY↗

A Configuration Based Pumped Storage Hydro Model in the MISO Day-Ahead Market

Pumped storage hydro units (PSHU) can provide flexibility to power systems. This becomes particularly valuable in recent years with the increasing shares of intermittent renewable resources. However, due to emphasis on thermal generation in the current market practices, the flexibility from PSHUs have not been fully explored and utilized. This paper proposes a configuration based pumped storage hydro (PSH) model for the day-ahead market, in order to enhance the use of PSH resources in the system. A strategic design of incorporating and fully optimizing PSHUs in the day-ahead market is presented. Here, we show the compactness of the proposed model. Numerical studies are presented in an illustrative test system and the Midcontinent Independent System Operator (MISO) system.

13 HYDRO ENERGY↗

Resilient off-grid microgrids: Capacity planning and N-1 security

Over the past century the electric power industry has evolved to support the delivery of power over long distances with highly interconnected transmission systems. Despite this evolution, some remote communities are not connected to these systems. These communities rely on small, disconnected distribution systems, i.e., microgrids to deliver power. However, as microgrids often are not held to the same reliability standards as transmission grids, remote communities can be at risk for extended blackouts. To address this issue, we develop an optimization model and an algorithm for capacity planning and operations of microgrids that include N-1 security and other practical modeling features like AC power flow physics, component efficiencies and thermal limits. Lastly, we demonstrate the computational effectiveness of our approach on two test systems; a modified version of the IEEE 13 node test feeder and a model of a distribution system in a remote community in Alaska.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗

Profile of Resource Adequacy in the MISO Region

MISO is facing a number of generation resource challenges, ranging from large amounts of retirements, behind schedule retrofit projects, and internal resources committed to exporting power to PJM's capacity market. This report identifies potential issues with generator retirements and retrofits, as well as potential transmission issues, including the impact of imports and exports in a short-term outlook for resource adequacy in the MISO region, including specific concerns with the generation capacity expected to be available in the MISO North and Central regions from 2014 to 2016, as well as additional risks from proposed environmental regulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗