Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “science orbit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Design and Execution of Dawn HAMO to LAMO Transfer at Ceres

On October 23, 2015, the Dawn spacecraft left the High Altitude Mapping Orbit (HAMO) around Ceres and began its final decent to the Low Altitude Mapping Orbit (LAMO), arriving on December 15. The transfer between the two science orbits, a tight spiraling trajectory with over 100 revolutions, required the operations team to perform weekly maneuver designs for a period of 50 days. While the first six weeks of the transfer executed as planned, unexpectedly the spacecraft incurred a multi-sigma delivery error to the final science orbit that was subsequently clean-up at the first orbit maintenance maneuver. In this paper we discuss the design architecture for the transfer in detail, including challenges the team faced in flying the transfer and lessons learned.

Grebow, Daniel J.↗

Design and Execution of Dawn HAMO to LAMO Transfer at Ceres

On October 23, 2015, the Dawn spacecraft left the High Altitude Mapping Orbit (HAMO) around Ceres and began its final decent to the Low Altitude Mapping Orbit (LAMO), arriving on December 15. The transfer between the two science orbits, a tight spiraling trajectory with over 100 revolutions, required the operations team to perform weekly maneuver designs for a period of 50 days. While the first six weeks of the transfer executed as planned, unexpectedly the spacecraft incurred a multi-sigma delivery error to the final science orbit that was subsequently clean-up at the first orbit maintenance maneuver. In this paper we discuss the design architecture for the transfer in detail, including challenges the team faced in flying the transfer and lessons learned.

Grebow, Dan↗

HelioSwarm: Swarm Mission Design in High Altitude Orbit for Heliophysics

Resolving the complex three-dimensional turbulent structures that characterize the solar wind requires contemporaneous spatially and temporally distributed measurements. HelioSwarm is a mission concept that will deploy multiple, co-orbiting satellites to use the solar wind as a natural laboratory for understanding the fundamental, universal process of plasma turbulence. The HelioSwarm transfer trajectory and science orbit use a lunar gravity assist to deliver the ESPA-class nodes attached to a large data transfer hub to a P/2 lunar resonant orbit. Once deployed in the science orbit, the free-flying, propulsive nodes use simple Cartesian relative motion patterns to establish baseline separations both along and across the solar wind flow direction.

lunar resonant orbit↗

HelioSwarm: Swarm Mission Design in High Altitude Orbit for Heliophysics

Resolving the complex three-dimensional turbulent structures that characterize the solar wind requires contemporaneous spatially and temporally distributed measurements. HelioSwarm is a mission concept that will deploy multiple, co-orbiting satellites to use the solar wind as a natural laboratory for understanding the fundamental, universal process of plasma turbulence. The HelioSwarm transfer trajectory and science orbit use a lunar gravity assist to deliver the ESPA-class nodes attached to a large data transfer hub to a P/2 lunar resonant orbit. Once deployed in the science orbit, the free-flying, propulsive nodes use simple Cartesian relative motion patterns to establish baseline separations both along and across the solar wind flow direction.

lunar resonant orbit↗

The Mars Reconnaissance Orbiter Mission: 10 Years of Exploration from Mars Orbit

The Mars Reconnaissance Orbiter ( MRO ) entered Mars orbit on March 10, 2006. After five months of aerobraking, a series of propulsive maneuvers were used to establish the desired low -altitude science orbit. The spacecraft has been on station in its 255 x 320 k m, sun -synchronous (approximately 3 am -pm ), primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. This paper will provide a summary of the major achievements of the mission to date and the major flight activities planned for the remainder of its third Extended Mission (EM3). Some of the major flight challenges the flight team has faced are also discussed.

MRO↗

The Mars Reconnaissance Orbiter Mission: 10 Years of Exploration from Mars Orbit

The Mars Reconnaissance Orbiter (MRO) entered Mars orbit on March 10, 2006. After five months of aerobraking, a series of propulsive maneuvers were used to establish the desired low-altitude science orbit. The spacecraft has been on station in its 255 x 320 km, sun-synchronous (~3 am-pm), primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. This paper will provide a summary of the major achievements of the mission to date and the major flight activities planned for the remainder of its third Extended Mission (EM3). Some of the major flight challenges the flight team has faced are also discussed.

MRO↗

The Missions of the Viking Orbiters

A description of the orbiter science instruments is presented and the chronology of the two Viking missions is reviewed. The design of the Viking orbiter spacecraft is discussed, taking into account the propulsion subsystem, the attitude control subsystem, the planetary scan platform, aspects of command processing, problems of instrument operation and data processing, and data quantity limitations. Details concerning the Viking orbits and the visibility of the planet are also considered and the future of the Viking orbiter missions is evaluated. If the orbiters continue to perform well, all the orbiter science investigations will continue to acquire data for another year and perhaps somewhat longer.

Snyder, C. W.↗

Ocean in Motion

Under a data purchase agreement with Goddard Space Flight Center, Orbital Sciences Corporation has been able to contract building of the Sea-Viewing Wide-Field-of-View Sensor (SeaWIFS). Orbital Sciences was then able commercialized the data that the satellite produces. These data are used to create daily fish finding maps, allowing fishing fleets to focus on locations where many commercially important surface feeding fish, like tuna and swordfish, congregate. In agriculture and forestry, SeaWIFS' images offer an alternative to direct on-site inspection or expensive serial photography.

Source record↗

Science in orbit: The shuttle and spacelab experience, 1981-1986

Significant achievements across all scientific disciplines and missions for the first six years of Shuttle flights are presented. Topics covered include science on the Space Shuttle and Spacelab, living and working in space, studying materials and processes in microgravity, observing the sun and earth, space plasma physics, atmospheric science, astronony and astrophysics, and testing new technology in space. Future research aboard the Shuttle/Spacelab is also briefly mentioned.

Source record↗

DAWN Mission Bus and Waveguide Venting Analysis Review

A concern was raised regarding the time after launch when the DAWN Mission Communications Subsystem, which contains a 100 Watt X-Band Traveling Wave Tube Amplifier (TWTA) with a high voltage ((approximately 7 Kilo Volt (KV)) Electronic Power Converter (EPC), will be powered on for the first post-launch downlink. This activation is planned to be approximately one hour after launch. Orbital Sciences (the DAWN Mission spacecraft contractor) typically requires a 24-hour wait period prior to high voltage initiation for Earth-orbiting Science and GEO spacecraft. The concern relates to the issue of corona and/or radio frequency (RF) breakdown of the TWTA ((high voltage direct current (DC) and RF)), and of the microwave components (high voltage RF) in the presence of partial atmospheric pressures or outgassing constituents. In particular, generally the diplexer and circulator are susceptible to RF breakdown in the corona region due to the presence of small physical gaps ((~ 2.5 millimeter (mm)) between conductors that carry an RF voltage. The NESC concurred the DAWN Mission communication system is safe for activation.

Cragg, Clinton H.↗

In-flight Operation of the Dawn Ion Propulsion System Through Year One of Cruise to Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide an additional delta- V of approximately 11 km/s for the heliocentric transfers to each body and for all orbit transfers including orbit capture/escape and transition to the various science orbits. Deterministic thrusting to Vesta began in December 2007 and concluded with orbit capture at Vesta in July 2011. The transfer to Vesta included a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s and was the only postlaunch mission delta-V not provided by IPS. During the mission at Vesta the IPS was used for all orbit transfers which included six different near-polar science mapping orbits. Thrusting for departure from Vesta and the start of cruise to Ceres began on July 25, 2012 with escape from Vesta occurring on September 5, 2012. To date the IPS has been operated for approximately 31,000 hours, consumed approximately 300 kg of xenon, and provided a delta-V of approximately 8.3 km/s. IPS performance characteristics are very close to the expected performance based on analysis and testing performed prelaunch. Thrusting for cruise to Ceres will continue until the spring of 2015, with a planned arrival date at Ceres in April 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations from Vesta departure through the first year of cruise to Ceres.

Hayabusa spacecraft↗

Galileo Preparing for Jupiter Arrival

The most critical events of the Galileo mission occur on Jupiter arrival day, December 7, 1995. In chronological order, these one-time events are: a 1000 km flyby of the innermost Galilean satellite Io, the 75-minute Atmospheric Entry Probe mission, and the Orbiter's Jupiter Orbit Insertion (JOI) maneuver. In addition, extensive, unique Orbiter science observations are planned because this is the only time Galileo will encounter Io, fly through the Io torus, and will be so close to Jupiter -- three times closer than at any of the perijove passes in the orbital mission. All of these events occur in what will be by far the most intense radiation environment Galileo will ever see. The focus of this paper is the extraordinary preparations being made to maximize the reliability of the most critical events in order to ensure a successful probe mission and Orbiter Insertion while also gathering unique arrival day Orbiter science. The paper also provides a mission status report including the return of the asteroid Ida data and the Galileo direct line-of-sight observations of Comet Shoemaker-Levy fragments impacting Jupiter in July 1994.

Galileo↗

Commercial Orbital Transportation Cargo Services Environmental Control and Life Support Integration

The International Space Station s (ISS) largest crew and cargo resupply vehicle, the Space Shuttle, will retire in 2011. To help augment ISS resupply and return capability, NASA announced a project to promote the development of Commercial Orbital Transportation Services (COTS) for the ISS in January of 2006. By December of 2008, NASA entered into space act agreements with SpaceX and Orbital Sciences Corporation for COTS development and ISS Commercial Resupply Services (CRS). The intent of CRS is to fly multiple resupply missions each year to ISS with SpaceX s Dragon vehicle providing resupply and return capabilities and Orbital Science Corporation s Cygnus vehicle providing resupply capability to ISS. The ISS program launched an integration effort to ensure that these new commercial vehicles met the requirements of the ISS vehicle and ISS program needs. The Environmental Control and Life Support System (ECLSS) requirements cover basic cargo vehicle needs including maintaining atmosphere, providing atmosphere circulation, and fire detection and suppression. The ISS-COTS integration effort brought unique challenges combining NASA s established processes and design knowledge with the commercial companies new initiatives and limited experience with human space flight. This paper will discuss the ISS ECLS COTS integration effort including challenges, successes, and lessons learned.

Duchesne, Stephanie↗

Cargo Commercial Orbital Transportation Services Environmental Control and Life Support Integration

The International Space Station s (ISS) largest crew and cargo resupply vehicle, the Space Shuttle, retired in 2011. To help augment ISS resupply and return capability, NASA announced a project to promote the development of Commercial Orbital Transportation Services (COTS) for the ISS in January of 2006. By December of 2008, NASA entered into space act agreements with SpaceX and Orbital Sciences Corporation for COTS development and ISS Commercial Resupply Services (CRS). The intent of CRS is to fly multiple resupply missions each year to ISS with SpaceX s Dragon vehicle providing resupply and return capabilities and Orbital Science Corporation s Cygnus vehicle providing resupply capability to ISS. The ISS program launched an integration effort to ensure that these new commercial vehicles met the requirements of the ISS vehicle and ISS program needs. The Environmental Control and Life Support System (ECLSS) requirements cover basic cargo vehicle needs including maintaining atmosphere, providing atmosphere circulation, and fire detection and suppression. The ISS-COTS integration effort brought unique challenges combining NASA s established processes and design knowledge with the commercial companies new initiatives and limited experience with human space flight. This paper will discuss the ISS ECLS COTS integration effort including challenges, successes, and lessons learned.

Duchesne, Stephanie↗

Geostationary orbit Earth science platform concepts for global change monitoring

Functionality of a geostationary spacecraft to support Earth science regional process research is identified. Most regional process studies require high spatial and temporal resolution. These high temporal resolutions are on the order of 30 minutes and may be achievable with instruments positioned in a geostationary orbit. A complement of typical existing or near term instruments are identified to take advantage of this altitude. This set of instruments is listed, and the requirements these instruments impose on a spacecraft are discussed. A brief description of the geostationary spacecraft concepts which support these instruments is presented.

Farmer, Jeffery T.↗

Application of Tisserand's Criterion and the Lidov-Kozai Effect to STORM's Trajectory Design

The Solar-Terrestrial Observer for the Response of the Magnetosphere (STORM) concept recently completed its Phase A design funded by NASA's Heliophysics Medium-class Explorers program. The mission design required a lunar gravity assist to insert the single spacecraft into a 30-Earth-radii circular geocentric science orbit inclined 90 degrees to the ecliptic. STORM's trajectory design leveraged several interesting gravitational effects from third bodies. This paper describes our application of Tisserand's criterion for finding feasible transfers and lunar gravity assist trajectories, and the Lidov-Kozai effect to design a maneuver-free science orbit optimization and decommissioning strategy.

tisserand criterion↗

Proximity Link Design and Performance Options for a Mars Areostationary Relay Satellite

Current and near-term Mars relay telecommunications services are provided by a set of NASA and ESA Mars science orbiters equipped with UHF relay communication payloads employing operationally simple low gain antennas. These have been extremely successful in supporting a series of landed Mars mission, greatly increasing data return relative to direct-to-Earth lander links. Yet their relay services are fundamentally constrained by the short contact times available from the selected science orbits. Future Mars areostationary orbiters, flying in circular, equatorial, 1- sol orbits, offer the potential for continuous coverage of Mars landers and rovers, radically changing the relay support paradigm. Achieving high rates on the longer slant ranges to areostationary altitude will require steered, high-gain links. Both RF and optical options exist for achieving data rates in excess of 100 Mb/s. Several point designs offer a measure of potential user burden, in terms of mass, volume, power, and pointing requirements for user relay payloads, as a function of desired proximity link performance.

telecommunications↗

Proximity Link Design and Performance Options for a Mars Areostationary Relay Satellite

Current and near-term Mars relay telecommunications services are provided by a set of NASA and ESA Mars science orbiters equipped with UHF relay communication payloads employing operationally simple low-gain antennas. These have been extremely successful in supporting a series of landed Mars mission, greatly increasing data return relative to direct-to-Earth lander links. Yet their relay services are fundamentally constrained by the short contact times available from the selected science orbits. Future Mars areostationary orbiters, flying in circular, equatorial, 1- sol orbits, offer the potential for continuous coverage of Mars landers and rovers, radically changing the relay support paradigm. Achieving high rates on the longer slant ranges to areostationary altitude will require steered, high-gain links. Both RF and optical options exist for achieving data rates in excess of 100 Mb/s. Several point designs offer a measure of potential user burden, in terms of mass, volume, power, and pointing requirements for user relay payloads, as a function of desired proximity link performance.

telecommunications↗