Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk minimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Different Approaches for Ensuring Performance/Reliability of Plastic Encapsulated Microcircuits (PEMs) in Space Applications

Engineers within the commercial and aerospace industries are using trade-off and risk analysis to aid in reducing spacecraft system cost while increasing performance and maintaining high reliability. In many cases, Commercial Off-The-Shelf (COTS) components, which include Plastic Encapsulated Microcircuits (PEMs), are candidate packaging technologies for spacecrafts due to their lower cost, lower weight and enhanced functionality. Establishing and implementing a parts program that effectively and reliably makes use of these potentially less reliable, but state-of-the-art devices, has become a significant portion of the job for the parts engineer. Assembling a reliable high performance electronic system, which includes COTS components, requires that the end user assume a risk. To minimize the risk involved, companies have developed methodologies by which they use accelerated stress testing to assess the product and reduce the risk involved to the total system. Currently, there are no industry standard procedures for accomplishing this risk mitigation. This paper will present the approaches for reducing the risk of using PEMs devices in space flight systems as developed by two independent Laboratories. The JPL procedure involves primarily a tailored screening with accelerated stress philosophy while the APL procedure is primarily, a lot qualification procedure. Both Laboratories successfully have reduced the risk of using the particular devices for their respective systems and mission requirements.

Gerke, R. David↗

Navigation Strategy for the Mars 2001 Lander Mission

The Mars Surveyor Program (MSP) is an ongoing series of missions designed to robotically study, map and search for signs of life on the planet Mars. The MSP 2001 project will advance the effort by sending an orbiter, a lander and a rover to the red planet in the 2001 opportunity. Each vehicle will carry a science payload that will Investigate the Martian environment on both a global and on a local scale. Although this mission will not directly search for signs of life, or cache samples to be returned to Earth, it will demonstrate certain enabling technologies that will be utilized by the future Mars Sample Return missions. One technology that is needed for the Sample Return mission is the capability to place a vehicle on the surface within several kilometers of the targeted landing site. The MSP'01 Lander will take the first major step towards this type of precision landing at Mars. Significant reduction of the landed footprint will be achieved through two technology advances. The first, and most dramatic, is hypersonic aeromaneuvering; the second is improved approach navigation. As a result, the guided entry will produce in a footprint that is only tens of kilometers, which is an order of magnitude improvement over the Pathfinder and Mars Polar Lander ballistic entries. This reduction will significantly enhance scientific return by enabling the potential selection of otherwise unreachable landing sites with unique geologic interest and public appeal. A landed footprint reduction from hundreds to tens of kilometers is also a milestone on the path towards human exploration of Mars, where the desire is to place multiple vehicles within several hundred meters of the planned landing site. Hypersonic aeromaneuvering is an extension of the atmospheric flight goals of the previous landed missions, Pathfinder and Mars Polar Lander (MPL), that utilizes aerodynamic lift and an autonomous guidance algorithm while in the upper atmosphere. The onboard guidance algorithm will control the direction of the lift vector, via bank angle modulation, to keep the vehicle on the desired trajectory. While numerous autonomous guidance algorithms have been developed for use during hypersonic flight at Earth, this will be the first flight of an autonomously directed lifting entry vehicle at Mars. However, without sufficient control and knowledge of the atmospheric entry conditions, the guidance algorithm will not perform effectively. The goal of the interplanetary navigation strategy is to deliver the spacecraft to the desired entry condition with sufficient accuracy and knowledge to enable satisfactory guidance algorithm performance. Specifically, the entry flight path angle must not exceed 0.27 deg. to a 3 sigma confidence level. Entry errors will contribute directly to the size of the landed footprint and the most significant component is entry flight path angle. The size of the entry corridor is limited on the shallow side by integrated heating constraints, and on the steep side by deceleration (g-load) and terminal descent propellant. In order to meet this tight constraint it is necessary to place a targeting maneuver seven hours prior to the time of entry. At this time the trajectory knowledge will be quite accurate, and the effects of maneuver execution errors will be small. The drawback is that entry accuracy is dependent on the success of this final late maneuver. Because propulsive maneuvers are critical events, it is desirable to minimize their occurrence and provide the flight team with as much response time as possible in the event of a spacecraft fault. A mission critical maneuver at Entry - 7 hours does not provide much fault tolerance, and it is desirable to provide a strategy that minimizes reliance on this maneuver. This paper will focus on the Improvements in interplanetary navigation that will decrease entry errors and will reduce the landed footprint, even in the absence of aeromaneuvering. The easiest to take advantage of are Improvements In the knowledge of the Mars ephemeris and gravity field due to the MGS and MSP'98 missions. Improvements In data collection and reduction techniques such as "precislon ranging' and near-simultaneous tracking will also be utilized. In addition to precise trajectory control, a robust strategy for communications and flight operations must also be demonstrated. The result Is a navigation and communications strategy on approach that utilizes optimal maneuver placement to take advantage of trajectory knowledge, minimizes risk for the flight operations team, is responsive to spacecraft hardware limitations, and achieves the entry corridor. The MSP2001 mission Is managed at JPL under the auspices of the Mars Exploration Directorate. The spacecraft flight elements are built and managed by Lockheed-Martin Astronautics in Denver, Colorado.

Mase, Robert A.↗

Technology Thrust for Future Earth Science Applications

This paper presents NASA's recent direction to invest in the critical science instrument and platform technologies in order to realize more reliable, frequent and versatile missions for future Earth Science measurements. Traditionally, NASA's Earth Science Enterprise has developed and flown science missions that have been large in size, weight and volume. These missions have taken much longer implementation due to technology development time and have carried a large suite of instruments on a large-size spacecraft. NASA is also facing an era where the budget for the future years is more or less flat and the possibility for any major new start does not vividly appear on the horizon. Unfortunately, the scientific goals have not shrunk to commensurate with the budget constraints. In fact, the challenges and scientific appetite in search of answers to a score of outstanding questions have been gradually expanding. With these factors in mind, for the last three years NASA has been changing its focus to concentrate on how to take advantage of smaller missions by relying on industry, and minimizing the overall life cycle by infusing technologies that are being developed independently of any planned mission's implementation cycle. The major redirection of early investment in the critical technologies should have its rewards and significantly reduce the mission development period. Needless to say, in the long run this approach should save money, minimize risk, promote or encourage partnering, and allow for more frequent missions or earth science measurements to occur. This paper gives an overview of some of the identified crucial technologies and their intended applications for meeting the future Earth Science challenges.

Habib, Shahid↗

Technology Thrusts for Future Earth Science Applications

This paper presents NASA's recent direction to invest in the critical science instrument and platform technologies in order to realize more reliable, frequent and versatile missions for future Earth Science measurements. Historically, NASA's Earth Science Enterprise has developed and flown science missions that have been large in size, mass and volume. These missions have taken much longer to implement due to technology development time, and have carried a large suite of instruments on a large spacecraft. NASA is now facing an era where the budget for the future years is more or less flat and the possibility for any major new start does not vividly appear on the horizon. Unfortunately, the scientific measurement needs for remote sensing have not shrunk to commensurate with the budget constraints. In fact, the challenges and scientific appetite in search of answers to a score of outstanding questions have been gradually expanding. With these factors in mind, for the last three years NASA has been changing its focus to concentrate on how to take advantage of smaller missions by relying on industry, and minimizing the overall mission life cycle by developing technologies that are independent of the mission implementation cycle. The major redirection of early investment in the critical technologies should eventually have its rewards and significantly reduce the mission development period. Needless to say, in the long run this approach should save money, minimize risk, promote or encourage partnering, allow for a rapid response to measurement needs, and enable frequent missions making a wider variety of earth science measurements. This paper gives an overview of some of the identified crucial technologies and their intended applications for meeting the future Earth Science challenges.

Habib, Shahid↗

Rapid Modeling and Analysis Tools: Evolution, Status, Needs and Directions

Advanced aerospace systems are becoming increasingly more complex, and customers are demanding lower cost, higher performance, and high reliability. Increased demands are placed on the design engineers to collaborate and integrate design needs and objectives early in the design process to minimize risks that may occur later in the design development stage. High performance systems require better understanding of system sensitivities much earlier in the design process to meet these goals. The knowledge, skills, intuition, and experience of an individual design engineer will need to be extended significantly for the next generation of aerospace system designs. Then a collaborative effort involving the designer, rapid and reliable analysis tools and virtual experts will result in advanced aerospace systems that are safe, reliable, and efficient. This paper discusses the evolution, status, needs and directions for rapid modeling and analysis tools for structural analysis. First, the evolution of computerized design and analysis tools is briefly described. Next, the status of representative design and analysis tools is described along with a brief statement on their functionality. Then technology advancements to achieve rapid modeling and analysis are identified. Finally, potential future directions including possible prototype configurations are proposed.

Knight, Norman F., Jr.↗

Nuclear Electric Propulsion for Outer Space Missions

Today we know of 66 moons in our very own Solar System, and many of these have atmospheres and oceans. In addition, the Hubble (optical) Space Telescope has helped us to discover a total of 100 extra-solar planets, i.e., planets going around other suns, including several solar systems. The Chandra (X-ray) Space Telescope has helped us to discover 33 Black Holes. There are some extremely fascinating things out there in our Universe to explore. In order to travel greater distances into our Universe, and to reach planetary bodies in our Solar System in much less time, new and innovative space propulsion systems must be developed. To this end NASA has created the Prometheus Program. When one considers space missions to the outer edges of our Solar System and far beyond, our Sun cannot be relied on to produce the required spacecraft (s/c) power. Solar energy diminishes as the square of the distance from the Sun. At Mars it is only 43% of that at Earth. At Jupiter, it falls off to only 3.6% of Earth's. By the time we get out to Pluto, solar energy is only .066% what it is on Earth. Therefore, beyond the orbit of Mars, it is not practical to depend on solar power for a s/c. However, the farther out we go the more power we need to heat the s/c and to transmit data back to Earth over the long distances. On Earth, knowledge is power. In the outer Solar System, power is knowledge. It is important that the public be made aware of the tremendous space benefits offered by Nuclear Electric Propulsion (NEP) and the minimal risk it poses to our environment. This paper presents an overview of the reasons for NEP systems, along with their basic components including the reactor, power conversion units (both static and dynamic), electric thrusters, and the launch safety of the NEP system.

Barret, Chris↗

In-Space Propulsion Solar Electric Propulsion Program Overview of 2006

The primary source of electric propulsion development throughout NASA is implemented by the In-Space Propulsion Technology Project at the NASA MSFC under the management of the Science Mission Directorate. The Solar Electric Propulsion technology area's objective is to develop near and mid-term SEP technology to enhance or enable mission capture while minimizing risk and cost to the end user. Major activities include developing NASA s Evolutionary Xenon Thruster (NEXT), implementing a Standard Architecture, and developing a long life High Voltage Hall Accelerator (HiVHAC). Lower level investments include advanced feed system development, advanced cathode testing and xenon recovery testing. Progress on current investments and future plans are discussed.

Baggett, Randy M.↗

Electric Propulsion Requirements and Mission Analysis Under NASA's In-Space Propulsion Technology Project

The In-Space Propulsion Technology Project (ISPT) is currently NASA's sole investment in electric propulsion technologies. This project is managed at NASA Glenn Research Center (GRC) for the NASA Headquarters Science Mission Directorate (SMD). The objective of the electric propulsion project area is to develop near-term and midterm electric propulsion technologies to enhance or enable future NASA science missions while minimizing risk and cost to the end user. Systems analysis activities sponsored by ISPT seek to identify future mission applications in order to quantify mission requirements, as well as develop analytical capability in order to facilitate greater understanding and application of electric propulsion and other propulsion technologies in the ISPT portfolio. These analyses guide technology investments by informing decisions and defining metrics for technology development to meet identified mission requirements. This paper discusses the missions currently being studied for electric propulsion by the ISPT project, and presents the results of recent electric propulsion (EP) mission trades. Recent ISPT systems analysis activities include: an initiative to standardize life qualification methods for various electric propulsion systems in order to retire perceived risk to proposed EP missions; mission analysis to identify EP requirements from Discovery, New Frontiers, and Flagship classes of missions; and an evaluation of system requirements for radioisotope-powered electric propulsion. Progress and early results of these activities is discussed where available.

Dudzinski, Leonard a.↗

Solar Electric Propulsion

The Solar Electric Propulsion (SEP) technology area is tasked to develop near and mid-term SEP technology to improve or enable science mission capture while minimizing risk and cost to the end user. The solar electric propulsion investments are primarily driven by SMD cost-capped mission needs. The technology needs are determined partially through systems analysis tasks including the recent "Re-focus Studies" and "Standard Architecture Study." These systems analysis tasks transitioned the technology development to address the near term propulsion needs suitable for cost-capped open solicited missions such as Discovery and New Frontiers Class missions. Major SEP activities include NASA's Evolutionary Xenon Thruster (NEXT), implementing a Standard Architecture for NSTAR and NEXT EP systems, and developing a long life High Voltage Hall Accelerator (HiVHAC). Lower level investments include advanced feed system development and xenon recovery testing. Future plans include completion of ongoing ISP development activities and evaluating potential use of commercial electric propulsion systems for SMD applications. Examples of enhanced mission capability and technology readiness dates shall be discussed.

LaPointe, Michael↗

The Importance of Technology Readiness in NASA Earth Venture Missions

The first set of Venture-class investigations share the characteristic that the technology should be mature and all investigations must use mature technology that has been modeled or demonstrated in a relevant environment (Technology Readiness Level (TRL) >5). Technology Readiness Levels are a systematic metric/measurement system that supports assessments of the maturity of a particular technology and the consistent comparison of maturity between different types of technology. The TRL is used in NASA technology planning. A major step in the level of fidelity of the technology demonstration follows the completion of TRL 5. At TRL 6, a system or subsystem model or prototype must be demonstrated in a relevant environment (ground or space) representative model or prototype system or system, which would go well beyond ad hoc, "patch-cord," or discrete component level breadboarding. These TRL levels are chosen as target objectives for the Program. The challenge for offerors is that they must identify key aspects (uncertainty, multi subsystem complexity, etc) of the TRL estimate that should be properly explained in a submitted proposal. Risk minimization is a key component of the Earth Venture missions. Experiences of prior airborne missions will be shared. The discussion will address aspects of uncertainty and issues surrounding three areas of airborne earth science missions: (1) Aircraft or proposed flight platform -- Expressing the capability of the aircraft in terms of the supporting mission requirements. These issues include airplane performance characteristics (duration, range, altitude, among others) and multiship complexities. (2) Instruments -- Establishing that the instruments have been demonstrated in a relevant environment. Instruments with heritage in prior space missions meet this requirement, as do instruments tested on the ground. Evidence that the instruments have demonstrated the ability to collect data as advertised will be described. The complexity of the integration of multiple subsystems will also be addressed. Issues associated with tailoring the instrument to meet the specific Venture mission objectives must be thoroughly explained and justified. (3) Aircraft/Instrument Integration -- Explicitly defining what development may be required to harden the instrument and integrate the instrument. The challenges associated with this key aspect of major airborne earth science investigations will be presented.

Wells, James E.↗

Individualized Cognitive Modeling for Close-Loop Task Mitigation

An accurate real-time operator functional state assessment makes it possible to perform task management, minimize risks, and improve mission performance. In this paper, we discuss the development of an individualized operator functional state assessment model that identifies states likely leading to operational errors. To address large individual variations, we use two different approaches to build a model for each individual using its data as well as data from subjects with similar responses. If a subject's response is similar to that of the individual of interest in a specific functional state, all the training data from this subject will be used to build the individual model. The individualization methods have been successfully verified and validated with a driving test data set provided by University of Iowa. With the individualized models, the mean squared error can be significantly decreased (by around 20%).

Zhang, Guangfan↗

Qualification of a High Accuracy Dual-Axis Antenna Deployment and Trimming Mechanism

The Antenna Deployment and Trimming Mechanism Mark 2 (ADTM Mk2) has been developed to answer today's need for a generic antenna deployment and high accuracy pointing mechanism, allowing RF sensing applications and easier dual deployments configurations. This paper presents the design and evolution from its predecessor, the experience of the design team from kick off to qualification and batch manufacture, as well as some lessons learned from ramping up "mass-production" capabilities while implementing customer driven changes. Astrium has manufactured and flown ADTM units for the past 20 years, from an initial deployment-only mechanism developed for the Orion program to today's Eurostar E3000 ADTM family. The Antenna ADTM Mk2 is an evolution of the original ADTM Mk1. Although it uses Mk1 building blocks to minimize risks associated with the development of a new product, it incorporates major evolutions and is the new baseline for Astrium latest generation of Eurostar E3000 telecom satellites.

Gossant, Alain↗

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

The Successful Implementation of NASA Orbital Debris Requirements for the Retirement of TDRS-1

TDRS-1 was decommissioned on October 28th 2009 following more than 26 years of operation. The Grand Old Dame of the TDRSS constellation wa s launched aboard the maiden voyage of the Space Shuttle Challenger ( STS-6) in April 1983. TDRS-1 survived a malfunction of the Inertial Upper Stage eventually utilizing its own propulsion system to success fully reach its assigned station in geosynchronous orbit. The anomalo us beginning of the TDRS-1 mission was not without lasting consequenc es as the primary reaction control system (A-side) was completely di sabled with an apparent propellant leak and the secondary system (B-s ide) suffered damage to its negative roll thruster rendering the thru ster inoperable. Following decommissioning the challenge to completin g a successful TDRS-1 end-of-mission (EOM) was the implementation of the stringent orbital debris requirements of NPR 8715.6 with a parti ally functioning spacecraft not originally designed to meet those req uirements. The TDRS-1 EOM had three key goals: 1) removal of the spac ecraft from geosynchronous orbit; 2) depletion of the remaining prope llant; and 3) passivation of all other sources of energy storage or generation. The TDRS-1 EOM approach was one of minimizing risks while accomplishing the goals above. The orbit raising portion of EOM was accomplished using deltavelocity operations already proven during pre vious stationchanging maneuvers. The propellant depletion approach wa s necessarily more aggressive as over 20 hours of burn time was requ ired to deplete the remaining fuel. A novel approach utilizing a spin ning, thrusting, passively controlled spacecraft configuration was ut ilized to achieve reasonable burn durations that met schedule constra ints. This nonstandard configuration required careful analysis of ele ctrical, thermal, and communication subsystems. The configuration wa s thoroughly simulated prior to the start of operations and carefully characterized during the initial spin period and first burn. Passiva tion was by definition a unique operation not previously performed wi thin the TDRS 1-7 constellation. Use was made of a TDRS spacecraft si mulator to verify the operational procedure to mitigate risks and pro vide crew training. TDRS-1 orbit raising maneuvers commenced on June 5th 2010 and completed on June 14th with an apogee 370 km and a peri gee 352 km above geosynchronous altitude. 127 kg of propellant were e stimated to be remaining in the tanks at the completion of orbit rais ing. TDRS-1 was placed in its spinning orientation on June 16th and the first fuel depletion burn was performed the following day. A seri es of 10 depletion burns were performed ending on June 26th when both propellant tank pressures experienced dramatic drops. Final passivat ion was performed on June 27 th deactivating electronics, removing t he batteries from the bus and solar arrays, and disabling the space-t o-ground communications equipment. The Second TDRS Ground Terminal (S TGT) continued to open loop track TDRS-1 for several days attempting command reacquisition several times a day. All attempts were unsucce ssful confirming passivation was achieved. The TDRS-1 orbit at passiv ation was an orbital debris compliant 36,319 x 36,128 km in height. W hile differing spacecraft designs may preclude mimicking the exact TD RS-1 EOM approach, the TDRS-1 campaign serves to demonstrate that pr e-NPR 8715.6 designs can be made to meet the requirements resulting i n a reduced orbit debris environment for future missions

Mirczak, Walter↗

The J-2X Upper Stage Engine: From Design to Hardware

NASA is well on its way toward developing a new generation of launch vehicles to support of national space policy to retire the Space Shuttle fleet, complete the International Space Station, and return to the Moon as the first step in resuming this nation s exploration of deep space. The Constellation Program is developing the launch vehicles, spacecraft, surface systems, and ground systems to support those plans. Two launch vehicles will support those ambitious plans the Ares I and Ares V. (Figure 1) The J-2X Upper Stage Engine is a critical element of both of these new launchers. This paper will provide an overview of the J-2X design background, progress to date in design, testing, and manufacturing. The Ares I crew launch vehicle will lift the Orion crew exploration vehicle and up to four astronauts into low Earth orbit (LEO) to rendezvous with the space station or the first leg of mission to the Moon. The Ares V cargo launch vehicle is designed to lift a lunar lander into Earth orbit where it will be docked with the Orion spacecraft, and provide the thrust for the trans-lunar journey. While these vehicles bear some visual resemblance to the 1960s-era Saturn vehicles that carried astronauts to the Moon, the Ares vehicles are designed to carry more crew and more cargo to more places to carry out more ambitious tasks than the vehicles they succeed. The government/industry team designing the Ares rockets is mining a rich history of technology and expertise from the Shuttle, Saturn and other programs and seeking commonality where feasible between the Ares crew and cargo rockets as a way to minimize risk, shorten development times, and live within the budget constraints of its original guidance.

Byrd, Thomas↗

Integration of MSFC Usability Lab with Usability Testing

As part of the Stage Analysis Branch, human factors engineering plays an important role in relating humans to the systems of hardware and structure designs of the new launch vehicle. While many branches are involved in the technical aspects of creating a launch vehicle, human factors connects humans to the scientific systems with the goal of improving operational performance and safety while reducing operational error and damage to the hardware. Human factors engineers use physical and computerized models to visualize possible areas for improvements to ensure human accessibility to components requiring maintenance and that the necessary maintenance activities can be accomplished with minimal risks to human and hardware. Many methods of testing are used to fulfill this goal, such as physical mockups, computerized visualization, and usability testing. In this analysis, a usability test is conducted to test how usable a website is to users who are and are not familiar with it. The testing is performed using participants and Morae software to record and analyze the results. This analysis will be a preliminary test of the usability lab in preparation for use in new spacecraft programs, NASA Enterprise, or other NASA websites. The usability lab project is divided into two parts: integration of the usability lab and a preliminary test of the usability lab.

Cheng, Yiwei↗

Evolution of Space Shuttle Range Safety (RS) Ascent Flight Envelope Design

Ascent flight envelopes are trajectories that define the normal operating region of a space vehicle s position from liftoff until the end of powered flight. They fulfill part of the RS data requirements imposed by the Air Force s 45th Space Wing (45SW) on space vehicles launching from the Eastern Range (ER) in Florida. The 45SW is chartered to protect the public by minimizing risks associated with the inherent hazards of launching a vehicle into space. NASA s Space Shuttle program has launched 130+ manned missions over a 30 year period from the ER. Ascent envelopes were delivered for each of those missions. The 45SW envelope requirements have remained largely unchanged during this time. However, the methodology and design processes used to generate the envelopes have evolved over the years to support mission changes, maintain high data quality, and reduce costs. The evolution of the Shuttle envelope design has yielded lessons learned that can be applied to future endevours. There have been numerous Shuttle ascent design enhancements over the years that have caused the envelope methodology to evolve. One of these Shuttle improvements was the introduction of onboard flight software changes implemented to improve launch probability. This change impacted the preflight nominal ascent trajectory, which is a key element in the RS envelope design. While the early Shuttle nominal trajectories were designed preflight using a representative monthly mean wind, the new software changes involved designing a nominal ascent trajectory on launch day using real-time winds. Because the actual nominal trajectory position was not known until launch day, the envelope analysis had to be customized to account for this nominal trajectory variation in addition to the other envelope components.

Brewer, Joan D.↗

Innovative Approach Enabled the Retirement of TDRS-1 Compliant with NASA Orbital Debris Requirements

The first Tracking and Data Relay Satellite (TDRS-1) was deactivated on June 27th 2010 following more than 26 years of operation. The end-of-mission (EOM) operations were developed to address the stringent requirements of NPR 8715.6: NASA Procedural Requirements for Limiting Orbital Debris, which consists of three key items: 1) removal from the geosynchronous arc; 2) depletion of the remaining propellant; and 3) passivation of all sources of energy storage or generation [1]. The EOM approach minimized risks while accomplishing these goals. Raising TDRS-1 over 350 km above geosynchronous was accomplished via proven station change operations. Depleting propellant was the most challenging task, requiring over 20 hours of thruster on-time accumulated within schedule, orbit, and spacecraft subsystem constraints. The attitude configuration and operational procedures, including the unique final passivation method, were thoroughly analyzed and simulated prior to the start of operations. The complete EOM campaign lasted 21 days. The TDRS-1 EOM campaign demonstrated that pre-NPR 8715.6 satellite designs can be made to comply and that lessons learned could be applied to other satellite designs. The significant TDRS-1 effort demonstrates a commitment by NASA to responsible orbital debris management in compliance with international standards.

Zaleski, Ronald↗