Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Deep Direct-Use for Industrial Applications: Producing Chilled Water for Gas-Turbine Inlet Cooling

Direct use of deep, low-temperature geothermal resources is underutilized due to challenging project economics associated with developing a deep geothermal resource for what are historically small-scale, variable-demand projects. This project assesses the feasibility of geothermal energy integration in natural-gas combined cycle power stations in the Sabine Uplift and Gulf Coast regions of Texas. The low-grade geothermal resource is tapped to drive absorption chillers for production of chilled water at 5-10 degrees C (41-50 degrees F). This chilled water is stockpiled and dispatched to provide turbine inlet cooling (TIC) at the inlet to the compressor of a natural-gas combined cycle power plant, thereby boosting power production during periods of high temperature and high-power demand. This presentation focuses on the system design related to geothermal well-site selection (proximity vs. resource quality), absorption chiller size and location, chilled-water storage capacity, and dispatch logic to realize the maximum financial benefit.

15 GEOTHERMAL ENERGY↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on the Banshee Distribution Network: Preprint

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on Banshee Distribution Network

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flash Recycling of Graphite Anodes

The ever-increasing production of commercial lithium-ion batteries (LIBs) will result in a staggering accumulation of waste when they reach their end of life. A closed-loop solution, with effective recycling of spent LIBs, will lessen both the environmental impacts and economic cost of their use. Presently, <5% of spent LIBs are recycled and the regeneration of graphite anodes has, unfortunately, been mostly overlooked despite the considerable cost of battery-grade graphite. Here, in this work, an ultrafast flash recycling method to regenerate the graphite anode is developed and valuable battery metal resources are recovered. Selective Joule heating is applied for only seconds to efficiently decompose the resistive impurities. The generated inorganic salts, including lithium, cobalt, nickel, and manganese, can be easily recollected from the flashed anode waste using diluted acid, specifically 0.1 M HCl. The flash-recycled anode preserves the graphite structure and is coated with a solid-electrolyte-interphase-derived carbon shell, contributing to high initial specific capacity, superior rate performance, and cycling stability, when compared to anode materials recycled using a high-temperature-calcination method. Life-cycle-analysis relative to current graphite production and recycling methods indicate that flash recycling can significantly reduce the total energy consumption and greenhouse gas emission while turning anode recycling into an economically advantageous process.

36 MATERIALS SCIENCE↗

Characterization of demand response in the commercial, industrial, and residential sectors in the United States

The goal of our study is to provide an overview of demand response (DR) technologies, including standards and end uses, in the United States and describe resource characteristics and the attributes of 14 specific DR resources in the U.S. commercial, residential, and industrial sectors. The attributes reviewed for the end uses being considered are response frequency, response time, the need for and impacts of energy pre- or recharge, the cost of enabling a resource to respond to a load-curtailment signal, and the magnitude of load curtailment in a given resource. We also describe controls and communications technologies that can enable end uses to participate in DR programs. The characterization was initially developed as a foundational work to quantify hourly availability of DR resources from the selected end uses followed by a multi-laboratory effort that quantified DR's value within the Western Interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic probabilistic risk assessment for electric grid cybersecurity

Electric grid cybersecurity risk has become a significant concern of industries and governments. This paper proposes a dynamic probabilistic risk assessment method for electric grid cybersecurity risk analysis. The proposed method helps reduce the reliance on expert judgment, capture a broad range of components and system dynamics, and model the interactions between various contributing entities (e.g., attacker, operator). In addition, the scenarios with multiple events, such as the occurrence of both cyberattacks and failures of physical components, the occurrence of both cyberattacks and operators’ (in)correct reactions, are considered and analyzed. Further, for each cyberattack scenario, Monte Carlo simulations are used to obtain possible sequences of the system's evolution under study and then derive risk estimates. As an application of the proposed method, the risk assessment method serves as the basis of risk-informed defense resource allocation to improve electric grid cybersecurity. The proposed method is verified using the IEEE 14-bus system by evaluating different security resource allocations for selected cyberattack scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modelling predicts that heat stress, not drought, will increase vulnerability of wheat in Europe

New crop cultivars will be required for a changing climate characterised by increased summer drought and heat stress in Europe. However, the uncertainty in climate predictions poses a challenge to crop scientists and breeders who have limited time and resources and must select the most appropriate traits for improvement. Modelling is a powerful tool to quantify future threats to crops and hence identify targets for improvement. We have used a wheat simulation model combined with local-scale climate scenarios to predict impacts of heat stress and drought on winter wheat in Europe. Despite the lower summer precipitation projected for 2050s across Europe, relative yield losses from drought is predicted to be smaller in the future, because wheat will mature earlier avoiding severe drought. By contrast, the risk of heat stress around flowering will increase, potentially resulting in substantial yield losses for heat sensitive cultivars commonly grown in northern Europe.

54 ENVIRONMENTAL SCIENCES↗

Degradation of Commercial Lithium-Ion Cells as a Function of Chemistry and Cycling Conditions

Energy storage systems with Li-ion batteries are increasingly deployed to maintain a robust and resilient grid and facilitate the integration of renewable energy resources. However, appropriate selection of cells for different applications is difficult due to limited public data comparing the most commonly used off-the-shelf Li-ion chemistries under the same operating conditions. This article details a multi-year cycling study of commercial LiFePO 4 (LFP), LiNi x Co y Al 1–x–y O 2 (NCA), and LiNi x Mn y Co 1–x–y O 2 (NMC) cells, varying the discharge rate, depth of discharge (DOD), and environment temperature. The capacity and discharge energy retention, as well as the round-trip efficiency, were compared. Even when operated within manufacturer specifications, the range of cycling conditions had a profound effect on cell degradation, with time to reach 80% capacity varying by thousands of hours and cycle counts among cells of each chemistry. The degradation of cells in this study was compared to that of similar cells in previous studies to identify universal trends and to provide a standard deviation for performance. All cycling files have been made publicly available at batteryarchive.org, a recently developed repository for visualization and comparison of battery data, to facilitate future experimental and modeling efforts.

25 ENERGY STORAGE↗

Stuff- The Materials that Shape our World - Experimental Learning Opportunities

Making Stuff is a four-part series that explores how materials changed history and are shaping the future. To further enhance public engagement in and understanding of materials science, the project convened an extensive network of community coalitions across the country that hosted Making Stuff outreach activities and events, science cafes, and educator workshops in their local areas. Department Of Energy funding enabled us to increase the number of communities formally involved in the project, from 10 to 20 community hubs. Department of Energy funding also made it possible to develop a collection of materials science resources, activities and hands-on demonstrations for use in a variety of formal and informal settings, and Making Stuff activities were presented at science conferences and festivals around the country. The design, printing and national dissemination of the Making Stuff afterschool activity guide were also developed with DOE funding, as well as professional webinar trainings for scientists and educators to help facilitate many of the community activities and other online and print materials. Thanks to additional funding from the Department of Energy, we were able to expand the reach and scope of the project's outreach plan, specifically in the areas of: 1) content development, 2) training/professional development, 3) educational activities and 4) community partnerships. This report documents how the following DOE project goals were met: (1) Train scientists and provide teachers and informal educators with resources to engage youth with age appropriate information about materials science; (2) Provide activities and resources to five selected communities with ties to DOE researchers; (3) Increase interest in STEM.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decision Paper for the Disposition of FS-65 Shipping Containers, Support Equipment, and Mixed Oxide (MOX) Material Contents (Rev. 1.1)

A description of the containers, contents, and disposition alternatives follow. Table 1 provides a rough order of magnitude cost and schedule duration estimate for the 2 disposition alternatives. Cost and schedule data are rounded to two significant figures and the durations are based on 1735 working hours per year. The sub-task durations and personnel are not totaled for the tasks because many of the sub-tasks will be conducted in parallel. Once an Alternative is selected a detailed resource loaded schedule will be developed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decision Paper for the Disposition of FS-65 Shipping Containers, Support Equipment, and Mixed Oxide (MOX) Material Contents (Rev. 1.2)

A description of the containers, contents, and disposition alternatives follow. Table 1 provides a rough order of magnitude cost and schedule duration estimate for the 2 disposition alternatives. Cost and schedule data are rounded to two significant figures and the durations are based on 1735 working hours per year. The sub-task durations and personnel are not totaled for the tasks because many of the sub-tasks will be conducted in parallel. Once an Alternative is selected a detailed resource loaded schedule will be developed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Element Verification and Comparison in Sierra/Solid Mechanics Problems

The goal of this project was to study the effects of element selection on the Sierra/SM solutions to five common solid mechanics problems. A total of nine element formulations were used for each problem. The models were run multiple times with varying spatial and temporal discretization in order to ensure convergence. The first four problems have been compared to analytical solutions, and all numerical results were found to be sufficiently accurate. The penetration problem was found to have a high mesh dependence in terms of element type, mesh discretization, and meshing scheme. Also, the time to solution is shown for each problem in order to facilitate element selection when computer resources are limited.

97 MATHEMATICS AND COMPUTING↗

Application of stochastic optimization to nuclear power plant asset management decisions

We describe the development and application of stochastic optimization models and algorithms to address an issue of critical importance in the strategic allocation of resources; namely, the selection of a portfolio of capital investment projects under the constraints of a limited and uncertain budget. This issue is significant and one that faces decision-makers across all industries. The objective of this strategic decision process is generally self evident - to maximize the value obtained from the portfolio of selected projects (with value usually measured in terms of the portfolio's net present value). However, heretofore, many organizations have developed processes to make these investment decisions using simplistic rule-based rank-ordering schemes. This approach has the significant limitation of not accounting for the (often large) uncertainties in the costs or economic benefits associated with the candidate projects or in the uncertainties in the actual funds available to be expended over the projected period of time. As a result, the simple heuristic approaches that typically are employed in industrial practice generate outcomes that are non-optimal and do not achieve the level of benefits intended. In this paper we describe the results of research performed to utilize stochastic optimization models and algorithms to address this limitation by explicitly incorporating the evaluation of uncertainties in the analysis and decision making process. (authors)

97 MATHEMATICS AND COMPUTING↗

Greater Sage-Grouse Habitat Use and Population Demographics at the Simpson Ridge Wind Resource Area, Carbon County, Wyoming

This study was conducted to obtain baseline data on use of the proposed Simpson Ridge Wind Resource Area (SRWRA) in Carbon County, Wyoming by greater sage-grouse. The first two study years were designed to determine pre-construction seasonally selected habitats and population-level vital rates (productivity and survival). The presence of an existing wind energy facility in the project area, the PacifiCorp Seven Mile Hill (SMH) project, allowed us to obtain some information on initial sage-grouse response to wind turbines the first two years following construction. To our knowledge these are the first quantitative data on sage-grouse response to an existing wind energy development. This report presents results of the first two study years (April 1, 2009 through March 30, 2011). This study was selected for continued funding by the National Wind Coordinating Collaborative Sage-Grouse Collaborative (NWCC-SGC) and has been ongoing since March 30, 2011. Future reports summarizing results of this research will be distributed through the NWCC-SGC. To investigate population trends through time, we determined the distribution and numbers of males using leks throughout the study area, which included a 4-mile radius buffer around the SRWRA. Over the 2-year study, 116 female greater sage-grouse were captured by spotlighting and use of hoop nets on roosts surrounding leks during the breeding period. Radio marked birds were located anywhere from twice a week to once a month, depending on season. All radio-locations were classified to season. We developed predictor variables used to predict success of fitness parameters and relative probability of habitat selection within the SRWRA and SMH study areas. Anthropogenic features included paved highways, overhead transmission lines, wind turbines and turbine access roads. Environmental variables included vegetation and topography features. Home ranges were estimated using a kernel density estimator. We developed resource selection functions (RSF) to estimate probability of selection within the SRWRA and SMH. Fourteen active greater sage-grouse leks were documented during lek surveys Mean lek size decreased from 37 in 2008 to 22 in 2010. Four leks located 0.61, 1.3, 1.4 and 2.5 km from the nearest wind turbine remained active throughout the study, but the total number of males counted on these four leks decreased from 162 the first year prior to construction (2008), to 97 in 2010. Similar lek declines were noted in regional leks not associated with wind energy development throughout Carbon County. We obtained 2,659 sage-grouse locations from radio-equipped females, which were used to map use of each project area by season. The sage-grouse populations within both study areas are relatively non-migratory, as radio-marked sage-grouse used similar areas during all annual life cycles. Potential impacts to sage-grouse from wind energy infrastructure are not well understood. The data rom this study provide insight into the early interactions of wind energy infrastructure and sage-grouse. Nest success and brood-rearing success were not statistically different between areas with and without wind energy development in the short-term. Nest success also was not influenced by anthropogenic features such as turbines in the short-term. Additionally, female survival was similar among both study areas, suggesting wind energy infrastructure was not impacting female survival in the short-term; however, further analysis is needed to identify habitats with different levels of risk to better understand the impact of wind energy development on survival. Nest and brood-rearing habitat selection were not influenced by turbines in the short-term; however, summer habitat selection occurred within habitats closer to wind turbines. Major roads were avoided in both study areas and during most of the seasons. The impact of transmission lines varied among study areas, suggesting other landscape features may be influencing selection. The data provided in this report are preliminary and are not meant to provide a basis for forming any conclusions regarding potential impacts of wind energy development on sage-grouse. Although the data collected during the initial phases of this study indicate that greater sage-grouse may continue to use habitats near wind-energy facilities, research conducted on greater sage-grouse response to oil and gas development has found population declines may not occur until 2-10 years after development. Therefore, long-term data from several geographic areas within the range of the sage-grouse will likely be required to adequately assess impacts of wind-energy development on greater sage-grouse.

17 WIND ENERGY↗

A systematic decision-making methodology to formalize the selection of degree of realism in screening analysis of probabilistic risk assessment

In the nuclear power domain, Probabilistic Risk Assessment (PRA) is used to inform decision-making for Nuclear Power Plants (NPPs). Recently, there has been an increase in the utilization of modeling and simulation (M&S) to support the estimation of PRA inputs. Risk analysts should carefully select the PRA items that require M&S and their degree of realism (DoR) with consideration of the required resources. To support this selection, this article formulates a systematic decision-making approach for the DoR selection. The DoR selection is made based on two predictive decision-making attributes: the predicted differences in safety risk estimate (ΔSaRi) and the cost of analysis (ΔCAN). This research also develops and quantifies causal models to estimate ΔSaRi and ΔCAN. The causal model-based prediction of ΔSaRi and ΔCAN helps reduce the trial-and-error nature of the DoR selection in the PRA screening analysis and provides insights for DoR selection and the gradual refinements of PRA realism. This approach is demonstrated for a case study on fire PRA of NPPs, where an adequate DoR is selected from two fire models: an engineering correlation and a zone model.

Alkhatib, Sari [Department of Nuclear, Plasma, and↗

Multiobjective Optimization of Regional and Teleseismic Data to Constrain the Source of the 12 September 2016 Mw 5.4 Earthquake in South Korea

In this paper, we propose a new approach for source inversion with automatic criteria for the station selection process and using a multiobjective optimization scheme combining teleseismic body-wave and regional surface-wave observations. To illustrate the approach, we determine the source parameters of the 12 September 2016 M w 5.4 South Korea earthquake, as well as its foreshock (same day) and its main aftershock on 19 September 2016. Available teleseismic (short period and broadband) and regional (broadband) seismograms from the Incorporated Research Institutions for Seismology International–Federation of Digital Seismograph Networks (IRIS-FDSN) webservice are selected (see Data and Resources). First, all teleseismic data with signal-to-noise ratio (SNR) above 2 in the 0.3–1.5 Hz frequency band are selected and a cepstrum function is blindly applied to help detect reflected wave arrivals inside a P coda. This method allows the identification of records with weak P-coda and clear depth phase (pP, sP) arrivals and can be used to select an optimal set of teleseismic seismograms to be used for the inversion. Second, regional seismograms are selected according to the fit between their observed and theoretical dispersion curves extracted from local 1D velocity model. Depending on the epicentral distance, two frequency bands are proposed for regional data: 15–50 s for epicentral distances smaller than 2° and 30–80 s otherwise. Finally, we explore the space parameters from exhaustive grid searches for the two objective functions Tf and Rf for teleseismic and regional data, respectively. We show that the seismic moment parameters can be exclusively derived from Rf and can be fixed for Tf. However, the depth parameter is not sensitive to Rf and can be simultaneously inverted from both. The selection of the optimal solution satisfying both cost functions uses the optimum Pareto front that allows a decrease in epistemic uncertainty. Lastly, we discuss the advantage of this approach for improving the characterization of moderate earthquake sources in areas with limited regional instrumentation.

58 GEOSCIENCES↗

MULTI-MODAL CHALLENGES IN THE INTERNATIONAL TRANSPORT OF NUCLEAR AND RADIOACTIVE MATERIALS (THE ONLY INTERESTING PARTS OF A SYSTEM ARE THE INTERFACES.)

Transportation of nuclear and radioactive material exposes these materials to the most risk for malicious acts. Unlike physical facilities, securing radioactive and nuclear materials during transport requires that many different organizations including operators, regulatory agencies, and security agencies work together to ensure the security of the cargo. A major security challenge for international movement of nuclear and radioactive material is the need to use multiple transport modes. Ensuring security of these cargos as they move through intermodal facilities, some of which may take multiple hours, or days, depending on operational constraints at the yards, ports, or other facilities, is a major operational and regulatory challenge. Especially in the international context, ensuring the security of material in transport through in-transit countries and coordinating transport activities across jurisdictions can lead to challenges as to whose security plan controls, whose transport regulations are to be followed, and how might plans need to be adjusted to adapt to in-transit conditions and ultimately how to ensure cargo security. This paper introduces and highlights selected challenges in the multi-modal movement of nuclear and radioactive material in transport. While the paper will address selected challenges in coordination of stakeholders and resources, activities at intermodal facilities, and other selected issues, this does not address all the challenges, rather it brings issues forward and suggests solutions and strategies for enhancing the security of nuclear and radioactive material transported internationally.

Singley, Paul↗