Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “regulated river”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

October 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the October 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). At 64 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The October 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the sample collection at SWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

April 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the April 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The April 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The use of the LANDSAT data collection system and imagery in reservoir management and operation

The author has identified the following significant results. An increase in the data collection system's (DCS) ability to function in the flood control mission with no additional manpower was demonstrated during the storms which struck New England during April and May of 1975 and August 1976. It was found that for this watershed, creditable flood hydrographs could be generated from DCS data. It was concluded that an ideal DCS for reservoir regulation would draw features from LANDSAT and GOES. MSS grayscale computer printout and a USGS topographic map were compared, yielding an optimum computer classification map of the wetland areas of the Merrimack River estuary. A classification accuracy of 75% was obtained for the wetlands unit, taking into account the misclassified and the unclassified pixels. The MSS band 7 grayscale printouts of the Franklin Falls reservoir showed good agreement to USGS topographic maps in total area of water depicted at the low water reservoir stage and at the maximum inundation level. Preliminary analysis of the LANDSAT digital data using the GISS computer algorithms showed that the radiance of snow cover/vegetation varied from approximately 20 mW/sq cm sr in nonvegetated areas to less than 4 mW/sq cm sr for densely covered forested area.

Cooper, S.↗

Endangered and potentially endangered wildlife on John F. Kennedy Space Center and faunal integrity as a goal for maintaining biological diversity

Buffer zones for space operations provide for a wildlife diversity unsurpassed among most federal facilities in the continental U.S. demonstrating the coexistence possible with one of man's greatest technological achievements. This document ranks 119 resident or migratory wildlife species that are endangered or declining. The ranking system herein was based on species' vulnerability to extinction and the relevance of Kennedy Space Center (KSC) for maintaining populations in the U.S. and Florida. One amphibian, 19 reptiles, 80 birds, and 19 mammals were considered endangered or declining. KSC is an integral area for regional species diversity being the focus of the Merritt Island/Cape Canaveral/Turnbull Ecosystem which is part of the Indian River Lagoon watershed, an estuary of national significance. Many species that use this system also use the nearby St. Johns River Basin ecosystem. These two ecosystems are biological corridors between temperate Carolinian and tropical/subtropical Caribbean biotic provinces. Threats to biological diversity on KSC were also reviewed. Traditional environmental assessments, resulting from environmental regulation guidelines, focus on environmental contaminants and habitat lost due to construction. However, this review suggested that small population sizes, isolation of populations, ecosystem and habitat fragmentation, road mortality, and other edge effects may represent more critical threats to biological diversity than the traditional topics.

Breininger, David R.↗

Solar PV Water Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from bodies of water based on county ordinances as of April 2022. A setback requirement is a minimum distance from water that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a default setback of 30 meters was applied in counties without specific water setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Structure Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from structures based on county ordinances as of April 2022. A setback requirement is a minimum distance from a structure that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a default setback of 61 meters was applied in counties without specific structure setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Road Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from roads based on county ordinances as of April 2022. A setback requirement is a minimum distance from a road that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a default setback of 30 meters was applied in counties without specific road setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Characterizing the movements and habitat use of two fish species of concern in a regulated ecosystem

In freshwater ecosystems in the northwest United States, the distribution and movements of fish between their essential habitats are particularly impacted by the presence of hydroelectric dams. Bull Trout Salvelinus confluentus and Westslope Cutthroat Trout Oncorhynchus clarkii var. lewisi are two fish species of concern inhabiting the Pend Oreille River between Idaho and Washington states. The purpose of this study was to identify the behavior and habitat use of Bull Trout and Westslope Cutthroat Trout in the restricted area of the Pend Oreille River, downstream of Albeni Falls Dam (AFD), using a long-term radiotelemetry dataset. Between 2015 and 2018, 24 Bull Trout and 24 Westslope Cutthroat Trout were captured, tagged, and released downstream AFD. Among the fish tagged, 79% (n = 19 of 24) of Bull Trout and 67% (n = 16 of 24) of Westslope Cutthroat Trout were detected during the study period. Our results revealed movements of fish towards tributary confluences mostly in May, June, and July for both species with Bull Trout traveling longer distances than Westslope Cutthroat Trout. Although the sample size was limited, Bull Trout individual movements towards the dam suggested attempts to re-ascend the river, indicating the importance of restoring upstream connectivity.

Garavelli, Lysel↗

Two-Way Option Contracts That Facilitate Adaptive Water Reallocation in the Western United States

Many water markets in the western United States (U.S.) have the ability to reallocate water temporarily during drought, often as short-term water rights leases from lower value irrigated activities to higher value urban uses. Regulatory approval of water transfers, however, typically takes time and involves high transaction costs that arise from technical and legal analyses, discouraging short-term leasing. This leads municipalities to protect against drought-related shortfalls by purchasing large volumes of infrequently used permanent water rights. High transaction costs also result in municipal water rights rarely being leased back to irrigators in wet or normal years, reducing agricultural productivity. This research explores the development of a multi-year two-way option (TWO) contract that facilitates leasing from agricultural-to-urban users during drought and leasing from urban-to agricultural users during wet periods. The modeling framework developed to assess performance of the TWO contracts includes consideration of the hydrologic, engineered, and institutional systems governing the South Platte River Basin in Colorado where there is growing competition for water between municipalities (e.g., the city of Boulder) and irrigators. The modeling framework is built around StateMod, a network-based water allocation model used by state regulators to evaluate water rights allocations and potential rights transfers. Results suggest that the TWO contracts could allow municipalities to maintain supply reliability with significantly reduced rights holdings at lower cost, while increasing agricultural productivity in wet and normal years. Additionally, the TWO contracts provide irrigators with additional revenues via net payments of option fees from municipalities.

54 ENVIRONMENTAL SCIENCES↗

Solar PV Transmission Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from transmission. A setback requirement is a minimum distance from transmission infrastructure that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Railroad Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from railroads. A setback requirement is a minimum distance from a railroad that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Oil and Gas Pipeline Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from oil and gas pipelines. A setback requirement is a minimum distance from a pipeline that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Wind Turbine Water Setbacks: Ordinances (2022) and Extrapolated Trends, 115 Hub Height 170 Rotor Diameter

This dataset represents wind energy setback requirements from water based on existing county ordinances as of April 2022. A setback requirement is a minimum distance from water that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a median setback equivalent to 1.1 times the turbine tip-height was applied in counties that lacked specific water setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where wind energy is prohibited or permitted across the contiguous United States. The turbine parameters used were a hub-height of 115 meters and a rotor diameter of 170 meters, as obtained from the Annual Technology Baseline (ATB) 2022. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Wind Turbine Transmission Setbacks: Ordinances (2022) and Extrapolated Trends, 115 Hub Height 170 Rotor Diameter

This dataset represents wind energy setback requirements from transmission based on existing county ordinances as of April 2022. A setback requirement is a minimum distance from transmission infrastructure that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a median setback equivalent to 1.1 times the turbine tip-height was applied in counties that lacked specific transmission setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where wind energy is prohibited or permitted across the contiguous United States. The turbine parameters used were a hub-height of 115 meters and a rotor diameter of 170 meters, as obtained from the Annual Technology Baseline (ATB) 2022. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Wind Turbine Structure Setbacks: Ordinances (2022) and Extrapolated Trends, 115 Hub Height 170 Rotor Diameter

This dataset represents wind energy setback requirements from structures based on existing county ordinances as of April 2022. A setback requirement is a minimum distance from a structure that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a median setback equivalent to 2 times the turbine tip-height was applied in counties that lacked specific structure setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where wind energy is prohibited or permitted across the contiguous United States. The turbine parameters used were a hub-height of 115 meters and a rotor diameter of 170 meters, as obtained from the Annual Technology Baseline (ATB) 2022. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Wind Turbine Road Setbacks: Ordinances (2022) and Extrapolated Trends, 115 Hub Height 170 Rotor Diameter

This dataset represents wind energy setback requirements from roads based on existing county ordinances as of April 2022. A setback requirement is a minimum distance from a road that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a median setback equivalent to 1.1 times the turbine tip-height was applied in counties that lacked specific railroad setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where wind energy is prohibited or permitted across the contiguous United States. The turbine parameters used were a hub-height of 115 meters and a rotor diameter of 170 meters, as obtained from the Annual Technology Baseline (ATB) 2022. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Ecological Impacts of the Space Shuttle Program at John F. Kennedy Space Center, Florida

The Space Shuttle Program was one of NASAs first major undertakings to fall under the environmental impact analysis and documentation requirements of the National Environmental Policy Act of 1969 (NEPA). Space Shuttle Program activities at John F. Kennedy Space Center (KSC) and the associated Merritt Island National Wildlife Refuge (MINWR) contributed directly and indirectly to both negative and positive ecological trends in the region through the long-term, stable expenditure of resources over the 40 year program life cycle. These expenditures provided support to regional growth and development in conjunction with other sources that altered land use patterns, eliminated and modified habitats, and contributed to cultural eutrophication of the Indian River Lagoon. At KSC, most Space Shuttle Program related actions were conducted in previously developed facilities and industrial areas with the exception of the construction of the shuttle landing facility (SLF) and the space station processing facility (SSPF). Launch and operations impacts were minimal as a result of the low annual launch rate. The majority of concerns identified during the NEPA process such as potential weather modification, acid rain off site, and local climate change did not occur. Launch impacts from deposition of HCl and particulates were assimilated as a result of the high buffering capacity of the system and low launch and loading rates. Metals deposition from exhaust deposition did not display acute impacts. Sub-lethal effects are being investigated as part of the Resource Conservation and Recovery Act (RCRA) regulatory process. Major positive Space Shuttle Program effects were derived from the adequate resources available at the Center to implement the numerous environmental laws and regulations designed to enhance the quality of the environment and minimize impacts from human activities. This included reduced discharges of domestic and industrial wastewater, creation of stormwater management systems, remediation of past contamination sites, implementation of hazardous waste management systems, and creation of a culture of sustainability. Working with partners such as the USFWS and the St Johns River Water Management District (SJRWMD), wetlands and scrub restoration and management initiatives were implemented to enhance fish and wildlife populations at the Center. KSC remains the single largest preserve on the east coast of Florida in part due to NASAs commitment to stewardship. Ongoing Ecological Program projects are directed at development of information and knowledge to address future KSC management questions including the transition to a joint government and commercial launch facility, enhanced habitat management requirements for wetlands and scrub, potential impacts of emerging contaminants, and adaptation to climate change including projected sea level rise over the next 50-75 years.

Space Shuttle Program↗

Wind Turbine Railroad Setbacks: Ordinances (2022) and Extrapolated Trends, 115 Hub Height 170 Rotor Diameter

This dataset represents wind energy setback requirements from railroad based on existing county ordinances as of April 2022. A setback requirement is a minimum distance from a railroad that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a median setback equivalent to 1.1 times the turbine tip-height was applied in counties that lacked specific railroad setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where wind energy is prohibited or permitted across the contiguous United States. The turbine parameters used were a hub-height of 115 meters and a rotor diameter of 170 meters, as obtained from the Annual Technology Baseline (ATB) 2022. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗