Creation of Synthetic Electric Grids (SPP/MISO) Supporting PERFORM (Final Report)
Over the course of the project, two “realistic but not real” synthetic transmission-level grid models over the SPP-MISO and ERCOT footprints were created to provide more realistic data and increase the reliability and resiliency of the grids under a variety of scenarios. The synthetic ERCOT transmission grid is compatible with the distribution grid developed in collaboration with NREL. All generators are based on the EIA 860 data and a column with EIA plant code and Gen ID is added to generators of both grids so that they can be easily mapped. The improvements are also made to electric grids including N-1 contingencies with some remedial actions, improving the transmission lines to avoid lines in lakes, including an HVDC line to the SPP-MISO case, providing several generator parameters and their temporal constraints that were not included in EIA 860 form, generators’ cost curves, load offer curves, adding phase shifters and tap changers with impedance correction tables, adding reactive power control and partitioning the grids into active and reactive reserve zones and determine different types of the required reserve for each zone. Hourly load time series at the bus level were generated to create scenarios for solving power flow in different loading conditions. Weather measurement information and the models of renewable generators are used to directly include the impact of weather on the grids. Based on a variety of load and weather conditions the grids are improved to accommodate different conditions. The ERCOT 7k-bus grids were also modeled for the year 2030 with predicted improvements in renewable resources. The renewable generation model was also improved with historic weather data included. The impact of electric vehicles on the ERCOT grid is also modeled.