Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Final Seismic Shake Table Test Plan

The Spent Fuel Waste Disposition (SFWD) program is planning to conduct a full-scale seismic shake table test on the dry storage systems of spent nuclear fuel (SNF) to close the gap related to seismic loads on fuel assemblies in dry storage systems. This test will allow for quantifying the strains and accelerations on surrogate fuel assembly hardware and cladding during earthquakes of different magnitudes and frequency content. Full-scale testing is needed because a dry storage system is a complex and highly nonlinear system making it hard to predict (model) the responses to seismic excitations. The non-linearity arises from the multiple spatial gaps in the system – between fuel rods and the basket, between the basket and dry storage canister, between the dry storage canister and the storage cask (overpack), and ventilation gaps. The non-linearities pose significant limitations on the value of tests with scaled systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Software Quality Assurance Plan: Cardinal

The Cardinal Software Quality Assurance (SQA) Program aims to provide the controls and processes necessary to enable continuous, high-quality software development while meeting user and program sponsor requirements. This SQA Plan (SQAP) delineates the SQA Program framework for Cardinal by describing the Program activities, organization, and documentation, and by clearly defining the interconnection of all Program items. It should be noted that this SQAP is aligned with the current version of the Argonne Quality Assurance Program Plan, which was designed to align with DOE O 414.1D. This SQAP is also aligned with the revision 10 of the SQAP for MOOSE and MOOSE-based applications.

97 MATHEMATICS AND COMPUTING↗

Statistical Framework for Planning a Shelf Life Program with Binary Performance Data

This document outlines a statistical framework for establishing a shelf-life program for components whose performance is measured by a binary response, usually ‘pass’ or ‘fail.’ The approach applies to both single measurement devices and repeated measurement devices. The high-level objective of these plans is to quickly detect any sizeable increase in fraction defective as the product ages. The statistical approach is to choose a sample size and monitoring technique that alarms when the fraction defective increases to an unacceptably high level, but does not alarm when the process is at nominal. The nominal (acceptable) fraction defective is used, and an increased fraction defective (unacceptable) is assumed as part of the control chart design. The control chart recommended for this problem is the Bernoulli Cumulative Sum (CUSUM) control chart.

97 MATHEMATICS AND COMPUTING↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of a regional resource adequacy program on utility integrated resource planning: Study for the Western United States

LBNL collaborated with the Western Interstate Energy Board and the University of Texas, Austin to investigate the implications of a regional resource adequacy (RA) program on utility integrated resource planning. This report is focused on an active policy discussion to develop a novel voluntary program to share capacity resource and improve RA in the Western Interconnection. This report identifies two RA components of IRP that will be highly impacted by a regional RA program: resource capacity accreditation and RA targets. There are at least four resources that will require specific attention for their capacity credit calculation: (1) variable renewable resources, (2) demand-side resources, (3) hydropower, and (4) contracts. It will then be necessary to decide on a RA target reliability metric (e.g., a planning reserve margin) that is at least the minimum requirement in IRPs to ensure consistency in RA requirement calculations. The report finds that load forecasting and transmission expansion analyses will be moderately impacted, but that most of IRP components will not be significantly impacted. The report includes (i) a review of traditional resource adequacy practices in IRP; (ii) a case study of an existing regional RA program that interacts with IRP (Southwest Power Pool) and (iii) an overview of the NWPP regional resource adequacy proposal that is the object of this work. This paper does not (1) advocate for or against a regional RA program for the NWPP, (2) make detailed design recommendations for this program, or (3) assess its benefits and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

State Indicators for Advancing Demand Flexibility and Energy Efficiency in Buildings - Part I [Slides]

This slide deck report identifies objectives and key indicators for state activities that advance demand flexibility in buildings — legislation, utility regulatory proceedings, executive orders and programs. It also illustrates progress to date and identifies trends, gaps, and opportunities. Part I of the report focuses on (1) demand response and (2) energy efficiency targeted to reduce peak demand or integrate with demand response. This section covers building energy codes, appliance and equipment standards, resource standards, utility planning, utility programs, advanced metering infrastructure and meter data, rate design, state programs, state energy planning, and related state policies and regulations. Part II of the report addresses traditional energy efficiency indicators, including utility and state programs, codes, and standards that support annual energy savings. See the additional links for an infographic, library of cited state documents on demand flexibility, and presentation to the NASEO-NARUC Grid-Interactive Efficient Buildings Working Group.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Two-stage Stochastic Generalized Disjunctive Programming (GDP) Model for Proactive Planning and Reactive Operations of Resilient Power Systems under Disruptions

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Symposium: Quantum Theory, Quantum Materials, Quantum Computing (Final Report, DE-SC0022551)

Quantum mechanics is fundamental to understanding, predicting, and controlling many physical processes in a vast range of scientific and technological areas. In molecules and materials, the quantum mechanics of Coulombic many-body systems determines far more than the ground state and bulk properties. Quantum mechanics governs magnetism, electron and spin transport, chemical reactions and catalysis, superconductivity, photosynthesis, etc. Each plays a vital role in modern society. As digital technologies push both temporal and length-scale limits, fundamental quantum principles become the current focus for a new class of technologies: quantum computing, quantum sensing, quantum encryption, etc. This oncoming quantum information sciences wave is manifest recently in frontier foci of all six Department of Energy Office of Science programs. The Sanibel Symposium offers a proven, influential platform for facilitating and advancing cross-fertilization among theoretical and computational chemists and physicists, computer scientists, and materials engineers. The Symposia have a long, successful record of driving progress on theory and computation of materials, nanostructures, and their molecular constituents. The Symposia thus are well-suited for advancing the quantum information science thrust in the Office of Basic Energy Sciences (BES). With that QIS thrust as the focus, we propose five sessions of the 61st Sanibel Symposium on the theme Quantum Theory, Quantum Materials, Quantum Computing. From a longer perspective, this thematic program for 2022 is the second year of a five year plan of program segments addressed at challenges in quantum information sciences and quantum materials. The rest of the Symposium program will be of considerable relevance, with, for example, sessions on quantum molecular and material dynamics, and new directions in coupled cluster theory. New ideas for methods and applications can be expected to emerge from the stimulus of the formal presentations and informal discussions. The proposed award is targeted at students, post-docs, and junior scientists. Conscious effort, characteristic of the Sanibel Symposia, to stimulate the participation of women and under-represented minorities will continue.

36 MATERIALS SCIENCE↗

Analysis of US Industrial Assessment Centers (IACs) implementation

Industrial energy assessments are a fundamental action toward developing a decarbonization strategy at any level. They provide an understanding of where energy efficiency opportunities exist and help to make informed business decisions about the costs and benefits of implementing sustainable policies and practices. This paper examines the effectiveness of the Department of Energy's Industrial Assessment Centers Program at providing useful energy-efficiency audits as well as the barriers faced by the program and plans for future growth and improvement. This paper presents an analysis of the program between 1981 and 2022, covering 20,290 industrial assessments and 151,198 recommendations, with $2.6 billion of recommended savings. The analysis includes a breakdown of the IAC recommendations and implemented projects based on both the industrial subsectors according to the Standard Industrial Classification code, energy type, and systems evaluated. The results include a 47 % implementation rate, a gap analysis to understand the missed opportunities, and a discussion about reasons for recommendation rejection. A comparison of the IAC Program with other country-level energy auditing or assessment programs was conducted, and suggestions for improving implementation rates were mentioned.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Machine Learning Enabled Sensor Fusion for In-Situ Defect Detection in Laser Powder Bed Fusion

Laser Powder Bed Fusion (L-PBF) Additive Manufacturing (AM) is among the metal 3D printing technologies most broadly adopted by the manufacturing industry. The current industry qualification paradigm for critical-application L-PBF parts relies heavily on expensive non-destructive inspection techniques such as X-Ray Computed Tomography (XCT), which significantly limits the use-cases of L-PBF. In situ monitoring of the process promises a less expensive alternative to ex situ testing, but existing sensor technologies and data analysis techniques struggle to detect sub-surface flaws (e.g., porosity and cracking) on production-scale L-PBF printers. RTX Technologies Research Center (RTRC) has licensed ORNL’s Peregrine software package – a printer- and camera-agnostic data analytics tool designed specifically for detecting process anomalies using in situ data collected during powder bed printing. The goal of this project was to feed temporally rich, multi-modal sensor data, including visible light, integrated near infrared (NIR), and spatially mapped co-axial melt pool thermal emission data into Peregrine to enable detection of subsurface flaws. XCT data was used as ground truth training data to allow Peregrine’s deep learning algorithms to recognize anomalies in these complex data streams in both test artifacts and industrially relevant geometries. Completion of this program has seen the successful implementation of multi-modal, multi-layer sensor data footprints for training of machine learning models in Peregrine. Flaws detected in XCT data have been successfully detected directly from this in situ data footprint, and initial analyses of the in situ probability-of-detection has been conducted, showing performance levels commensurate with traditional non-destructive evaluation (NDE) methods. The in situ monitoring methodology was then applied to an industrially relevant component that was using post-build NDE, highlighting the utility of the proposed method for hard-to-inspect AM components. As a direct result of this program, two journal manuscripts [1], [2] have been published in Additive Manufacturing, with additional manuscripts planned following program completion.

36 MATERIALS SCIENCE↗

E2C Cohorts: Implementation Funding Projects - Impact Summary [Slides]

From August 2024 to October 2025, 11 Clean Cities and Communities coalitions supported projects to advance transportation goals by gathering input from local stakeholders, and using the resulting insights to develop new plans and programs for local partners. This effort leveraged information and best practices shared during the 2024 E2C Cohort on Integrating Community Priorities into Electric Vehicle Plans and Projects. These coalitions supported partners across the country to develop plans for electric vehicle integration through one-on-one technical assistance and tailored local engagement. This deck summarizes the individual projects completed by coalitions, and the overall reach and impact of all of this program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Complex Brownfields Case Study—The Former Bannister Federal Complex, Kansas City, Missouri

Abstract In November 2017, 225 acres (91 ha) of the former Bannister Federal Complex (BFC) in Kansas City, Missouri were transferred from the Federal Government to Bannister Transformation & Development, LLC (BTD), for demolition; environmental corrective measures; and preparation of the site for redevelopment. This presented a once‐in‐a‐lifetime opportunity to reconfigure groundwater remedies and address long‐standing soil contamination issues. The property included more than 40 previously‐identified Solid Waste Management Units, 3.9 million square feet (362,000 m 2 ) of buildings, subsurface utilities dating back to the 1940s, and an active groundwater containment system. Demolition of buildings and installation of an interim groundwater containment system began almost immediately after property transfer. In 2018, BTD substantially modified its project schedule to incorporate the construction of the first new buildings while demolition and remedial activities were ongoing. By October 2020, construction of the first new warehouse commenced while excavation and capping of contaminated soils, installation of a groundwater containment treatment systems, and abandonment of legacy utilities were still underway. Completion of this work, within the originally planned timeframe, was made possible by factors including up‐front multi‐year funding, early and ongoing engagement of regulators, an extended 3‐year due diligence program and planning stage, and establishment of well‐defined environmental targets. Both the soil and groundwater remedies were also designed with the flexibility needed to accommodate unknown conditions, changing schedules, and revisions to the regrading and redevelopment plans. This case study highlights key technical and management factors that led to the successful completion of this complex brownfields remediation project.

Water Resources↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators (2019)

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

Weatherization Assistance Program and Low Income Home Energy Assistance Program for Solar Survey Responses and Plan

This data contains the results of surveys given to Low Income Home Energy Assistance Program (LIHEAP)/Weatherization Assistance Program (WAP) administrators in 2022, 2023, and 2024, as well as spreadsheets coding states' annual LIHEAP and WAP plans from 2021, 2022, and 2023 for mentions of solar energy. This data is the second version of the original dataset which has been updated to include the most recent years of LIHEAP and WAP plans. The original version of the dataset is also part of this record but has been deprecated.

14 SOLAR ENERGY↗