Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power system models”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

PNNL-CIM-Tools/EASY-CIM

Extracting Attributes in a Simple DictionarY of CIM (EASY-CIM) is a python library to reduce the time and burden of model queries using simplified data representations of CIM power system models.

Anderson, Alex↗

1.2.2.404 – Improving the Representation of Hydropower in Production Cost Models

This project's goal is to improve hydropower's representation in power system models by actively coupling river basin (hydrologic) models with grid operations (production cost) models. Near term, this work provides a foundation that allows improved available flexibility and operational constraints representation. Longer term, the work will provide a template that can be used by commercial production cost modeling software vendors to capture the nuances of hydropower operations in their software offerings.

HYDRO ENERGY↗

A Data-Driven Algorithm for Enabling Delay Tolerance in Resilient Microgrid Controls Using Dynamic Mode Decomposition

The increased implementation of smart grid technologies in the power distribution grid presents unique opportunities that enable resiliency, but also brings challenges motivating needs for novel solutions and mitigation techniques. The bi-directional power and data flow allow for the grid to operate with increased resiliency, which is the ability to avoid discontinuity of service to end-use loads during extreme events. However, in applications where control of the distribution grid or microgrid relies on communication networks, the degradation of communication systems in the form of loss or high latency can cause maloperation and result in loss of end-use loads. Here this paper presents a novel framework to enable delay tolerance of centralized microgrid control schemes to mitigate communication system latency impacts and guarantee successful control action. We demonstrate the delay tolerance on a control scheme that operates a battery energy storage system (BESS) to offset the sudden loss of generation and maintain system frequency. During periods of severely degraded communication system performance, the proposed delay-tolerant algorithm compensates for the latency by utilizing a data-driven model generated at the device level using dynamic mode decomposition (DMD) to determine the performance of the communications. The DMD technique predicts the system’s frequency using device-level terminal measurements and provides updated control signals. The HELICS cosimulation platform evaluates the cyber-physical interaction of the power system model in GridLAB-D, the centralized control agent in Python, and the discrete network model in NS-3. The framework is tested and validated on the IEEE-123 node system modified to represent a networked remote microgrid model, and the results show an improvement in the dynamic performance

24 POWER TRANSMISSION AND DISTRIBUTION↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Enabling Data Exchange and Data Integration with the Common Information Model: An Introduction for Power Systems Engineers and Application Developers

The Common Information Model (CIM) is an open-source information model that is used to model an electrical network and the various equipment used on the network. CIM is widely used for data exchange of bulk transmission power systems and is finding increasing use for distribution systems. Use of a non-proprietary information model (such as CIM) that has been agreed upon and adopted by numerous utilities, vendors, and researchers allows significant reduction in the effort and cost of data integration. Likewise, adoption of open data platforms built around the CIM increases available functionalities for managing and optimizing the smart grid of the future. This report is intended as an introduction to CIM for utility engineers, power systems researchers, and application developers, providing a broad view of the CIM and how particular profiles can be adapted for various use cases. Unlike most other CIM introduction documents and the International Electrotechnical Commission (IEC) standards (which are mostly targeted to an audience of data scientists, enterprise database managers, and platform developers), this report is intended for users of traditional power systems analysis software and other readers without any prior experience with canonical information models, data profiles, or UML modeling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Inverter-Based Operation of Maui: Electromagnetic Transient Simulations

As larger and larger power systems approach and reach 100% inverter-based resource (IBR) operation during some hours of the year, questions arise regarding the stability of such extremely-high IBR power systems, the potential need for grid-forming (GFM) inverter technology, and the potential need for synchronous condensers. Relatedly, questions also arise about the ability of conventional positive sequence power system modeling tools to capture high-IBR system dynamics. This presentation introduces electromagnetic transient (EMT) simulations in PSCAD of the near-future (year 2023) Maui power system at and near 100% IBR operation and compares those simulations to positive sequence (PSSE) simulations. The Maui PSCAD model is parallelized on 30 cores and includes the entire transmission system (>200 three-phase buses), >170 individual and aggregate IBR models, four wind plants, and three synchronous generators plus six synchronous condensers at two locations. We investigate system stability with varying levels of inertia using conventional grid-following IBR controls, and then we investigate the impact of GFM controls on stability. Results suggest that: 1) positive sequence simulations can miss key dynamics in extremely high IBR cases; 2) EMT simulations can also miss key dynamics if inverter inner control dynamics are not modeled; 3) synchronous condensers can stabilize a system in which 100% of the energy is supplied by IBRs, even conventional grid-following IBRs; 4) GFM controls on just some of the IBRs can stabilize a 100% IBR power system, even if that system has zero inertia (i.e. no synchronous condensers, though synchronous condensers may be needed for other purposes such as protection system operations).

41 EE - Solar Energy Technologies Office (EE-4S)↗

Feeder Power Disaggregation: A Data-Efficient Matrix Completion Approach: Preprint

This paper presents a data-driven algorithm for the feeder power disaggregation problem in distribution systems. Leveraging spatio-temporal power patterns in residential homes, residential power is discomposed into three components: sparse-switching loads, periodic loads, and photovoltaic generation, using two sparse matrices and a rank-one matrix. The matrix completion process is data-efficient because of the matrix sparsity and low rankness, along with the use of power system models. The proposed approach is tested using real-world residential datasets on a 33-bus distribution system, demonstrating accurate power disaggregation with efficient matrix completion.

distribution system↗

Data-Driven Modeling of High-Resolution Residential Load Profiles Using Low-Resolution Smart Meter Measurements

Accurate and high-resolution residential load profiles are essential for power system modeling, demand response planning, and effective grid operation. As the energy sector moves towards a more actively managed distribution system, the ability to understand residential energy consumption at a minute-by-minute scale becomes increasingly critical. High-resolution load profiles provide key insights into demand patterns and user behavior, enabling grid operators to design more effective energy solutions; however, residential load measurements in the field are typically recorded at low resolutions, such as 15-60 minutes, which makes it hard to study the characteristics of different residential customers. This paper addresses these challenges by introducing a data-driven approach to generate realistic, high-resolution residential load profiles based on lowre-solution measurements and weather information. The proposed method retains the key features of the actual residential load measurements while offering appliance-level energy consumption details for each residential building. The results demonstrate the effectiveness of the proposed load profile generator, proving its capability to support utilities in optimizing residential energy management and ensuring a more reliable and resilient grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Feeder Power Disaggregation: A Data-Efficient Matrix Completion Approach

This paper presents a data-driven algorithm for the feeder power disaggregation problem in distribution systems. Leveraging spatio-temporal power patterns in residential homes, residential power is discomposed into three components: sparse-switching loads, periodic loads, and photovoltaic (PV) generation, which are characterized through the design of two sparse matrices and a low-rank matrix. The matrix completion process is data-efficient because of the matrix sparsity and low rankness, along with the use of power system models. The proposed approach is tested using real-world residential data set on a 33-bus distribution system, demonstrating accurate power disaggregation with efficient matrix completion.

distribution system↗

Analysis and design of DC-link capacitor in cascaded H-bridge multilevel active front-end converter

Medium-voltage grid-tied systems often use a cascaded H-bridge multi-level active front-end. In this converter, dc link bus capacitors play an important role in stabilizing the converter and enabling both active and reactive power injections. The present work provides analytical expressions for the capacitor current, which are essential for optimizing system design (especially capacitor size vs. lifetime). Then, the expression is incorporated into the grid connected bidirectional power system model. Consequently, this work contributes to the guiding principles to choose accurate dc link capacitor ratings against grid-side power delivery requirements. DC-link capacitors come with an expiration date which is dependent on the operating power and voltage values. Lack of information about the lifetime of the dc-link capacitor creates uncertainty in the duration of online operation of the converter, thus increasing the probability of a contingency outage. The lifetime of the capacitor can range from only a few seconds of online operation of the station due to under-sizing, to a compromised quality of power flowing through other solid state devices which may not have been designed for the transients that are caused by over-sizing of the dc-link capacitor. A better estimate of the lifetime of these capacitors can help maximize usage and maintain scheduled outages more efficiently, without disruption in service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connecting Minds: AI Use Cases to Bridge Power Systems and Large Language Models for Practical Applications

Recent advances in artificial intelligence (AI) and development of large language models (LLMs) present the opportunity to develop a new generation of power systems applications. In contrast with early power system AI applications based on structured numerical data, LLMs offer unique capabilities to perform logical reasoning using text documents, unstructured data, and application programming interface (API) calls to computational software. This paper seeks to bridge the knowledge gap between power systems engineers and LLM developers through a crosscutting explanation of use cases, characteristics, requirements, practical considerations from the perspectives of both LLM capabilities and industry needs. Specific focus is given to applications that can be realistically deployed by electric utilities. After introducing the architecture of LLMs and unique challenges of the power systems domain, this paper proposes twenty representative LLM applications grouped into categories of 1) power system operations, 2) asset management, 3) system planning and analytics, and 4) energy management and protection systems. Five use cases are presented within each category with descriptions of the motivation, objectives, approaches, example inputs / outputs, and benefits of each use case.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Computing is at the Forefront of a New “Moonshot” Revolutionizing the North American Power Grid

In the 50+ years since the first humans landed on the moon, computing has grown at breakneck speed. We are faced with another challenge that is just as daunting, and just as important to overcome-modernizing the North American electric power grid-and high-performance computing (HPC) systems with specialized software will be an important element in rising to this challenge. We describe at a high level how software developed in the ExaSGD project addresses this "moonshot" goal by utilizing exascale computing and a novel high performance solver software stack to support the mission of decarbonizing power grid operations in an environment of uncertain weather and climate. To reach the exascale benchmark the team has made a number of first-of-their-kind innovations, including novel method for stochastic optimization, fine grained parallel methods for modeling power systems, and GPU resident sparse numerical linear solvers.

17 WIND ENERGY↗

CIMantic Graphs

CIMantic Graphs (aka CIM-Graph) is a new python library developed by PNNL to reduce the burden of working with the Common Information Model. CIMantic Graphs takes a novel approach of building in-memory labeled property graphs for creating, parsing, and editing CIM power system models.

Anderson, Alexander↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimized allocation method of the VSC-MTDC system for frequency regulation reserves considering the cost

In recent years, the interconnection of asynchronous power grids through the VSC-MTDC system has been proposed and extensively studied in light of the potential benefits of economical bulk power exchanges and frequency regulation reserves sharing. This paper proposed an optimized allocation method for sharing frequency regulation reserves among the interconnected power systems and the corresponding frequency regulation control of the VSC-MTDC system under emergency frequency deviation events. Firstly, the frequency regulation reserve classification is proposed. In the classification, the available frequency response capacity reserves of each interconnection are divided into commercial reserves and regular reserves. While the commercial reserves are procured through long-term contracts, the regular reserves are purchased based on market prices of frequency regulation services. Secondly, based on the proposed frequency regulation reserve classification, a novel frequency regulation control is then introduced for the VSC-MTDC system. This control method could minimize the costs of the disturbed power grid for the needed frequency response supports from the other power grids. Simulation verifications are performed on a modified IEEE 39 bus system and a highly reduced power system model representing the North American grids. The simulation verification indicates that the developed frequency regulation control significantly reduced ancillary service costs of the disturbed power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗