Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Wide-area, real-time monitoring and visualization system

A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

47 OTHER INSTRUMENTATION↗

Wide-area, real-time monitoring and visualization system

A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Baseline Monitoring Data for the Remote-Handled Low-Level Waste Disposal Facility at Idaho National Laboratory

The purpose of this document is to summarize environmental monitoring data collected at the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility during the first four years of facility operations (FY 2019 through FY 2022). This summary provides a “baseline” condition for the facility, which can be used to distinguish contaminant releases from the RHLLW Disposal Facility from pre existing contamination as well as potential future releases from other sources (i.e., upgradient aquifer sources), as specified in the facility monitoring plan. Sufficient data has been collected over the first four years of operation of the RHLLW Disposal Facility to establish baseline conditions for future compliance monitoring of aquifer wells and performance monitoring of vadose zone lysimeters. Except for seven elevated tritium measurements from lysimeter HFEF-South believed to have been impacted by waste disposals, all data was deemed appropriate for establishing baseline concentrations. Monitoring of the aquifer detected indicator analytes gross alpha and gross beta and target analytes tritium and C-14. There were a few C-14 detections prior to an increase in the required detection level (RDL) after the first round of sampling. I-129 and Tc-99 were not detected above RDLs in aquifer samples. Lysimeter samples detected indicator analytes gross alpha and gross beta and target analyte tritium. Target analytes C-14, I-129, and Tc-99 were not detected above RDLs in lysimeter samples. Except for tritium, baseline concentrations of indicator and target analytes measured during the first four years of RHLLW facility operations are expected to represent conditions through the expected 20 year operating period of the facility. Elevated tritium in the aquifer, a result of past discharges of tritium at upgradient facilities, showed a decline over the first four years of operations, and levels are expected to continue to decline with time as a result of dilution and decay. Current tritium levels in lysimeter samples may be elevated due to tritium in the water applied during construction and infiltration testing of the facility. As a result, tritium concentrations in lysimeters may decline with time as a result of dilution and decay. Statistical measures (i.e., mean, standard deviation, and 99% upper confidence level [UCL]) were calculated for all detected analytes using the four years of concentration data. These measures will be used to evaluate future monitoring results and to demonstrate the facility is performing, or not performing, as established in the facility performance assessment (PA). Future monitoring results will also be combined with the baseline data in this report to further establish temporal trends and natural variability in the measurements. Based on the data collected during the baseline period, it is recommended the gross alpha action level for performance monitoring increase from 10 to 20 pCi/L due to several baseline measurements exceeding the preliminary action level of 10. An action level of 20 pCi/L is slightly greater than the 99% UCL, is protective of the aquifer, and would reduce unnecessary sampling. It is also recommended that tritium be added to the lysimeter analyte list for post-baseline period monitoring. Tritium, while not a dose concern, is a good tracer that can provide valuable information on water flow in and around the RHLLW Disposal Facility. Recommendations for a tritium action level are provided if considered necessary.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of zion comparative analysis project for assessment of Boral{sup R} neutron absorber material performance and monitoring in spent fuel pools - 14618

Neutron absorber materials are used in spent fuel pool (SFP) storage racks to control reactivity. In the United States, about half of the operating plants currently use BORAL{sup R} neutron absorber material in SFP racks. Although operational experience spanning more than 25 years has not shown any loss of the BORAL{sup R} core material, corrosion effects, including blisters and pits, have been observed and reported. To improve understanding for the behavior of BORAL{sup R} in SFPs and evaluate the performance of monitoring approaches, EPRI initiated the Zion comparative analysis project in 2014. The Zion project involves three phases. During the first phase of the project, in situ measurements were performed on selected SFP rack panels in December 2014. Panels for in situ measurements were selected after an extensive analysis of each panel in the pool to ensure that the selected panels represented the pool in terms of variation in neutron and gamma dose values. As part of the second phase of the project, the remaining 10 coupons from the Zion SFP were shipped to a Penn State University (PSU) laboratory for analysis in January 2015. During the final phase of the project, a subset of the panels for which in situ measurements were performed will be harvested from the Zion SFP, cut into samples, and analyzed at PSU. The overall scope of this project will allow comparison of in situ measurements to real panel data as well as data obtained from coupon analysis. In this paper, an overview of the Zion comparative analysis project, the criteria and procedure for panel selection for in situ measurements and harvesting, preliminary coupon analysis results and in situ measurement results are presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring the Performance of an Alternative Landfill Cover at the Monticello, Utah, Uranium Mill Tailings Disposal Site

The U.S. Department of Energy Office of Legacy Management (DOE) and the U.S. Environmental Protection Agency (EPA) collaborated on the design and monitoring of an alternative cover for the Monticello uranium mill tailings disposal cell, a Superfund site in southeastern Utah. Ground-water recharge is naturally limited at sites like Monticello where thick, fine-textured soils store precipitation until evaporation and plant transpiration seasonally return it to the atmosphere. The cover at Monticello uses local soils and a native plant community to mimic the natural soil water balance. The cover is fundamentally an evapotranspiration (ET) design with a capillary barrier. A 3-hectare drainage lysimeter was embedded in the cover during construction of the disposal cell in 2000. The lysimeter consists of a geo-membrane liner below the capillary barrier that directs percolation water to a monitoring system. Soil water storage is determined by integration of point water content measurements. Meteorological parameters are measured nearby. Plant cover, shrub density, and leaf area index (LAI) are monitored annually. The cover performed well over the 7-year monitoring period (2000-2007). The cumulative percolation was 4.2 mm (0.6 mm yr{sup -1}), satisfying an EPA goal of an average percolation of <3.0 mm yr{sup -1}. Almost all percolation can be attributed to the exceptionally wet winter and spring of 2004-2005 when soil water content slightly exceeded the water storage capacity of the cover. The diversity, percent cover, and LAI of vegetation increased over the monitoring period, although the density of native shrubs that extract water from deeper in the cover has remained less than revegetation targets. DOE and EPA are applying the monitoring results to plan for long-term surveillance and maintenance and to evaluate alternative cover designs for other waste disposal sites. (authors)

54 ENVIRONMENTAL SCIENCES↗

Monitoring and Commissioning Verification Algorithms for CHP Systems

This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

20 FOSSIL-FUELED POWER PLANTS↗

Aging Infrastructure: Application of System Health Monitoring at the Defense Waste Processing Facility - 16069

The disposition of high level waste (HLW) into borosilicate glass canistered waste forms began at SRS in 1996. Since that time, the Defense Waste Processing Facility (DWPF) has produced nearly four thousand HLW canisters. The DWPF is now approaching 20 years of radioactive service and 25 years of operation since the commencement of nonradioactive testing in 1990. Many facility systems are challenged by equipment or component obsolescence, which places a premium on proper work planning, engineering, and maintenance resource allocation to ensure facility reliability. To this end, Savannah River Remediation (SRR) implements programs and procedures for performance monitoring of structures, systems, and components (SSCs) within all of its processing facilities. As these programs have matured, they have helped to identify vulnerabilities within facility systems and provided a framework for ranking system assets to ensure correct priority is established and maintained. This paper provides an overview of how SRR structures and implements system performance monitoring with specific focus on the recent replacement of the DWPF Safety Grade Purge Flowmeters. This case study will discuss: 1) How the performance monitoring process identified an availability risk due to the minimal vendor support for the in-use flow transmitters, 2) The design changes developed as part of the project to transition to a different measurement technology, which includes operational lessons learned from the original installation, 3) The execution of the replacement effort, which was complicated by the fact that the purge system is a Vital Safety System (VSS) and not easily taken out of service for extended maintenance, and 4) The need to consider future maintainability, particularly given that continued acceleration in technical innovation will likely increase the frequency of equipment obsolescence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Understanding and Analysis for Exascale Data Management Workflows

The goal of the Exascale Data Management Workflows project is to create tools to support techniques for in-situ data analysis and data management. Online data management co-running with simulations accelerates the scientific processes being carried out, provides rapid and timely scientific insights, and can help avoid unnecessary and scientifically invalid simulation computations, particularly when combined with or able to utilize data from experimental instrument and/or from past simulation runs. The University of Oregon team is contributing to the performance instrumentation and analysis aspect of this project. Our focus has been on efficient performance monitoring of data management at scale. The general approach of the MONA project is depicted in Figure 1 below. The figure shows performance monitoring applied to an I/O workflow associated with a scientific simulation, with online measurements captured from this workflow informing methods for workflow reconfiguration and dynamic adjustment. The goal is to maintain suitable levels of Quality of Service for workflow execution, by understanding the under lying causes of workflow performance and behavior. One outcome is workflow performance models able to characterize realistic workflows. Another outcome is performance ’mini-apps’ implementing such workflow behavior. Out of scope for this project are advanced methods for online workflow control.

97 MATHEMATICS AND COMPUTING↗

Correlation analysis on real-time tab-delimited network monitoring data

End-End performance monitoring in the Internet, also called PingER is a part of SLAC National Accelerator Laboratory’s research project. It was created to answer the growing need to monitor network both to analyze current performance and to designate resources to optimize execution between research centers, and the universities and institutes co-operating on present and future operations. The monitoring support reflects the broad geographical area of the collaborations and requires a comprehensive number of research and financial channels. The data architecture retrieval and methodology of the interpretation have emerged over numerous years. Analyzing this data is the main challenge due to its high volume. Finally, by using correlation analysis, we can make crucial conclusions about how the network data affects the performance of the hosts and how it depends from countries to countries.

97 MATHEMATICS AND COMPUTING↗

Performance and Compliance Monitoring - Different Objectives and Different Interpretation - 19109

Environmental surveillance and monitoring are a critical part of an overall strategy for protection of the public and environment. For site closure and disposal activities, monitoring and surveillance can be expected to continue many years into the future. In the case of environmental monitoring, two general types are commonly discussed: compliance and performance (or functional) monitoring. The objective of compliance monitoring is relatively clear. Compliance monitoring is conducted to demonstrate compliance with specific regulatory limits (e.g., maximum contaminant levels in groundwater). In this case, if your measurement is above these values, it is a regulatory concern. Monitoring can be especially challenging for engineered solutions involving robust barriers expected to last for decades or potentially hundreds or thousands of years. Although some gradual releases are expected to occur as barriers lose effectiveness, observable changes in groundwater are likely to be very small and may be delayed for very long times. For robust engineered systems, compliance in the near future is not expected to be a significant concern. The question becomes, what type of monitoring can be used to identify the potential for a compliance problem in the future? This has led to increasing use of performance monitoring as an early warning system. Rather than comparing against environmental standards, performance monitoring is compared against assumptions and results from a performance assessment. Performance monitoring is used to observe other potential indicators of changes in system behavior (vadose zone concentrations, changes in chemistry near the waste, changes in engineered features). Translating a change in a local measurement to a potential change in the concentration in an aquifer that would lead to a potential compliance concern in the future is a significant challenge for performance monitoring. Such monitoring needs to be more carefully interpreted and communicated than compliance monitoring. Considerations for implementation of performance monitoring are the focus of this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining a location and size of a gas source with a spectrometer gas monitor

A process for determining a location and size of a gas source within an area with a spectrometer gas monitor includes: providing the spectrometer gas monitor; performing fence line monitoring of the area with the spectrometer gas monitor; collecting spectroscopic data over multiple open paths around the area with the spectrometer gas monitor; measuring atmospheric conditions along gas inflows and gas outflows of the area; subtracting a background for a selected gas from the spectroscopic data; applying a boundary constraint to the spectroscopic data; determining an atmospheric concentration of air entering the area; applying bootstrapping to the spectroscopic data; applying zero minimum elimination to the spectroscopic data; and producing inversion data from the spectroscopic data to determine the location and size of the gas source within the area.

03 NATURAL GAS↗

CRITICAL RADIONUCLIDE AND PATHWAY ANALYSIS FOR THE SAVANNAH RIVER SITE

This report is an update to the analysis, Assessment of SRS Radiological Liquid and Airborne Contaminants and Pathways, that was performed in 1997. An electronic version of this large original report is included in the attached CD to this report. During the operational history (1954 to the present) of the Savannah River Site (SRS), many different radionuclides have been released to the environment from the various production facilities. However, as will be shown by this updated radiological critical contaminant/critical pathway analysis, only a small number of the released radionuclides have been significant contributors to potential doses and risks to offsite people. The analysis covers radiological releases to the atmosphere and to surface waters, the principal media that carry contaminants offsite. These releases potentially result in exposure to offsite people. The groundwater monitoring performed at the site shows that an estimated 5 to 10% of SRS has been contaminated by radionuclides, no evidence exists from the extensive monitoring performed that groundwater contaminated with these constituents has migrated off the site (SRS 2011). Therefore, with the notable exception of radiological source terms originating from shallow surface water migration into site streams, onsite groundwater was not considered as a potential exposure pathway to offsite people. In addition, in response to the Department of Energy's (DOE) Order 435.1, several Performance Assessments (WSRC 2008; LWO 2009; SRR 2010; SRR 2011) and a Comprehensive SRS Composite Analysis (SRNO 2010) have recently been completed at SRS. The critical radionuclides and pathways identified in these extensive reports are discussed and, where applicable, included in this analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hybrid Analytics Solution to Improve Coal Power Plant Operations

This project focused on developing advanced methods for thermal performance monitoring of a coal-fueled power plant. The specific goal was to develop and demonstrate a new thermal performance monitoring approach using a hybrid model that integrates a physics-based heat balance model with a machine learning-based pattern recognition model. The hybrid model enables increased accuracy and scope of the thermal analysis and an improved ability to monitor and detect changes in plant operation. This new approach takes full advantage of the individual model capabilities and creates an important new set of capabilities not previously possible using the two types of models separately. Using the heat balance model, a rich set of derived parameters (virtual sensors) are calculated from the measured plant operating data at each time point. The combined measured and derived data values are used by machine learning algorithms to create pattern recognition models over the range of normal unit operation. To create the monitoring models, historical data from normal operation of the plant is first processed by the heat balance model to compute the derived parameter data. The result is a greatly expanded set of normal operating data that can be used as input to create the pattern recognition model. Once the models are calibrated for normal operation, the hybrid model is suitable for use in continuous online monitoring. During online monitoring, new plant operating data is processed first by the heat balance model and then by the pattern recognition model. Results from the pattern recognition model quantify the deviation of each measured or derived parameter from its expected value in normal operation. The hybrid models can detect abnormal changes in plant operating data with very high accuracy and sensitivity. When abnormal behavior is detected, alerts are generated automatically for evaluation by the plant monitoring staff. The new hybrid solution product was developed and verified in the performance of the project. The hybrid solution was tested first in a simulation environment that mimicked the plant data systems and infrastructure used by U.S. power generating plants and utilities. The hybrid solution was then deployed for real-time, online monitoring of an operating coal-fueled power plant at a field test site. Field testing demonstrated that all hybrid solution development objectives were accomplished. The project work was based on combining the capabilities of two existing software products to create the new hybrid solution product. One of these was the existing MapEx® heat balance product and the other was the existing SureSense® advanced pattern recognition product. Each of these separate products was assessed to be at a Technology Readiness Level (TRL) of 9 at the start of the effort. The hybrid solution product was assessed to be at a TRL of 2 at the start of the project based on early feasibility work by the project team. At completion of the field testing performed in the project, the hybrid solution product was assessed to be at a TRL of 7. The project team expects that the hybrid solution product will be deployed commercially and will achieve a TRL of 9 within one year after completion of the project.

01 COAL, LIGNITE, AND PEAT↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗