Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Waste Isolation Pilot Plant Annual Site Environmental Report for 2014. Emended

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2014 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year (CY); Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE environmental sustainability goals made through implementation of the WIPP Environmental Management System (EMS).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar, Wind, and Load Forecasting Dataset for MISO, NYISO, and SPP Balancing Areas

The Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program is an initiative intended to foster "a fundamental shift in grid management rooted in an understanding of asset risk and system risk" (ARPA-E 2020). Launched by the Advanced Research Projects Agency-Energy (ARPA-E), the program supports efforts to incorporate uncertainty in electric power decision making. In support of PERFORM, the National Renewable Energy Laboratory (NREL) has produced a set of time-coincident forecasts of solar, wind, and load profiles. As part of Phase I of the PERFORM effort, NREL created a dataset that consists of one year of time-coincident load, wind, and solar actuals and probabilistic forecasts based on data from the Electric Reliability Council of Texas (ERCOT) (Bryce et al. 2023). In Phase II, NREL developed similar datasets for three other U.S. Independent System Operators (ISO): the Midcontinent Independent System Operator (MISO), the New York Independent System Operator (NYISO), and the Southwest Power Pool (SPP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2009 Site Environmental Report

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

54 ENVIRONMENTAL SCIENCES↗

High Performance Computing Systems Tools, Visualization, and Management

High Performance Computing (HPC) systems are complex setups of servers, storage devices, network switches, and cables that are specifically designed to accommodate hundreds of users running highly computationally intensive applications at a time. These applications require numerous softwares, licenses, and various levels of storage as well. All of these resources must be monitored and managed by HPC administrators, which presents a daunting task. In this project, I created numerous software tools as part of an HPC Visualization and Management system, which is now used by HPC administrators on a daily basis.

97 MATHEMATICS AND COMPUTING↗

2010 Site Environmental Report

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report. BNL is operated and managed for DOE's Office of Science by Brookhaven Science Associates (BSA), a partnership formed by Stony Brook University and Battelle Memorial Institute. For more than 60 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory's motto, 'Exploring Life's Mysteries...Protecting its Future,' and its Environmental, Safety, Security and Health Policy reflect the commitment of BNL's management to fully integrate environmental stewardship into all facets of its mission and operations.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Quarterly Occurrence Analysis - 1st Quarter FY 2016

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 74 reportable events (16 from the 1st Qtr FY-16 and 58 from the prior three reporting quarters), as well as 35 other issue reports (including events found to be not reportable and Significant Category A and B conditions) identified at INL during the past 12 months (15 from this quarter and 20 from the prior three quarters).

99 GENERAL AND MISCELLANEOUS↗

Idaho National Laboratory Quarterly Occurrence Analysis - 3rd Quarter FY-2016

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 73 reportable events (23 from the 3rd Qtr FY-16 and 50 from the prior three reporting quarters), as well as 45 other issue reports (including events found to be not reportable and Significant Category A and B conditions) identified at INL during the past 12 months (16 from this quarter and 29 from the prior three quarters).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Covenant Deferral Request for the Proposed Transfer of Land Parcel ED-8 at the East Tennessee Technology Park, Oak Ridge, Tennessee - Final - May 2009

The United States Department of Energy (DOE) is proposing to transfer a land parcel (hereinafter referred to as 'the Property') designated as Land Parcel ED-8 at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, by deed, and is submitting this Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and applicable U. S. Environmental Protection Agency (EPA) guidance. The Oak Ridge Reservation (ORR), which includes ETTP, was placed on the National Priorities List (NPL) in November 1989. Environmental investigation and cleanup activities are continuing at ETTP in accordance with CERCLA, the National Contingency Plan (NCP), and the Federal Facility Agreement (FFA). The FFA was entered into by the DOE-Oak Ridge Office (ORO), EPA Region 4, and the Tennessee Department of Environment and Conservation (TDEC) in 1991. The FFA establishes the schedule and milestones for environmental remediation of the ORR. The proposed property transfer is a key component of the Oak Ridge Performance Management Plan (ORPMP) for accelerated cleanup of the ORR. DOE, using its authority under Section 161(g) of the Atomic Energy Act of 1954 (AEA), proposes to transfer the Property to Heritage Center, LLC, a subsidiary of the Community Reuse Organization of East Tennessee (CROET), hereafter referred to as 'Heritage Center.' CROET is a 501(c)(3) not-for-profit corporation established to foster the diversification of the regional economy by re-utilizing DOE property for private-sector investment and job creation. The Property is located in the southern portion of ETTP and consists of approximately 84 acres proposed as the potential site for new facilities to be used for office space, industrial activities, or other commercial uses. The parcel contains both grassy fields located outside the ETTP 'main plant' area and infrastructure located inside the 'main plant' area. No buildings are included in the proposed ED-8 transfer. The buildings in ED-8 have already been transferred (Buildings K-1007, K-1580, K-1330, and K-1000). These buildings are not included in the transfer footprint of Land Parcel ED-8. A number of temporary structures, such as trailers and tents (non-real property), are located within the footprint. These temporary structures are not included in the transfer. DOE would continue to be responsible for any contamination resulting from DOE activities that is present on the property at the time of transfer but found after the date of transfer. The deed transferring the Property contains various restrictions and prohibitions on the use of the Property that are subject to enforcement pursuant to State Law Tennessee Code Annotated (T.C.A.) 68-212-225 and state real property law. These restrictions and prohibitions are designed to ensure protection of human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

Brookhaven National Laboratory 2008 Site Environment Report Volume 1

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in this volume in Chapter 7, Groundwater Protection. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report.

54 ENVIRONMENTAL SCIENCES↗

Palo Alto Research Center - Smart Embedded Network of Sensors with an Optical Readout

PARC is developing new fiber optic sensors that would be embedded into batteries to monitor and measure key internal parameters during charge and discharge cycles. Two significant problems with today's best batteries are their lack of internal monitoring capabilities and their design oversizing. The lack of monitoring interferes with the ability to identify and manage performance or safety issues as they arise, which are presently managed by very conservative design oversizing and protection approaches that result in cost inefficiencies. PARC's design combines low-cost, embedded optical battery sensors and smart algorithms to overcome challenges faced by today's best battery management systems. These advanced fiber optic sensing technologies have the potential to dramatically improve the safety, performance, and life-time of energy storage systems.

25 ENERGY STORAGE↗

ExMC Digital Engineering

Future missions beyond Artemis II will become increasingly complex as multiple vehicles (e.g., Gateway, Human Landing System (HLS), and Extravehicular Activity and Human Surface Mobility Program (EHP)), each having their own Program requirements and other associated documentation, which will need to be integrated into a single mission. Currently, the Human Health and Performance Directorate (HHPD)Program Support Teams mostly use documents to manage, perform, and archive their analyses. Identifying an opportunity for efficiency, ExMC demonstrated the ability to utilize MagicDraw, a Model-Based Systems Engineering (MBSE) tool, as a requirements database with traceability, dependencies, and relationships in one place. Rather than existing in documents, emails, and historical knowledge, ExMC pursued a Digital Engineering (DE) effort in coordination with HHPD by combining MBSE tools with other digital platforms to manage and develop user-defined databases and interfaces. This DE approach is aimed to simplify processes and reduce risk through the unification of requirements into a centralized digital network, improving collaboration, decision-making, and transparency compared to isolated documents and knowledge. However, manipulating data views and content in MagicDraw requires a steep learning curve not needed by all users and even the user-friendly web view comes with downsides due to the static views. To provide a more dynamic user interface, ExMC investigated the use of Microsoft Power Platform which does not require as steep of a learning curve to become proficient. This introduces analytics to the DE infrastructure, offering customizable and dynamic data dashboards. ExMC continues developing these dashboards and tailoring the DE infrastructure in alignment with HHPD workforce needs.

M Krihak↗

Site Environmental Report for 2009, Volume I

Each year, the University of California (UC), as the managing and operating contractor of the Ernest Orlando Lawrence Berkeley National Laboratory, prepares an integrated report regarding its environmental programs to satisfy the requirements of United States Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting.1 The Site Environmental Report for 2009 summarizes Berkeley Lab's environmental management performance, presents environmental monitoring results, and describes significant programs for calendar year (CY) 2009. Throughout this report, 'Berkeley Lab' or 'LBNL' refers both to (1) the multiprogram scientific facility the UC manages and operates on the 202-acre university-owned site located in the hills above the UC Berkeley campus, and the site itself, and (2) the UC as managing and operating contractor for Ernest Orlando Lawrence Berkeley National Laboratory. The report is separated into two volumes. Volume I is organized into an executive summary followed by six chapters that contain an overview of LBNL, a discussion of its environmental management system (EMS), the status of environmental programs, summarized results from surveillance and monitoring activities, and quality assurance (QA) measures. Volume II contains individual data results from surveillance and monitoring activities. The Site Environmental Report is distributed by releasing it on the World Wide Web (Web) from the Berkeley Lab Environmental Services Group (ESG) home page, which is located at www.lbl.gov/ehs/esg/. Many of the documents cited in this report also are accessible from the ESG Web page. Links to documents available on the Web are given with the citations in the References section. CD and printed copies of this Site Environmental Report are available upon request. The report follows Berkeley Lab's policy of using the International System of Units (SI), also known as the metric system of measurements. Whenever possible, results are also reported using the more conventional (non-SI) system of measurements, because the non-SI system is referenced by several current regulatory standards and is more familiar to some readers. Two tables are provided at the end of the Glossary to help readers: Table G-1 defines the prefixes used with SI units of measurement, and Table G-2 provides conversions to non-SI units. Years mentioned in this report refer to calendar years unless specified as fiscal year(s). Berkeley Lab's fiscal year (FY) is October 1 to September 30, and begins in the year previous to its name, i.e., FY 2009 was from October 1, 2008, to September 30, 2009. For ease of reference, a key to acronyms and abbreviations used in this report can be found directly after the text, at the end of Chapter 6. Following that is also a glossary for readers who may be unfamiliar with some of the terms used in this report. This report was prepared under the direction of Ron Pauer of ESG. Please address any questions regarding this report to him by telephone at 510-486-7614, or by e-mail at ropauer@lbl.gov. The primary contributors were David Baskin, Tim Bauters, Ned Borglin, Robert Fox, John Jelinski, Ginny Lackner, Patrick Thorson, Linnea Wahl, and Suying Xu (Volume II). Readers are encouraged to comment on this report by completing the survey form found at the ESG Web page where this report is available.

57↗

Risk Assessment/Management Tool

RAMTool performs the following: • A tool to perform facility and programmatic risk assessments, produce risk registers, develop risk management plans (RMPs), link risks to improvement/risk-reduction projects, and actively manage risks • Ability to conduct risk assessments. Ease of determination of probability and consequence based on industry standard risk matrices. Complies with site risk management performance document. Provides multiple outputs/report for required risk forms. Conduct quick risk data analysis. • Performs/calculates a facility risk factor (RF) and a programmatic RF. Supports project and initiative prioritization and funding in order to make solid decisions on risk reduction. Assigns responsibility and accountability at a risk owner (RO) level. Monitors and tracks progress toward completing mitigation strategies. Ability to import massive amounts of data at the push of a button. Integrates development of a Risk Management Plan (RMP) Built for ease-of-use – design, built, and used by technical/management personnel. Can be customized (functions and/or reports) for further analysis

Carlos Castillo, Jerel Nelson↗

Metrics for border management systems.

There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Knowledge-based network operations

An expert system for enhancing the operability of the ground communication element of the Jet Propulsion Laboratory's Deep Space Network is described. The system performs network fault management, configuration management, and performance management in real time. Extracted management information serves as input to the expert system and is used to update a management information data base. The monitor and control activities involve dividing software for each processor into layers which are each modeled as a finite state machine.

Wu, Chuan-Lin↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2025

The U.S. Department of Energy (DOE) requires the performance assessment (PA) (Department of Energy Idaho Operations Office [DOE-ID] 2018a), composite analysis (CA) (DOE-ID 2012), and CA addendum (DOE-ID 2018b) for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility at the Idaho National Laboratory (INL) Site shall be maintained to evaluate changes that could affect the performance, design, and operating basis for the facility (DOE Manual 435.1-1 Change 3, “Radioactive Waste Management Manual,” Section IV.P. [4]). The RHLLW Disposal Facility became operational in September 2018 after the completion of operational readiness activities required by DOE Order 425.1D, “Verification of Readiness to Start Up or Restart Nuclear Facilities,” and the issuance of the startup authorization by the Startup Approval Authority (Boston 2018). The first waste disposals at the RHLLW Disposal Facility began in Fiscal Year (FY) 2019. In Fiscal Year (FY) 2025, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. This FY 2025 annual summary report (ASR) documents the continued adequacy of the PA, CA, operating disposal authorization statement (ODAS) (ODAS 2018), ODAS technical-basis documents, and the radioactive waste management basis (RWMB) (INL 2024a) to meet DOE Order 435.1, “Radioactive Waste Management,” performance objectives for the RHLLW Disposal Facility. Annual review of the adequacy of the PA and CA at the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of DOE Order 435.1.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

UK and Italian EIA systems: A comparative study on management practice and performance in the construction industry

This study evaluates and contrasts the management practice and the performance that characterise Environmental Impact Assessments (EIA) in Italy and in the UK. The methodology relies on the investigation of six carefully selected case studies, critically reviewed by referring to EIA and project design information, as well as collecting the opinion of key project participants. The study focuses on the construction industry and on specific key sectors like infrastructure for transport and renewable energy and commercial and tourism development. A main term of reference for the analyses has been established by critically reviewing international literature so as to outline common good practice, requirements for the enhancement of sustainability principles and typically incurred drawbacks. The proposed approach enhances transfer of knowledge and of experiences between the analyzed contexts and allows the provision of guidelines for practitioners. Distinctive differences between the UK and the Italian EIA systems have been detected for pivotal phases and elements of EIA, like screening, scoping, analysis of alternatives and of potential impacts, definition of mitigation strategies, review, decision making, public participation and follow up. - Highlights: Black-Right-Pointing-Pointer The Italian and the UK Environmental Impact Assessment systems are compared. Black-Right-Pointing-Pointer The research is centred on the construction industry. Black-Right-Pointing-Pointer Issues and shortcomings are analysed by investigating six case studies. Black-Right-Pointing-Pointer Integration of EIA with sustainability principles is appraised. Black-Right-Pointing-Pointer General guidelines are provided to assist practitioners in the two national contexts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗