Approximate methods in electric propulsion mission analysis
Approximate methods in electric propulsion missions such as lunar orbiter lander
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Approximate methods in electric propulsion missions such as lunar orbiter lander
The NASA Langley Research Center vehicle design evaluation program (VDEP-2) was expanded by (1) incorporating into the program a capability to conduct preliminary design studies on subsonic commercial transport type aircraft using both JP and such alternate fuels as hydrogen and methane;(2) incorporating an aircraft detailed mission and performance analysis capability; and (3) developing and incorporating an external loads analysis capability. The resulting computer program (VDEP-3) provides a preliminary design tool that enables the user to perform integrated sizing, structural analysis, and cost studies on subsonic commercial transport aircraft. Both versions of the VDEP-3 Program which are designated preliminary Analysis VDEP-3 and detailed Analysis VDEP utilize the same vehicle sizing subprogram which includes a detailed mission analysis capability, as well as a geometry and weight analysis for multibodied configurations.
The Space Station Polar Orbiting Platform will be a serviceable spacecraft supporting a range of missions. The planning and analysis of these missions is investigated. The subjects of STS compatibility, rendezvous strategy, and requisite launch windows are addressed. General, as well as, two specific cases are detailed with respect to their incremental velocity requirements.
The Mars Surface Penetrator mission was designed to provide a capability for multiple and diverse subsurface science measurements at a low cost. Equipment required to adapt the Pioneer Venus spacecraft for the Mars mission is described showing minor modifications to hardware. Analysis and design topics which are similar and/or identical to the Pioneer Venus program are briefly discussed.
Explore the source record for details and available documents.
Mission and planetary vehicles characteristics affecting design of solid propellant motors and thrust vector control systems in planetary orbiters and landers
An investigation of the shuttle orbital maneuvering system (OMS) pressure-volume-temperature (P-V-T) propellant gaging module has revealed that the gaging errors due to the combined effects of random instrumentation measurement errors, propellant loading uncertainties, and simplifying assumptions in the software are non-linear over the range of the usable propellant quantity gage (0-100%), with the largest error being at the zero point. When the OMS propellant tanks in the orbiter vehicle pods are filled to contain 100% of the maximum usable propellant, the gaging error at the zero point was determined to be 9.5% for the fuel and 9.5% for the oxidizer. When the OMS propellant tanks initially contain 50% of the maximum usable propellant, the largest gaging error is still 9.5% for the fuel and 9.5% for the oxidizer.
The In-Space Propulsion Technology Project (ISPT) is currently NASA's sole investment in electric propulsion technologies. This project is managed at NASA Glenn Research Center (GRC) for the NASA Headquarters Science Mission Directorate (SMD). The objective of the electric propulsion project area is to develop near-term and midterm electric propulsion technologies to enhance or enable future NASA science missions while minimizing risk and cost to the end user. Systems analysis activities sponsored by ISPT seek to identify future mission applications in order to quantify mission requirements, as well as develop analytical capability in order to facilitate greater understanding and application of electric propulsion and other propulsion technologies in the ISPT portfolio. These analyses guide technology investments by informing decisions and defining metrics for technology development to meet identified mission requirements. This paper discusses the missions currently being studied for electric propulsion by the ISPT project, and presents the results of recent electric propulsion (EP) mission trades. Recent ISPT systems analysis activities include: an initiative to standardize life qualification methods for various electric propulsion systems in order to retire perceived risk to proposed EP missions; mission analysis to identify EP requirements from Discovery, New Frontiers, and Flagship classes of missions; and an evaluation of system requirements for radioisotope-powered electric propulsion. Progress and early results of these activities is discussed where available.
An experimentally verified performance scaling model for gas-fed pulsed plasma thrusters (GFPPTs) is used as part of a mission study for refuelable satellites.
Characteristics and trajectory analysis of solar electric propulsion space missions - Mars orbiter and Jupiter flyby
General aviation missions in national transportation system /1968, 1975, 1980/, considering fuel taxes, overall system economics, ground facilities, etc
Mariner Jupiter-Saturn '77 mission objectives for Saturn are considered which affect the trajectory design and in particular the aim point at Saturn. These objectives include the following: (1) earth, sun occulation of Saturn, rings, and satellites; (2) close as possible to surface; (3) close as possible to rings; (4) close encounter with Titan (approximately 20,000 km); (5) close encounter with lapetus; (6) multiple satellite encounters; (7) post-Saturn trajectory to Uranus; and (8) post-Saturn trajectory toward solar apex.
This paper presents the results of mission analyses that expose the advantages and disadvantages of the NuPIT for missions considered under the Prometheus Project.
Development and characteristics of simulator for planning photogrammetric missions of lunar surface
The effect of a real mission scenario on a solar powered airplane configuration which had been developed in previous work were assessed. The mission used was surveillance of crop conditions over a route from Phoenix to Tucson to Tombstone, Arizona. Appendices are attached which address the applicability of existing platforms and payloads to do this mission.
The three most promising vehicle use patterns (missions) for the near term electric hybrid vehicle were found to be all-purpose city driving, commuting, and family and civic business. The mission selection process was based principally on an analysis of the travel patterns found in the Nationwide Transportation Survey and on the Los Angeles and Washington, D.C. origin-destination studies data. Travel patterns in turn were converted to fuel requirements for 1985 conventional and hybrid cars. By this means, the potential fuel savings for each mission were estimated, and preliminary design requirements for hybrid vehicles were derived.
Space environment studies, astrophysics, Earth environment, life sciences, and material sciences are discussed. Commercial communication, materials processing, and Earth observation missions are addressed. Technology development, space operations, scenarios of operational capability, mission requirements, and benefits analysis results for space-produced gallium arsenide crystals, direct broadcasting satellite systems, and a high inclination space station are covered.
Vehicle requirements and mission planning for manned space flight and exploration of mars during 1975-1985 time period