Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “maintenance optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Wave energy in season: a comparative approach to feasibility of seasonal deployments for remote coastal communities

Remote coastal communities, which could be early adopters of wave energy projects, have concerns over costs, conflicts, and potential risks of development. Designers and developers are challenged to address these community concerns as they continue to develop wave energy technologies. One potential means of reducing costs, conflicts, and risks, especially for demonstration and pilot-scale projects, could be planning a deployment that operates for only a portion of the year—a seasonal deployment. Here, in this paper, we examine the impacts of a seasonal deployment in terms of cost, electricity production, operations and maintenance, environmental impacts, and community benefits. We take a holistic, comparative approach to feasibility that can be replicated for other comparative studies. We estimate electricity production using a point absorber WEC modeled near Sitka, AK, USA and optimized for the given sea conditions. We determine that, for remote community sized projects, seasonal deployments could result in small cost savings (less than 10 %), but larger decreases in annual energy production (around 30 % for our case study area). Seasonal deployments could be preferable in places with seasonal energy needs, if failures and device access become a major hindrance to wave energy technology development, or as a cautionary approach to introducing new technology to the oceans. We also determine that a highly seasonal wave resource is not necessarily a requirement for seasonal deployments to be considered. Seasonal deployments are an alternative to year-round deployments that can be considered in places where marine spatial conflict is a seasonal concern.

WEC optimizations↗

Optimal Control Strategy With Efficiency and Reliability Improvement for Offshore DC Microgrids

Offshore microgrids, due to their remote location and lack of external energy support, face significant challenges in wide-range load operation and maintenance. Consequently, efficiency and reliability are critical concerns for converters in offshore dc microgrids. This article presents an optimal control strategy aimed at enhancing both efficiency and reliability. A normalized nonlinear relationship between power loss and thermal stress of a paralleled converter is first established. Based on this, a dual-objective optimization function with an active weight function as well as a system overall performance index is established. The active weight function dynamically adjusts the control priority based on converter efficiency and switching device thermal stress. Then, the optimal power-sharing strategy is derived by the Lagrange multiplier method with the proposed optimal function. Additionally, to accommodate a wide load range, an optimal selection strategy for operating converter combinations is proposed, requiring only low-bandwidth communication. Experiment verification is given to validate the effectiveness of the proposed control strategy. The experiment results demonstrate that the proposed control strategy can improve the overall performance of offshore microgrids by optimizing efficiency and reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-Development of Oscillating Water Column (OWC) and Offshore Power Station

The project proposed an Oscillating Water Column (OWC) at a low power rating (1-5kW); to build a prototype and perform field testing within 1–3 years and achieving a commercial version of the OWC 3–5 years. We selected the OWC off-the-shelf components to secure the supply-chain sources and to warrant stable and minimum pricing. We want to curtail the capital cost by reducing the weight and volume of the overall system structure at the design level by designing a high-speed turbine generator and optimizing the airspeed amplification. We want to minimize the operational and maintenance (O&M) costs through simplified architecture, minimal parts, modular/plug-and-play, and easy access designs.

16 TIDAL AND WAVE POWER↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis 𝜈𝑒 Appearance) long baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This presentation offers updates and a comprehensive review of the lessons learned from the operation, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance, challenges in maintaining beamline stability, and proposed Machine Learning implementations to enhance monitoring. The talk aims to share best practices and provide a roadmap for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

Wickremasinghe, Athula↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis $\nu_e$ Appearance) long-baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This proceeding paper discusses updates and the lessons learned from recent experiences during the beam operations, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance and challenges in maintaining beamline stability. The paper aims to share best practices and provide a road-map for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

43 PARTICLE ACCELERATORS↗

High-burnup boiling water reactor steady-state operating conditions and fuel performance analysis

The primary operational costs for existing nuclear reactors are plant operation costs, maintenance costs, and fuel costs, all of which are influenced by the materials used and the design of the reactor core. Optimizing core design parameters—including burnup limits and enrichment levels—can lengthen cycles, reduce outages, reduce reload batch fractions and spent fuel storage requirements, and lower maintenance and operating expenses, thereby enhancing economic viability. Furthermore, developing higher-fidelity tools to simulate these parameters enables better identification of the available margin, improves overall plant safety, and improves the understanding a given plant’s responses to accident scenarios. Here, in the US, much of the research and development focus has traditionally been on pressurized water reactors (PWRs), but boiling water reactors (BWRs) comprise approximately one-third of the US reactor fleet. Modeling and simulation advances for BWRs and PWRs—particularly those achieved through the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program—are crucial to the long-term viability of the light–water reactor industry. A key research area of the high burnup and increased enriched fuel initiative is focused on addressing issues related to postulated loss-of-coolant accident (LOCA) scenarios. NEAMS has dedicated significant effort to enhancing tools to better support BWRs. A current focus is showcasing the BWR framework for high-burnup LOCA analysis. This high-fidelity steady-state analysis is a first step toward demonstrating a best-estimate, pin-by-pin high-burnup BWR LOCA analysis to assess full-core cladding rupture behavior for a representative BWR. The objective of this effort is to provide a modeling capability that will help elucidate and provide a best-estimate evaluation for cladding rupture susceptibility in BWRs. This modeling capability could then be used to prevent and/or mitigate cladding ruptures in postulated accident scenarios without penalizing operational parameters. Additionally, the results of this work will help identify strategies for finding additional margins or potentially limiting cladding ruptures through core design optimizations to enable more efficient core designs.

Capps, Nathan [Oak Ridge National Laboratory (ORNL↗

Predictive Analytics for Hydropower Fleet Intelligence

A primary challenge in hydropower industry is the ability to maintain cost-competitiveness, reliability, and security of hydropower assets through evolving power system contexts and aging of the fleet. Maintaining cost-effective and reliable operations under these conditions is expected to require new modernization and maintenance paradigms for changing contexts. Changes in existing practices for O&M will require an understanding of the current state and health of hydropower assets, and the impact of changing paradigms on asset health and reliability. The Hydropower Fleet Intelligence project is developing and evaluating standardized methodologies and analysis tools for data-driven asset reliability and management technologies for hydropower, leading to eventual predictive maintenance planning, repair/replacement decision making, and asset-reliability and cost-optimized operations. A key question is the feasibility of using existing data sets at hydropower facilities to perform assessments of asset reliability. This document uses data from hydropower facilities to assess the potential for using available analytics methods for asset reliability estimates. In addition to reliability assessments, the feasibility of using existing analytics techniques for several other potential applications is discussed. Finally, a case study that a data-driven model is trained to learn nominal operations via vibration data from an asset of a certain plant, and then utilized to identify anomalies on a similar asset from a different plant, highlighting the generic use of proposed Prognostics and Health Management (PHM) approaches.

Yucesan, Yigit↗

Ontario International Airport Fleet Electrification Blueprint: Zero-Emission Vehicle Technology Assessment for Energy Optimization [Slides]

Ontario International Airport Authority (OIAA)'s Electric Vehicle (EV) Blueprint project presentation focuses on the possibilities for fleet electrification, including medium heavy duty charging and hydrogen refueling and their associated planning, infrastructure, operation, and maintenance options. This report includes detailed list of available electric ground support equipment (GSE), description of NREL tools for EV infrastructure design and optimization, and analyses of the current fleet and the potential grid impacts of electrification. Key recommendations are made in regard to simulation-based and in-depth system analyses to identify optimal charging infrastructure and long-term grid stability, and to ensure that the selected station architecture will provide enough space and capacity for future expansion and resiliency.

30 DIRECT ENERGY CONVERSION↗

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY↗

FORCE Update 2024

The Framework for Optimization of Resources and Economics (FORCE) tool suite is the U.S. Department of Energy’s Nuclear Integrated Energy Systems (IES) Program flagship tool suite for technoeconomic IES analysis of IES. This tool suite is useful for analysis designed to evaluate and improve the technoeconomics of energy production systems, particularly for systems including nuclear technology. In this report, we document the development activity for the FORCE tool suite to extend its capabilities as performed during fiscal year 2024. In addition to reliability and accessibility, capability is one of the three standards guiding the development of the FORCE tool suite and the software codes that are its constituent parts. Extending the capabilities of the FORCE tool suite allows analysis both within the IES program as well as industry, university, and laboratory partners to perform analysis with more accuracy, insight, and impactful narrative. Four areas of capability development were the focus of activity this year: economic parameter uncertainty quantification, multiresolution analysis, components-to-optimization workflow automation, and statespace construction workflows for real-time optimal control. In economic parameter uncertainty quantification, the ability of HERON to capture risk due to scenarios (weather and energy demand uncertainty) was expanded to also include uncertainties in financial parameters such as capital cost or operation and maintenance costs. By including these sources of uncertainty, which are sometimes very large compared with scenario uncertainty, HERON is better able to capture the risk posed by investment in various IES technology. Because of this, analysts can also consider the reduction in risks that can be realized by choice of some technologies. In multiresolution analysis, development activity extended on work completed previously. In fiscal year 2023, methods for decomposing time series signals, such as demand, solar and wind availability, and price profiles, were analyzed and down-selected to those most effective at splitting signals into different resolutions. These resolutions allow considering the influence of different energy demand and supply behaviors across different time scales. For example, energy demand might be divided into seasonal, weekly, and hourly profiles. In fiscal year 2024, this preliminary work was extended and implemented within the Risk Analysis Virtual Environment (RAVEN) risk and uncertainty analysis platform, which is used throughout the FORCE framework. This development of the “multi-resolution time series analysis” (MR-TSA) module in RAVEN allows training synthetic history generators on complex time series. These synthetic history generators can then be used in HERON for generating scenarios that represent possible market and weather scenarios that can be analyzed on different time scales. We envision completing this work in the future, implementing multiresolution dispatch optimization strategies that can make the most beneficial use of these stratified time histories. In components-to-optimization workflow development, workflows for translating user inputs of components into algorithms for algebraic optimization were selected and implemented. Similar algorithms within the Holistic Energy Resource Optimization Network (HERON) were separated from the main code base of HERON and gathered with the components-to-optimization workflows in the new Dispatch Optimization Variable Engine (DOVE) software library. This modularization allows FORCE users to analyze dispatch optimization and energy system duty cycles independently of HERON, which previously was a burdensome task. Additionally, these dispatch optimization algorithms, set up in an independent library, can now be used across all software applications within FORCE, especially including the real-time optimal control software Optimization of Real-time Capacity Allocation (ORCA). Allowing FORCE software to share dispatch optimization algorithms within a single library allows for improved software maintenance and reliability. In statespace characterization workflow development, alternative workflows for optimizing dispatch with additional technical accuracy was the focus, particularly to improve the real-time optimization decision making in ORCA. Using algorithms and workflows initially developed for the Feasible Actuator Range Modifier (FARM), workflows for determining the statespace representation of IES were identified and demonstrated. The resulting dispatch optimization required a more robust optimization algorithm than that originally used in HERON (and moved to DOVE), which required adding an alternate workflow to DOVE that can more accurately match the behavior of physical systems using a partial differential equation representation. In conclusion, capability developments in the FORCE tool suite in fiscal year 2024 have improved the ability of the FORCE tool suite to perform

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Efficient Loads Surrogates for Waked Turbines in an Array

Accurately and efficiently predicting wind turbine structural loading is a crucial step in wind farm design. Without considering structural loading, wind farm optimization could negatively impact turbine fatigue and ultimate loads, especially for waked and partially waked turbines, which could result in higher maintenance costs and reduced turbine lifetime. However, predicting turbine loads throughout an array is a costly step, as these quantities require time-accurate results across long time histories, which is often intractable for large array optimization. Therefore, surrogate models that link array spacing to load outputs are often used, but the surrogates are then unique to the inflow conditions and array configurations in the training library. This work develops surrogate models for many wind turbine load outputs based solely on rotor plane velocity measurements, with no required input about array configuration or freestream inflow parameters. Surrogate models were constructed for many turbine quantities of interest (QoI), considering mean, standard deviation, ultimate, and fatigue loads. In general, most QoI statistics were accurately captured, as measured by predicted vs. actual correlation coefficient, confirming the suitability of the approach. Temporal mean values of the QoI required only temporal mean measurements of the rotor plane inflow velocity. However, accurate prediction of temporal standard deviation, ultimate, and fatigue values of QoI also required temporal standard deviations of the rotor plane velocity field. Poor surrogate performance was observed when too many correlated inputs were used, such as multiple velocity components. If the fewest inflow parameters are used to construct the surrogates, the average correlation coefficient value for all output QoI statistics is 0.89. Surrogates for standard deviations and damage equivalent loads (DELs) of turbine QoIs generally had lower accuracy and tower-base and shaft load channels posed the most difficult to capture accurately. The results suggest that these surrogates could be easily paired with analytic wake models, which are frequently used for pre-construction wind farm array optimization, to account for turbine loading in addition to power production. By including the optimal inflow conditions, the surrogate accuracy can improve to an average correlation coefficient value for all output QoI statistics of 0.92. This work has established the ability to build accurate surrogates for mean, standard deviation, ultimate load, and DEL turbine QoI values based on the rotor plane inflow velocity, and identified which inflow conditions lead to greater surrogate accuracy.

17 WIND ENERGY↗

Several Small or Single Large? Quantifying the Catchment-Wide Performance of On-Site Wastewater Treatment Plants with Inaccurate Sensors

On-site wastewater treatment plants (OSTs) often lack monitoring, resulting in unreliable treatment performance. They thus appear to be a stopgap solution despite their potential contribution to circular water management. Low-maintenance but inaccurate soft sensors are emerging that address this concern. However, how their inaccuracy impacts the catchment-wide treatment performance of a system of many OSTs has not been quantified. Here, we develop a stochastic model to estimate catchment-wide OST performances with a Monte Carlo simulation. In our study, soft sensors with a 70% accuracy improved the treatment performance from 66% of the time functional to 98%. Soft sensors optimized for specificity, indicating the true negative rate, improve the system performance, while sensors optimized for sensitivity, indicating the true positive rate, quantify the treatment performance more accurately. This new insight leads us to suggest programming two soft sensors in practical settings with the same hardware sensor data as input: one soft sensor geared to high specificity for maintenance scheduling and one geared to high sensitivity for performance quantification. Our findings suggest that a maintenance strategy combining inaccurate sensors with appropriate alarm management can vastly improve the mean catchment-wide treatment performance of a system of OSTs.

54 ENVIRONMENTAL SCIENCES↗

Dispatch analysis of flexible power operation with multi-unit small modular reactors

The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment of Technoeconomic Opportunities in Automation for Nuclear Microreactors

Achieving full decarbonization of all economic sectors remains a challenge, especially in niche markets. For example, remote communities and industrial or mining activities detached from the main electric grid heavily rely on fossil fuels, similar to urban and industrial microgrids with combined heat and power needs. A combination of renewables and energy storage is often not suitable due to cost, reliability, intermittency, and large storage requirements. Small nuclear reactors with a flexible purpose could serve these applications. Microreactors (MR) are a class of reactors that are compact, factory manufactured, transportable, and self-regulating. Typically, they generate much less power than their large reactor counterparts. The main advantages of microreactors include the versatile nature of the energy produced, the reliability of supply, and freedom from having to transport and store large quantities of fuels on-site, coupled with the absence of dependence on an electrical grid. A strong business case is needed to move from the microreactor prototype to the commercialization phase. In fact, fossil fuels are still relatively inexpensive, and in the near term, carbon credits will be available to virtually compensate for emissions. For microreactors, one of the main costs in operation and maintenance (O&M) is their staffing levels. In this study, we investigate how to optimize the number (and thus the cost) of workers, moving from a traditional, fully manned, on-site personnel approach to an unmanned, remote personnel approach. We examine four different staffing models that can be implemented as the technology matures and evolves. We estimate the staffing needs of each model and build a business case to justify the substitution of on-site personnel with adequate technologies. To do so, we propose a cost model to quantify potential cost reductions from automating O&M activities. The model accounts for both the reduction in cost derived from the reduced number of full-time-equivalent (FTE) employees and the increase in cost derived from the need to buy new control hardware as needed. Applying the cost model that we created to different scenarios, an on-site O&M cost reduction exceeding 80% can be expected. Additionally, we found that it is more impactful to focus on automating routine O&M tasks rather than attempting to automate transient management (shutdowns, restarts, monitoring condition deviations). In fact, transients typically account for less than 1% of the total FTE time spent on the reactors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The Hydrogen Production, Grid Integration, and Scaling for the Future project will inform clean hydrogen production deployment across the planning, procurement, and operation stages of hydrogen production on the grid. Hydrogen production from renewables is a clean source of fuel which is near zero for greenhouse gas emissions and criteria pollutants. The results from this project will inform entities looking to build clean energy projects that produce good paying jobs in manufacturing, installation, maintenance and operation of these facilities. This project provides system characterization examples, multiple configurations, optimizations, and suggested metering and custody transfer points through multiple scenarios and hardware testing of NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios. This work also creates a digital twin for emulation in the Advanced Research on Integrated Systems (ARIES) virtual environment and performs hardware-in-the-loop (HIL) testing of pilot-scale, decentralized, and centralized hydrogen systems.

centralized hydrogen production↗

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

An Operations and Maintenance Roadmap for U.S. Offshore Wind: Enabling a Cost-Effective and Sustainable U.S. Offshore Wind Energy Industry Through Innovative Operations and Maintenance

The United States is currently targeting 30GW of offshore wind to be installed by 2030, and 150GW by 2050. Even considering future turbine sizes, this represents thousands of new turbines installed in a diverse set of environments, each with their unique design, installation, and maintenance challenges. While much can be learned from European and Asian experience with offshore wind over the past two decades, it is important to understand the unique circumstances of the U.S. This document explores operations and maintenance of offshore wind energy, specific to the U.S. and attempts to lay out a roadmap for needed activities to ensure reliability of future installations. The roadmap was informed through dozens of interviews with a wide cross-section of the industry, including representatives from OEMs, owner/operators, service companies, certification agencies, service providers, and researchers. The roadmap first describes the problem by component - blades, drivetrain and nacelle, structures and foundations, and electrical systems - through a look at current practices and opportunities for improvement in the areas of Failure Mode Analysis and Mitigation; Monitoring, Sensing, and Inspection; and Maintenance Execution. Crosscutting areas of Digitalization, Robotics and Automation, Prognostics and Health Management and O&M Optimization, Experimentation and Demonstration, Standardization, and Design Optimization Considering Reliability and O&M are then discussed. Finally, the roadmap summarizes all of these topics with recommendations for short (1-3 years), medium (4-7 years), and long term (8-12 years) activities, with a description of needed public and private sector contributions.

17 WIND ENERGY↗

Shape Optimization of Header Pipes in Power Plants for Enhanced Efficiency and Environmental Sustainability

In a power plant, the header pipe plays a pivotal role in optimizing the performance of diverse systems by serving as a central conduit for the collection and distribution of steam within the plant. This paper investigates the significance of header pipes within power plant setups, highlighting their critical influence on reliability, efficiency, and the performance of the power plant as a whole. The concept of shape optimization emerges as a crucial factor in power plant design and operation, with the potential to maximize performance while minimizing the use of materials. Shape optimization not only enhances efficiency but also contributes to reducing the environmental footprint of power plant installations. In this paper, we initially developed a methodology designed for optimizing header shapes with the primary goal of reducing the usage of costly new alloy materials and lowering the overall maintenance operation expenses. Secondly, we conducted a case study based on an authentic header sourced from an operational power plant.

20 FOSSIL-FUELED POWER PLANTS↗