Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “kW”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

M-Star ® Modeling of SME Mixing with Three Impeller Blades

Before a sample of the Slurry Mix Evaporator (SME) can be taken, the SME product sampling procedure requires that the agitator power be stable between 20 and 30 kW for at least one hour. The SME transfer to Melter Feed Tank (MFT) procedure also requires the SME agitator power be stabilized between 20 and 30 kW prior to transfer. These requirements are specified to ensure samples are homogeneous, as discussed in the Waste Form Qualification Report. During SME Batch 804, the agitator power dropped to 19 kW and struggled to achieve and maintain 20 kW. It was later discovered that the cause of the power drop was due to one of the bottom blades of the agitator breaking off. Both the sample and the transfer occurred without the power stabilizing between 20 and 30 kW. Therefore, the quality of SME Batch 804 is indeterminate, and homogeneity was questionable. To evaluate mixing in the SME with a broken agitator containing only three blades (90 degrees apart with space for a missing blade) on the bottom impeller, the Savannah River National Laboratory (SRNL) was requested to perform computer simulations of impeller mixing in the SME using M-Star ® software. The simulations will be used to determine if SME Batch 804 was well mixed and satisfies homogeneity requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pueblo of Laguna Village Community Solar

The project was to install approximately 11.44 kilowatts (kW) rooftop solar photovoltaic (PV) system on the Mesita Village Community Center, an approximately 9.24 kW rooftop solar PV system on the Paguate Village Community Center, an approximately 21.56 kW rooftop solar PV system on the Paraje Village Community Center, and an approximately 11.00 kW rooftop solar PV system on the Seama Community Center, for a total of about 53.24 kW on four village community centers. The systems were expected to generate approximately 93,329 kWh annually. Installing solar PV systems on the four village community centers would have helped achieve the Pueblo of Laguna’s six energy objectives: community development (decreased utility bills, funds for other needs), economic development (training and participation in the renewable energy economy), energy reliability (future storage), community resilience (alternative sources), relationship to people and the natural world (reducing fossil fuel use), and energy sovereignty (Pueblo decision-making). Installing solar PV systems would have also met specific project goals to offset not less than 85% of each selected building’s annual electricity use, ranging from 87% to 103% of demand; save a minimum of 70% of the cost of utility bills per year for each building, ranging from 75% to 77% percent (including service charges); and would have had payback periods shorter than the estimated useful life of the project

14 SOLAR ENERGY↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NLR HPC Facility Power Usage Effectiveness (PUE) Data

Timeseries of Energy Systems Integration Facility (ESIF) Data Center Power Usage Effectiveness (PUE) Data provided in Parquet and compressed CSV formats Power Metrics Timeseries Fields: ts: Timestamp cooling_kw: Cooling (kilowatts) - Captures the power used by fans and pipe trace heaters associated with outdoor cooling equipment. The dedicated tower filter pump power is also captured as cooling load. energy_reuse: Energy Reuse Effectiveness hvac_kw: Heating, ventilation, and air conditioning (kilowatts) - Captures fan walls, fan coils that support the data center electrical rooms, and the make-up air unit. it_power_kw: IT equipment (kilowatts) - Captures power used by the IT equipment on the data center floor. plug_and_light_kw: Lights and utility plugs (kilowatts) - Captures power associated with the data center and dedicated mechanical room. The crank-case heater for the emergency standby generator is also captured as light and plug load. pue: Power Usage Effectiveness pump_kw: Pumps (kilowatts) - Captures power from pumps that move water in the data center Energy Recover Water loop and the Tower Water loops, and also captures power used by the boost pumps that circulate water through the fan walls. Note: The tower filter pump runs constantly to filter water from the data center cooling tower system, so 2.67 kilowatts are attributed to this pump and that is not reflected in this data field. day: Day of month Outside Weather Station Timeseries Fields: ts: Timestamp outside_air_humidity: Outside air humidity - Relative humidity percent outside_air_temp: Outside air temperature - Degrees Fahrenheit day: Day of month More detail: High-Performance Computing Data Center Power Usage Effectiveness

97 MATHEMATICS AND COMPUTING↗

Supercritical CO2 Recuperators, Presented at The ASME Turbo Expo 2017, June 29, 2017, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

High Effectiveness, Compact, High Pressure and Low-Cost Recuperator, Presented at The Fifth International Symposium – Super-Critical CO2 Power Cycles, San Antonio, Texas, March 28-31, 2016, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

High Effectiveness, Compact, High Pressure and Low Cost Recuperator for Super-Critical CO2 Power Cycles, Paper Presented at The Fifth International Symposium – Super-Critical CO2 Power Cycles, San Antonio, Texas, March 28-31, 2016, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

In-route inductive versus stationary conductive charging for shared automated electric vehicles: A university shuttle service

In-route inductive charging technology, as applied to automated electric vehicles, can help realize a fully automated system of both vehicles and chargers. This study presents a planning optimization analysis for fixed-route automated shuttles supported by in-route inductive charging technology. A techno-economic feasibility of inductive charging was assessed in comparison with stationary charging, including Level 2 AC chargers, and DC fast chargers (DCFCs). This analysis considered both present-day and future vehicle operations and overall system costs. A real project with two circulator Navya Arma shared automated electric vehicles (SAEVs) at the University of Michigan was investigated using real-world collected energy and travel data. The outcomes show that the proper design of quasi-dynamic inductive chargers at designated stops allows SAEVs to realize unlimited driving range and be cost-competitive to DCFC technology. Considering present-day costs and vehicles, low-speed SAEVs can realize charge-sustaining operation at a minimum cost either by implementing a 50-kW inductive charger at two stops with one segment per position and a 29-kWh onboard battery, or by installing a 100-kW inductive charger at one stop with one segment per position and a 28-kWh onboard battery. Overall, considering future costs and vehicles, either a 40-kW charger at one stop with a 29-kWh battery or a 50-kW charger at the north stop with a 14-kWh battery would enable charge-sustaining operation. In addition, quasi-dynamic inductive solution can reduce the onboard battery by about 15% while providing unlimited driving range, but stationary scenarios require about 112% additional battery capacity to support a 12-h driving range.

33 ADVANCED PROPULSION SYSTEMS↗

Characterizing peak electricity demand for U.S. households: an assessment of end-use loads and demand factors

Understanding household peak electricity demand is critical to evaluate the technical need for electrical infrastructure upgrades. This study characterizes peak loads for existing and new equipment using metered data from a convenience sample of 11,940 U.S. dwellings from four sources, including 911 from two sources with end-use metering. After standardized data cleaning and labeling, we derived descriptive statistics for key metrics, such as maximum demand and demand factors, and developed predictive models relating 60- to 15-min demand for the National Electrical Code (NEC). Mean 15-min maximum demand was 9.7 kW (median 9.0 kW; IQR 7.0–11.5 kW, 95% CI 9.6–9.8 kW), indicating spare capacity in 98% of homes with hypothetical 100 A panels. Maximum demand increased with floor area and number of high-demand loads. Dwelling maximum demand was driven by higher-power, longer-duration heating appliances and vehicle charging, while most user-operated appliances contributed little. Demand factors are used to account for how most devices contribute less than their rated power to maximum demand. Existing load mean demand factors (28%; median 10%; IQR 0–58%; CI 28–29%) were higher than those for new loads (21%; median 7%; IQR 0–35%; CI 20–21%), because new loads changed the timing and magnitude of maximum demand. New high-demand loads had higher than average demand factors (40–60%). Whole dwelling demand factors support the NEC's 40% assumption, but they challenge its conservative 100% treatment of new HVAC. We propose a data-driven 50% demand factor for new equipment, which would align with metered data, improve affordability, and modernize electrical codes.

Appliances↗

Dual-season thermal energy storage-integrated heat pump system for load shifting: experiments, modeling and nationwide analysis

Here, this paper proposes and validates a dual-season thermal energy storage-integrated heat pump (TES-HP) system that shifts building electric load in both cooling and heating modes using a single phase-change TES. The design uses the TES as a heat sink for the condenser in summer and a heat source for the evaporator in winter, thereby reducing on-peak electric demand while ensuring compatible with existing air-distribution systems. A 14-kW TES-HP prototype with six operating modes and novel refrigerant charge management strategies was experimentally tested under varied conditions. Subsequently, data-driven polynomial performance curves were developed and validated against experiments, then coupled with a phase change material (PCM) model and a calibrated building model within a rule-based controller. Single-day case studies demonstrated effective on-peak demand reduction while maintaining thermal comfort. During cooling, hourly power was lowered by up to 1.5 kW; in heating, average hourly power decreased from over 3.5 kW to 1.8 kW, compared to an HP-only system, achieving 64.5 % load shifting, and the need for resistance heating was eliminated. Seasonal simulations showed typical on-peak electricity savings of 25–35 % in cooling and 40–65 % in heating, with the largest benefits on the hottest and coldest days. Extended response-surface analysis and nationwide mapping quantified load shifting as functions of ambient and TES temperatures, revealing a seasonal trade-off in TES phase-change temperature. These results demonstrate the TES-HP system as a practical and scalable solution for grid-interactive buildings that reduces on-peak demand and electricity use while maintaining thermal comfort and enhancing grid flexibility and reliability.

Grid-interactive buildings↗

Investigation of the silicon coated film characteristics on tungsten surface in EAST fusion device

Siliconization using 10 % SiD 4 + 90 % He assisted by ion cyclotron range of frequency discharge (ICRF) or glow discharge (GD) was performed in EAST with full tungsten (W) diverters. It was found that the coated Si film on W sample at a higher baking temperature (160 °C) was smoother than that at a lower baking temperature (60 °C). This was mainly because physically adsorbed gaseous impurities were released at a higher baker temperature. This process improved the adhesion between the film and the surface of W. An increase in the ICRF working power from 20 kW to 40 kW further increased the Si content and the film thickness by 1.5 times. The cleaning efficiency of ICRF on the surface of the W sample before siliconization was higher at 40 kW than that at 20 kW, which facilitated the removal of oxides and other compounds from the surface of W. The ratio of silicon/oxygen (Si/O) and the thickness improved considerably due to greater ionization and deposition of SiD 4 . Additionally, siliconization via GD was more uniform and 1.5 nm thicker than that via ICRF, which was because of the greater working gas pressure, coating duration, and homogeneity in GD. These results might be used as a reference for evaluating the effect of siliconization on plasma performance and its application in fusion devices.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Effect of CO{sub 2}-laser power density on the absorption coefficient of polycrystalline CVD diamonds

The effect of 1-s irradiation of an uncooled polycrystalline CVD diamond plate by a focused cw CO{sub 2} laser beam with a power density of 300 – 800 kW cm{sup −2} is investigated. The absorption coefficient of the sample at a power density of 800 kW cm{sup −2} is found to be 0.035 cm{sup −1} larger as compared with that at 300 kW cm{sup −2}, which is related to the temperature dependence of its phonon-induced absorption with a change in temperature from 44 to 100 °C. It is shown that polycrystalline diamond, in contrast to other optical materials, does not exhibit nonlinear (avalanche-like) rise in absorption at high CO{sub 2}-laser power densities, at least up to 800 kW cm{sup −2}. (paper)

36 MATERIALS SCIENCE↗

Commissioning Results of the ESR2 Compressors at JLab

Abstract The future operation of the 4 kW 15 Kelvin MOLLER experiment at Jefferson lab necessitates an increase of cryogenic capacity at the End Station Refrigerator. The current plant is the former 1.5 kW (4.5 K) ESCAR plant that has been operating at Jefferson Lab since 1995. The existing 1.5 kW plant is not able to support the load for MOLLER and will be replaced with a refurbished plant comprised of the cold box and compressors of the 4 kW ASST-A plant from the Superconducting Super Collider in Texas. This paper reports the commissioning results of the warm compressor system. We compare the compressors’ current and past performance, specifically examining their Isothermal and Volumetric efficiency. The results indicate that the refurbished equipment’s efficiency is comparable to its original performance, proving that the reuse and refurbishment of old systems is a worthwhile endeavor.

Perry, C. [Thomas Jefferson National Accelerator F↗

Analysis of Magnetic Field Emissions and Shield Requirements for Interoperating High-Power EV Wireless Charging System

In this study, the magnetic field emission (MFE) is investigated for matching (identical primary and secondary couplers) and interoperating (different couplers) 11 kW wireless charging systems (WCS). The interoperating charging pads generate higher MFE than the matching charging-pads; hence, using interoperable couplers requires a more effective shielding. In this work, different shield topologies are investigated to suppress the MFE for interoperable conditions. Four 11 kW WCSs with the unipolar (uni) and bipolar (bi) transmitter (Tx) and receiver (Rx) pads has been investigated: 1) uniTx with uniRx, 2) uniTx with biRx, 3) biTx with uniRx, and 4) biTx with bi-Rx. The studied systems are designed for 11 kW WPT3 level with Z2 airgap class (140-150 mm) resembling the standard SAE-J2954. The WCSs are simulated in finite element analysis (FEA) and validated experimentally using a 11 kW biTx-biRx system. The experimental results match with the simulation results with <5% error. The FEA results show that a biTx needs a magnetic shield, and a uniTx needs an aluminum shield to meet the MFE under all interoperability and alignment conditions.

Mohammad, Mostak↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Monte Carlo simulation analysis for radiation damage on Glidcop Al-15 caused by 17-20 MeV/u heavy ions

The Facility for Rare Isotope Beams (FRIB) SRF linear heavy-ion accelerator is designed to accelerate all ions up to uranium to a maximum beam power of 400 kW. Several beam intercepting devices (BIDs) are essential to the successful operation of the accelerator, including a low power charge selector (LPCS) made of copper containing 0.15% precipitated aluminum oxide by weight called Glidcop Al-15. As FRIB ramps up the primary beam power beyond the current 20 kW level, the charge selector must withstand higher radiation damage rates, typically measured in displacements per atom (dpa). Significant beam induced radiation damage including significant deformation, like swelling, blistering, and cracking has been observed on a recently removed LPCS. We also observed physical features up to about 5.5 mm wide and appear to be deeper than the projected range of any ions. This paper presents the results of Monte Carlo simulations carried out using the Particle and Heavy Ion Transport code System (PHITS), quantifying the total damage dose and ion concentration, etc. Simulating an accurate irradiation history is essential to determining the scope of post irradiation examination (PIE) work.

Fletcher, Ethan [Michigan State U.]↗

Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

Upon completion of the Second Target Station (STS) Project in the mid 2030s, the Spallation Neutron Source accelerator at Oak Ridge National Laboratory will deliver a 2.7 MW proton beam to the neutron production targets. In the post-STS phase, the accelerator will have a reserve beam power capacity of at least 100 kW beyond what the two neutron production targets will receive, which could potentially be ramped up to 300 kW. In this paper, a design concept for a radioisotope production target that could utilize 250 kW of the reserve beam power capacity is presented. The target consists of thorium discs encapsulated in 316L austenitic steel shells that are cooled by water. The estimated post-irradiation activity of Ac-225 and Ra-225, critical medical radioisotopes used in targeted alpha therapy cancer treatment, is calculated at the end of bombardment after a 14 day long irradiation time. Thermal and structural analyses are performed on the basis of calculated nuclear heating data. The technical feasibility of a high-power target under a 250-kW beam load with an extremely low duty factor of $3.5\cdot 10^{-6}$ is presented from thermal, structural and fatigue lifetime perspectives.

Lee, Yong Joong [ORNL] (ORCID:0000000298381723)↗

White Earth Community Facilities Solar PV Project (Final Report)

Funded project was for the design, installation, and performance monitoring of 2 - 11.4 kW AC and 1-38.0 kW AC ground-mount solar installations for three tribal community facilities, for a total 60.8 kW AC, including a daycare facility and two community centers. Of in excess of 120 tribal buildings these facilities had showed the best promise for implementing solar, based upon site characteristics, roof loads, roof orientation and building size. The White Earth Nation seeks to move forward proactively to address the following project goals and objectives: 1) Reduction of energy costs, 2) Increasing energy security for Indian Tribes and tribal members, 3) Adding 60.8 KW in renewable energy generation (solar PV), 4) Offsets, reduces coal-fired electric energy demand by 76,397 kWh, 817,448 Source Energy Btu annually, and S) Meets the overall solar PV target set in the FOA.

14 SOLAR ENERGY↗