Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ion clock”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

102 records · Page 6

Closed Loop solar array-ion thruster system with power control circuitry

A power control circuit connected between a solar array and an ion thruster receives voltage and current signals from the solar array. The control circuit multiplies the voltage and current signals together to produce a power signal which is differentiated with respect to time. The differentiator output is detected by a zero crossing detector and, after suitable shaping, the detector output is phase compared with a clock in a phase demodulator. An integrator receives no output from the phase demodulator when the operating point is at the maximum power but is driven toward the maximum power point for non-optimum operation. A ramp generator provides minor variations in the beam current reference signal produced by the integrator in order to obtain the first derivative of power.

Gruber, R. P.↗

Stable Reconnection at the Dusk Flank Magnetopause

The dusk flank magnetopause was surveyed with instruments on board the Magnetospheric Multiscale (MMS) spacecraft on 28 August 2015 between 13:55 UT and 14:15 UT during a period of persistent southward interplanetary magnetic field (IMF) with varying dawn-dusk component. Plasma measurements (500 eV electrons are greater than 2 keV ions) revealed the existence of at least one active reconnection region that persisted throughout the interval. The reconnection region convected equatorward despite the poleward and tailward magnetosheath flow, which ranged from slightly sub-Alfvenic to slightly super-Alfvenic throughout the interval. These results suggest that magnetic reconnection moved in response to changes in the IMF clock angle rather than the magnetosheath flow, which is corroborated using predictions of the maximum magnetic shear model.

Gomez, R. G.↗

Prospects for Ultra-Stable Timekeeping with Sealed Vacuum Operation in Multi-Pole Linear Ion Trap Standards

A recent long-term comparison between the compensated multi-pole Linear Ion Trap Standard (LITS) and the laser-cooled primary standards via GPS carrier phase time transfer showed a deviation of less than 2.7x10(exp -17)/day. A subsequent evaluation of potential drift contributors in the LITS showed that the leading candidates are fluctuations in background gases and the neon buffer gas. The current vacuum system employs a "flow-through" turbomolecular pump and a diaphragm fore pump. Here we consider the viability of a "sealed" vacuum system pumped by a non-evaporable getter for long-term ultra-stable clock operation. Initial tests suggests that both further stability improvement and longer mean-time-between-maintenance can be achieved using this approach

timekeeping stability↗

Single-Event Upset and Scaling Trends in New Generation of the Commercial SOI PowerPC Microprocessors

SEU from heavy-ions is measured for SOI PowerPC microprocessors. Results for 0.13 micron PowerPC with 1.1V core voltages increases over 1.3V versions. This suggests that improvement in SEU for scaled devices may be reversed. In recent years there has been interest in the possible use of unhardened commercial microprocessors in space because of their superior performance compared to hardened processors. However, unhardened devices are susceptible to upset from radiation space. More information is needed on how they respond to radiation before they can be used in space. Only a limited number of advanced microprocessors have been subjected to radiation tests, which are designed with lower clock frequencies and higher internal core voltage voltages than recent devices [1-6]. However the trend for commercial Silicon-on-insulator (SOI) microprocessors is to reduce feature size and internal core voltage and increase the clock frequency. Commercial microprocessors with the PowerPC architecture are now available that use partially depleted SOI processes with feature size of 90 nm and internal core voltage as low as 1.0 V and clock frequency in the GHz range. Previously, we reported SEU measurements for SOI commercial PowerPCs with feature size of 0.18 and 0.13 m [7, 8]. The results showed an order of magnitude reduction in saturated cross section compared to CMOS bulk counterparts. This paper examines SEUs in advanced commercial SOI microprocessors, focusing on SEU sensitivity of D-Cache and hangs with feature size and internal core voltage. Results are presented for the Motorola SOI processor with feature sizes of 0.13 microns and internal core voltages of 1.3 and 1.1 V. These results are compared with results for the Motorola SOI processors with feature size of 0.18 microns and internal core voltage of 1.6 and 1.3 V.

Irom, Farokh↗

Jet Propulsion Laboratory: Annual Report 1999

The Jet Propulsion Laboratory, located in the foothills near Pasadena, California, is the nation's lead center for the robotic exploration of space. Intense activity in space missions was the hallmark of the Jet Propulsion Laboratory as a new generation of smaller, less expensive spacecraft were sent out from Earth. From late 1998 to mid-1999, JPL launched a craft testing a futuristic ion engine, an orbiter and lander bound for Mars, a mission to fly by a comet and return a sample of its dust to Earth, a small infrared telescope, and an Earth-circling satellite that uses radar to gauge winds over the oceans. This unprecedented schedule resulted in spectacular achievements, tempered by highly visible mission losses. Weighed together, the successes and failures dramatically underscored the difficulty and risk involved in the unique business of space science and exploration. Among the achievements, the ion-engine-powered Deep Space 1, comet-bound Stardust and Earth-orbiting SeaWinds were joined by such ongoing missions as Mars Global Surveyor, Galileo and Cassini in delivering on their promise and, in some cases, providing surprising new views of space and Earth. At the same time, mission teams were disappointed by the losses of an orbiter and lander at Mars, as well as a small infrared telescope. JPL worked closely with NASA to learn from these experiences and build successful future missions. The Laboratory also achieved a key goal by winning the International Organization of Standards' 'ISO 9001' certification - a standard shared by the world's best engineering organizations. As the year rolled to a close, clocks rolled over from 1999 to 2000. Operations teams at JPL and NASA watched with satisfaction as a major campaign of Year 2000 readiness paid off with no problems among the thousands of computer systems that support the Laboratory's missions. With that auspicious beginning, JPL was positioned to step into the 21st century and embark on even yet unimagined future explorations.

Jet Propulsion Laboratory (JPL)↗

NASA Tech Briefs, February 2012

This issue contains the following briefs: (1) Optical Comb from a Whispering Gallery Mode Resonator for Spectroscopy and Astronomy Instruments Calibration (2) Real-Time Flight Envelope Monitoring System (3) Nemesis Autonomous Test System (4) Mirror Metrology Using Nano-Probe Supports (5) Automated Lab-on-a-Chip Electrophoresis System (6) Techniques for Down-Sampling a Measured Surface Height Map for Model Validation (7) Multi-Component, Multi-Point Interferometric Rayleigh/Mie Doppler Velocimeter (8) Frequency to Voltage Converter Analog Front-End Prototype (9) Dust-Tolerant Intelligent Electrical Connection System (10) Gigabit Ethernet Asynchronous Clock Compensation FIFO (11) High-Speed, Multi-Channel Serial ADC LVDS Interface for Xilinx Virtex-5 FPGA (12) Glovebox for GeoLab Subsystem in HDU1-PEM (13) Modified Process Reduces Porosity when Soldering in Reduced Gravity Environments (14) Use of Functionalized Carbon Nanotubes for Covalent Attachment of Nanotubes to Silicon (15) Flexible Plug Repair for Shuttle Wing Leading Edge (16) Three Dimensionally Interlinked, Dense, Solid Form of Single-Walled CNT Ropes (17) Axel Robotic Platform for Crater and Extreme Terrain Exploration (18) Site Tamper and Material Plow Tool - STAMP (19) Magnetic Interface for Segmented Mirror Assembly (20) Transpiration-Cooled Spacecraft-Insulation-Repair Fasteners (21) Fluorescence-Based Sensor for Monitoring Activation of Lunar Dust (22) Aperture Ion Source (23) Virtual Ultrasound Guidance for Inexperienced Operators (24) Model-Based Fault Diagnosis: Performing Root Cause and Impact Analyses in Real Time (25) Interactive Schematic Integration Within the Propellant System Modeling Environment (26) Magnetic and Electric Field Polarizations of Oblique Magnetospheric Chorus Waves (27) Variable Sampling Mapping.

Source record↗

Single-Event Latchup Testing of the Micrel MIC4424 Dual Power MOSFET Driver

We conducted 47 exposures of four different MIC4424 devices and did not observe any SEL or high-current events. This included worst-case conditions with a LET of 81 MeV-sq cm/mg, applied voltage of 18.5 V, a case temperature greater than 120 C, and a final fluence of 1x10(exp 7)/sq cm. We also monitored both the outputs for the presence of SETs. While the period of the 1 MHz square wave was slightly altered in some cases, no pulses were added or deleted. 1. Purpose: The purpose of this testing is to characterize the BiCMOS/DMOS Micrel MIC4424 dual, non-inverting MOSFET driver for single-event latchup (SEL) susceptibility. These data will be used for flight lot evaluation purposes. 2. Devices Tested: The MIC4423/4424/4425 family are highly reliable BiCMOS/DMOS buffer/driver MOSFET drivers. They are higher output current versions of the MIC4426/4427/4428. They can survive up to 5V of noise spiking, of either polarity, on the ground pin. They can accept, without either damage or logic upset, up to half an amp of reverse current (either polarity) forced back into their outputs. Primarily intended for driving power MOSFETs, the MIC4423/4424/4425 drivers are suitable for driving other loads (capacitive, resistive, or inductive) which require low-impedance, high peak currents, and fast switching times. Heavily loaded clock lines, coaxial cables, or piezoelectric transducers are some examples. The only known limitation on loading is that total power dissipated in the driver must be kept within the maximum power dissipation limits of the package. Five (5) parts were provided for SEL testing. We prepared four parts for irradiation and reserved one piece as an un-irradiated control. More information about the devices can be found in Table 1. The parts were prepared for testing by removing the lid from the CDIP package to expose the target die. The parts were then soldered to small copper circuit adapter boards for easy handling. These parts are fabricated in a bulk BiCMOS/DMOS technology. Since we do not know the number of overlayers used in the fabrication processes, linear energy transfer calculations are determined based on the top-surface incident ion species and kinetic energy.

Power MOSFET↗

Integrity Monitoring of Mercury Discharge Lamps

Mercury discharge lamps are critical in many trapped ion frequency standard applications. An integrity monitoring system can be implemented using end-of-life signatures observed in operational mercury discharge lamps, making it possible to forecast imminent failure and to take action to mitigate the consequences (such as switching to a redundant system). Mercury lamps are used as a source of 194-nm ultraviolet radiation for optical pumping and state selection of mercury trapped ion frequency standards. Lamps are typically fabricated using 202Hg distilled into high-purity quartz, or other 194-nm transmitting material (e.g., sapphire). A buffer gas is also placed into the bulb, typically a noble gas such as argon, neon, or krypton. The bulbs are driven by strong RF fields oscillating at .200 MHz. The lamp output may age over time by two internal mechanisms: (1) the darkening of the bulb that attenuates light transmission and (2) the loss of mercury due to migration or chemical interactions with the bulb surface. During fabrication, excess mercury is placed into a bulb, so that the loss rate is compensated with new mercury emanating from a cool tip or adjacent reservoir. The light output is nearly constant or varies slightly at a constant rate for many months/years until the mercury source is depleted. At this point, the vapor pressure abruptly falls and the total light output and atomic clock SNR (signal-to-noise ratio) decrease. After several days to weeks, the light levels decrease to a point where the atomic clock SNR is no longer sufficient to stay in lock, or the lamp self-extinguishes. This signature has been observed in four separate end-of-life lamp failures while operating in the Deep Space Network (DSN). A simple integrator circuit can observe and document steady-state lamp behavior. When the light levels drop over a predetermined time interval by a specified amount (e.g., 20 percent), an alarm is set. For critical operational applications, such as the DSN or in space flight, this warning provides notice that a failure may be imminent, and for operators or control algorithm to take action.

Tjoelker, Robert L.↗

Polar, Cluster and SuperDARN Evidence for High-Latitude Merging during Southward IMF: Temporal/Spatial Evolution

Magnetic merging on the dayside magnetopause often occurs at high latitudes. Polar measured fluxes of accelerated ions and wave Poynting vectors while skimming the subsolar magnetopause. The measurements indicate that their source was located to the north of the spacecraft, well removed from expected component merging sites. This represents the first use of wave Poynting flux as a merging discriminator at the magnetopause. We argue that wave Poynting vectors, like accelerated particle fluxes and the Walen tests, are necessary, but not sufficient, conditions, for identifying merging events. The Polar data are complemented with nearly simultaneous measurements from Cluster in the northern cusp, with correlated observations from the SuperDARN radar, to show that the locations and rates of merging vary. Magnetohydrodynamic (MHD) simulations are used to place the measurements into a global context. The MHD simulations confirm the existence of a high-latitude merging site and suggest that Polar and SuperDARN observed effects are attributable to both exhaust regions of a temporally varying X-line. A survey of 13 merging events places the location at high latitudes whenever the interplanetary magnetic field (IMF) clock angle is less than approximately 150 degrees. While inferred high-latitude merging sites favor the antiparallel merging hypothesis, our data alone cannot exclude the possible existence of a guide field. Merging can even move away from equatorial latitudes when the IMF has a strong southward component. MHD simulations suggest that this happens when the dipole tilt angle increases or when IMF B(sub X) increases the effective dipole tilt.

Maynard, N. C.↗

Combined Global Navigation Satellite Systems in the Space Service Volume

Besides providing position, velocity, and timing (PVT) for terrestrial users, the Global Positioning System (GPS) is also being used to provide PVT information for earth orbiting satellites. In 2006, F. H. Bauer, et. al., defined the Space Service Volume in the paper GPS in the Space Service Volume , presented at ION s 19th international Technical Meeting of the Satellite Division, and looked at GPS coverage for orbiting satellites. With GLONASS already operational, and the first satellites of the Galileo and Beidou/COMPASS constellations already in orbit, it is time to look at the use of the new Global Navigation Satellite Systems (GNSS) coming into service to provide PVT information for earth orbiting satellites. This presentation extends GPS in the Space Service Volume by examining the coverage capability of combinations of the new constellations with GPS GPS was first explored as a system for refining the position, velocity, and timing of other spacecraft equipped with GPS receivers in the early eighties. Because of this, a new GPS utility developed beyond the original purpose of providing position, velocity, and timing services for land, maritime, and aerial applications. GPS signals are now received and processed by spacecraft both above and below the GPS constellation, including signals that spill over the limb of the earth. Support of GPS space applications is now part of the system plan for GPS, and support of the Space Service Volume by other GNSS providers has been proposed to the UN International Committee on GNSS (ICG). GPS has been demonstrated to provide decimeter level position accuracy in real-time for satellites in low Earth orbit (centimeter level in non-real-time applications). GPS has been proven useful for satellites in geosynchronous orbit, and also for satellites in highly elliptical orbits. Depending on how many satellites are in view, one can keep time locked to the GNSS standard, and through that to Universal Time as long as at least one satellite is in view (the longest duration with no satellites in view is important in determining the maximum clock drift from GNSS time). Instantaneous position requires four satellites in view, but because orbital motion is predictable, it is possible to build up knowledge of the orbital position gradually through time without a need for constant four satellite coverage. However, it is desirable to have four satellite coverage when performing satellite maneuvers, since there can be significant changes in velocity, leading to large changes in orbit parameter, causing substantial divergence in position over time. The Space Service Volume has been defined as the volume between three thousand km altitude and geosynchronous altitude, and can be divided into medium orbit services between three thousand km altitude and eight thousand km altitude, and high orbit services above eight thousand km. The Terrestrial Service Volume includes the Earth s surface, the atmosphere, and space below the altitude of three thousand km. The Terrestrial Service Volume is the volume within which the GNSS systems will have very similar performance to the Earth surface, and satellites need only use the signals specified to provide terrestrial performance. Above three thousand km the use of signals passing by the Earth s limb becomes important, so it is desirable to have additional information on signal strength, phase delay, and group delay covering wider beam angles than are needed for terrestrial service (and which can be obtained by monitoring GNSS signals from the Earth s surface). This presentation will look at each of the new GNSS constellations in combination with GPS (GLONASS with GPS, Galileo with GPS, Beidou/COMPASS with GPS), and also at the combination of all four GNSS systems. The presentation will largely follow the format of GPS in the Space Service Volume , presenting data on the availability of one, two, three, or four of the various combinations of GNSS constellation satelles at approximately two thousand grid points evenly spaced and fixed in longitude and latitude, the duration of the longest single-fold outages (intervals when no satellites are available), and the duration of the longest four-fold outages (intervals when fewer than four satellites are available) at several altitudes. Following the original paper, we will use the altitudes of three hundred km (typical LEO satellite, and within the Terrestrial Service Volume), at three thousand km (border between Terrestrial Service Volume and Space Service Volume), at eight thousand km (the border between medium and high orbit service within the Space Service Volume), at fifteen thousand km (just below the GNSS constellations), at twenty five thousand km (just above the GNSS constellations), at thirty six thousand, five hundred km (limit of Space Service Volume definition, geosynchronous altitude), and at seventy thousand km (to show the potential usefulness of GNSS beyond geosynchronous altitude).

Force, Dale A.↗

Solar vs. Fission Surface Power for Mars

A multi-discipline team of experts from the National Aeronautics and Space Administration (NASA) developed Mars surface power system point design solutions for two conceptual missions. The primary goal of this study was to compare the relative merits of solar- versus fission-powered versions of each surface mission. First, the team compared three different solar power options against a fission power system concept for a sub-scale, uncrewed demonstration mission. The 4.5 meter (m) diameter pathfinder lander's primary mission would be to demonstrate Mars entry, descent, and landing techniques. Once on the Martian surface, the lander's In Situ Resource Utilization (ISRU) payload would demonstrate liquid oxygen propellant production using atmospheric resources. For the purpose of this exercise, location was assumed to be at the Martian equator. The three solar concepts considered included a system that only operated during daylight hours (at roughly half the daily propellant production rate of a round-the-clock fission design), a battery-augmented system that operated through the night (matching the fission concept's propellant production rate), and a system that operated only during daylight, but at a higher rate (again, matching the fission concept's propellant production rate). Including 30% mass growth allowance, total payload masses for the three solar concepts ranged from 1,116 to 2,396 kg, versus the 2,686 kg fission power scheme. However, solar power masses are expected to approach or exceed the fission payload mass at landing sites further from the equator, making landing site selection a key driver in the final power system decision. The team also noted that detailed reliability analysis should be performed on daytime-only solar power schemes to assess potential issues with frequent ISRU system on/off cycling. Next, the team developed a solar-powered point design solution for a conceptual four-crew, 500-day surface mission consisting of up to four landers per crewed expedition mission. Unlike the demonstration mission, a lengthy power outage due to the global dust storms that are known to occur on Mars would pose a safety hazard to a crewed mission. A similar fission versus solar power trade study performed by NASA in 2007 concluded that fission power was more reliable-with a much lower mass penalty-than solar power for this application. However, recent advances in solar cell and energy storage technologies and changes in operational assumptions prompted NASA to revisit the analysis. For the purpose of this exercise a particular landing site at Jezero Crater, located at 18o north latitude, was assumed. A fission power system consisting of four each 10 kW Kilopower fission reactors was compared to a distributed network of Orion-derived Ultraflex solar arrays and Lithium ion batteries mounted on every lander. The team found that a solar power system mass of about 9,800 kg would provide the 22 kilowatts (kW) keep-alive power needed to survive a dust storm lasting up to 120-days at average optical depth of 5, and 35 kW peak power for normal operations under clear skies. Although this is less than half the mass estimated during the 2007 work (which assumed latitudes up to 30o) it is still more than the 7,000 kg mass of the fission system which provides full power regardless of dust storm conditions.

Rucker, Michelle A.↗