Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integral operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Alpha: A real-time decentralized operating system for mission-oriented system integration and operation

Alpha is a new kind of operating system that is unique in two highly significant ways. First, it is decentralized transparently providing reliable resource management across physically dispersed nodes, so that distributed applications programming can be done largely as though it were centralized. And second, it provides comprehensive, high technology support for real-time system integration and operation, an application area which consists predominately of aperiodic activities having critical time constraints such as deadlines. Alpha is extremely adaptable so that it can be easily optimized for a wide range of problem-specific functionality, performance, and cost. Alpha is the first systems effort of the Archons Project, and the prototype was created at Carnegie-Mellon University directly on modified Sun multiprocessor workstation hardware. It has been demonstrated with a real-time C(sup 2) application. Continuing research is leading to a series of enhanced follow-ons to Alpha; these are portable but initially hosted on Concurrent's MASSCOMP line of multiprocessor products.

Jensen, E. Douglas↗

Integrated Ground Operations Demonstration for Responsive Space Access

Integrated Ground Operations Demonstration Units (IGODU) project developed to mature, integrate and demonstrate advancements in cryogenics, system health management and command and control technologies. Two Distinct Testing Environments: a) GODU Integrated Refrigeration and Storage - GODU LH2; b) GODU Autonomous Control - GODU LO2. Scope: I. GODU LH2: a) Investigate alternative storage and distribution architecture for future cryogenic propellant operations. b) Demonstrate advanced cryogenic propellant handling operations (liquefaction, storage and distribution) of normal boiling point and sub-cooled cryogenic propellants. II. GODU L02: a) Develop and demonstrate advanced control and health management technologies and techniques to autonomously control cryogenic propellant servicing operations. b) Investigate modern COTS hardware and control systems in an effort to reduce the "standing army" of engineers associated with maintaining and operating ground systems through the use of health management and autonomous control technologies. Goals: a) Raise Technology Readiness Levels (TRL) and Integration Readiness Levels (IRL) of several key technology development areas. b) Reduce operations lifecycle costs of future test programs and launch complexes. c) Demonstrate technologies for future exploration beyond low earth orbit. d) Serve as test environments for extraterrestrial surface operations.

Johnson, Robert G.↗

Model-based interface design for smart field-device integration

Operational complexity is ever-increasing for electric utilities that face challenges including integration of DERs, customer expectation of energy choices, the proliferation of non-utility-owned resources, new business models with energy service providers, and new technology with IT/OT convergence. To maintain and improve the quality of operations, planning, and decision-making in general, utilities need to manage and navigate the complexity. Managing complexity requires a modular, scalable, and flexible solution. Connecting large amounts of DERs and introducing new services requires increased grid control and evolving applications. In this paper, we show an approach utilizing model-based standardized interfaces that simplifies integration and deployment of new algorithms and smart field devices for interoperability across legacy or new systems. A modular design is presented for a reference implementation of widely used DNP3 and IEEE 2030.5 interfaces within an open-source, standards-based data integration platform for integration of smart field devices with independently developed, best-of-breed applications.

Model-driven development, system integration, smar↗

Quantizations of the classical time of arrival and their dynamics

The classical time of arrival in the interacting case is quantized by way of quantizing its expansion about the free time of arrival. The quantization is formulated in coordinate representation which represents ordering rules in terms of two variable polynomial functions. This leads to representations of the quantized time of arrival operators as integral operators whose kernels are determined by the chosen ordering rule. The formulation lends itself to generalization which allows construction of time of arrival operators that cannot be obtained by direct quantization using particular ordering rules. Weyl, symmetric and Born–Jordan quantizations are specifically studied. The dynamics of the eigenfunctions of the different time of arrival operators are investigated. The eigenfunctions exhibit unitary arrival at the intended arrival point at their respective eigenvalues.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Research Operations and Integration Flight Session – Always Sweat the Small Stuff

Human research routinely involves elaborate operations with substantial hardware setup, such as functional MRIs, CT scans, ultrasounds, exercise sessions, and cardiac evaluations. These conspicuous operations garner most of our attention and, understandably, resources, but the unsung heroes of spaceflight human research often get by with little fanfare. The collection of human samples and surveys is often just as much of a challenge in terms of both planning and logistics. The samples and surveys are often collected or completed by the crew autonomously, with little to no oversight from science support staff, which puts them the most at risk for data loss. The Research Operations and Integration team will host an interactive session with audience participation to demonstrate the importance of the written communications and instructions that are provided to the astronauts. During this hands-on session, ROI will walk through the challenges faced to ensure astronaut subjects can successfully collect all the various samples (e.g., saliva, fecal, urine, and blood) that the human research community needs. The format will be part lecture and part game show intended to provide both an enlightening and fun session. As we often instruct the crew: “Don’t forget to arrive fasted and bring a list of all the medications you’ve taken in the past week.”

Cherie Morgan Oubre↗

Assessment of Durable SiC JFET Technology for +600 C to -125 C Integrated Circuit Operation

Electrical characteristics and circuit design considerations for prototype 6H-SiC JFET integrated circuits (ICs) operating over the broad temperature range of -125 C to +600 C are described. Strategic implementation of circuits with transistors and resistors in the same 6H-SiC n-channel layer enabled ICs with nearly temperature-independent functionality to be achieved. The frequency performance of the circuits declined at temperatures increasingly below or above room temperature, roughly corresponding to the change in 6H-SiC n-channel resistance arising from incomplete carrier ionization at low temperature and decreased electron mobility at high temperature. In addition to very broad temperature functionality, these simple digital and analog demonstration integrated circuits successfully operated with little change in functional characteristics over the course of thousands of hours at 500 C before experiencing interconnect-related failures. With appropriate further development, these initial results establish a new technology foundation for realizing durable 500 C ICs for combustion engine sensing and control, deep-well drilling, and other harsh-environment applications.

Neudeck, P. G.↗

Design for an integrated discipline operations control center for Space Station Freedom

This paper presents selected features of a human factors oriented plan for a Space Station Freedom (SSF) ground Discipline Operations Center (DOC) that is integrated with other work areas used by multidisciplinary life scientists. This combined facility is referred to as an integrated DOC or IDOC. This plan is based upon the assumption that there will be a constantly changing array of specialized equipment and procedures used by life sciences principal investigators (PI) on the ground which must be linked to SSF through various DOC systems. Other sites will also be able to communicate with SSF (Anon., 1992). It is also assumed that cost reduction will be a major design consideration and that one integrated structure will be less expensive to build and operate than two separate ones. Since both the DOC personnel and PIs will need to communicate with the flight crew aboard SSF, the general interconnect architecture of the PIs' communication linkage is considered here. Key human factor design elements of this plan include: a candidate facility layout which accommodates three (3), multipurpose, rapidly reconfigurable work areas (suites) and consequent user traffic flow considerations, a multimedia telecommunications support capability, functional (human) traffic flow, optimized internal illumination and acoustics requirements, selected volumetric and safety requirements, and other architectural design parameters.

Haines, Richard F.↗

Floquet operator as integral of motion

Nonstationary quantum systems have no energy levels. However, for time-dependent periodical quantum systems, the notion of quasi-energy levels has been introduced. The main point of the quasi-energy concept is to relate quasi-energies to eigenvalues of the Floquet operator or monodromy operators which is equal to the evolution operator of a quantum system taken at the moment coinciding with the period of the system. The purpose of this article is to relate the Floquet operator to integrals of the motion and to introduce a new operator which is the integral of motion and has the same quasi-energy spectrum that the Floquet operator has. We wish to discuss an explicit formula for this new integral of motion.

Manko, V. I.↗

Modular space station phase B extension integrated ground operations

Requirements for development test, manufacturing, facilities, GSE, training, logistics support, and launch operations are described. The prime integrating requirement is the early establishment of a common data base and its use throughout the design, development, and operational life of the station. The common data base is defined, and the concept of its use is presented. Development requirements for the station modules and subsystems are outlined along with a master development phasing chart.

Selegue, D. F.↗

The key to successful management of STS operations: An integrated production planning system

Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

Johnson, W. A.↗

Integrated Ground Operations Demonstration Units Testing Plans and Status

Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

Johnson, Robert G.↗

Analysis and Planning Framework for Nuclear Plant Transformation

Commercial nuclear power in the United States has been an unqualified success by any measure, providing low cost, carbon-free, and safe baseload electricity for decades. The industry today is at the peak of its historical performance in terms of generation output, reliable operations, and demonstrated nuclear safety. However, it is no longer among the lowest-cost electric generation sources with the emergence of subsidized renewables and shale gas generation. The business model that has served the operating nuclear fleet so well over its life is now a drag on cost performance due to its reliance on a large highly skilled labor force. In contrast, digital technology and innovation are enabling dramatic efficiencies in energy production, resulting in fierce competition for a commodity such as electricity. The nuclear power industry has responded to this challenge with many initiatives to improve efficiency and modernize plant equipment, especially where reliability and obsolescence issues are pressing. However, it would be a missed opportunity to merely modernize the plant components and the work processes of an outdated business model that was formulated to manage the technology of the 1960s. Rather, the greater opportunity is to transform that business model to one that fully exploits the capabilities of modern digital technology, resulting in substantially lower production costs and sustainable market viability. One successful example of such transformation is the concept of Integrated Operations, which was introduced into the North Sea oil and gas industry a couple of decades ago when the profitability of operating these fields was severely threatened by low world petroleum prices and the high overhead of operating the offshore oil and gas platforms. This effort resulted in significant changes to how these oil fields were operated and allowed the industry to continue profitable operation of these platforms. This example has some remarkable parallels to the U.S. commercial nuclear industry as described in the next section. This report provides an analysis and planning framework for such a nuclear plant operating model transformation based on the transferable learnings from the North Sea transformation. This framework is termed Integrated Operations for Nuclear or ION. This report describes the key principles and methods of Integrated Operations and how they are being applied in a collaboration between the DOE Light Water Reactor Sustainability Program and Xcel Energy in an initiative to transform its operating model for performance improvement and long-term sustainability. It describes a method to bring the operating costs of a nuclear fleet in line with market-based pricing, transforming work functions to reduce cost with technology innovations. This initiative will continue over the next several years in the detailed development of transformative concepts for nuclear plants, which will be published as follow-up to this initial report on Integrated Operations for Nuclear.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integrating Safety, Operations, Security, and Safeguards (ISOSS) into the design of small modular reactors : a handbook.

The existing regulatory environment for nuclear reactors impacts both the facility design and the cost of operations once the facility is built. Delaying the consideration of regulatory requirements until late in the facility design - or worse, until after construction has begun - can result in costly retrofitting as well as increased operational costs to fulfill safety, security, safeguards, and emergency readiness requirements. Considering the scale and scope, as well as the latest design trends in the next generation of nuclear facilities, there is an opportunity to evaluate the regulatory requirements and optimize the design process for Small Modular Reactors (SMRs), as compared to current Light Water Reactors (LWRs). To this end, Sandia has embarked on an initiative to evaluate the interactions of regulations and operations as an approach to optimizing the design of SMR facilities, supporting operational efficiencies, as well as regulatory requirements. The early stages of this initiative consider two focus areas. The first focus area, reported by LaChance, et al. (2007), identifies the regulatory requirements established for the current fleet of LWR facilities regarding Safety, Security, Operations, Safeguards, and Emergency Planning, and evaluates the technical bases for these requirements. The second focus area, developed in this report, documents the foundations for an innovative approach that supports a design framework for SMR facilities that incorporates the regulatory environment, as well as the continued operation of the facility, into the early design stages, eliminating the need for costly retrofitting and additional operating personnel to fulfill regulatory requirements. The work considers a technique known as Integrated Safety, Operations, Security and Safeguards (ISOSS) (Darby, et al., 2007). In coordination with the best practices of industrial operations, the goal of this effort is to develop a design framework that outlines how ISOSS requirements can be incorporated into the pre-conceptual through early facility design stages, seeking a cost-effective design that meets both operational efficiencies and the regulatory environment. The larger scope of the project, i.e., in future stages, includes the identification of potentially conflicting requirements identified by the ISOSS framework, including an analysis of how regulatory requirements may be changed to account for the intrinsic features of SMRs.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Renewable energy integration and system operation challenge: control and optimization of millions of devices

The electric power infrastructure, originally designed and built on large-scale power plants, is evolving into a more resilient power generation and delivery system in which millions of smaller units of distributed energy generation resources units will be installed in sub-transmission and distribution networks. In order to control, manage and optimize the future grid, a hierarchical design is presented in this chapter which enables the distributed control on grid edge while inheriting the existing centralized control structure. This layered design of large-scale power system operation and control uses the following principle: reactive power control is treated as a primary control for voltage stability, and the real power control is primarily a grid-level control but can also be a supplementary control for voltage support in the case of insufficient reactive power control capacity. For the purpose of active control and operation at the distribution level, a recursive power network model is derived from nodal injection and branch power flow models. Based on the model, the proposed algorithms of hierarchical control, grid-edge inference and dynamic hosting allowance are developed and presented for multi-level controlled operation. And, a co-simulation architecture of integrated T&D system is presented to validate and demonstrate the feasibility and scalability of proposed algorithms.

Xu, Ying↗

Autonomous Sensorweb Operations for Integrated Space, In-Situ Monitoring of Volcanic Activity

We have deployed and demonstrated operations of an integrated space in-situ sensorweb for monitoring volcanic activity. This sensorweb includes a network of ground sensors deployed to the Mount Saint Helens volcano as well as the Earth Observing One spacecraft. The ground operations and space operations are interlinked in that ground-based intelligent event detections can cause the space segment to acquire additional data via observation requests and space-based data acquisitions (thermal imagery) can trigger reconfigurations of the ground network to allocate increased bandwidth to areas of the network best situated to observe the activity. The space-based operations are enabled by an automated mission planning and tasking capability which utilizes several Opengeospatial Consortium (OGC) Sensorweb Enablement (SWE) standards which enable acquiring data, alerts, and tasking using web services. The ground-based segment also supports similar protocols to enable seamless tasking and data delivery. The space-based segment also supports onboard development of data products (thermal summary images indicating areas of activity, quicklook context images, and thermal activity alerts). These onboard developed products have reduced data volume (compared to the complete images) which enables them to be transmitted to the ground more rapidly in engineering channels.

Chien, Steve A.↗